Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0047384_Ash Clarifier Permit Set DWGs_S&S 1-31-18_20180202
is 2 :5 4 W�__ , I� 11 MILE wwwwmmmmm SCALE f2" � � V Iz E @44484484%4re4$84$f?�7�$yD$R ,�&qui$#4&4� 4�dgpd`R9 h ,, �g644tly,6«4�444g�4$$£r$�r� q&##$,�4£�4R 4#tdt4�f f „ Rib, , '8 �g"l'�4, Tg��,s4°�4$'i J° A�. ESRC �Ls q,'+ tom. C tie ? ° `9® W'+�'`® q t,a R'I /^9, 04 Z/, aaB giw"a� R� ® �9'�y".� '�i�� 'm®�o ie 0 *B,"�q B� p��� ae� � ,p�.7r� � b• �r � �waA�� ®� e�i.,_� � ti: V i �♦Hgq.s�C�r �`.Y�ys� jj �#^i'*#�dq ,„s T �s.,3K / .e C : .Y ; ;.. a, : s 3 Y\nEl°( £ IT 102a g �r� E "'�gyygf s$ .�-�'T$..��¢.+ppr� rm� �_ G '6 �¢°qqg�. �4�p i .. s 3 pw ,.. �a$B6�Rg1�i�u.; Ff_g�( $'�#�aa^ .. ig,•"g`�/"[��ti: £ "E✓Ay��d .,,,�f$t.�Y�rar�#� rA �1�� g C' a'tf 4',gOg.y A#4s'&�q�y.�t�9 R f t �x� gg s �$® A� � ii'{!' � Y' ��Y����°`bi ,. B�Ms)Hx��g�°v�'®0A�/.�e J £ eirofa �� ,eQ p �y'1��1 S rk� R F9,d ,`' , i-' Sy % fi � i � 3 16 �t 3 r��g ®f�aVeBa .f �.+g=pp1�� # �gf • p�, qy So yywya+ f E.+Z 93 $R9R34ffiSA iR9&#'8gf0iq ��' £ f •' s'g�$¢f € o it. �° 1$R RReif 4i'"ggq J' i �gFa gtia aaw##►#s+ r Z / y i CIVIL STRUCTURAL MECHANICAL ELECTRICAL I INSTRUMENTATION Water Environment lJ £,Y. CDM Smith Inc. NC . License roo. r4zmizo 54 .'. 0 Glenwood .� r .�r: .A �` "� � Faclolesiti PIPING SYMBOLOGY DOUBLE LINE SYMBOL in m Q U oz Q N z Q z w IN 715 w SINGLE LINE SYMBOL FEATURE FLANGED JOINT COMPLEX REPRESENTATION. MECHANICAL JOINT COMPLEX REPRESENTATION. DIRECTION OF FLOW PLAIN END x PLAIN EIVD PIPE COUPLING PLAIN END x PLAIN END PIPE COUPLING RESTRAINED FLANGE x PLAIN END PIPE COUPLING PIPE MATERIAL (OPTIONAL) ABBREVIATED PROCESS LINE D DESCRIPTION O� STANDARDS ARE ACCESSIBLE VIA THE CITY OF GREENSBORO WEBSITE: http://www.greensboro-nc.gov Q U VALVE SYMBOLOGY Q _1P W OF GREENSBORO'S DETAILS. cy_ PIPE TAG U E o (3) 3/4" SHC—PVC a_ �— Lij w NUMERICAL INDICATOR z FOR MULTIPLE IDENTICAL o FLOWSTREAMS 0 0 z Q NOMINAL PIPE SIZE FEATURE FLANGED JOINT COMPLEX REPRESENTATION. MECHANICAL JOINT COMPLEX REPRESENTATION. DIRECTION OF FLOW PLAIN END x PLAIN EIVD PIPE COUPLING PLAIN END x PLAIN END PIPE COUPLING RESTRAINED FLANGE x PLAIN END PIPE COUPLING PIPE MATERIAL (OPTIONAL) DOUBLE LINE SYMBOL SINGLE LINE SYMBOL FEATURE U __ M FLOW METER, GENERAL SYMBOL LL_ O E:I�m - - VENTURI FLOW METER Li q- 0 Of PIPE AND FITTING SYMBOL NOTES W 1. SIMPLIFIED JOINT SYMBOL IS USED FOR ALL SINGLE LINE PIPING SHOWN ON THE INTERIOR AND EXTERIOR PIPING DRAWINGS. Q 2. BOTH SIMPLIFIED AND COMPLEX JOINT REPRESENTATIONS MAY BE SHOWN ON THE DRAWINGS. z_ W 3. UNLESS MODIFIED BY THE GENERAL PROJECT NOTES OR DETAILED ON THE LAYOUT LLJ Of AND SCHEMATIC DRAWINGS PIPE AND FITTING JOINT REQUIREMENTS FOR THE VARIOUS = PIPE MATERIALS ARE DEFINED IN THE SPECIFICATIONS. 0 � W a X ry a_ z ry U SUBTITLE OR DESCRIPTION (AS REQ'D) 0 o ABBREVIATED PROCESS LINE o DESCRIPTION W STANDARDS ARE ACCESSIBLE VIA THE CITY OF GREENSBORO WEBSITE: http://www.greensboro-nc.gov Q U VALVE SYMBOLOGY Q o _ W OF GREENSBORO'S DETAILS. cy_ SYMBOL FEATURE OLi E z UNCLASSIFIED. TYPE AS SHOWN ON THE o DRAWINGS ADJACENT TO SYMBOL CONSTRUCTION. FLOW METER z BUTTERFLY VALVE BM GATE VALVE 0 0 cwn-t0�-� PLUG VALVE D 4. M CHECK VALVE, GENERAL SYMBOL O 3/4" = 1'_0" ~ ECCENTRIC REDUCER OR REDUCING BUSHING O z z SEDIMENTATION CONTROL MEASURES PER THE EROSION AND SEDIMENT CONTROL PLANNING AND W �—� CONCENTRIC REDUCER OR REDUCING BUSHING DESIGN MANUAL U Q http://deq.nc.gov/about/divisions/ener(ly-mineral-land-resources/engery-mineral-land-permit EXISTING CABLE TELEVISION PIPELINE APPURTENANCES SYMBOLOGY z a� DOUBLE LINE SYMBOL SINGLE LINE SYMBOL FEATURE U __ M FLOW METER, GENERAL SYMBOL LL_ O E:I�m - - VENTURI FLOW METER Li q- 0 Of PIPE AND FITTING SYMBOL NOTES W 1. SIMPLIFIED JOINT SYMBOL IS USED FOR ALL SINGLE LINE PIPING SHOWN ON THE INTERIOR AND EXTERIOR PIPING DRAWINGS. Q 2. BOTH SIMPLIFIED AND COMPLEX JOINT REPRESENTATIONS MAY BE SHOWN ON THE DRAWINGS. z_ W 3. UNLESS MODIFIED BY THE GENERAL PROJECT NOTES OR DETAILED ON THE LAYOUT LLJ Of AND SCHEMATIC DRAWINGS PIPE AND FITTING JOINT REQUIREMENTS FOR THE VARIOUS = PIPE MATERIALS ARE DEFINED IN THE SPECIFICATIONS. 0 � W a X ry a_ z ry U SUBTITLE OR DESCRIPTION (AS REQ'D) 0 o - ALL CONSTRUCTION TO COMPLY WITH CITY OF GREENSBORO STANDARDS. CITY OF GREENSBORO 0 U STANDARDS ARE ACCESSIBLE VIA THE CITY OF GREENSBORO WEBSITE: http://www.greensboro-nc.gov Q U > ry IN CASE OF CONFLICT, THE DETAILS PRESENTED IN THE CONTRACT DOCUMENTS OVERRULE THE CITY o _ w cf) OF GREENSBORO'S DETAILS. EXISTING FORCE MAIN 2. STORM WATER MANAGEMENT FOR THIS PROJECT IS BEING PROVIDED ON-SITE. THE CONTRACTOR WILL E z no nrf n/1A IC Inl r r/%n \IAI IT IA IIA I/1 AA1\/ Tr /IMAM\/ CT \ lATrn !�l1A IT /11 r-A("I Inr! In IAI/•� DL (CGJrUI IS1BLC r 0 R NAA1 V IAIIVII G HIV I I CMPORAR I S I MV�VHI r_M I.UIV I VL MGf•1JUI�CCJ DUR\IIVh BF O CONSTRUCTION. n) C5 cn cn BUTTERFLY VALVE BM W Ll - THE 100 -YR FLOODPLAIN ELEVATION AT TZ OSBORNE WRF IS 695 -FT (NAVD88) PER FEMA PANEL 0 a_ SECTION EXISTING POWER DUCTS OR CABLES 4. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AND PRACTICES, m I m 3/4" = 1'_0" CONC CONCRETE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADDITIONAL EROSION AND z o SEDIMENTATION CONTROL MEASURES PER THE EROSION AND SEDIMENT CONTROL PLANNING AND DIP W Q DESIGN MANUAL U O http://deq.nc.gov/about/divisions/ener(ly-mineral-land-resources/engery-mineral-land-permit EXISTING CABLE TELEVISION EAST -guidance/erosion-sediment-contrl- planning -design-manual) AS DEEMED NECESSARY BY THE a� w ENGINEER DURING CONSTRUCTION. Q cn z CD PROPERTY OWNER: � � w DEPARTMENT OF WATER RESOURCES CITY OF GREENSBORO o 0 P.O. BOX 3136, GREENSBORO, NC 27402, 336-373-7792 FEET/FOOT o Z CONTACT FOR THIS PROJECT: MONICA JARRET, E.I. - Q DETAIL 0 6. ENGINEER: 3/411 N Oo \� W >� WHS 5400 GLENWOOD AVENUE, SUITE 400, RALEIGH, NC 27612 w U O WATER MAIN L__j Q) (D E W C) ~ —I w U� W 7. PLAN 1/4" = 1'-0j' SECTION NUMBER SHEET WHERE CUT IS TAKEN IF SECTION OR DETAIL IS DRAWN ON THE SAME SHEET THAT IT IS TAKEN FROM, THE SHEET NUMBER IS REPLACED WITH A HYPHEN. IF THE SECTION IS REFERENCED ON MULTIPLE SHEETS, THE SHEET NUMBER SHOWN INDICATES THE FIRST SHEET THE SECTION IS TAKEN FROM. SHEET WHERE DETAIL IS TAKEN E w I = CD DRAWING, SECTION AND DETAIL TITLES (f) a- ry crEJ� ° Qz Uj (nI ) U o :2E o u QW > 3 U0 a w c / o D REV. DATE DRWN CHKD REMARKS x_j a0� N0. X GENERAL 20„ WM dM_ SAN S 10') FM CA TV 3 f-1 or 0 PP 0 or o LP SB -1 PZ -1 BM (t) X- X-- -- 0 —0- 12.00- 12.00 , 12.00...12.00 NAME GENERAL NOTES EXISTING WATER MAIN PIEZOMETER BENCH MARK EXISTING CHAIN LINK FENCE NEW CHAIN LINK FENCE EXISTING CONTOUR NEW CONTOUR FLOODPLAIN LINE FLOODWAY BUFFER WETLAND LINE EXISTING SPOT ELEVATION NEW SPOT ELEVATION NEW STRUCTURES, STRUCTURAL COMPONENTS OR EQUIPMENT EXISTING STRUCTURES (TO REMAIN) EXISTING STRUCTURES (TO BE MODIFIED) EXISTING STRUCTURES (TO BE REMOVED) EXISTING PIPES (TO BE CUT AND CAPPED) FUTURE STRUCTURES NEW CONCRETE SLAB OR SIDEWALKS NEW PAVEMENT DETAIL LETTEr" SECTION NUMBER 1 A-1 CTION LINE �I SHEET WHERE E T LEADER LINE SCION SHEET WHERE DETAIL IS LOCATED IF THE IS LOCATED SECTION IS SHOWN ON THE SAME SHEET IT IS THIS SYMBOLOGY TO BE CUT, THE SHEET IF MULTIPLE DETAILS REFER TO THE SAME AREA OF USED FOR SHORT SECTION NUMBER IS REPLACED THE DRAWING THE BUBBLES ARE STACKED WITH A DASH. SIDE BY SIDE. CUTS ONLY. SECTION CUT SYMBOLS DETAIL CALL OUT SYMBOLS DESIGNED BY: B. MASON DRAWN BY: D. DORAN4 SHEET CHK'D BY: M. TAYLOR Smith ]CROSS CHK'D BY: J. HEALY 5400 Glenwood Avenue, Suite 400 APPROVED BY:Raleigh, INC 27612 1 Tel: (919) 325-3500 JANUARY 2018 DATE: NC F-1255 B. MASON A 1. ALL CONSTRUCTION TO COMPLY WITH CITY OF GREENSBORO STANDARDS. CITY OF GREENSBORO AGGREGATE BASE COURSE AL STANDARDS ARE ACCESSIBLE VIA THE CITY OF GREENSBORO WEBSITE: http://www.greensboro-nc.gov EXISTING SANITARY SEWER W/ MANHOLE ASH PUMP DISCHARGE IN CASE OF CONFLICT, THE DETAILS PRESENTED IN THE CONTRACT DOCUMENTS OVERRULE THE CITY APPROXIMATE (LY) APS OF GREENSBORO'S DETAILS. EXISTING FORCE MAIN 2. STORM WATER MANAGEMENT FOR THIS PROJECT IS BEING PROVIDED ON-SITE. THE CONTRACTOR WILL ASH SLURRY FEED ASPH no nrf n/1A IC Inl r r/%n \IAI IT IA IIA I/1 AA1\/ Tr /IMAM\/ CT \ lATrn !�l1A IT /11 r-A("I Inr! In IAI/•� DL (CGJrUI IS1BLC r 0 R NAA1 V IAIIVII G HIV I I CMPORAR I S I MV�VHI r_M I.UIV I VL MGf•1JUI�CCJ DUR\IIVh BF BLIND FLANGE CONSTRUCTION. EXISTING BURIED TELEPHONE BFV BUTTERFLY VALVE BM 3. THE 100 -YR FLOODPLAIN ELEVATION AT TZ OSBORNE WRF IS 695 -FT (NAVD88) PER FEMA PANEL BOTTOM BH 3710789500J, EFFECTIVE DATE JUNE 18, 2007. EXISTING POWER DUCTS OR CABLES 4. