Loading...
HomeMy WebLinkAbout20090170 Ver 1_Individual_20090218 49 NCDENR North Carolina Department of Environment and Nat ural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary February 13, 2009 MEMORANDUM TO: Cyndi Karoly (( a `- 0 OWLS Environmental Biological Supervisor Division of Water Quality FEB 1 g 2009 FROM: Doug Huggett DENR - WEIR QUALITY WETLANDSME)STORMWAMBRAWA Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Robert and Susan Daniels Project Location: 329 Whites Neck Lane, Knotts Island, Currituck County Proposed Project: Bulkhead, riprap sill, boat ramp, pier, platform, boatlift, mooring piles Please indicate below your agency's position or viewpoint on the proposed project and return this form by 03/06/09 to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-3901 1 FAX: 252-264-3723 ; Internet: www.nccoastalmanagement.net One NorthCarohna An Equal Opportunity 1 Affirmative Action Employer Natmrall# rlrn'`r.?..-m•-???vr ?-'r ms DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Robert & Susan Daniels 2. LOCATION OF PROJECT SITE: 329 Whites Neck Lane (off of SR 1390), Knotts Island, Currituck County, adjacent to the Currituck Sound. Photo Index - 2006: 197-7021 (1 11-13) 2000: 197-2378 (J 11-13) 1995: 197-2072 (19-12) 1989: 1 35-1 (P 9-11) 1984: 131-647 (R 14-16) 1978: 96-1474 (0,P 9-11) State Plane Coordinates - X: 2910500 Y: 1011600 Rover File: E012914A Quadrangle: Barco, NC U.R 3. INVESTIGATION TYPE: CAMA / Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 5/1/08, 1/29/09 Was Applicant Present - Yes, No 5. PROCESSING PROCEDURE: Application Received Complete - February 5, 2009 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Currituck County Land Classification From LUP - Limited Service and Conservation (B) AEC(s) Involved: ES, EW, PTA (C) Water Dependent: Yes (D) Intended Use: Private residential (E) Wastewater Treatment: Existing - Septic Planned - N/A (F) Type of Structures: Existing - House, Boathouse, Barn and Sheds Planned - Riprap sill, bulkhead, boat ramp, pier & platform, mooring piles and boat lift (G) Estimated Annual Rate of Erosion: 5 feet/year Source - Applicant 7. HABITAT DESCRIPTION: [AREA, square feet (SF)] FII I Pn rnTU1:0 (A) Shallow Bottom PTA, EW AEC's -Bulkhead 5,600 SF -Riprap Sill 482 SF -Concrete Boat Ramp 300 SF -Alternate Wooden Boat Ramp 300 SF Shaded -Pier and Platform 888 SF Shaded (B) Estuarine Shoreline -Concrete Boat Ramp 225 SF Impervious surface - Alternate Wooden Boat Ramp 225 SF Disturbed area ?v? uiai Afea uibLurbea: i,4yb 5t- Robert & Susan Daniels Field Investigation Report Page 2 (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The applicant proposes to replace a remnant wooden bulkhead with a new vinyl bulkhead, construct an off-shore riprap sill to protect a 404 wetland shoreline, install a boatramp, and construct a pier & platform with a boatlift and mooring piles. Proiect Setting The site of the proposed development is a located on Bay Point at 329 Whites Neck Lane, off of SR 1390 on Knotts Island, Currituck County adjacent to Knotts Island Bay and the Currituck Sound. The property has approximately 1,750' of shoreline on the north and east side and is bordered on the south and west side by a single parcel of land. The tract is 16 acres in size and contains approximately 5 acres of USACE 404 and coastal wetlands located in the northwest corner and eastern side of the property. The remaining area is further divided into approximately 8 acres of agricultural fields and 3 acres of cleared uplands along the northern shoreline. The portion of the tract that the proposed development will take place in is within the cleared upland area and an adjacent section of 404-wetlands. The upland area is flat, has an elevation of approximately 2.5 ft above normal water level (NWL), has sandy soils and is vegetated with loblolly pines (Pious taeda), live oaks (Quercus virginiana) and mowed yard grasses. Man-made structures include a gravel road, a single-family residence, a barn, sheds, a bulkheaded canal with a boathouse that has filled in and a bridge over the canal. The adjacent property to the west and south is largely undeveloped with USACE 404-wetlands and agricultural fields with no man-made structures. Based on available information, there appears to be no archaeological sites on this property, however, site # CK24 is located approximately 1.4 miles to the southwest. The shoreline within the development area is approximately 650' long. A remnant 497' bulkhead that has fallen into disrepair exists along this shoreline. Due to storms and age, it has been washed out in several places causing erosion to occur landward of the bulkhead along its entire length. The bulkhead now averages 12.8' waterward of the current NWL with a maximum distance of 30'. A 1 ft erosion escarpment exists at NWL. Approximately 135' of shoreline exists to the west of the remnant bulkhead that borders USACE 404-wetlands and a portion of coastal wetlands along the property boundary. Coastal wetlands species identified within this area include giant cordgrass (Spartina cynosuroides), black needlerush (Juncus reomerianus) and cattails (Typha spp.). The waters of the Currituck Sound