Loading...
HomeMy WebLinkAbout20170622 Ver 1_Corps approval e-mail_20170116 Clay: The following Low Impact Bridge Replacement projects submitted forreview in Decemberof 2017are being authorized as Nation Wide Permit (NWP-3), NWP-3’s w/Special Conditionsor No Permit Required (NPR) and the following action I.D. numbers and file numbers are associated with these actions. NCDOT Project-With Special Conditions: Washington B-5601 Bridge #11 Kendrick Cr.SAW-2017-02599 Iwon’t send you individual tear sheetsfor these actions and this email is acting as the official authorization for these projects. I request that you attach a copy of this email and print out the associated permit conditions for NWP3 and give them to the project superintendents who will be overseeing these projects so they can have a copy on site when the work is taking place. I also request that you coordinate with the appropriate POCs for NCWRC,NCDMF, and NMFSfor any in water work moratoriums or restrictions (i.e. use of sediment curtains etc.) that may be associated with these projects.The regional condition for NWP 3 excludes the use of this permit for discharges into Waters of the United States designated by either the North Carolina Division of Marine Fisheries (NCDMF) or the North Carolina Wildlife Resources Commission (NCWRC) as anadromous fish spawning areas during the prohibited period of February 15 and June 30,without prior written approval from NCDMF or NCWRC and the Corps. Additionally, discharges into Waters of the US designated as sturgeon spawning areas are prohibited during the period between February 1 and June 30, without prior written approval from the National Marine Fisheries Service (NMFS). NWP3 also requires that you obtain any required CAMA permits in the 20 coastal counties and that construction activities may not commence for these projects until you obtain the required CAMA permit. Please provide the Corps w/a copy of the CAMA authorization for these projects, if applicable.The expiration date of these Nationwide Permits is March 18, 2022.No compensatory mitigation isrequired for these projects. If you have any questions regarding the verification, or any conditions of the permits for these projects, please contact me at 910-251-4584. Kyle Barnes Regulatory Project Manager Digitally signed by BARNES.KYLE.WILLIAM.1388035397 BARNES.KYLE.WIL DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, LIAM.1388035397 cn=BARNES.KYLE.WILLIAM.1388035397 Date: 2018.01.16 17:45:22 -05'00'