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AND PRACTICES, CONCRETE MASONRY UNIT CO WHETHER TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE CONC CONCRETE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADDITIONAL EROSION AND OVERHEAD POWER DI SEDIMENTATION CONTROL MEASURES PER THE EROSION AND SEDIMENT CONTROL PLANNING AND DIP DUCTILE IRON PIPE DESIGN MANUAL DIAMETER DWG http://deq.nc.gov/about/divisions/ener(ly-mineral-land-resources/engery-mineral-land-permit EXISTING CABLE TELEVISION EAST -guidance/erosion-sediment-contrl- planning -design-manual) AS DEEMED NECESSARY BY THE EACH EL ENGINEER DURING CONSTRUCTION. EXISTING STORM SEWER W/CATCH BASIN 5. PROPERTY OWNER: FINISHED FLOOR ELEVATION FI L DEPARTMENT OF WATER RESOURCES CITY OF GREENSBORO FIRE HYDRANT ASSEMBLY (EXISTING) FLANGE/FLANGED P.O. BOX 3136, GREENSBORO, NC 27402, 336-373-7792 FEET/FOOT GS CONTACT FOR THIS PROJECT: MONICA JARRET, E.I. FIRE HYDRANT ASSEMBLY (PROPOSED/RELOCATED) GATE VALVE HW HEAD WALL 6. ENGINEER: R/W - RIGHT OF WAY INVERT ELEVATION CDM SMITH INCH WHS 5400 GLENWOOD AVENUE, SUITE 400, RALEIGH, NC 27612 WM WATER MAIN CONTACT FOR THIS PROJECT: JAMES BUTCHER (919) 325-3500 - R PROPERTY LINE 7. A 25 -FOOT UNDISTURBED BUFFER SHALL BE MAINTAINED ADJACENT TO ALL STREAMS. NEW MAIN TO BE CONST. UNDER EXISTING UTILITY 8. CONTRACTOR SHALL COMPLY WITH ANY APPLICABLE RULES, LAWS AND REGULATIONS INCLUDING BUT NOT LIMITED TO CITY STANDARDS, FLOODPLAIN DEVELOPMENT RULES/PERMIT AND COORDINATE WORK NEW MAIN TO BE CONST. OVER EXISTING UTILITY WITH OWNER. 9. CONTRACTOR SHALL STOCKPILE EARTHWORK AND MATERIALS IN THE AREAS SPECIFICALLY DESIGNATED EXISTING POWER POLE FOR STAGING. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION TO AVOID AND MINIMIZE RUN-ON AND RUN-OFF FROM SUCH AREAS. EXISTING LIGHT POLE SOIL BORING IONS ABBREVIATIONS PIEZOMETER BENCH MARK EXISTING CHAIN LINK FENCE NEW CHAIN LINK FENCE EXISTING CONTOUR NEW CONTOUR FLOODPLAIN LINE FLOODWAY BUFFER WETLAND LINE EXISTING SPOT ELEVATION NEW SPOT ELEVATION NEW STRUCTURES, STRUCTURAL COMPONENTS OR EQUIPMENT EXISTING STRUCTURES (TO REMAIN) EXISTING STRUCTURES (TO BE MODIFIED) EXISTING STRUCTURES (TO BE REMOVED) EXISTING PIPES (TO BE CUT AND CAPPED) FUTURE STRUCTURES NEW CONCRETE SLAB OR SIDEWALKS NEW PAVEMENT DETAIL LETTEr" SECTION NUMBER 1 A-1 CTION LINE �I SHEET WHERE E T LEADER LINE SCION SHEET WHERE DETAIL IS LOCATED IF THE IS LOCATED SECTION IS SHOWN ON THE SAME SHEET IT IS THIS SYMBOLOGY TO BE CUT, THE SHEET IF MULTIPLE DETAILS REFER TO THE SAME AREA OF USED FOR SHORT SECTION NUMBER IS REPLACED THE DRAWING THE BUBBLES ARE STACKED WITH A DASH. SIDE BY SIDE. CUTS ONLY. SECTION CUT SYMBOLS DETAIL CALL OUT SYMBOLS DESIGNED BY: B. MASON DRAWN BY: D. DORAN4 SHEET CHK'D BY: M. TAYLOR Smith ]CROSS CHK'D BY: J. HEALY 5400 Glenwood Avenue, Suite 400 APPROVED BY:Raleigh, INC 27612 1 Tel: (919) 325-3500 JANUARY 2018 DATE: NC F-1255 B. MASON A AIR ABC AGGREGATE BASE COURSE AL ALUMINUM APD ASH PUMP DISCHARGE APPROX APPROXIMATE (LY) APS ASH PUMP SUCTION ASD ASH SLURRY DRAIN ASF ASH SLURRY FEED ASPH ASPHALT BF BLIND FLANGE BFP BACK FLOW PREVENTER BFV BUTTERFLY VALVE BM BENCHMARK BOT BOTTOM BH BOREHOLE BTWN BE i viiEEN CMU CONCRETE MASONRY UNIT CO CLEAN OUT CONC CONCRETE D DRAIN DI DUCTILE IRON DIP DUCTILE IRON PIPE DIA DIAMETER DWG DRAWING E EAST EA EACH EL ELEVATION EX EXISTING FFE FINISHED FLOOR ELEVATION FI L FI LTRATE FLG FLANGE/FLANGED FT FEET/FOOT GS GALVANIZED STEEL GV GATE VALVE HW HEAD WALL ID INSIDE DIAMETER IE INVERT ELEVATION IN INCH LF LINEAL FEET MAX MAXIMUM MGD MILLION GALLONS PER DAY MH MANHOLE MISC MISCELLANEOUS MJ MECHANICAL JOINT N NORTH NCRW NON -CHLORINATED RECLAIMED WATER NG NATURAL GAS NPW NON -POTABLE WATER NTS NOT TO SCALE OD OUTSIDE DIAMETER OVF OVERFLOW PLW PLANT WATER PS PUMP STATION PW POTABLE WATER R/W RIGHT-OF-WAY RAD RADIUS RC RECIRCULATION RCP REINFORCED CONCRETE PIPE RED REDUCER RJ RESTRAINED JOINT RPZ REDUCED PRESSURE ZONE S SOUTH SAN SANITARY SD STORM DRAIN SER W SERVICE WATER SPD SUMP PUMP DISCHARGE SQ SQUARE SS SANITARY SEWER SST STAINLESS STEEL STA STATION SW SERVICE WATER TBD TO BE DETERMINED TEL TELEPHONE TYP TYPICAL W WATER WAS WASTE ACTIVATED SLUDGE WHS WASH HOSE STATION WM WATER MAIN CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF INDEX OF SHEETS GENERAL -- COVER SHEET G-1 SHEET INDEX, ABBREVIATIONS, SYMBOLS AND GENERAL NOTES CIVIL C-1 SITE GRADING PLAN C-2 YARD PIPING PLAN CD -1 CIVIL DETAILS STRUCTURAL S-1 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS S-2 ASH CLARIFIER FOUNDATION PLANS S-3 M-3 ASH CLARIFIER TOP PLANS S-4 ASH CLARIFIER SECTIONS AND DETAILS S-5 SOLIDS BUILDING DEMOLITION PUMP ENCLOSURE FOUNDATION PLAN AND SECTIONS S-6 PIPE RACK PLANS, SECTIONS AND DETAILS SD -1 STANDARD DETAILS SD -2 STANDARD DETAILS SD -3 STANDARD DETAILS SD -4 STANDARD DETAILS SD -5 STANDARD DETAILS SD -6 SPECIAL INSPECTION TABLES AND NOTES MECHANICAL M-1 MECHANICAL SYMBOLS & ABBREVIATIONS, NOTES AND LEGEND M-2 ASH CLARIFIER PLAN M-3 ASH CLARIFIER SECTIONS M-4 SOLIDS BUILDING DEMOLITION AND PROPOSED PARTIAL PLAN M-5 SOLIDS BUILDING SECTIONS AND DETAIL MD -1 MISCELLANEOUS MECHANICAL DETAILS MD -2 MISCELLANEOUS MECHANICAL DETAILS MD -3 MISCELLANEOUS MECHANICAL DETAILS MD -4 MISCELLANEOUS MECHANICAL DETAILS ELECTRICAL E-1 ELECTRICAL LEGEND E-2 ELECTRICAL LEGEND II E-3 ELECTRICAL SITE PLAN E-4 MODIFICATIONS ONE -LINE DIAGRAM E-5 RISERS DIAGRAMS AND SCHEDULES E-6 ASH CLARIFIER AND PUMP ENCLOSURE ELECTRICAL PLANS ED -1 ELECTRICAL DETAILS INSTRUMENTATION 1-1 INSTRUMENTATION LEGEND 1-2 INSTRUMENTATION SYMBOLS 1-3 SYSTEM ARCHITECTURE 1-4 PROCESS AND INSTRUMENTATION DIAGRAM ASH CLARIFIER AND PUMP 1-5 INSTRUMENTATION DETAILS �j%k11111CA.90�jxxi •a SEAL $�: 3366 ' i��/tis' `•�. 12(0 l� 13'i\\\\\ SHEET INDEX, ABBREVIATIONS, SYMBOLS AND GENERAL NOTES PROJECT NO. 6145-217155 FILE NAME: GOO NTIX. DWG SHEET NO. G-1 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION BENCHMARK TABLE A B EASTING BM -1 855054.05 1796920.30 +723.+3 854978.06 1796944.98 BM -3 854983.91 N = 855061.06 854938.37 1796821.99 BM -5 E = 1796914.25 BM -6 854839.04 T1796794.91 MANHOLE U) BM 1 721 TOP: 721.93' 21.20 _ +720.32 N = 855038.81 o E = 1796875.70 GRATE INLET oTOP: 719.50' Q +722.3 N Q S� z LII EXISTING THICKENED SLUDGE p� HOLDING TANK EXISTING ASH Li _ CLARIFIER �' BENCHMARK TABLE POINT NORTHING EASTING BM -1 855054.05 1796920.30 BM -2 854978.06 1796944.98 BM -3 854983.91 1796862.87 BM -4 854938.37 1796821.99 BM -5 854878.65 1796878.33 BM -6 854839.04 T1796794.91 N 1 " = 20' 10 0 20 E F G H BM 722' MANHOLE Pte' 21.20 1 721-- TOP` 721.93' N F` +720.32 �Z GRATE INLET ' TOP: 719.50' +722.3 ; + 1 " = 20' ii • 10 0 20 1 EXISTING THICKENED SLUDGE HOLDING TANK EXISTING, ASH CLARIFIER SOLIDS HANDLING a '�o � � �` �•. BUILDING .� �, Via;. � " SOLIDS HANDLING �� 23.49•:. F -� k -p ">? BUILDING SM • E BM 23,49•,, E ys 3 SHED e 3 SHED N = 854970.51 723!45 V U BM PROPANE =� ��'.G -� r r`�.723.45 VAULT BM PROPANE 3� - E = 1796865.94`. E 2 TANK �'� --�` 2 TANK a' RETAINING '' RETAINING WALL WALL Uj = 726.65 VALV .:.,�, :_ 726.65 VALV 3 o EXISTING .`A.. }. °' EXISTING z THICKENED SLUDGE N = 854950.48 THICKENED SLUDGE Q HOLDING TANK CENTER POINT OF E = 1797037.28 HOLDING TANK `• PROPOSED ASH CLARIFIER � �nnntiuOLE `;• , +709.40 AN OLE ` o N LL__ 854942.88 .12' 725 23 " 4 `::'"`' 0$ = (TOP: 726.12' 725 23 ^ry `` ::.. NORTHING = 854917.15 +7x9.40 E - 1796821.58; 0 EASTING -_ 1796936.24 +725.88 +724.6 • d , p O +/5.88 +724.6 i �� •.: O v ("� ': •, +709.48 B �'` .. BM +709.48 / 4 Op WVc� +708.72 4 EXCAVATION SUPPORT ! Op yyv o,/ +70$.72 O 2" AIR - SS / 50 SPHALT '�� Q N SYSTEM (SEE NOTE 7) PIPE RACK ASPHALT Li +709 o (SEE NOTE 5) EXISTING +7{}g 29 'J (REFER TO S-6) +709.29 2 WALL -f 729.39 " PUMP STATION ,D9 WALL -f 729.39 o 4 p ASH CLARIFIER fps, z �jl O \ o j. 0 (REFER TO M-2) !vs� p 709,65 0 , .j O BOLLARD (TYP 4) CB2 709.65 Lij 1 70g 708.75 p 7 �, 4' SIDEWALK 708.75 O m \ .. MH -A o \ _2 SEE NOTE 9 MH`A '.'. ..•..... ,:. ` N = 854897.29 TOP: 708.87 TOP: 708.87 ...'.'.'....'.' ..'.'r:'.'.'.'. o GRAVITY _ ^'% %: GRAVITY i. E = 1796971.43 z SLUDGE (2) 6 GRIT DI '.!�''.' SLUDGE � W (SEE NOTE 6) .'.'.'.' ' r, ASH PUMP STATION � THICKNER k .............: '... - THICKNER o ...•........: .......... N = 854888.03 { Q BM ' ' ' ' .'.' 7i E = 1797073.33 BM N _ 854885.24 71 +727.6 5 ............ - _�s,.. . .r . . ..... � +727.6 5 s 'i pw_> E 1796948.31 i II t7 CHAIN' r' q ;` Db' \_7' CHAIN 729.6 cb .. zv ......, 'F......... LINK FENCE 729.6 c� _ �\ LINK FENCE 12 CPVC •...I_ 9e.....k,......,...•.....,., ,�`V o......... +728.3/ (SEE NOTE 8)' t ............:........ N = 854861.39 +728.3% , 0 4' WIDE F O ............ .... _ O + = J .'..............`:: , ; f a.� . E = 1797026.23 + CONCRETE N 854856.14 . s.: 729.3 ............ .....: -. SIDEWALK E = 1796821.33 �c.� 1 ........... ...... 729.3 +728.5 Elf SEE NOTE 1 . ' '.............. 1� ... ......';.,�� �1+ w BM *27.7 ............... .,. BM +727.7 a0 w .'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.' CONTRACTOR n R• ..................... .....................if, STAGING AREA Lij Q J '.'