in this area are classified as SC and are closed to shellfish taking. There is approximately 1 mile of open water to the east of the project site and 2 miles of open water to the north of the project site. Water depths with the project site range from NWL to -2.5' and the bottom substrate within this area is made up of fine sands. Due to high water turbidity within the project site, no Submerged Aquatic Vegetation was observed, however, it was observed floating within the water column. Robert & Susan Daniels Field Investigation Report Page 3 Previous permits issued for development on this property include CAMA Major Permit #174-78 issued in 1978 for maintenance excavation within the canal, USACE general permits SAWC078-N-027-000406 issued in 1978 for maintenance excavation within the canal and SAWC078-N-025-0080 issued in 1982 for the replacement of a bulkhead, and CAMA General Permit A176 issued in 1985 for repair work to an existing pier and bulkhead. Development Proposal In order to prevent further erosion, the applicant proposes to construct a bulkhead at the approximate location of the remnant bulkhead. The bulkhead will be run in a straight alignment for 477'. Approximately 307will be constructed 2 ft waterward of the existing remains and the remaining 170' will be constructed landward of the existing structure to keep the alignment straight. The return wall on the east side of the proposed bulkhead will turn back into the property for 29' where it will tie into an existing bulkhead of a canal that has filled in. The return wall on the west side of the proposed bulkhead will turn back into the property and run for 48' along the existing return walls alignment into the upland area. The bulkhead will average approximately 12.5' waterward of the existing NWL and will have a maximum distance of 27' from NWL. The applicant then proposes to construct an offshore riprap sill to protect a shoreline that borders USACE 404 wetlands and an area of coastal wetlands. The riprap sill will tie into the western return wall of the proposed bulkhead. The sill will begin 25' landward from the bulkhead corner and run in a straight alignment for 99' and then turn back towards shore and run for approximately 11' to the shoreline where it will end. The landward toe of the sill ranges from 8' to 22' from NWL and the base will be 4 ft wide. In order to provide water access, the applicant proposes to construct an 84'x 6' long pier that will end with a 24'x 16' open platform with built in benches. A 13'x 13' boatlift is proposed on the western side of the platform and two mooring piles are proposed on the eastern side of the platform to provide a second slip. The mooring piles will be placed 16' out from the platform and will be 13' apart. In order to provide boat access, the applicant proposes to construct a 35' x 15' boat ramp at the base of the pier on the eastern side. The applicant proposes two possible designs that both have identical footprints of 20' x 15' waterward of NWL. The first design will have a vinyl bulkhead built on the east and west side of the ramp extending out from the bulkhead 20' where a temporary cofferdam will be constructed to keep water out of the ramp area during construction. The enclosed area will be backfilled and capped with concrete to create an angle that will be even with the top of the bulkhead. The concrete ramp will extend landward of the bulkhead for 15'. The second design would be a pile supported timber frame ramp with a slotted-board deck and a 15' timber apron extending landward from the bulkhead. Anticipated Impacts • The construction of the bulkhead along the proposed alignment will result in the filling of approximately 5,600 SF of Estuarine Waters and Public Trust Area AEC's with clean fill from an upland source. Robert & Susan Daniels Field Investigation Report Page 4 • The construction of the riprap sill along the proposed alignment will result in the filling of approximately 482 SF of Estuarine Waters and Public Trust Area AEC's. • The placement of the pier and platform will result in the shading of 888 SF of shallow water habitat within the Estuarine Waters and Public Trust Area AEC's. • The proposed concrete boat ramp will result in the filling of 300 SF of shallow water habitat within the Estuarine Waters and Public Trust Area AEC's. • The proposed concrete boat ramp will result in 225 SF of impervious surface within the Estuarine Shoreline AEC. • The alternative wooden boat ramp will result in the shading of 300 SF of shallow water habitat within the Estuarine Waters and Public Trust Area AEC's. • The alternative wooden boat ramp apron will result in 225 SF of disturbance within the Estuarine Shoreline AEC. Submitted by: Ron Renaldi Date: February 6, 2009 MAJOR PERMIT FEE MATRIX Applicant: ?,Sar, ' )2o&/F 1)4n,c is Selection Development Type Fee DCM % DWQ % (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) 1. Private, non-commercial ? development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial E] development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- El commercial development, if $250 100%($250) 0%($0) General Water Quality Certification No. 3490 (See attached can be applied: 111(B). Public or commercial ? development, if General $400 100%($400) 0%($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water ? Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) cannot be applied: IV. For development that El involves the filling and/or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and/or open water areas: Project Narrative Date: August 25, 2008 Applicants: Susan and Robert Daniels Contact information: Adress:15351 Abner Church Rd, Glen Allen, VA 23059 Home Phone: 804-749-4098 Work Phone: 804-346-3814 Cell Phone: 804-402-4098 Fax: 804-346-4075 Location: 329 Whites Neck Lane. The property is located at the extreme south east portion of Knotts Island, NC. It faces Knotts Island Bay/Back Bay to the north and the channel that separates Knotts Island Bay from Cuzrituck Sound to the east (see location map). Overview: This project includes the repair/replacement of an existing bulkhead, building a boat ramp and re-building a pier where one previously stood. It also includes placing a rip-rap sill along approximately 100 feet of unprotected shoreline at the west end of the property. A major permit is being sought as the bulkhead is longer than 500 feet, and some portions of the bulkhead are washed out greater than 5 feet. The proposed 100' pier is to replace one has been gone now for several years. We recently inherited this property from my father-in-law Joe Burt. Due to his declining health, the property has not been kept up and our goal is to restore it to its previous splendor. The house looks out over Knotts Island Bay across a grass yard that extends to the water's edge. The bulkhead has been in need of repair for some time with loss of back fill along its length but Tropical storm Ernesto caused three breaches in the bulkhead and the erosion in these locations has been at a very rapid rate. This storm flooded the house and extensive repairs were required. As this was Joe Burt's residence, this took precedence over repairing the bulkhead and then with his rapid decline in health and subsequent death we could not address the bulkhead repairs until now. Replacement of bulkhead in front of house There has been a bulkhead here for decades. The current bulkhead is in severe disrepair and is washed out to various degrees along its entire length. It is a long straight bulkhead 477 feet in length with a turn back on the west end and continuing into the canal on the east end. We propose constructing a new vinyl bulkhead immediately in front of the existing bulkhead, except in one area where it will cross behind the old bulkhead. In the area with the greatest amount of erosion, the new bulkhead will pass landward of the old bulkhead to reduce the amount of backfill and produce straighter line between the east and west bulkhead returns. The current bulkhead still retains soil along the majority of its length. The water depth in front of the bulkhead is on average 12-18" deeper than immediately behind the bulkhead. (see cross section). The waterline varies behind the bulkhead. For the majority of the length of the bulkhead the waterline varies from zero to four feet, however there are three sections where it is more and one severely eroded area DCM MP-1 Vul15k?p LS U V L5 ill.) FEB 1 8 2009 DENR - WATER QUALITY _ JAN 5 2009, APPLICATION for 'Izhelhi'ViEi?r Major Development Permit Gast revisod 12/27/06) - 0 1 7 0 North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Robert MI M Last Name Daniels Applicant 2: First Name Susan MI B Last Name Daniels If additional applicants, please attach an additional page(s) with names listed. Mailing Address 15351 Abner Church Rd. PO Box City Glen Allen State VA ZIP 23059 Country USA Phone No. 804 - 749 - 4098 ext. FAX No. 804 - 346 - 4075 Street Address (if different from above) City State ZIP Email rdaniels@globalweb.net 2. Agent/Contractor Information Business Name Lyn Small, Inc Marine Construction Services Agent/ Contractor 1: First Name MI Last Name Lyn F Small Agent/ Contractor 2: First Name MI Last Name Scott C Small Mailing Address PO Box City State 113 Ballast Rock Dr Powells Point NC ZIP Phone No. 1 Phone No. 2 27966 252 - 491 - 8562 ext. ext. FAX No. Contractor # 252 491 8564 29760 Street Address (if different from above) City State ZIP Email lyn@lynsmall.com J <Form continues on back> Form DCM MP-1 (Page 2 of 4) IAN ? 0 rnq JAN 5 2 gg APPLICATION for Major Development Permit 3. Project Location '?? asett County (can be multiple) Street Address State Rd. # Currituck 329 Whites Neck La. Subdivision Name City State Zip Bay Point Farms Knotts Island NC 27950- Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 429 - 3180 ext. 5, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Back Bay/Knotts Island Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ?Manmade ?Unknown Currituck Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ZYes ?No work falls within. Currituck County 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 1750+/- 15.99 Acres c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 15.99 Ac, NWL (normal water level) (if many lot sizes, please attach additional page with a list) 2.5 ?NHW or ®NWL e. Vegetation on tract Yard Grass, Field Grass, Scrub and Pine woods, Coastal and Non-coastal Wetlands f. Man-made features and uses now on tract Single family residence, Boathouse, Barn and Sheds g. Identify and describe the existing land uses adjacent to the proposed project site. Residential & Agricultural h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? "A" Agicultural (Attach zoning compliance certificate, if applicable) ®Yes ?No ?NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ®No ?NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 3 of 4) APPLICATION for JAN 5 2909 U" 11c, -NA1;N; Major Development Permit m. (i) Are there wetlands on the site? ?