.'.'.'.'.'.'.'.'.'.'.'.'.'.' . .' ... / 3 w Elf // o ........• .... LIMITS OF o ^ .........:............... :.' DISTURBANCE r a 728.3, 728.3 o.......•................�:. A 11 �;:. SILT FENCEIL 0 CD -1 f o- OP: 706.46'�S� ......... ;, . U w .:.:.:.:.:.:..., .: NOTES: o > • • • ••• r�'� • • •.• 1. CONTRACTOR IS TO PROVIDE 24 HOUR PER DAY ACCESS FOR OWNER VEHICLE TRAFFIC ALONG ROADWAY. ROADWAY IS PROPOSED GRADING PLAN o W TO BE KEPT CLEAR AT ALL TIMES. co oa, :.. o ¢ "' 2. CONTRACTOR IS TO REPAIR ANY DAMAGE TO PAVEMENT THAT OCCURS DURING CONSTRUCTION TO THE SATISFACTION OF / o j' THE OWNER/ENGINEER AT NO ADDITIONAL COST TO THE OWNER. w A\i 3. FIELD SURVEY SHOWN ON DRAWINGS WAS CONDUCTED BY REGIONAL LAND SURVEYORS, INC. OF GREENSBORO, NC IN j0 Q,ZPAPRIL 2017. HORIZONTAL DATUM IS BASED UPON THE NORTH CAROLINA STATE PLAN COORDINATE SYSTEM (NAD83). � G c, VERTICAL DATUM IS BASED UPON NAVD 29. SURVEY FILES WILL BE PROVIDED TO CONTRACTOR FOR PURPOSES OF 4.0' m ROCK CHECK DAM ESTABLISHING CONTROL POINTS DURING CONSTRUCTION. LOCATION OF EXISTING PIPING HAS NOT BEEN FIELD VERIFIED m CD -1 ,% AND IS SHOWN BASED ON BEST INFORMATION AVAILABLE. COST OF FIELD LOCATION OF EXISTING UTILITIES SHALL BE z MH -D RESPONSIBILITY OF CONTRACTOR. 3 o n TOP: 69$.08' 4. CONTRACTOR SHALL COORDINATE THE RELOCATION OF THE EXISTING ASH CLARIFIER DRAIN PIPING WITH THE L s INSTALLATION OF ANY SHORING REQUIRED FOR NEW TANK INSTALLATION. PLANS FOR RELOCATION OF THE EXISTING x V)i, �p, '� DRAIN ARE TO BE REVIEWED BY ENGINEER PRIOR TO CONDUCTING WORK. a, N _ 854729.53 5. PRIOR TO WORK IN THIS AREA, CONTRACTOR IS TO LOCATE AND EXPOSE 2" STAINLESS STEEL AIR LINE AND RELOCATE \\//, O O O p O /\//� 4 in E E 1796967.98 AS NECESSARY SO AS NOT TO INTERFERE WITH CONSTRUCTION OF NEW FACILITIES. o `r �� CD -1 CONSTRUCTION 6. CONTRACTOR IS TO LOCATE TWO EXISTING 6" DI GRIT LINES AND REMOVE PORTIONS OF PIPING INTERFERING WITH \ \�/� � o ENTRANCE `\�\\ \ �\ CLASS 2 \�����NIIu11111i//���i 0 Q r CONSTRUCTION OF TANK. CONTRACTOR IS TO CAP THE ENDS OF THE PIPE THAT REMAINS. 18 C RIPRAP // /\/\//\/\/\/\/\/ GEOTEXTILE ```QN CA.I���j��,i'i �.N• ro LO � o / / SILT FENCE B 7. CONTRACTOR SHALL ENGAGE THE SERVICES OF A NORTH CAROLINA P.E. TO DESIGN EXCAVATION SUPPORT SYSTEM TO err• F�SSiO,�;•.�9 � ,� z /// / ' f OUTLET CD -1 PROTECT ADJACENT STRUCTURES DURING TANK CONSTRUCTION. BORINGS SHOWN WERE CONDUCTED BY SUMMIT DESIGN 9�•: o N o 1 N = 854705.31 `= AND ENGINEERING SERVICES IN MARCH 2017. RIPRAP CHANNEL = L oo' JE = 1796937.04 0 t cn 0 8. CONTRACTOR SHALL LOCATE EXISTING 12" CPVC PIPING AND REVISE LAYOUT PER C-2. REMAINING PIPE SHALL BE SECTIONrA N E�REMOVED AND DISPOSED OF OFF SITE. �7 •. GINE �� •••N.•N••• O �� / w i/ S tN v' E J �' EXISTING SITE PLAN AND DEMOLITION 9. EXISTING PUMP STATION TO REMAIN IN OPERATION DURING CONSTRUCTION OF NEW FACILITIES. CONTRACTOR IS TO NTS - i��i�14A4R o `- RELOCATE EXISTING CONTROL PANEL AS NECESSARY DURING CONSTRUCTION AND SHALL RESTORE TO EXISTING LLJ o a CONDITIONS AT COMPLETION OF PROJECT AT NO ADDITIONAL COST TO THE OWNER. cis ~ B. MASON PROJECT NO. 6145-217155 Q O J � � � Q w DESIGNED BY: N �_ DRAWN BY: D. DORAN CDM_ CITY OF GREENSBORO FILE NAME: C001 STPL. DWG � -0 E M. TAYLOR Smith NORTH CAROLINA SHEET NO. 0 -0SHEET CHK'D BY: SITE GRADING PLAN >� ASH CLARIFIER IMPROVEMENTS 0) 3 o p CROSS CHK'D BY: J. HEALY a a U 5400 Glenwood Avenue, Suite 400 C-1 _ �' / ti w APPROVED BY: B. MASON Raleigh, NC 27612 1 Tel: (919) 325-3500 T.Z. OSBORN E WRF c a 3 N w N0. DATE DRWN CHKD REMARKS DATE: JANUARY 2018 NC F-1255 x.j a00� FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION yV V) � P 0 0 w O z O f= Q N o Q 12" SS z EXISTING THICKENED SLUDGE HOLDING TANK EXISTING ASH _ <" CLARIFIER SHED IN s SLUDGE N THICKNEER C POST Q D- HYDRANT o B5 z Q C) o I a- 10" DRAIN -VC -----_ __� IL BM Ld = P� w Q z w m w 0 w < SEE NOTE 7 3 0 v w 0 MH -C 0 N z TOP: 706.46' O C INV. IN (NE): 700.06' 0 U - INV. IN (NE): 698.23' 0 01f INV. IN (N): 700.06' 0 cn INV. OUT (SW): 698.23' O J r�a j z - O > to w N w 0 o- 0 -0 w �S E m } I Z m 0 15" DRAIN SS o ami o of > 0 L J V) C cn / 5 N C / 0 (0 0of 55 �� � Q r,5 0 cn o0� z S� 0 N NC) Lli 0 O W D N E 7 cn a w o L o a z E vi W 0 Q Z Nom+= Uj >,(1) ;_ o 0 0 ow 3 > 00 in � j i. w w n Cn Rte' o' 0 DATE DRWN CHKD REMARKS 3 Nw N0. x_j aOG' A�Q MANHOLE TOP: 721.93' GRATE INLET TOP: 719.50' N 1"=20' 10 0 20 10" ASH SLURRY 2" NPW-PVC 3" THICKENED ASH � �\ 2 "x 1 " TEE -SST ASH CLARIFIER (REFER TO M-2) 2" TEE WITH GATE VALVE - (SEE NOTE 1 1) SOLIDS HANDLING PROPANE BUILDING TANK\ RETAINING 2" NPW-PVC WALL (SEE NOTE 10) ELECTRICAL DUCTBANK (SEE NOTE 8) REFER TO M-4 FOR PIPING IN THIS AREA 4,2 \\ 4 I S 0 ASH P1 STATION YARD PIPING PLAN 4" APS- ; . 1 2" D-CPV1 (SEE NOTE 12" OVF CPVC INSTALL NEW DOGHOUSE MANHOLE MH -B TOP: 706.75' INV. IN (NE): 699.0' INV. IN (N): 701.0' INV. OUT: 699.0' +/- * CONTRACTOR TO FIELD VERIFY EXISTING PIPE AND GRADE ELEVATIONS PRIOR TO MANHOLE FABRICATION 1 POINT TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1 854939.69 1796918.36 717.0 12"x45' BEND 2 854919.41 1796889.50 717.0 12"x45' BEND ULd 854893.43 vv�, 716.0 12"x45' BEND 4 854828.33 .,... D 12"x45' BEND 5 .; 1. +. 1796924.42 700.5 12" BEND* EXISTING 854896.36 1796952.19 0.0 THICKENED SLUDGE = HOLDING TANK 0 ` -� CONTRACTOR TO - z FIELD LOCATE AND Q CONNECT TO EXISTING 0 ANHOLE 12" CPVC PIPE WITH o (TOP: 726.12' NEW 45 DEGREE BEND o' BM 12" 45' VERTICAL- cr _. BEND (TYP 2) \ 0 o 12 OVF-CPVC WALL (BURIED) z 2 0 LU o w m 'r O o GRAVITY 3 z SHED IN s SLUDGE N THICKNEER C POST Q D- HYDRANT o B5 z Q C) o I a- 10" DRAIN -VC -----_ __� IL BM Ld = P� w Q z w m w 0 w < SEE NOTE 7 3 0 v w 0 MH -C 0 N z TOP: 706.46' O C INV. IN (NE): 700.06' 0 U - INV. IN (NE): 698.23' 0 01f INV. IN (N): 700.06' 0 cn INV. OUT (SW): 698.23' O J r�a j z - O > to w N w 0 o- 0 -0 w �S E m } I Z m 0 15" DRAIN SS o ami o of > 0 L J V) C cn / 5 N C / 0 (0 0of 55 �� � Q r,5 0 cn o0� z S� 0 N NC) Lli 0 O W D N E 7 cn a w o L o a z E vi W 0 Q Z Nom+= Uj >,(1) ;_ o 0 0 ow 3 > 00 in � j i. w w n Cn Rte' o' 0 DATE DRWN CHKD REMARKS 3 Nw N0. x_j aOG' A�Q MANHOLE TOP: 721.93' GRATE INLET TOP: 719.50' N 1"=20' 10 0 20 10" ASH SLURRY 2" NPW-PVC 3" THICKENED ASH � �\ 2 "x 1 " TEE -SST ASH CLARIFIER (REFER TO M-2) 2" TEE WITH GATE VALVE - (SEE NOTE 1 1) SOLIDS HANDLING PROPANE BUILDING TANK\ RETAINING 2" NPW-PVC WALL (SEE NOTE 10) ELECTRICAL DUCTBANK (SEE NOTE 8) REFER TO M-4 FOR PIPING IN THIS AREA 4,2 \\ 4 I S 0 ASH P1 STATION YARD PIPING PLAN 4" APS- ; . 1 2" D-CPV1 (SEE NOTE 12" OVF CPVC INSTALL NEW DOGHOUSE MANHOLE MH -B TOP: 706.75' INV. IN (NE): 699.0' INV. IN (N): 701.0' INV. OUT: 699.0' +/- * CONTRACTOR TO FIELD VERIFY EXISTING PIPE AND GRADE ELEVATIONS PRIOR TO MANHOLE FABRICATION 1 POINT TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1 854939.69 1796918.36 717.0 12"x45' BEND 2 854919.41 1796889.50 717.0 12"x45' BEND 3 854893.43 1796884.97 716.0 12"x45' BEND 4 854828.33 1796930.72 704.0 12"x45' BEND 5 854792.25 1796924.42 700.5 12" BEND* 6 854896.36 1796952.19 0.0 4"x22.5' BEND PAVED SURFACES NON -PAVED SURFACES 1 2 TRENCH WEARING SURFACE - 18 T MIN (TYP) CROWN TRENCH BACKFILL 3" MIN PAVEMENT / /�\//�\//�X/ THICKNESS / PAVEMENT 1 x BASEOURSES) //�/ / 1 TRENCH WIDTH VARIES = Z W/ SIZE OF PIPE ADDITIONAL BASE /�// Uj m COURSE MIN THICKNESS EQUAL �\ /\\ g 00 TO ORIGINAL j \ Loo BASE COURSE j * PIPE OD / F STRUCTURAL FILL UNDER CO 0 PAVEMENT (COMMON A//>/>� FILL IF NOT UNDER ��' Q� FILL W/ CONC & PAVEMENT)777 /\\\ PIPE //�\ Z �� ROUND OFF TOP CO SELECT FILL \I / o OQ o REFLECTIVE TAPE (SEE NOTE 4) i\ 1 /\% °' �m -� W w o 6„ DIA SCH 40 STEEL PIPE W/ SHEETING (IF REQD). j\ ��// \/ MOLDED SAFETY YELLOW HDPE COVERS IF ORDERED TO BE / / _j cn LEFT IN PLACE, %\ // / Ez PAVEMENT SHEETING SHALL BE- CUT OFF 18" BELOW, j ///, � ~p FINISHED GRADE, 12' , \ z �D - ABOVE TOP OF PIPE �� // / / / / /\\/Z \SEE NOTE 3 n \\\\\ CONCRETE ENCASEMENT UNDISTURBED EARTH aif= SLOPE TOP 1/2" PER FT. NO.67 STONE W/ FILTER - FABRIC BETWEEN STONE cO - & PERIMETER OF TRENCH -III I I 1 & BETWEEN STONE & SELECT FILL 6" (USE SAND FOR PVC PIPES) 1'-6" DIA. PIPE BEDDING FOR PLANT SITE AND OFFSITE PIPING (DI, STL, PCCP, HDPE,RCP, & PVC PIPE) STEEL BOLLARD DETAIL rA`o" DETAIL KOB NTS - NTS - * CONTRACTOR TO FIELD VERIFY AMOUNT OF BEND PRIOR TO INSTALLATION. DESIGNED BY: B. MASON D. DORAN D DRAWN BY: M_ SHEET CHWD BY: M. TAYLOR Smith CROSS CHK'J. HEALY D BY: APPROVED BY: B. MASON DATE: JANUARY 2018 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 NOTES: 1. PIPE BEDDING & TRENCH BACKFILL - COMPACTED IN LAYERS TO 98% MAXIMUM DENSITY AS PER ASTM D698 (STANDARD PROCTOR) & SPECIFICATION SECTION 31 23 33 EXCEPT TRENCH BEDDING WHERE NOT UNDER ROADS CAN BE 95% MAX. DENSITY PER ASTM D698. 2. ALL PIPE TO BE INSTALLED WITH BELL FACING UPSTREAM TO THE DIRECTION OF FLOW. 3. 