- l?Eth l.i "i ®Yes ?No (ii) Are there coastal wetlands on the site? ®Yes ?No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Private septic system o. Describe existing drinking water supply source. Well p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Residential yard with dock & boatramp, for recreational waterfront access & use c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. A small work barge, backhoe & bulldozer. Storage will be onsite in upland areas. d. List all development activities you propose. Replace existing bulkhead, add new rip-rap sill, construct new pier with boatlift and construct new boatramp. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 4500 ®Sq.Ft or ?Acres g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ®No ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ®NA j. Is there any mitigation proposed? ?Yes ®No ?NA If yes, attach a mitigation proposal. <Form continues on back> Form DCM MP-1 (Page 4 of 4) APPLICATION for JA+ 5 'A09 Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Jeffrey Burt - Phone No. 252-908-1160 Address 2992 Justice Branch Rd., Enfield, NC 27823 Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. SAWC078-N-027-000406 SAWC078-N-025-0080 See Attached h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further ce fy that the information provided in this application is truthful to the best of my knowledge. Date ' / / 5 '( ?/ Print Name _ _Robert Daniels Signature i-11 --I- Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts ?DCM MP-3 Upland Development ®DCM MP-4 Structures Information ,'?P R E C Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Ji~N 5 ZOO Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL stabilization Length 20' 110' Width 15' 4' Avg. Existing -1.5' NA NA Depth Final Project + 2.0' NA NA Depth 1. EXCAVATION ® This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of the excavation in these areas: d. High-ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL 0This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ?Yes ?No ?NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of disposal in these areas: d. (i) Will a disposal area be available for future maintenance? ?Yes ?No ?NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ?Yes ?No ?NA (ii) If yes, how much water area is affected? 3. SHORELINE STABILIZATION ?This section not applicable (if development is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: ®Bulkhead ?Riprap OBreakwater/Sill ?Other: c. Average distance waterward of NHW or NWL: 9.5' e. Type of stabilization material: Vinyl sheetpile bulkhead & concrete/granite rip-rap sill g. Number of square feet of fill to be placed below water level. Bulkhead backfill 4060 Riprap Breakwater/Sill 440 Other i. Source of fill material. Upland materials b. Length: 550 LF BKHD & 110 LF Rip-Rap Width: 1.5' BKHD & 4' Rip-Rap d. Maximum distance waterward of NHW or NWL: 27' f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ?No ?NA (ii) If yes, state amount of erosion and source of erosion amount information. 4 to 5 feet from local observations h. Type of fill material. Clean sand from upland source 4. OTHER FILL ACTIVITIES This section not applicable (Excluding Shoreline Stabilization) a. 6) Will fill material be brouqht to the site? ®Yes ?No ?NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water 22 cu. vd. (iii) Dimensions of fill area 15'x20' (iv) Purpose of fill To provide a compacted base for concrete boat ramp submerged aquatic vegetation (SAV), shell bottom (58), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Backfill to be placed only when bulkhead is completed or isolated A small construction barge, backhoe & bulldozer with silt fence c. (i) Will navigational aids be required as a result of the project? ?Yes ONo ?NA (ii) If yes, explain what type and how they will be implemented. d. (i) Will wetlands be crossed in transporting equipment to project site? ?Yes ®No ?NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. e Robert Daniels .! N 5 2009 Date 329 Whites Neck Lane, Knotts Island, Currituck Co., North Carolina Project Name Applicant Name S,y}ri_ MANAGF M ? T Applicant Signature Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) 11!! car ?'"? L ?rjANAG EMFil ; Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: []Commercial ?PubliclGovernment ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length I@ r$4 R.AQ (iv) Width 6' (v) Floating ?Yes ®No []This section not applicable b. (i) Will the facility be open to the general public? ?Yes ®No d. (i) Are Finger Piers included? ?Yes ®No If yes: 1-S-U4 (ii) Number (iii) Length (iv) Width (v) Floating ?Yes ?No e. (i) Are Platforms included? ®Yes ?No If yes: (ii) Number 1 (iii) Length 16' (iv) Width 24' (v) Floating ?Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed -X ;l U il, %-'9-0-R (ii) Number of slips existing 0 i. Check the proposed type of siting: ? Land cut and access channel []Open water; dredging for basin and/or channel ®Open water; no dredging required []Other; please describe: k• Typical boat length: 16-20' m. (i) Will the facility have tie pilings? ®Yes ?No (ii) If yes number of be pilings? 2 f. (i) Are Boatlifts included? ®Yes ?No If yes: (ii) Number 1 (iii) Length 13' (iv) Width 13' h. Check all the types of services to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 1 ? Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 ? Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Jon Boat, Skiffs 1. (i) Will the facility be open to the general public? ?Yes ®No Z DOCKING FACILITY/MARINA OPERATIONS 0This section not applicable T=;6, a. Check each of the following sanitary facilities that will be included in the proposed project. ? Office Toilets ? Toilets for patrons; Number: ; Location: ? Showers ilAWt rRIIAE;M ? Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater, c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? 1. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ?Yes ?No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ?No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), st1elllbottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. I*C; ENr'r. ?CW ?SAV ?SB tic ?r~ ?WL ?None 5 20?? p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No;?? z rrlY'jy j If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 1``'' ~= )' = tY`! 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?Public/Govemment ?Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) 10 This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ?This section not applicable a. Length 110 b. Average distance from NHW, NWL, or wetlands 11 c. Maximum distance beyond NHW, NWL or wetlands 20 6. MOORING PILINGS and BUOYS ?This section not applicable a. Is the structure(s): ?Commercial ?Public/Govemment ®Private/Community c. Distance to be placed beyond shoreline 100' Note: This should be measured from marsh edge, if present e. Arc of the swing 0 b. Number 2 d. Description of buoy (color, inscription, size, anchor, etc.) 2 piles placed adjacent to proposed pier to form one boat slip 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 350' +/- 1,000'+ Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 1.5 miles +/- d. Water depth at waterward end of structure at NLW or NWL -2.5 NWL e. (i) Will navigational aids be required as a result of the project? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER [D This section not applicable a. Give complete description: Z- l 1016>6, Date Daniels Property - Bulkhead, Pier/Dock-Boatlift & Boatramp Project Name Robert & Susan Daniels JAN 5 20L, a aaf AppliW Ine o Applicant Signature O J n U N ?+ O Qj u ?c c n ?: N m O a- t ? V co O a' N 4 ti z Q) ' c° OD Q ry U) u N O ? N v? O O ti ? DEPARTMENT OF THE ARMY WILMINGTON DISTRICT. CORPS OF ENGINEERS P. O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402 IN KGPLT NCrnn IV SAWC078-N-027-000406 Messrs. J. H. Burt and V. A. Etheridge Route 5, Box 113, Knotts Island, NC 27959 Dear Messrs. Burt and Etheridge: 16 November 1978 A", Z_ N1 cit, In accordance with your written request of 17 July 1978 and the ensuing administrative record, there are inclosed two copies of a permit to perform maintenance excavation in an existing canal located off Currituck Sound and Knotts Islands Bay, Knotts Island, Currituck County, North Carolina. You should acknowledge that you accept the terms and conditions of the attached permit by signing each copy in the space provided ("Permittee" on page 4). All pages of both copies of the signed permit should then be returned to this office for final authorization. For your convenience, a self-addressed envelope is inclosed. Title 33, Part 209, of the Code of Federal Regulations reads in part that "A $10.00 fee will be charged for permit applications when the work is noncommercial in nature and provides personal benefits that have no connection with a commercial enterprise..." and "A fee of $100.00 will be charged for permit applications when the planned or ultimate purpose of the project is commercial or industrial in nature and is in support of operations that charge for the production, distribution, or sale of goods or services." As your application fits the former category, you are requested to remit your check for $10.00 made payable to the Treasurer of the United States. The check should accompany the signed copies of your permit. Should you have questions, please contact Mr. Jeffrey Zippin, Regulatory Functions Branch, telephone (919) 343-4641. After the permit is authorized in this office, the original copy will be returned to you; the duplicate copy will be retained in this office for our file. Sincerely yours, 2 Incl W. H. SANDERSOI 1. Permit (2 cys) Chief, Construction-Operations Division 2. Envelope .pLo\Vsr? r GONl?,?GT?17 ???M N ? 