10" MAX FOR PIPE DIAMETER LESS THAN 24"; 12" MAX FOR PIPE DIAMETER LESS THAN 42" AND 24" MAX FOR PIPE DIAMETER 42" AND OVER. 4. 4" MIN ON SIDE FOR PIPE 24" DIA & LESS; 6"MIN ON SIDE FOR 30" DIA & LARGER OF COMPACTED SELECT COMMON FILL. 8" MIN IN ROCK. FOR CPVC PIPES, USE SAND OR SELECT FILL. 5. IF UNSUITABLE FOUNDATION IS ENCOUNTERED REMOVE UNSUITABLE MATERIAL TO REACH SUITABLE FOUNDATION, OR TO A DEPTH OF 3 FEET MAX CONFIRM WITH SUMMIT ENGINEERING (919-732-3883). REPLACE WITH STRUCTURAL FILL, SEE SPECIFICATIONS. 6. FOR INSTALLATIONS IN PAVEMENT, ALL EXISTING PAVEMENT SHALL BE CUT SQUARELY WITH A SAW. WEARING SURFACE SHALL BE SAME TYPE AND THICKNESS AS THE EXISTING PAVEMENT. 7. CONTRACTOR IS TO BE AWARE THAT CONCRETE SUPPORT BLOCK HAS BEEN PLACED ON NORTHEAST SIDE OF MH -C. CONTRACTOR SHALL BE RESPONSIBLE FOR COST OF REMOVING ANY CONCRETE TO ACCESS MANHOLE FOR WORK. 8. PRIOR TO INSTALLING NEW 12" OVF PIPING, CONTRACTOR SHALL LOCATE EXISTING 10" DRAIN AND ELECTRICAL DUCTBANK AND CONFIRM THAT NO CONFLICT EXISTS WITH NEW 12" OVF. IN EVENT OF CONFLICT, CONTRACTOR SHALL NOTIFY ENGINEER AND COORDINATE ON POTENTIAL REVISION TO 12" OVF ROUTING. 9. 3" THICKENED ASH PIPING IS TO BE RUN UNDERGROUND TO SOUTHWEST CORNER OF THE SOLIDS HANDLING BUILDING WITH 3 FOOT OF COVER. ONCE PIPE REACHES BUILDING, IT IS TO TURN UP AND RUN UP SIDE OF BUILDING TO ELEVATION 728.0 WHERE IT WILL GO THROUGH THE WALL. EXPOSED PIPE SHALL BE HEAT TRACED AND INSULATED AND SUPPORTED AT A MIN. 3 FOOT INTERVAL. SEE M DRAWINGS FOR ADDITIONAL DETAILS. 10. CONTRACTOR SHALL INSTALL 2" NPW PIPE WITH A MINIMUM OF 3 FEET OF COVER. EXACT ROUTING SHALL BE DETERMINED IN FIELD TO AVOID CONFLICTS. COORDINATE WITH ENGINEER ON EXACT ROUTING. 11. CONTRACTOR SHALL LOCATE EXISTING 2" STAINLESS STEEL AIR LINE AND INSTALL 2"X1" TEE. INSTALL NEW 1" STAINLESS STEEL AIR PIPE TO ASH PUMP STATION WITH A MINIMUM OF 3 FEET OF COVER. EXACT ROUTING SHALL BE DETERMINED IN FIELD TO AVOID CONFLICTS. COORDINATE WITH ENGINEER ON EXACT ROUTING. 12. 2" CPVC DRAIN PIPE FROM ASH PUMP STATION SUMP IS TO BE ROUTED TO CLARIFIER AND RUN UP AND OVER WALL TO DISCHARGE INTO CLARIFIER FEED WELL. PIPE SHALL BE ANCHORED TO CLARIFIER WALL AT MIN. 3 FOOT INTERVALS. ALL EXPOSED PIPE SHALL BE INSULATED. 13. CONTRACTOR SHALL INSTALL 3" RECIRCULATION PIPE WITH A MINIMUM OF 3 FEET OF COVER. EXACT ROUTING SHALL BE DETERMINED IN THE FIELD TO AVOID CONFLICTS. COORDINATE WITH ENGINEER ON EXACT ROUTING. 14. CONTRACTOR IS TO ADJUST ELEVATIONS OF NEW PIPING AS NECESSARY TO AVOID EXISTING CONFLICTS. ANY ADJUSTMENT OF 3 FEET OR LESS IN INDICATED ELEVATION SHALL BE MADE AT NO ADDITIONAL COST TO OWNER. CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF INSIDE FACE OF MANHOLE OR PRECAST CONCRETE CATCH BASIN 3" MAXIMUM FORMED OPENING POURED OR HAND PACKED NON -SHRINK GROUT HALLEMITE, WATERPLUG EMBECO OR APPROVED EQUAL NOTE: THE CONTRACTOR MAY USE A-LOK OR "KOR-N-SEAL" AT HIS OPTION. FOR CPVC PIPE CONNECTION, USE SANDED CPVC MANHOLE ADAPTERS. � PIPE MANHOLE PIPE CONNECTION DETAIL rco""� NTS - YARD PIPING PLAN ZN uCA ESS PROJECT NO. 6145-217155 FILE NAME: C002STYP.DWG SHEET NO. C-2 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION z O N_ orf 0 a Li w 0 f— U w 0 W it W 0 r z Q Of 0 w Q Iz 0 Li J O z 0 w w m 0 0 Z W Q 0 z Q E- 0 U w 0 N z z elfLU IZ 0 W w f - w Q Z W w S N O � O 0 W rn t-- 3 ry O QLO U o z U w � U 0I �;, 0) i o -0E O > D 0r Q w U V) O J Q z o_ U � > 3 U O N W O L- 0 b\ m a- o 0) m w � / N � REV. DATE z o Li CHKD v NO. O cn °- Q_ c z rn � � � o 0 0 z ELEVATION SECTION TEMPORARY SILT FENCE DETAIL rA NTS - i i o oao p °�O.Opo 0 0'O �0•o0o°uoo -Map m:00.pip p0 °O�-OHO d0'•?°°+C°;°p�:�� 111111111116.0 OWa �0 O�O�pG40� O p�0 O O°pOO �`. pp0 DOlO e� p, a p0'o o -0 9_ dp�o9 0000 040 o°O°°IWWO.rt oo00'.±�o00°I p�e o°o0'0°O °fOYO`p0'popoo' oso 0 0 �a:o oo°"oOO. YO .o°to 00 0-000 0.� oo am 000 • r`° oo00°r?'o°,Oo oOSooY00i'"oo��op?O.a00000� opo00�0 1Oiloa op0o. opo ,oA.toval�ry°lO�oa.O�o;Oo 09191, Oto 01p po-.1 aaoo�O yooYoo. 0000 90000000 osO'a`oZa 0 Oo'oa ycoi0a•oho°,oS°oO,IRWI soo�0'000000�j°�5to Ypo goo aai°O � o° oop ° pot oop° ° o . p_%_aq�oO,o).O o0, t oi0 O.� opo o00a0°oo 00 0+ O ♦o- 000 pp o o O s0ep°O f. ....Ap'Op° s� e°�p00,o 0 jO.OvKp10 • 0 0*-* ,•.ti: , � s o'. o oA o00o gO0 ooti o0i00o0 O O•- ae Oi •O 69 r 9 ..a►'ea �'OOOOOQ�O � OlO_O:�0000°gyp 9OOp � � dao op►o ° ° ' oo°°poOtOso°o0�°O�°i° ° 'OYo`o'p°oo°ti'°o�01 ° .�..'+y o0 oop opo 400 O 000 op oo9oi�° ,?��sploo? °'�'O°+� 000ao°>°o°•O c�"o 0 0 °000 O 000� '�`�'��5°°°a008vo°}OOo°°°�0°00'oo�oOO �o.0~otrp.Ov O.o a°Opo-o*_O`00�00��Op� otkoo�� 000�o%i�Ogo O 00'i O,Or49°Q.O'04p0 O'ODOOpO.O Op �Oj�s•� °aeo$ oaYO000 °0°1[°O�vo°000p000���°�•oo�°`p'�o,�yp "g?po cor ooOl009 a 0+ podWpo`o;000376 3'O.oOo°O'o'o°°' O'o°o°Ov�.G yrs4yOrlo,pOpootoo�o•Oo 0 ®n -• °a y��.°,LpooO,r,O,�jo°ap �,a4"" . , o v) N z z W Lf) N Qbi _ N U W _ 6 E J (� aim �w E I =_ C� o � &i _ � U Q Z N O � O N D 0I �;, 0) i o -0E cc) > 3 U O r°n j r--LJ w � / N � REV. DATE DRWN CHKD x_ja0� NO. GRAVEL CONSTRUCTION ENTRANCE DETAIL rE NTS — REMARKS cn -r rrr.inr 12" WASH STONE EXCAVATED SEDIMENT STORAGE PIT FLOW if O C '� z 0 24" POS AVERAGE STONE DIA OF 2 TO 3—INCHES NOTES: 1. MATC HEIG OF 2. REM( WHEI IS COVERED. 18" 18" viiN. MIN. SILT FENCE 2 z SEE NOTE 1 N CLASS B RIPRAP WWF 6x6 -W 1.4xW 1 . PLAN VIEW SILT FENCE OUTLET DETAIL rB NTS - PITCH 1/2' x x......x x 6" GRAVEL BASE FOR WALKS 6 FLUSH W/ PAVEMENT FINISH GRADE RIGID NON -BITUMINOUS JOINT FILLER CSA PAVING PAVING OR AGGREGATE ROAD VARIES kef PITCH 1/2" 1" REBAR FOR BAG REti"OVAL FROM I"JLET (REBAR NOT INCLUDED) OPTIONAL OVERFLO SILTSACK DUMP LOOP (REBAR NOT INC------ FILTER FABRIC dv v } EXPAP 4 a RESTF v G DROP INLET OR CATCH BASIN FOAM DEFLECTOR TO BE INSTALLED IN CURB CATCH BASINS ONLY INSTALLATION DETAIL t SIDE VIEW INSTALLED SILTSACK INLET PROTECTION (FOR PAVED SURFACES) DETAIL C NTS — 1/2" PREMOLDED JOINT FILLER. WWF 6x6-W1.4xW1.4 PITCH 1/2" _X x 4" ' I cp 6" GRAVEL BASE FOR WALKS AT MASONRY STRUCTURE 4" . $0 6" GRAVEL BASE WWF 6x6 -W 1.4xW 1. 2,> TYPICAL CROSS SECTION FOR WALKS 1/2" 3/4" TOOLED CONTRACTION JOINT 5'- 0" O.C. 1/2" FIBERFILL 1. SURFACE OF PAVING TO BE BROOM FINISHED. EXPANSION JOINT WWF 6x6—W1.4xW1. 2. FINISH SURFACE SHALL BE SLOPED FOR FINISH GRADE POSITIVE DRAINAGE AND SHALL SLOPE AWAY FROM STRUCTURES. 4" x >f —x 14 x—x— ` C 3. EXPANSION JOINTS FOR WALKS SHALL NOT EXCEED 30' O.C. AND SHALL BE PLACED AT Ir ---------- ALL BUILDING ABUTMENTS. CONTRACTION 6" BANK -RUN GRAVEL BASE JOINTS SHALL NOT EXCEED 5' O.C. COMPACTED SUBGRADE FOR WALKS 4. GRAVEL BASE SHALL BE UNDERLAIN BY LONGITUDINAL SECTION CONCRETE SIDEWALK DETAIL F INV TS - DESIGNED BY: B. MASON DRAWN BY: D. DORAN Dm SHEET CHK'D BY: M. TAYLOR Smith CROSS CHK'D BY: J. HEALY 5400 Glenwood Avenue, Suite 400 APPROVED BY: B. MASON Raleigh, NC 27612 I Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 GEOTEXTILE FABRIC AS SPECIFIED IN SECTION 31 23 00. 5. SIDEWALKS SHALL BE 6' WIDE UNLESS OTHERWISE MARKED. SIDEWALK ACESS TO BUILDINGS SHALL BE 2' WIDER THAN DOOR OPENING. 72 s� S 0/V # /VCE RIP RT QASS AP B 0 2 ASPHALT CONC. TOP COURSE ASPHALT CONC. BINDER COURSE CRUSHED STONE BASE COMPACTED SUBGRADE OR SELECT FILL II Iii=hili llliii�iii PAVEMENT REPAIR DETAIL D NTS — SAWCUT EXISTING PAVEMENT, APPLY TACK COAT EXISTING PAVEMENT EXISTING BASE CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF FABRIC SECTION A—A TEMPORARY ROCK CHECK DAM DETAIL rG NTS - CIVIL DETAILS PROJECT NO. 6145-217155 FILE NAME: CDO1 STDT. DWG SHEET NO. CD -1 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION p U w 0 z 0 Q N ry 0 D Q z Li r_ ry w 0 U w 0 w ry w _ 0 z a ry 0 w ry Q w ry 0 w J O z 0 w D w m 0 0 z w ry Q p z a V) p U w 0 ry w n 0 ry n w w ry a z w ry w rn = 3 � p w z Q 0 0 0 0- cn o / U a z o - Q w U U o > LLJ / w o cf) U Q v z o cn U) w o w O 0 rn m z p Ld N p U � ry U) w v z N VJ m cr)o w LO p o z a L C) cn N ^_ z th N g � >� N we co w p ui r w o,ECL �w v � I =_ E V) CL E Jcn CD O J d O v Qz 04 N m F_ z �I >, o E'n u -0-a ow > 3 UO v N w W N x_j a-0ry DESIGN CRITERIA: CODES: - NORTH CAROLINA STATE BUILDING CODE, 2012 EDITION - ENVIRONMENTAL STRUCTURES: ACI 350 "CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES" - OTHER STRUCTURES: ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" - AISC MANUAL OF STEEL CONSTRUCTION, THIRTEENTH EDITION DESIGN LOADS: LIVE LOADS: - STAIRWAYS 100 PSF - WALKWAYS 200 PSF - ELEVATED SLABS 200 PSF (UNO) - PROCESS SLABS ON GRADE 200 PSF ROOF SNOW LOAD: - GROUND SNOWLOAD, PG 15 PSF - FLAT SNOW LOAD, PF 16.5 PSF - SNOW EXPOSURE FACTOR, CE 1.0 - SNOW LOAD IMPORTANCE FACTOR, 1 1.1 - THERMAL FACTOR, CT 1,2 SUPERIMPOSED DEADLOADS: - ROOFS AS NOTED - FLOORS AS NOTED WINDLOADS: - BASIC WIND SPEED 90 MPH - EXPOSURE CATEGORY C ACCORDANCE WITH THE LATEST - IMPORTANCE FACTOR 1.15 ALL STRUCTURAL STEEL: - INTERNAL PRESSURE COEFFICIENT SEE