5 2D / iii mil'-/ //?: .- F• ?' ??'?-? G ?, t t`;?t'" .`Y':r L. D?'I u E2 U? !y••T'•s GRovND toy I 20' 10' . LirjE :?? waTEK L I hi E °O 1 >rXGhvaT6o l 'y II ? IPResE: I I (r'S0, rOMML 111 ? 1 ! 1(1 • _ , MbTEIZt?L-? / C- 3.o) '?PROPoSCD PJ0TTOM.?? V FZJ N i1 L f:a 0 TTO M?- `T`>' ?Ic? L. SGGTI Owl L•i O? .oi `•. ?.r :.1! ??. North End i; Public _ 'EX s _ ,zr•,• ?y';: ??: Landing f - :='biv. .??? ?+ .- - • I Q 10 - `?. ? _ _ ? ?.?., -- - " ? •? ?•_ Isla nd _ ? ,? ?' Q _ _ . V 77 ° - ~ '?ti }wo1 pt..?TFt?IXTA?S'is rCr 1 7 V- iRLgc.ESSAN ?y ` (;GHI:IiF?CIt ?Ct3? ? _ ? ? ? E??' - .. ? ?G- f • ?? C ? ?? a. _ \ C. ;7 p *y= - - .,?_ _ti\( Ord _-- •- = --= ?` S__' M^' - ? -,-C7 Q t C? .. _ _ __ ` ' 3=. ;mil _•2 • • `- ?1, Y 7>?; e AL A-- .?P~'?• -_ =- - -_-I? Cason; w-4 T . ? - .. Y? J - -- _ - • 1 V T .mow ` 1,?. ??, `•f ?' ,l ? r -_111/ ?•- .. b • .. ?. ,''-"_ ..-,. _ i _ _ ` ? •? •'Q ? ' " ° 1. r'' ? {{ ' ' . ±~ d ` / l- - -. - •?: ' k? o I f Aler_kay Isle n er I _ ' !f((T,IKI \OJEGT -?"_ ~? fem., i _ ?? -_ . ? . .?S' 7-•?S+•_; ? +• r•..- -- V.A.,??URIDIs+? . y v , I ?.• _ tLr S µ , P,, U ft,T, r4 . NaIfv+•yPt A Lou Lnu.lLib ;KNoj'(S IsLt,I?D tJ.G. i •' jr. r ? µ R ?sGat,t ' o' 6o Nla No 2Aa' ? •C i ?''i' t t S i 1,11 ? t t Iii f ? f \? f 11 11 S 11 it T "I O 1z' A In, '3 ? G ado° ?' ?\ Z 73 Z p Q f ? C \? v, f' Z p 1\ c Z RES Q \I , G C too RES o y (? (>O&T 1 .fin In R rn r f z N IPA n z cr a DEPARTMENT OF THE ARMY WILMINGTON DISTRICT. CORPS OF ENGINEERS P. O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402 IN REPLY REFER TO SAWC078-N-025-0080 Mr. V. A. Etheridge Route 5, Box 113 Knotts Island, NC 27959 Dear Mr. Etheridge: 7 October 1982 n, ry 20119 Reference your recent telephone conversation with Mr. Steven Lund of my staff regarding your proposed replacement of approximately 325 linear feet of deteriorating bulkhead at your property known as Bay Point Farms adjacent to Knotts Island Bay at Knotts Island, Currituck County, North Carolina. Construction and backfill of a new bulkhead at an alignment not exceeding 2 feet waterward of the existing bulkhead is authorized under Department of the Army general permit SAWC078-N-025-0080 (copy inclosed). This general permit is applicable only along shorelines void of wetland vegetation such as marsh grass and wooded swamp or where all construction is to be accomplished landward of such vegetation. If, after reviewing the general and special conditions of this general permit you find that it does not meet your needs, please contact Mr. Lund at telephone (919) 343-4634 for information on applying for an individual permit. Any questions you have may also be addressed to Mr. Lund. Your proposal may require a permit under the provisions of the N.C. Coastal Area Management Act. You should contact Mr. Nelson Paul in this regard at telephone (919) 338-0206. -1 Incl As stated Copy Furnished: Mr. Nelson Paul Office of Coastal Management N.C. Department of Natural Resources and Community Development 108 South Water Street Elizabeth City, NC 27909 Sincerely, tloo"?- CHARLES W. HOLLIS Chief, Regulatory Functions Branch . ' 1? r r Application No. SAWC078-N -OZ -0080 Name of Applicant: General Permit Effective Date: 24 June 1982 Expiration Date: 31 December 1987 DEPARTMENT OF THE ARMY GENERAL PERMIT 5 2u- A general permit to perform work In or affecting navigable waters of the United States upon the recommendation of the Chief of Engineers, pursuant to Section 10 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 403) and to Section 404 (b) of the Clean Water Act (33 U.S.C. 1344), Is hereby issued by authority of the Secretary of the Army by the District Engineer US Army Engineer District, Wilmington PO Box 1890 Wilmington, NC 28402 TO MAINTAIN, REPAIR, CONSTRUCT, AND BACKFILL BULKHEADS AND TO PLACE RIPRAP MATERIAL ALONG ERODING SHORELINES IN THE WILMINGTON, NORTH CAROLINA, US ARMY ENGINEER DISTRICT. I. Proposed General Conditions a. The activities authorized by the general permit shall be activities conforming to the standards and conditions contained herein. b. At least 30 days before beginning any work under this general permit, the Wilmington District Corps of Engineers must be notified of the proposed activity. The 30-day time period is considered necessary to comply with the permit Special Condition which requires Corps of Engineers onslts review of the bulkhead or rlprap material alignment. Notification can be by telephone, In person, or in writing to: Regulatory Functions Branch Corps of Engineers PO Box 1890 Wilmington, NC 28402 343-4631 Location Federal Building Corner of Water and Market Streets Room 206 Notification must include: (1) The name, address, and telephone number of permittee (landowner) and location of work including county, nearest community, and waterbody. (2) The dimensions of the proposed bulkhead with beckfill or the area dimensions to be covered by placement of rlprap material. (3) Names and addresses of adjoining property owners. C, The permittee agrees to make every reasonable effort to prosecute the work authorized herein in a manner so as to minimize any adverse impact of the work on fish, wildlife and natural environmental values. •4uewesee