DESIGN DWGS EARTHQUAKE: A992 M, S AND HP SHAPES - - SEISMIC DESIGN CATEGORY B CHANNELS AND ANGLES - - SEISMIC IMPORTANCE FACTOR, 1 1.25 HSS (SQUARE, RECTANGULAR - MAPPED SPECTRAL RESPONSE ACC, SS 0.214 PLATES - - MAPPED SPECTRAL RESPONSE ACC, S1 0.082 HIGH-STRENGTH BOLTS - - SPECTRAL RESPONSE COEFFICIENT, SDS 0.228 TENSION CONTROL BOLTS - - SPECTRAL RESPONSE COEFFICIENT, SD1 0.131 NUTS - - BASIC SEISMIC -FORCE- RESISTING SYSTEM SEE DESIGN DWGS - DESIGN BASE SHEAR SEE DESIGN DWGS - SEISMIC RESPONSE COEFFICIENT, CS SEE DESIGN DWGS - RESPONSE MODIFICATION FACTOR, R SEE DESIGN DWGS - ANALYSIS PROCEDURE USED SEE DESIGN DWGS CONCRETE 28 -DAY STRENGTH: BLOCKING LW - CONCRETE FILL 2500 PSI BOTTOM - STRUCTURAL CONCRETE 4500 PSI BRG - PRESTRESSED ELEMENTS 5000 PSI MAXIMUM REINFORCING STEEL: - ALL BARS ASTM A615, GRADE 60 - WELDED WIRE FABRIC ASTM A185 FOUNDATIONS: - ALLOWABLE BEARING PRESSURE FOR SPREAD FOOTINGS OVER SUBSURFACE PREPARED AS PER SPECIFICATIONS: SEE DESIGN DWGS GENERAL CONDITIONS: ALL STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE ARCHITECTURAL, HVAC, PLUMBING, MECHANICAL, CIVIL, ELECTRICAL AND SHOP DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR SHALL REVIEW AND VERIFY DIMENSIONS SHOWN IN ALL PLANS AND REVIEW ALL FIELD CONDITIONS THAT MAY AFFECT THE INSTALLATION OF THE FACILITY, SHOULD DISCREPANCIES APPEAR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING TO OBTAIN ENGINEER'S CLARIFICATION BEFORE COMMENCING WITH THE WORK. FOR ALL ITEMS EMBEDDED IN OR PASSED THROUGH CONCRETE, THE CONTRACTOR SHALL INITIALLY REFER TO MECHANICAL, HEATING AND VENTILATION DRAWINGS FOR TYPE, SIZE, LOCATION AND SPECIAL INSTALLATION REQUIREMENTS FOR THESE ITEMS. THE CONTRACTOR SHALL TAKE ANY AND ALL NECESSARY MEASURES TO PROTECT EXISTING STRUCTURES FROM DAMAGE WHEN WORKING IN AND AROUND EXISTING STRUCTURES PERFORMING WORK SUCH AS DEMOLITION, FOUNDATION EXCAVATION AND OTHERS. SIZE AND LOCATION OF EQUIPMENT PADS AND ANCHOR BOLTS SHALL BE PER EQUIPMENT MANUFACTURER'S REQUIREMENTS. ANY EQUIPMENT THAT MAY INDUCE VIBRATION TO THE STRUCTURE SHALL BE ADEQUATELY ISOLATED FROM THE STRUCTURES. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSE- WHERE ON THE PROJECT, EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN. STANDARD DETAILS (SHOWN ON SD -1 THROUGH SD -6) APPLY TO ALL SIMILAR SITUATIONS ON THE PROJECT, EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN. EV I DATE I DRWN I CHKD REMARKS GENERAL NOTES ielmemaAs ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI 318 REQUIREMENTS. ALL CONCRETE SHALL BE AIR -ENTRAINED WITH 4500 PSI COMPRESSIVE STRENGTH AT 28 DAYS UNLESS OTHERWISE NOTED. WATER REDUCING AGENT SHALL BE IN ACCORDANCE WITH ASTM C494. ALL CONCRETE SURFACES EXPOSED TO AIR, UNLESS OTHERWISE NOTED IN SPECIFICATIONS, SHALL BE TREATED WITH AN APPROPRIATE CURING COMPOUND AS SOON AS CEMENT FINISHING IS COMPLETED OR FORMS ARE REMOVED. ALL EXPOSED CORNERS OF CONCRETE SHALL HAVE A MINIMUM CHAMFER OF 3�4" UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL FOR THE LOCATION OF CONSTRUCTION JOINTS THAT ARE NOT SHOWN ON THE DRAWING. REINFORCING STEEL: REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 60 REQUIREMENTS. ALL ACCESSORIES SHALL BE IN CONFORMANCE WITH ACI 315 REQUIREMENTS. REINFORCING STEEL SHALL HAVE THE FOLLOWING CLEAR COVER UNLESS OTHER- WISE NOTED: - CONCRETE CAST AGAINST EARTH 3" - FORMED SURFACES IN CONTACT WITH SOIL, SEWAGE, WATER OR EXPOSED TO WEATHER 2" - FORMED SURFACES NOT EXPOSED TO WEATHER OR IN CONTACT WITH SOIL: - SLABS, WALLS AND JOISTS %" - BEAMS AND COLUMNS 1-Y2" LAP SPLICES SHALL BE AS SHOWN ON THE DRAWINGS. FOR LAP SPLICES NOT SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL. THE CONTRACTOR SHALL PREPARE PLACING DRAWINGS AND SCHEDULES IN CONFORMANCE WITH ACI 315 REQUIREMENTS. PRECAST PRESTRESSED CONSTRUCTION: ALL PRECAST PRESTRESSED MEMBERS SHALL BE DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER FOR THE SUPERIMPOSED LOADS SHOWN ON THE DRAWINGS IN CONFORMANCE WITH THE REQUIREMENTS OF APPLICABLE SPECIFICATIONS. EQUIPMENT LOADS OR OTHER LOADING SUCH AS A BRIDGE CRANE SUPPORT LOADS SHALL BE CONSIDERED AS REQUIRED. FLOATATION CONSIDERATION: STRUCTURES WERE DESIGNED TO BE NON -BUOYANT AFTER THE STRUCTURE IS PLACED INTO SERVICE. THEREFORE, THE STRUCTURE MAY BE BUOYANT DURING CONSTRUCTION. THE GENERAL CONTRACTOR SHALL PROTECT ALL STRUCTURES (NEW AND EXISTING) FROM FLOATATION DURING CONSTRUCTION, REGARDLESS OF GROUNDWATER LEVELS, UNTIL STRUCTURES ARE PLACED IN OPERATION. STRUCTURAL STEEL: DIAMETER DESIGN, FABRICATION, ERECTION MATERIALS DESIGN, FABRICATION, ERECTION MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE LATEST AISC SPECIFICATIONS AND DESIGN DRAWINGS. ALL STRUCTURAL STEEL: LLLLLL ALUMINUM EXTRUDED PIPE - W SHAPES - ASTM A992 M, S AND HP SHAPES - ASTM A36 CHANNELS AND ANGLES - ASTM A36 HSS (SQUARE, RECTANGULAR AND ROUND) - ASTM A500 PLATES - ASTM A36 HIGH-STRENGTH BOLTS - ASTM A325 TENSION CONTROL BOLTS - ASTM F1852 NUTS - ASTM A563 HARDENED STEEL WASHER - ASTM F436 ANCHOR RODS - ASTM F1554 THREADED RODS - ASTM A36 ALL PIPE: ASTM A53, GRADE B. THE FABRICATOR SHALL DESIGN AND DETAIL ALL PARTS OF CONNECTIONS NOT FULLY DETAILED ON THE DESIGN DRAWINGS. THE NUMBER OF BOLTS AND OTHER SIMILAR ELEMENTS SHOWN ON THE DRAWING ARE PICTORIAL ONLY. SHOP AND ERECTION DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. WELDED CONNECTIONS SHALL BE IN ACCORDANCE WITH THE LATEST AWS STRUCTURAL WELDING CODE REQUIREMENTS. ELECTRODES SHALL BE E-70XX. DESIGNED BY: M. KARTHIK DRAWN BY: P. DOUGLAS DM_ SHEET CHK'D BY: J. BOGGS Smith CROSS CHK'D BY: J. AREVALO APPROVED BY: J. BOGGS DATE: JANUARY 2018 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 STRUCTURAL ALUMINUM: DIAMETER DESIGN, FABRICATION, ERECTION MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE LATEST "ALUMINUM DESIGN MANUAL" (ADM) SPECIFICATIONS AND DESIGN DRAWINGS. LLLLLL ALL STRUCTURAL ALUMINUM: LLLLLL ALUMINUM EXTRUDED PIPE - ASTM B429, ALLOY 6063 -T6 -OR ALLOY 6061-T6 ALUMINUM EXTRUDED SHAPE - ASTM 8221, ALLOY 6061-T6 ALUMINUM SHEET AND PLATE - ASTM 8209, ALLOY 6061-T6 ALUMINUM ALLOY ROLLED THREAD PLATE - ASTM 8209, ALLOY 6061-T6 ALUMINUM CASTING - ASTM B26/B36M, ALLOY 443.0-F SHOP AND ERECTION DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. WELDED CONNECTIONS SHALL BE IN ACCORDANCE WITH THE LATEST ANS D1.2/D1.2M "STRUCTURAL WELDING CODE - ALUMINUM". WHERE ALUMINUM CONTACTS A DISSIMILAR METAL, APPLY TO THE DISSIMILAR METAL A HEAVY BRUSH COAT OF ZINC -CHROMATE PRIMER FOLLOWED BY TWO COATS OF ALUMINUM METAL PAINT. ALUMINUM WHERE ALUMINUM CONTACTS MASONRY OR CONCRETE, APPLY A HEAVY COAT OF BITUMASTIC OR EPDXY PAINT. ALTERNATE (ING) CONCRETE CRACK REPAIR: 1. CRACKS ON HORIZONTAL SURFACES SHALL BE REPAIRED BY GRAVITY FEEDING CRACK SEALANT INTO CRACKS PER MANUFACTURER'S RECOMMENDATIONS. IF CRACKS ARE LESS THAN �'' IN THICKNESS THEY SHALL BE PRESSURE INJECTED. 2. CRACKS ON VERTICAL SURFACES SHALL BE REPAIRED BY PRESSURE INJECTING CRACK SEALANT THROUGH VALVES SEALED TO SURFACE WITH CRACK REPAIR EPDXY ADHESIVE PER MANUFACTURER'S RECOMMENDATIONS. MODIFICATION AND REPAIR TO EXISTING CONCRETE NOTES: SEE SPECIFICATION SECTION 03740 FOR EXPLANATION OF CONCRETE REMOVAL METHODS, CONNECTION METHODS AND MATERIALS USED. AT LIMITS OF CONCRETE REMOVAL WHERE SURFACE WILL REMAIN EXPOSED MAKE SURFACE SMOOTH BY SAW CUTTING OR GRINDING. COAT ENTIRE SURFACE WITH COATING TO PROTECT EXPOSED REBAR. IF CONCRETE IS REMOVED BEYOND LIMITS, REBUILD TO DESIRED LIMITS W/REPAIR MORTAR AND FINISH SMOOTH. COAT SURFACE W/PROTECTIVE COATING WHERE THERE IS LESS THAN 2" OF COVER OVER REBAR. CONNECTION METHODS ARE DEFINED IN SPECIFICATION SECTION 03740. METHOD A - CEMENT SLURRY BOND METHOD B - ADHESIVE BOND METHOD C - EMBEDDED DOWELS (EMBED REBAR 10 DIAMETERS & SMOOTH BAR 15 DIAMETERS) METHOD D - COMBINATION OF METHODS B & C GEOTECHNICAL REPORT: GEOTECHNICAL DESIGN REPORT ENTITLED, REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL EVALUATION, PREPARED FOR THE CITY OF GREENSBORO, NORTH CAROLINA BY SUMMIT DESIGN AND ENGINEERING SERVICES, PLLC DATED MARCH 2017. GRATING SPAN DIRECTION DIAMETER WATERSTOP (SEE SPECS INTERIOR FOR TYPE AND MATERIALS) NUMBER EARTH FILL LLLLLL & LLLLLL JT LLLLLL @ o�O�Oo�0 UNDISTURBED EARTH o AB o 0 0 LG LENGTH CONCRETE ABOVE CONCRETE MASONRY LONG LEG HORIZONTAL STEEL ADDITIONAL STRUCTURAL FILL LONG LEG VERTICAL CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF ALUMINUM GRATING CHECKERED PLATE GRANULAR FILL SAN D GROUT ABBREVIATIONS 0 DIAMETER INT INTERIOR # NUMBER INV INVERT & AND JT JOINT @ AT KO KNOCKOUT AB ANCHOR BOLT LG LENGTH ABV ABOVE LLH LONG LEG HORIZONTAL ADDL ADDITIONAL LLV LONG LEG VERTICAL AL ALUMINUM LNTL LINTEL ALT ALTERNATE (ING) LOC LOCATION/LOCATED APPROX APPROXIMATELY LONG. LONGITUDINAL B TO B BACK TO BACK LP LOW POINT BEV BEVEL (ED) LT LEFT BLK BLOCKING LW LIGHTWEIGHT BOT BOTTOM MAS MASONRY BRG BEARING MAX MAXIMUM CIRC CIRCUMFERENTIAL MB MACHINE BOLTS CJ CONSTRUCTION JOINT MCJ MASONRY CONTROL JOINT CL CENTERLINE MIN MINIMUM CLJ CONTROL JOINT MO MASONRY OPENING CLR CLEAR NF NEAR FACE CMU CONCRETE MASONRY UNITS NSG NON -SHRINK GROUT COL COLUMN OC ON CENTER CONC CONCRETE OD OUTSIDE DIAMETER CONN CONNECTION OF. OUTSIDE FACE CONT CONTINUOUS OPNG OPENING CPLG COUPLING OPP OPPOSITE CRS COURSE (S) OPT OPTIONAL CSK COUNTERSINK PJF PREMOLDED JOINT FILLER CTR CENTER(ED) PLYWD PLYWOOD d PENNY PREFAB PREFABRICATED DET DETAIL PROJ PROJECTION DIA DIAMETER PVMT PAVEMENT DIAG DIAGONAL R RISERS) DIR DIRECTION RAD RADIUS DL DEAD LOAD RC REINFORCED CONCRETE DO. DITTO REF REFERENCE/REFER DWG DRAWING REINF REINFORCE (D, ING) DWL DOWEL REQD REQUIRED EB EXPANSION BOLT REV REVISION EF EACH FACE RLG RAILING EL ELEVATION RO ROUGH OPENING EQ EQUAL (LY) RT RIGHT ES EACH SIDE SCJ SLAB CONTROL JOINT EW EACH WAY SECT SECTION EXST EXISTING SP SPACE (S, ED) EXP JT EXPANSION JOINT SQ SQUARE EXT EXTERIOR SS STAINLESS STEEL Vc CONCRETE COMPRESSION STRESS STD STANDARD Vm MASONRY PRISM STRESS STIF STIFFENER FAB FABRICATE (OR, ED) STIR. STIRRUP (S) FDN FOUNDATION SYM SYMMETRICAL FF FAR FACE T TREAD(S) FHMS FLATHEAD MACHINE SCREW T/ TOP OF FHWS FLATHEAD WOOD SCREW T&B TOP AND BOTTOM FL FLOOR TF TOP FACE FRP FIBERGLASS REINFORCED PLASTIC THD THREADED FTG FOOTING TOC TOP OF CONCRETE GALV GALVANIZED TRNSV TRANSVERSE GLB GLASS BLOCK TYP TYPICAL GR GRADE UNO UNLESS NOTED OTHERWISE GRTG GRATING VB VAPOR BARRIER H HIGH VIF VERIFY IN FIELD HAS. HEADED ANCHOR STUD W WIDE HDR HEADER W/ WITH HOR HORIZONTAL W/0 WITHOUT HP HIGH POINT WP WORKING POINT ID INSIDE DIAMETER WSTP WATERSTOP 1. E. INVERT ELEVATION WWF WELDED WIRE FABRIC IF. INSIDE FACE ABBREVIATION NOTES: 1. ABBREVIATIONS AND DESIGNATIONS FOR STEEL MEMBERS MAY BE FOUND IN THE CURRENT MANUAL OF STEEL CONSTRUCTION BY AISC. 2. ABBREVIATIONS OF TECHNICAL SOCIETIES AND TRADE ASSOCIATIONS MAY BE FOUND IN THE SPECIFICATIONS. 3. WELDING SYMBOLS AND ABBREVIATIONS MAY BE FOUND IN AWS 2.4. DEMOLITION NOTE: ABBREVIATIONS SHOWN ON THIS SHEET APPLY ONLY TO THE BEDROCK S -SHEETS NOTE: REFER TO CIVIL, MECHANICAL & ELECTRICAL SHEETS FOR MISCELLANEOUS SITE CONCRETE AND EQUIPMENT FOUNDATIONS. STRUCTURAL GENERAL NOTES AND ABBREVIATIONS �N CAR 04 o o -4, ��'•oNGINE��°'� ,S„�e�' PROJECT NO. 6145-217155 FILE NAME: SOO1 STNT. DWG SHEET NO. S-1 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION / 3 G > 0 0 e 0 z 0 \ N E 0 / \ 2 LLJ\ 3 4 0 / \ 0 / \ \ 0 3 ± 3 s 0 x \ e 0 c / < E 3 0 / 0 ± * z 3 c G e 0 m 0 e 0 z c / c z < / 5 e > c 0 s 0 / / E 0 3 3 c / s \ / 2 / cn \ / / ƒ $ 2 0 a E 0 3 o 0 0 / / / > � \ Z3 < \ 0 « 7 @ / 0 0 rya - m m 2 c c \ 0 \ 3 $ � / § ® e / PC) � / / / 0 g a � \ U) 00/� 0 \ % 0 / / / /00%/o ®� G / / u r E 3 3 a Q n / a c a-\/ e E / [ / a w < / 0 1--\ a_ -0 § C / �$/>s >»d0 ƒ / 2 / 6 C) =) $ \ \ \ / FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION / 3 2 > c G s 0 z 0 / x y c ± \ < 2 / z * g / \ c / k \ e / 3 E e s ± 0 y f 3 0 c / < E I c s a 0 $ z / a e g e 3 0 R \ z s I < c / / 3 V) > 0 C) s c / 3 s E 0 3 E u / u / z 3 3 e / \ \ / ƒ \ 2 0 r E 0 3 U) / 2 - / / / ry / 2 < \ 0 / \ 0 \ 3 .2 ± 3 � m 2 c s m c > a 0L. ry / ® n k \ � » 7 0 / c � a � f § 00 z e\u \ \ \f g/ G /c �a/3g rEa2e a p E ¥ e 04 � 0 % » \<\ o 0 \ / Uc1r)0 / ) \ s >�/o LL- Cn u!os « q } 2 ƒ @ ƒ FINAL DRAWING - F O R REVIEW PURPOSES O N LY - NOT RELEASED F O R CONSTRUCTION ± F-- 0 0 0 e 0 z 0 \ w y 0 2 \ < 3 / e m x c / \ 0 / 4 \ s 0 3 2 3 g / 0 y Z < 3 0 s ry m I 0 / 0 ƒ z 3 s g D s m 0 + \ Z s \ c f ± e > V) > C) O FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION z LLJ/ z 4 0 / \ 0 / k \ s / e E z e 3 0 y 3 < z c e ry c 3 0 \ 0 / Z y e e a s @ c + \ 2 s ƒ 0 / / 3 3 > c 0 LL 0 / I c m 0 3 E s � s / z 3 3 LLJ \ / b / ƒ 0 0 2 2 0 � G e Z e - C) / 0 3 % S / / 9 / / # / o 0 2 ¥ E 0 m 2 c c (n c Q) 0 z / n C \ 0 \ \ 2 o 2 0 2 / < 0 / \��/\ >g k$/0 E %/2 �§!,s \ / � / / �R: / % % y E / ( o e < f 0 \ / § \ �\\>s 0 3. a- ƒ/®/ 2m/Gg \ 2 \ g 04 ƒ FINAL DRAWING - F O R REVIEW PURPOSES O N LY - NOT RELEASED F O R CONSTRUCTION 8 9 70 cin ° 10" t 71.1 �... , W 0 z,.----------------------------------- O I. N 1�, t ---------------------------r----------- I .. I I �.•.. i I Q i LO I I I Q i - - - - - 1 1 W I 2'-0" SQ CONIC PIER (Np nc A) 16'-0" 9 10 EXISTING BUILDING _____________________________----------_------------ t I Ir i I I W10x33 (TYP) KNEE BRCG L4x4XY4" (TYP) ----------------------- -- ---------- I W12x45 I10 (NP) W8x24 (TYP) , ffT TOS EL 722.00 NEW CLAP A D-4 (TYP) HB HORZ BRCG L4X4XY4", 2" BELOW TOS (TYP UNO) 0 I in N A 11 D-4 (TYP) w HA a U) W U) - VERT BRCG L4X4XY4", (TYP 2 LOCS) wir%u A I -I I CLARIFIER FOUNDATION PLAN 1/4" = 1'-0" TOC EL 714.00 q � co LO •. .d ° I < t- 2'-0„ (TYP) 12'-0" - W8x24 L4X4XY4" (TYP) C D-4 (TYP) VD \ \ \ ell B\<II -4 (TYP) T !d #6@10" T&B, EW C ° v Id PIPE RACK FRAMING PLAN 1/4" = 1'-0" — — — — — — — W8x24TYP (TYP) TOS EL 722.00 H I - D-4 (TYP) C W1 2x45 -. VB KL— —4 COL W10x33 KNEE BRCG (TYP) _ i I I L4x4xY4" (TYP) I FOR BASE PLATE, ANCHORAGE 00 COL W10x33 ` ------J AND PIER SIZE & REINF SEE (NP) DETAIL F&G/ SD -4 (TYP) SEE DETAIL F/ SD -4 FOR BASE PLATE AND ANCHOR DETAILS i� l I N TOC EL 714.00 1 © Ld D- (TYP) —L #4 TIES 1 12" NCDOT #57 STONE a • O DESIGN REMOVE EXIST SLAB GEOTEXTILE O a .: i 7 -0" i TO ACCOMMODATE 12'-0" (TYP) SECTION z = 40% OF PIPE OPERATING t NEW FOUNDATION 3/8" = 1'-0" W a m i O DESIGNED BY: w DM_ 1" PJF W/ SEALANT 16'-0" E = 10 PSI (ASSUMED) 0 DRAWN BY: ". r ALL AROUND TYP I U z .. I wIr--------------------------------------------- PER TABLE 15.4-1, ASCE 7-05 Q ------------------------------- ---- ------------------------O 0 RESPONSE MODIFICATION FACTOR, R: z I EQUIVALENT LATERAL FORCE APPROVED BY: J. BOGGS I— REMARKSDATE: 2500 PSF JANUARY 2018 NC F-1255 ALL STRUCTURES O U w 0 o W HP EL 710.00 SLOPE ---�- LP EL 709.50 z 0 '• I � Q w I o I �-- EXISTING RETAINING WALL L� o- Q � w ���• :•� _ :r` .. ... � r 'fir. .. •.. -. . _� _ �, i_ •' tr•�- ...}! _. •_ w .� :�� .. � I. 2'-0" SQ CONIC PIER (Np nc A) 16'-0" 9 10 EXISTING BUILDING _____________________________----------_------------ t I Ir i I I W10x33 (TYP) KNEE BRCG L4x4XY4" (TYP) ----------------------- -- ---------- I W12x45 I10 (NP) W8x24 (TYP) , ffT TOS EL 722.00 NEW CLAP A D-4 (TYP) HB HORZ BRCG L4X4XY4", 2" BELOW TOS (TYP UNO) 0 I in N A 11 D-4 (TYP) w HA a U) W U) - VERT BRCG L4X4XY4", (TYP 2 LOCS) wir%u A I -I I CLARIFIER FOUNDATION PLAN 1/4" = 1'-0" TOC EL 714.00 q � co LO •. .d ° I < t- 2'-0„ (TYP) 12'-0" - W8x24 L4X4XY4" (TYP) C D-4 (TYP) VD \ \ \ ell B\<II -4 (TYP) T !d #6@10" T&B, EW C ° v Id PIPE RACK FRAMING PLAN 1/4" = 1'-0" — — — — — — — W8x24TYP (TYP) TOS EL 722.00 H I - D-4 (TYP) C W1 2x45 -. VB KL— —4 COL W10x33 KNEE BRCG (TYP) _ i I I L4x4xY4" (TYP) I FOR BASE PLATE, ANCHORAGE 00 COL W10x33 ` ------J AND PIER SIZE & REINF SEE (NP) DETAIL F&G/ SD -4 (TYP) SEE DETAIL F/ SD -4 FOR BASE PLATE AND ANCHOR DETAILS i� l I N TOC EL 714.00 1 © Ld D- (TYP) —L #4 TIES 1 12" NCDOT #57 STONE a • O DESIGN W J GEOTEXTILE O a UNDISTURBED Ed (TYP) SECTION z = 40% OF PIPE OPERATING 0 3/8" = 1'-0" W a m D DESIGNED BY: w DM_ m = 10 PSI (ASSUMED) 0 DRAWN BY: P. DOUGLAS DESIGNED AS OPEN STRUCTURE, LATTICE FRAME WORK BASED ON FIGURE 6-21, ASCE 7-05 O z SHEET CHK'D BY: w Smith PER TABLE 15.4-1, ASCE 7-05 Q CROSS CHK'D BY: J. AREVALO RESPONSE MODIFICATION FACTOR, R: z Q EQUIVALENT LATERAL FORCE APPROVED BY: J. BOGGS I— REMARKSDATE: 2500 PSF JANUARY 2018 NC F-1255 ALL STRUCTURES O U w 0 W o_ 0 w w o- Q z w � w = 3 � o J W IZ Q a_ � a_o 0 W o j o z o - w U o % w v cn 0 J Q U z O c cn It W C) L O a- a a 01 m 2 z o W a o U � 0 L Elf U) w cn d C z O W I'7 L6 0 z u In Q to orn N N C21 :W2 wU 0 (D w o E J (n N H W 3r.I C �I Y O J �-' U Q W 0O Y � = :�E D o _0 E�o O U 0 w u > 3 UO 0 6rn j �w w n N :D REV. DATE DRWN CHKD X _j Q. O N0. 2'-0" SQ CONIC PIER (Np nc A) 16'-0" 9 10 EXISTING BUILDING _____________________________----------_------------ t I Ir i I I W10x33 (TYP) KNEE BRCG L4x4XY4" (TYP) ----------------------- -- ---------- I W12x45 I10 (NP) W8x24 (TYP) , ffT TOS EL 722.00 NEW CLAP A D-4 (TYP) HB HORZ BRCG L4X4XY4", 2" BELOW TOS (TYP UNO) 0 I in N A 11 D-4 (TYP) w HA a U) W U) - VERT BRCG L4X4XY4", (TYP 2 LOCS) wir%u A I -I I CLARIFIER FOUNDATION PLAN 1/4" = 1'-0" TOC EL 714.00 q � co LO •. .d ° I < t- 2'-0„ (TYP) 12'-0" - W8x24 L4X4XY4" (TYP) C D-4 (TYP) VD \ \ \ ell B\<II -4 (TYP) T !d #6@10" T&B, EW C ° v Id PIPE RACK FRAMING PLAN 1/4" = 1'-0" — — — — — — — W8x24TYP (TYP) TOS EL 722.00 H I - D-4 (TYP) C W1 2x45 -. VB KL— —4 COL W10x33 KNEE BRCG (TYP) _ i I I L4x4xY4" (TYP) I FOR BASE PLATE, ANCHORAGE 00 COL W10x33 ` ------J AND PIER SIZE & REINF SEE (NP) DETAIL F&G/ SD -4 (TYP) SEE DETAIL F/ SD -4 FOR BASE PLATE AND ANCHOR DETAILS i� l I N TOC EL 714.00 1 © Ld D- (TYP) —L #4 TIES 1 12" NCDOT #57 STONE a • ° ° Q, DESIGN <.