pies ;o edoos 044 uj1411M esodJnd Aue Jo; ewll Aug to pepeeu eJe spuel PIeS `S01els Peliun 041 dO ;le4eq uo 6u140e sJeeui6u3 ;o sdJoo Aw-1y sn 9141 ;o 4.uew6pnf e41 ul `1041 4.USAe ayl ul esuedxe UAO sly 4e s1ueW9AO-1dwl pue e-1n;onJls AUG 9A0WOJ o} peJjnbeJ eq II IM ey 10141 sae ke pue spue;sJepun luewesee 041 u1441A A4.Jedo-1d 6uIA94 9044IWJed eyl 'llwJed sly; ;o uolllpuoo o se 'Aj6ulp-1oooV •AeMJ91ej4 Ie4.s900eJ4-ul 3l1Ue11V 041 ;o 4.ueW06Jelue pue 'lueWenoJdwj 'eoueualulew 'uo1l2Jedo syl Jo; se4.e4.S pe11un 944 ;o JOAe; ul luewasee ue o4 pefgns spuel uo eJe lluued jeJeue6 e41 Aq peJenoo eeJ9 944. ;0 SUOI;JOd -U •e6eWep 4ons Aue Jo; 91gell selels Pellun 041 Plo4 lou Ile4s 99"laied 041 pue tjseM eneM Aq e6ewep woJ; oleJe41 peJooW s4wq ;o Ale;es 941 Pug uleJe4 p9441WJed e-1n4.onJls 041 ;o A11J691uj 9141 einsul of sdels J9doJd lie 6ulNel wDJ; ee11IWJed 044 eneljeJ lou seop ;IWJed s141 ;o eouenssl 941 •s19sseA 6ulssed woJ; 4seM eneM Aq e6ewep o4 percins eq Aar ule-1ey pei.41wed eJ4on.4s e41 1e41 A+Illglssod •41 sezlu6ooeJ Age-194 00111wJed 041 •w •IIWJed slyl Aq pezljoytne A1IAIloe 041 O; tueogfpe JO +e sJeleM eIge6IAeu I I e ;o o11gnd e41 Aq esn eeJ{ put IIn; 041 lueneJd of 96;;IwJed e41 Aq spew eq IIe4s ldwelle oN •I •09111wied 94; wOJ; 400-104; lsoo 014; JenooOJ pue 'OSIAJe410 Jo ;aeJ.;um Aq 'uolllpuoo Jewjo; s11 % AeMJeIeM e4; eJolseJ Aar eeu6lsep siy Jo AJo19JoeS eyl '9A!1elu9se.JdeJ pezlJo44.ne sly Jo Auuy 941 ;o AJel9Jo9S 044 ;o u01130JIP 041 411M Aldwoo of silo; 9944tuuod e41 ;j •suo1jipuoo Jew-1o; s+1 O1 AeNJe*a^ eyl a mi seJ 'toeJlp Aar eA1letueseJde-1 pezlJOylrwz s14 Jo AWJV 041 ;o AJelajoeS eyl se Jeuuew pue OWll tens ul Put selels P011un 941 of esuedxe 1n0411A '11e4s 1-4JoM Jo 9-1n4on-1ls pezlJoylne 041 ;o uoj;eldwoo s-1o;eq uo1leJldxe sll uodn Jo I1WJed s141 ;o uolleOOAOJ 40 901;.ou a ;o &djeoej uodn 'JeuMo eJnlonJ+s V •N •s01e1S Pstjufl 9141 4.sule6e se6ewep Jo; wlelo Aue Jo; slseq •41 eq &ou I1e4s &Iwjed s141 ;o u011eooneJ JO 'uojsuadsns 'suolleol;jpow AuV •r •s-1eeA S eq Ile4s llwJed le-19ue6 x141 ;o ruel 9141 'uolleooneJ Jo 'uolsuedsns 'uollool;lpow of loergns sselun •1seJe4.ul olignd lseq eyl ul eq plno^ uolloe yons 1e41 seuluu94.e1) (s)sAjleluese-1deJ pezlJo4lne sly Jo AWJV e14.? ;o AJeleJoeS e41 ;j 1Jed ul Jo elo4N ul peijoneJ Jo 'pepuedsns `pel;lpow Je1411e eq Aew lIw-1ed le-1eua6 s141 •j •4.se-1e+uI oIIgnd e41 ul s91e1S pe+jun 0141 Aq ueMe pepun suol4 wedo einln; Jo 6ullslxe woJ; 11nseJ -1o Aq pesneo eq Am yolyM uleJe4 pezlJo4lne MJoA Jo se-1np n-1ls e41 of AJnjul Jo e6owep Jo; uojlesuedwoo of p011ltue e9 lou Ileys eel;lw-1ed ey; pue 4oeroid le-1epej pesodoJd Jo 6ul4.slx9 Aue y11M 9ou9J9;Je4.uj 0141 ezjJo4lne lou seop 11wJed 12Jeue6 sl41 •4 •uleJe4 pezlJO41ne A11A11OQ 041 Jo; Mel Aq peJlnbeJ luesse 12001 JO Ole*S ulelgo of luow9Jlnbei e41 949IAgo 41 sooP -1ou 'suo11eln6eJ JO smel Ieoo1_ao elel$ 'IoJepej ;o lueWe6ulJ4uj AUG Jo s1461J ;o UOlsenul Jo A1JedoJd of A-1n(ul Aue ezlJoylne lou seop 11 Pug :se6e11AIJd 9Alsnioxe Aue Jo 'jelJelew Jo 94.else leeJ uj Je41le 's4y6jj Aug A9AU0o lou seop 41wied IeJeue6 siyl •6 •u011e61AM of pJe2e4 a lueseJd lou of se uojljpuoo 4ons ul uleJe4 PO7IJ04lne IelJelew de-1dlJ ;o 99Je Jo 111;)1oeq 411M Pee4mlnq 041 ujelulew IIe4s ee441w-1ed ey1 •; •uleJe4 peglJoseJd suo111Puoo pue swJel 044 ytlM e3uepJ00012 ul 51 41wJed s1y1 ;o A;IJoylne Jepun pewJo;Jed 6uleq A11AIloe 044 4941 eJnsse of Jepio ul AJosseoeu peweep ewjl Aug ;.e suolloadsuj olpojJad ailew of (s)eeu6isep Jo (s)OAjiglues9JdeJ p9zjJo44lne sly -1o J9eu16u3 loIJlslp 9141 ;lwJed IIe4s 9911lwJed 941 •a •A111enb JeleM ;o uollepeJ6ep Aug ezlwlulw 4 so os Jeuuar o ul uleJe4 pezli 41ne ?JoM et4 e;,noesoJd of seeJ6e ee111wJed 041 •P o. This general permit will not be applicable to proposed construction when the District Engineer believes that authorization may be warranted but that the proposed activity might significantly affect the quality of the human environment. P- This general permit will not be applicable to proposed construction when the District Engineer determines after any necessary Investigations that the proposed activity would adversely affect areas which possess historic, cultural, scenic, conservation, or recreational values. Application of this exemption applies to: (1) Rivers named in Section 3 of the Wild and Scenic Rivers Act (15 U.S.C. 1273), those proposed for inclusion as provided by Sections 4 and 5 of the Act, and wild, scenic, and recreational rivers established by State and local entities. (2) Historic, cultural, or archeological sites listed in or eligible for Inclusion in the National Register of Historic Places as defined in the National Historic Preservation Act of 1966 and its codified regulations and in the National Historic Preservation Amendments Act of 1980. (3) Sites included in or determined eligible for listing in the National Registry of Natural Landmarks. (4) Endangered or threatened species or habitat of such species as determined by the Secretaries of the Interior or Commerce and conserved in accordance with the Endangered Species Act (16 U.S.C. 1531). q. At his discretion, the District Engineer may determine that this general permit will not be applicable to a specific construction