° GEOTEXTILE FABRIC a UNDISTURBED Ed (TYP) SECTION 1 = 40% OF PIPE OPERATING 3/8" = 1'-0" - a LIVE LOAD FLOW VELOCITY DESIGNED BY: S. DINESH DM_ \//\11X/\11X/\1X� 4. A e q,l #6@10" T&B, EW Ad• `r) q e =1 I I=1 I I=1 I I1I I=1 I' Boz NON—WOVEN DESIGN LOAD DATA GEOTEXTILE FABRIC a UNDISTURBED EARTH (TYP) SECTION 1 = 40% OF PIPE OPERATING 3/8" = 1'-0" - THRUST LOAD FROM PIPE CONSIDERED AS LIVE LOAD FLOW VELOCITY DESIGNED BY: S. DINESH DM_ = 10 PSI (ASSUMED) WIND: DRAWN BY: P. DOUGLAS DESIGNED AS OPEN STRUCTURE, LATTICE FRAME WORK BASED ON FIGURE 6-21, ASCE 7-05 SEISMIC: SHEET CHK'D BY: J. BOGGS Smith PER TABLE 15.4-1, ASCE 7-05 SEISMIC RESPONSE COEFFICIENT, CROSS CHK'D BY: J. AREVALO RESPONSE MODIFICATION FACTOR, R: 3.25 ANALYSIS PROCEDURE USED: EQUIVALENT LATERAL FORCE APPROVED BY: J. BOGGS 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 Tel: (919) 325-3500 REMARKSDATE: 2500 PSF JANUARY 2018 NC F-1255 Q0 0 e• DESIGN LOAD DATA ea SELF -STRAINING LOAD (T) a C .. 5'-0" Q m 25'-0" 1,_0" NOTES: 1. HA & HB INDICATES HORIZONTAL BRACING CONNECTION, FOR DETAILS SEE STANDARD DETAIL DWG SD -4. 2. FVAI VB & 1VD1 INDICATES VERTICAL BRACING CONNECTION, FOR DETAILS SEE STANDARD DETAIL DWG SD -4. 3. REFER SD -4 FOR ALL STANDARD STEEL CONNECTIONS. 4. STEEL BOLTS, NUTS AND WASHERS SHAL BE ASTM A325, ANCHOR BOLT SHALL BE ASTM F1554 A36 AND SHALL BE MECHANICALLY GALVANIZED. 5. ALL STEEL FRAMING MEMBERS SHALL BE EPDXY COATED IN ACCORDANCE WITH DIVISION 9 OF THE SPECIFICATION. PIPES NOT SHOWN FOR CLARITY. SEE PROCESS/MECH DWG I I I 20'-G" TOPIWALL EL 719.5 EL VARIES FROM 7 10. 0 TO 709.5 EL VARIES FROM ') 719.5 TO 711.00 EL VARIES #6@10" T&B, EW TOC EL 714.00 A. A a 1,_4„ SEE SECTION 1/- FOR ADD'L INFO 1" PJF W SEALAN SECTION t2 3/8" = 1'-0" - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF 10" 41 DESIGN LOAD DATA SELF -STRAINING LOAD (T) d C .. DIFFERENTIAL TEMPERATURE CONSIDERED FOR STEEL FRAMING MEMBERS = 100' F FRICTION EXPANSION FORCE DUE TO PIPE ON STEEL MEMBER = 40% OF PIPE OPERATING LOAD CONSIDERED THRUST LOAD FROM PIPE CONSIDERED AS LIVE LOAD FLOW VELOCITY = 5 FT/S (ASSUMED) FLUID PRESSURE = 10 PSI (ASSUMED) WIND: DESIGNED AS OPEN STRUCTURE, LATTICE FRAME WORK BASED ON FIGURE 6-21, ASCE 7-05 SEISMIC: BASIC SEISMIC FORCE RESISTING SYSTEM: STEEL ORDINARY CONCENTRICALLY BRACED FRAMES PER TABLE 15.4-1, ASCE 7-05 SEISMIC RESPONSE COEFFICIENT, Cs 0.071 RESPONSE MODIFICATION FACTOR, R: 3.25 ANALYSIS PROCEDURE USED: EQUIVALENT LATERAL FORCE PROCEDURE DESIGN BASE SHEAR: Cs X W ALLOWABLE BEARING PRESSURE: 2500 PSF REFER TO SHEET S-1 FOR DESIGN LOAD DATA THAT IS THE SAME FOR ALL STRUCTURES PIPES NOT SHOWN FOR CLARITY. SEE PROCESS/MECH DWG I I I 20'-G" TOPIWALL EL 719.5 EL VARIES FROM 7 10. 0 TO 709.5 EL VARIES FROM ') 719.5 TO 711.00 EL VARIES #6@10" T&B, EW TOC EL 714.00 A. A a 1,_4„ SEE SECTION 1/- FOR ADD'L INFO 1" PJF W SEALAN SECTION t2 3/8" = 1'-0" - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF 10" 2'-10" 1" PJF H PIPE RACK PLANS, SECTIONS AND DETAILS rrrrrNtuunUryq,, tH CARO • 3 �• �NGINEF'Q'' G S PROJECT NO. 6145-217155 FILE NAME: S006PRPL.DWG SHEET NO. S-6 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION 41 d a q o° d C .. ° . 2'-10" 1" PJF H PIPE RACK PLANS, SECTIONS AND DETAILS rrrrrNtuunUryq,, tH CARO • 3 �• �NGINEF'Q'' G S PROJECT NO. 6145-217155 FILE NAME: S006PRPL.DWG SHEET NO. S-6 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION _ 1E 0 U w 0 z 0 Q N ry O _ D Q z w r - Li _ D O _ t-- 0 Li 0 ry ry Li O z Q 0 w 1- m Q m ry 0 w J 0 _ z D w Ln III m 0 O z Li ry a 0 z Q cn 0 U 0 y w m 0 ry m w T w ry Q z w ry w _ 0 w 3- ry -v 0 n a � 0 � U o z 0 U) C) o > o Q w U cf) O J / z 0 U 0 0 I- 0 Qom~ NW Q U i w U- 4 U) 0 1h 2. SIZE AND SPACING OF BAR TO MATCH WALL/BEAM REINFORCEMENT 0 >- m • • a b\ O co 0 w #4@12" DOWELS AT 0 " z > 0 3. FOR ADDITIONAL BARS AT CORNERS AND INTERSECTIONS I- m a a' z a> a� CD `n N N w ~ ( w 0 4. FOR DOWEL SIZE AND w V) Q U m V) V) U WALL CORNER REINFORCING DETAIL rA NTS - EXTEND SLAB REINFORCEMENT TO 1j" CLEAR AT JOINT—\ M 0 A CLASS "B" CASE 1 TENSION LAP -E NOTE C`1-(' AIl1Tr 9 INITIAL CAST — i Q L---- ----�� d r.-- --------�--' WALL INTERSECTION REINFORCING DETAIL rB NTS - CONTINUOUS REINFORCEMENT OR LAP AS SHOWN #4@12" EW SEE NOTE 1 Q � Z Z O 3: U w o O z ft� O OL J z 3 0 O = SEE NOTE 4 SEE NOTE 1 a \ 6" PVC WATERSTOP ROUGHENED SURFACE • FULL AMPLITUDE SEE NOTE 1 N � a a a a a a a WALL BASE CONSTRUCTION JOINT DETAIL rc NTS - ANCHOR BOLT BASE PLATE 3" MIN BY EQUIPMENT MANUFACTURER J MIN 1 " GROUT x a 0 tY Uj OUj� :D w 0 U z ofZw wft� _ 0 Qom~ NW -1 F -0L` CD w D '— 4 zCD 2. SIZE AND SPACING OF 3xOD 3xOD CONDUIT IN SLAB OR WALL DETAIL ri NTS j - AL I D MAX OD=T/3 MAX a NOTES: a) m z 0 < 1. BASIC SLAB/WALL/BEAM REINFORCING AS SHOWN ON DESIGN DRAWINGS 4 z 2. SIZE AND SPACING OF BAR TO MATCH WALL/BEAM REINFORCEMENT GROUTED SLEEVE AS SHOWN ON DESIGN • • a a #4@12" DOWELS AT " ANCHOR BOLT SIZE, - 3. FOR ADDITIONAL BARS AT CORNERS AND INTERSECTIONS 4;i a a' PERIMETER BEND 12" NUMBER AND LOCATION ~ ( w 4. FOR DOWEL SIZE AND 6" PVC WATERSTOP. BOND AS REQUIRED MINI -TO BE SUPPLIED BY TO INTERSECTING WATERSTOP (TYP) EQUIPMENT 3" CLEAR 1-8" KEYWAY MANUFACTURER DIMENSIONS OF PAD AS REQUIRED TO SUIT EQUIPMENT (4" MINIMUM NOTE: 2ND POUR SHALL BE 24 HOURS AFTER INITIAL POUR. HEIGHT UNLESS PAD IS CAST INTEGRALLY WITH SLAB) BASE/ELEVATED SLAB CONSTRUCTION JOINT EQUIPMENT PAD DETAIL rF DETAIL rG NTS - NTS - 3xOD 3xOD CONDUIT IN SLAB OR WALL DETAIL ri NTS j - AL I D MAX OD=T/3 MAX E0j�� a- J Q 3 JZ r7 U a_ Q w C14 V) 0 N F=-- �I .a < cf) 0 0 �0 �— > Q �L0 v 0 6 m U) 3 `'4 w NO DATE DRWN CHKD REMARKS x -1 a O� FLAT TEE VERTICAL TEE #4 INITIAL CAST 3" CLEAR TYP - C1 CLASS "B" CASE 1 TENSION LAP n NO CONTINUOUS REIN- FORCEMENT OR LAP AS SHOWN 4 d Q 6" PVC WATERSTOP. BOND TO 1- " KEYWAY INTERSECTING WATERSTOP. WHERE SHOWN TERMINATE WATERSTOP AND KEYWAY 8" BELOW TOP OF WALL NOTE: 2ND POUR SHALL BE 24 HOURS AFTER INITIAL POUR WALL CONSTRUCTION JOINT DETAIL D NTS - 11" TREAD 1" EMBEDDED SAFETY TREAD DETAIL rH NTS - FIELD SPLICE NOTES: GROUT FILLET 1. FACTORY FABRICATED INTERSECTION PIECES. 2. USE THERMOSTATICALLY CONTROLLED SPLICING IRON TO WELD INTERSECTION PIECE TO FIELD DETAILKOR PIECE SPLICING IRON SHALL BE DESIGNED SPECIFICALLY FOR THE WATERSTOP BEING SPLICED. NTS - 3. USE INDIRECT SOURCE OF HEAT ONLY. USE OF DIRECT FLAME IS SPECIFICALLY PROHIBITED. 4. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR ALL SPLICING AND WELDING REQUIREMENTS. DESIGNED BY: M. KARTHIK DRAWN BY: P. DOUGLAS DM_ SHEEP CHK'D BY: J. BOGGS Smith CROSS CHK'D BY: J. AREVALO J. BOGGS 5400 Glenwood Avenue, Suite 400 APPROVED BY: Raleigh, NC 27612 1 Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 PVC WATERSTOP SPLICE AND JOINTS DETAIL L NTS - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORN E WRF ALUMINUM SAFETY TREADS WITH ABRASIVE WEARING SURFACE 4" WIDE x 6" SHORTER THAN STAIR ALUMINUM WING ANCHORS OR EQUAL C� W w U � �z Dw Qw#4@12' :2 " FOR NEW O CONCRETE ww � a✓ PER MANUFACTURER REQUIREMENTS ROUGHENED JOINT DRILL AND EPDXY GROUT #4@12" AROUND PERIMETER INTO EXISTING CONCRETE COMGACTEDCLEAN ROUGHENED SURFACE ON EXISTING CONCRETE SEE SPECIFICATION SECTION 03740 FOR MODIFICATION AND REPAIR DETAILS HOUSEKEEPING PAD FOR NEW OR EXISTING SLAB DETAIL rE� NTS - SLAB OR F,,,,T,.,,. AA /19 n" PIPE ENCASEMENT DETAIL rm NTS - #4 (NP) MINIMUM LAP PIPE ENCASEMENT NOTES: 1. ALL PIPE SHALL BE PRESSURE TESTED BEFORE CONCRETE PLACEMENT. 2. ALL BELOW GRADE PIPES SHALL BE SUPPORTED ON CONCRETE BLOCKS PRIOR TO CASTING OF CONCRETE BEDDING. SIZE AND SPACING OF CONCRETE BLOCK SUPPORTS SHALL BE PER PIPE MANUFACTURER. 3. FOR ALL PIPES 12 -INCH DIAMETER AND LARGER, ENCASEMENT SHALL BE CAST IN TWO POURS. INITIAL CAST SHALL BE CURED FOR 12 HR. BEFORE CASTING THE SECOND POUR. 4. THE DEPTH OF THE INITIAL POUR SHALL BE SELECTED TO PREVENT FLOTATION OF THE PIPE. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT FLOTATION OF THE PIPE DURING CONCRETING. 5. ENCASE ALL PIPES BELOW SLABS AND FOOTINGS. EXTEND ENCASEMENT 5'-0" BEYOND EDGE OF SLAB OR FOOTING. 6. ENCASEMENT FOR 6" DIAMETER AND SMALLER PIPES SHALL BE 6" MINIMUM. FOR PIPE DIAMETERS GREATER THAN 6", ENCASEMENT SHALL BE 12" MINIMUM. 7. MAINTAIN MINIMUM COVER FOR LAPS FOR PIPES SMALLER THAN 6" DIAMETER. STANDARD DETAILS PROJECT NO. 6145-217155 FILE NAME: SDO1 STDT. DWG SHEET NO. SD -1 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION NOTES: a) m z 0 < 1. BASIC SLAB/WALL/BEAM REINFORCING AS SHOWN ON DESIGN DRAWINGS i z 2. SIZE AND SPACING OF BAR TO MATCH WALL/BEAM REINFORCEMENT AS SHOWN ON DESIGN DRAWINGS " 0 3. FOR ADDITIONAL BARS AT CORNERS AND INTERSECTIONS 4;i w o SEE DESIGN DRAWINGS 6 E u-) 0�w ~ ( w 4. FOR DOWEL SIZE AND SPACING SEE DESIGN DRAWINGS E0j�� a- J Q 3 JZ r7 U a_ Q w C14 V) 0 N F=-- �I .a < cf) 0 0 �0 �— > Q �L0 v 0 6 m U) 3 `'4 w NO DATE DRWN CHKD REMARKS x -1 a O� FLAT TEE VERTICAL TEE #4 INITIAL CAST 3" CLEAR TYP - C1 CLASS "B" CASE 1 TENSION LAP n NO CONTINUOUS REIN- FORCEMENT OR LAP AS SHOWN 4 d Q 6" PVC WATERSTOP. BOND TO 1- " KEYWAY INTERSECTING WATERSTOP. WHERE SHOWN TERMINATE WATERSTOP AND KEYWAY 8" BELOW TOP OF WALL NOTE: 2ND POUR SHALL BE 24 HOURS AFTER INITIAL POUR WALL CONSTRUCTION JOINT DETAIL D NTS - 11" TREAD 1" EMBEDDED SAFETY TREAD DETAIL rH NTS - FIELD SPLICE NOTES: GROUT FILLET 1. FACTORY FABRICATED INTERSECTION PIECES. 