proposal. In such case, the procedure for processing an individual permit in accordance with 33 CFR 325 will be available. r. Any construction of a proposed bulkhead and backfiII which does not comply with the general permit, must have prior approval under the customary permit regulations administered by the Corps of Engineers and as found in CFR 320-329. II. Special Conditions a. This general permit does not eliminate the need to obtain any other required Federal, State, or local authorization. b. This general permit only applies to work along shorelines which are experiencing erosion due to water and/or wave action. C, This general permit Is applicable only along shorelines void of wetland vegetation such as marshgrass and wooded swamp or where all construction is to be accomplished landward of such vegetation. d. Bulkhead with backfilI and placement of riprap material authorized by this general permit will be limited to a maximum shoreline length of 500 feet. e. Bulkhead and riprap material authorized by this general permit must be positioned to extend an average distance of not more than 2 feet waterward of the mean high water (MHW) elevation contour (distance relative to the average water line (AWL) in nontidal areas. f. This general permit does not authorize bulkhead with backfiil or riprap material that extend further waterward than 5 feet from the MHW elevation contour at any point along its alignment (distance relative to the average water line (AWL) in nontidal areas). Jeeul6u3 P 14SIO sJeeul6u3 ;o sdJOO 'leuolo0 S3f&H 'N 1MON L 'se40eeq ueeoo uo elgeolldde Iou s1 llwJed leJeue6 s141 •o •deJdlJ peJePlsuoo lou eJe lelJelew Jeilwis Jo slJgep pooA 'sgwll eeJl 'slonpoJd Jeded 'lo4ow dejos `selpoq Jeo 'seJil se 4one slelJelew •eleJouoo uo,,piq Jo 'ilolJq 'lJew se 4ons slelJelew AJUOSew Jo )looJ ueelo ;o lslsuoo lsnw lelJelew deJdlb •u 'PQ84MI nq 841 46noJ41 slelJelew III;)loeq ;o e6edees lUQAGJd of se os 14611 AIIeJnlonJls eq Isnw pee4ml nq e41 'w •peogxlnq a peJeplsuoo lou sl slelJelew Jellwls Jo sgwlI eeJl 'selPOq Jeo 'lle4dse 'elggnJ 'deJdlJ 'seJ11 ;o epau eJnlonJls V •slelJelew Jellwis Jo 6ullee4s solsegse pele6nJJOo 'send Iae4s lelew 'sgels eleJouoo 'pooh peleeJl ;o pelonJlsuoo eJnlonJls pllos a aq lsnw pea4Mlnq 941 •1 •eeJe Jo 4.uewu6112 841 10 IenoJdde Jel;e sAep 06 ul'l11M 'J168q lsnw sel;l^Iloe uollonJlsuoO •All^Iloe uollonJlsuoo Aue of JolJd Joloedsul llwJed sJeeul6u3 ;o sdJOO a Aq penoJdde 4-uewu611e 841 pup JeuMOpuel 841 Aq pe66el; Jo peYlels eq lsnw 1eIJelew deJdlJ ;o Iuewooe1d Jo; eeJe Jo luawu611e peOLIMInq pesodoJd e41 •)l •ole 'selgeo `uewpeep 'lleM pee"I nq e41 ;o uollpllelsu! Jo; pajlnbeJ eq Aew 4314A 1941 JO; ldeoxe llwJed leJeue6 s141 Jepun pel;IwJed sl UOlleneoxe ON •f •eoJnos pueldn up woJ; peulelgo eq lsnw slelJelew deJdlJ pup lll;)loeq IIV 'I •llwJed leJeue6 sl41 Aq pezlJOUlne lou sl seBJe puellen ul Jo sJeleM ul lelJelew deJdlJ ;o pJeMpuel lelJelew III; ;o luew9oeld e41 •4 •9BlllAll09 6ullll;)loeq Aue of JolJd pelonJlsuoo eq lsnw pee4)llnq 841 •6 ro ?T?ISYSy? P{'Y ' 7 , U4600 uo/l?tiJauo , Bufuue/d I I I S'IHINVQ ,L233fl02I 28 NVSf15 ON ')Ijf1.L12 uno 'ONVISI S.LLONN -YI MORN S3SIHY BZ£ wo 09 w ?\ M " O VI> w 4 <-ti I w? a a \a dNVULVOU -7 UVld `d?W-dIN 3X17,790HE (7VJHX7Dg Q,7SOdOHd I \ I 1 I ?. ti.U / Nk l 1 1 r ? 11 I ' r w I Iv I eve I 1 I ?\ o ? I 1 ?? I 0 1 N i 1 :r N \IOm> / Z \1 I r I I Z w Y W V1 (Y Y J I X Q I w U z n L z I a 0 >' 1 pO w46 00 I X wm V) w Q / O C) o r I m p vwi K 0 x ( ( m C 'o a ? m 1 m a? x I I` 1 I \ z w Y I ? 1 w Z I I ? ? _ Z L \ 1 1\ 11 I ? i 1 1 Q N , 1 O 1 V) JAL W 0 ) o r / N 0 a 1 1 a 0 cr z z F N w aNnos >ionimuno 0 0 0- r- 1 i ?0 cD r 0 r -i N LC) c _W i Z O 1 Lu 1 000 1 Z O i Q aCY) ?z ) I ? d m ?j I U) CD C) 1 I 1 1 1 i Iw rw z? rl cD N C m ?rn0C) LEI .. 00 Q tl Z_ Wa-m•- DCDmN j , n , Q z . _U Y 2?? m ;a m O ?v m m m ? 0 O N O H m r rn D -i O z V) A J O i 8 fTl, < vmi o \ \? m / IX 60 Q I L< (17 0 ?u U) I I 00 0m n 120' } 0 (A C) E-` mD ?. _< S O I ?m \ m I Ul Z D / r: -1 z rn I I m ? / I I I: m0 O N00 :a Z I. D 1 I II e 11 I I ? II ? ' N I I 1 1\ I I 'I I. ` 0 Iz 0 ? r9 [n (? I z IO? m rTl ( < W 0 o n m 1 Q M / N ? 1 N co ''' 0 -9 , 0 C) m I o / D / ( !-t 6' ?N I I \ I l I N Cn 1 -20' -; w\ i v co ,oo' I Sm / mm , I Irni v I 1 u mm I I N 1 i rn M i rn I I o f? I n 1 cN o I /1r t ' 0 m I O m D ' m 1 L f I , ? r m mz I am z o O / mm -? 0 0 c I c I I , u, 1 ---- ------------ I _ ?• N (. HS ONVS O U 1 r0 I 0 `- I m mZ OO I I Z n CD _<0 SOS ;o D D ?D Z?ZOi I. \ Y .. U r r n I m \ \ crd y cn _u VW/19 O ?I . z CII N ) om NC) V_ O D > 1 r i YACXBTlC cn U U m Lc. NO F o r m \ O m 2K I- U O N 00 l0 ro K) v N O O z O O wm z m0 O o zw Q > m ? Z = Y LLJ > a J J WD W W 6 i.. m a J C) Q J J w 3 z LL. o Y O .II m II I I ? I W 4. I iJI I! U ? Q ? J J I -?t I; I; I Q Q Q o n i ? Q W ID a ? a W Q III:. If 0.Y Y ~ a It_'il I J am J ? Li ? ? 2 5' ? o v v Z -m I• I S J I l L LJ d (n hl" 1 o C;d -II lip I ? ail - F- - 1... Q J IIII - I' - J J Q Z W _ _ ? ; " f- U In I 11 i ? U Q x J - Q O -Q W ci? w J I. Q W D Q7 = N JA Y ? aJ LL 3 m O I I -Aj: v? L ?< L Q m FF ? I M "o aY a 0 -j O S CL (1) a a z w \ S m U Z O U W w U ?0 U H xA (F 0 ti a 0 0 Q x Y J W m J r W Q U Z ZO S of U