2. USE THERMOSTATICALLY CONTROLLED SPLICING IRON TO WELD INTERSECTION PIECE TO FIELD DETAILKOR PIECE SPLICING IRON SHALL BE DESIGNED SPECIFICALLY FOR THE WATERSTOP BEING SPLICED. NTS - 3. USE INDIRECT SOURCE OF HEAT ONLY. USE OF DIRECT FLAME IS SPECIFICALLY PROHIBITED. 4. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR ALL SPLICING AND WELDING REQUIREMENTS. DESIGNED BY: M. KARTHIK DRAWN BY: P. DOUGLAS DM_ SHEEP CHK'D BY: J. BOGGS Smith CROSS CHK'D BY: J. AREVALO J. BOGGS 5400 Glenwood Avenue, Suite 400 APPROVED BY: Raleigh, NC 27612 1 Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 PVC WATERSTOP SPLICE AND JOINTS DETAIL L NTS - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORN E WRF ALUMINUM SAFETY TREADS WITH ABRASIVE WEARING SURFACE 4" WIDE x 6" SHORTER THAN STAIR ALUMINUM WING ANCHORS OR EQUAL C� W w U � �z Dw Qw#4@12' :2 " FOR NEW O CONCRETE ww � a✓ PER MANUFACTURER REQUIREMENTS ROUGHENED JOINT DRILL AND EPDXY GROUT #4@12" AROUND PERIMETER INTO EXISTING CONCRETE COMGACTEDCLEAN ROUGHENED SURFACE ON EXISTING CONCRETE SEE SPECIFICATION SECTION 03740 FOR MODIFICATION AND REPAIR DETAILS HOUSEKEEPING PAD FOR NEW OR EXISTING SLAB DETAIL rE� NTS - SLAB OR F,,,,T,.,,. AA /19 n" PIPE ENCASEMENT DETAIL rm NTS - #4 (NP) MINIMUM LAP PIPE ENCASEMENT NOTES: 1. ALL PIPE SHALL BE PRESSURE TESTED BEFORE CONCRETE PLACEMENT. 2. ALL BELOW GRADE PIPES SHALL BE SUPPORTED ON CONCRETE BLOCKS PRIOR TO CASTING OF CONCRETE BEDDING. SIZE AND SPACING OF CONCRETE BLOCK SUPPORTS SHALL BE PER PIPE MANUFACTURER. 3. FOR ALL PIPES 12 -INCH DIAMETER AND LARGER, ENCASEMENT SHALL BE CAST IN TWO POURS. INITIAL CAST SHALL BE CURED FOR 12 HR. BEFORE CASTING THE SECOND POUR. 4. THE DEPTH OF THE INITIAL POUR SHALL BE SELECTED TO PREVENT FLOTATION OF THE PIPE. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT FLOTATION OF THE PIPE DURING CONCRETING. 5. ENCASE ALL PIPES BELOW SLABS AND FOOTINGS. EXTEND ENCASEMENT 5'-0" BEYOND EDGE OF SLAB OR FOOTING. 6. ENCASEMENT FOR 6" DIAMETER AND SMALLER PIPES SHALL BE 6" MINIMUM. FOR PIPE DIAMETERS GREATER THAN 6", ENCASEMENT SHALL BE 12" MINIMUM. 7. MAINTAIN MINIMUM COVER FOR LAPS FOR PIPES SMALLER THAN 6" DIAMETER. STANDARD DETAILS PROJECT NO. 6145-217155 FILE NAME: SDO1 STDT. DWG SHEET NO. SD -1 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION S 0 U w O z O a N_ w O S Q Z W r- cr- 'S W S O S H U W O W' n W S O Z Q ry O w ry Q ry O w J O S 'S z a w w m O O z III ry Q 0 z Q S 0 U W O rr w a_ O ry W w S w rK Q z w ry w S 0 w rn Q 3 ry -a O O � F- O N U N Z O — � I.aJ / U D � D ry Q W U cn O J / Z v O_ .� cn U W 0 W L- O U) Of W It O / m O 0 �p W M > z O ry p n N v V) z a� (D L0w <n r) ci a� z M Q V) 04 z rniiw ,� \.- >� n`� Wo jwo E w �~ cnw o J F cn �a3 I -- Li N F_ O �I O n W u > Q rO p � U in U / t --W W / p D aff N LLJ X J a @ f -r- FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION cn Mi 0 U w O z O Q N ry O a z w ry w O U w O ry n o- w O z Q ry O w ry a w O w J O z 0 Li w O 0 z W n" a 0 z Q V) 0 U 0 w o� cn z cqtoW� cr— W0 jwo �~ V)w 0 __ E U / UFr- F- O w to U a Q w N cf) F=— -0 cn o 0�� �w > Q ouO 0 U 6 i % r_hl U_ �/ oD N X J a @ 0_ NO. I DATE I DRWN I CHKD c I C, 1j" ID SCHEDULE 40 ANODIZED ALUMINUM MECHANICAL GUARDRAIL SYSTEM SEE SPECIFICATIONS OR MANUFACTURER'S REQUIREMEk ` GUARDRAIL SW WITH OSHA AN CAROLINA BUIL KICKPLATE 5'-0" MHA POST SPACING * ALL CONNECTIONS MUST BE DESIGNED FOR SPECIFIED LOADS 7Q * SIDE MOUNT SURFACE MOUNT GUARDRAIL SS ADHESIVE ANCHOR MINIMUM EMBED 6" (TYP) 1 II LOCATED AT 60'-0" MAXIMUM INTERVALS DETAIL rA NTS - REMARKS EXPANSION JOINT 14" SCHEDULE ALUMINUM PIPE "'0 SS ROUND MACHINE SCREV "0 SS SOCKE- HEAD CAP SCRE ADJUSTAE FITTING (3) Vo WALL HANDRAIL DETAIL rc NTS — DESIGNED BY. M. KARTHIK DRAWN BY: P. DOUGLAS SHEET CHK'D BY: J.BOGGS CROSS CHK'D BY: J. AREVALO APPROVED BY: J. BOGGS DATE: JANUARY 2018 �ItuXAMINt�IIAWe1m.1401M-1 Q 'r Cmith 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 HANDRAIL ATTACHED TO GUARDRAIL SYSTEM DETAIL rB NTS — "'0 SS CLOSED -CHAIN HOOK WITH HEX NUT (SHOP DRILL "'0 HOLE IN PIPE AND SHIP LOOSE) —r- GUARDRAIL POST 3'-6" SS CHAIN T 'HAIN HOOK WITH HEX NUT (SHOP DRILL "'0 HOLE IN PIPE AND SHIP LOOSE) AS NOTED (SEE PLANS) CHAIN OPENING HOOK DETAIL rD 1 "=1'-0" - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF P. 11" ('1 FAR T J ATE HANDRAIL /STEPS AND ILY 4TE kL RAI L SECTION A -A NOTE: PROVIDE CHAIN AT TOP RAIL AND INTERMEDIATE RAIL OF STEP NOTES: ALUMINUM GUARDRAIL AND HANDRAIL NOTES: GUARDRAILS GUARDRAILS SHALL BE TWO RAIL, 1.5" DIAMETER SYSTEM. THE CENTERLINE OF THE INTERMEDIATE PARALLEL RAIL SHALL BE AT THE POST MID—POINT BETWEEN THE TOP RAIL AND KICKPLATE (AT HORIZONTAL SURFACES) AND BETWEEN TOP RAIL AND STRINGER (AT STAIRS/STEPS). HOWEVER, MAXIMUM CLEAR DISTANCE BETWEEN RAILS MEASURED AT RIGHT ANGLES TO RAILS SHALL BE 21". GUARDRAILS AT HORIZONTAL SURFACES (LANDINGS, MEZZANINES, ETC) SHALL BE 42" HIGH AND SHALL BE PROVIDED WITH A 4" KICKPLATE. AT STAIRS/STEPS, PROVIDE STRINGER—MOUNTED GUARDRAIL SYSTEM PARALLEL TO STRINGER SLOPE, 42" HIGH ABOVE LEADING EDGE OF TREAD AND PROVIDE ADDITIONAL INSIDE MOUNTED HANDRAIL(S) MEETING THE REQUIREMENTS FOR HANDRAILS AS DESCRIBED BELOW. HANDRAILS HANDRAILS (WALL OR GUARDRAIL MOUNTED) AT STAIRS/STEPS. PROVIDE 1.5" DIAMETER WALL AND/OR GUARDRAIL MOUNTED (AS APPLICABLE) ALUMINUM HANDRAILS AT BOTH SIDES OF STAIRS/STEPS. HANDRAILS SHALL BE MOUNTED PARALLEL TO STRINGER SLOPE, 36" HIGH ABOVE LEADING EDGE OF TREAD. HANDRAILS SHALL EXTEND 12" BEYOND TOP RISER, AND SHALL EXTEND 24" BEYOND THE BOTTOM RISER. AT THE BOTTOM, HANDRAILS SHALL CONTINUE TO SLOPE FOR A DISTANCE OF THE DEPTH OF ONE TREAD BEYOND THE BOTTOM RISER; THE REMAINDER SHALL BE HORIZONTAL. THE FINGER CLEARANCE BETWEEN THE HANDRAIL AND THE WALL, GUARD OR OTHER OBSTRUCTION SHALL BE 1.5". GUARDRAIL NOTES: 1. ALUMINUM EMBEDDED IN CONCRETE SHALL BE PAINTED WITH ONE SHOP COAT OF HEAVY BITUMASTIC. 2. ALUMINUM SHAPES IN CONTACT WITH CONCRETE SHALL BE SEPARATED BY A 1/32" NEOPRENE GASKET OR ANY CASE WHERE TWO DIFFERENT METALS ARE TO BE IN CONTACT. A NEOPRENE GASKET SHALL BE PROVIDED. 3. HANDRAILS, GUARDRAILS, POSTS, BRACKETS AND MOUNTINGS SHALL MEET THE NORTHCAROLINA BUILDING CODE AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) LOADING REQUIREMENTS. 4. TOP OF ALL GUARDRAILS SHALL BE 42" HIGH ABOVE THE FINISH FLOOR OR WALKWAY. THE CLEAR DISTANCE BETWEEN THE TOP AND INTERMEDIATE RAILS MEASURED AT RIGHT ANGLES TO THE RAILS SHALL NOT EXCEED 21". 1. ALUMINUM EMBEDDED IN CONCRETE MUST BE PAINTED WITH ONE SHOP COAT OF HEAVY BITUMASTIC. 2. ALUMINUM SHAPES IN CONTACT WITH CONCRETE MUST BE SEPARATED BY A 12" NEOPRENE GASKET OR ANY CASE WHERE TWO DIFFERENT METALS ARE TO BE IN CONTACT, A NEOPRENE GASKET MUST BE PROVIDED. 3. HANDRAILS, GUARDRAILS, POSTS, BRACKETS AND MOUNTINGS SHALL MEET THE STANDARD BUILDING CODE (SBC) AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) LOADING REQUIREMENTS. 4. TOP OF ALL GUARDRAILS SHOULD BE 42" HIGH ABOVE THE FINISH FLOOR OR WALKWAY. THE CLEAR DISTANCE BETWEEN THE TOP AND INTERMEDIATE RAILS MEASURED AT RIGHT ANGLES TO THE RAILS SHALL NOT EXCEED 21". 5. ALL WALKWAYS SHALL USE GRATING UNLESS CHECKERED PLATE IS SHOWN ELSEWHERE ON THE DRAWINGS. STANDARD DETAILS PROJECT NO. 6145-2171/155 FILE NAME: SD03STDT.DWG SHEET NO. SD -3 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION cn 0 U w 0 z O a N O Q z w w S j O z U W O w W O >- z a o- O w F__ Of a w Of O w O z C) COL W10 w w m 0 x O m O z Y W U � Li Q U 0 Y z U Q J U F=- I o � z a W o (n U L' U 0 w O 01 Of w W w Z 0 0 w w w g � a m _ � w N Q � Q 0) � z w � NW W 0 �- o N = W ")Q 0 ^m w n cn � O E w U � a � W w ro O = "t m ~ J N W Q �I 0 0 "> > w uwi 0 W J x J d m 0 0 a 00 > I I O N th m (n z CD cn _ w 0 0 z Q rn F - z ow >� W 0 cn w �w �cn �w CD ~ it J cn J � Qz Li � U �O 0 0 0 U r-- w C) �LREV. DATE DRWN CHKD U 3'-6" C OR W BEAM PLATE THK "T" (TYP) MARK HORIZ BRCG - ANGLE (TYP) C OR W BEAM CL BOLTS (TYP) ANGLE W/ BOLT EACH LEG (TYP) SHEAR TAB, SEE BEAM TO COLUMN CONNECTION IN THIS SHEET W12 WP I L4X4XY4" 1 I 1 2-3/ „ 0 BOLTS (TYP) I Y4 Y4 TYP I 3/g" P L (CTRD ON W10) WP KNEE BRACE DETAIL rc NTS S-6 in Un 2'-0„ 1'-8" 5". 5 COLUMN BASE PLATE DETAIL F L PL (CTRD ON W12) 3/s TYP 'OJ WP cf) U J O O_ I m r.,) � Q© TYPE HA CONNECTION W BEAM NOTE: HORIZ BRACING NOT SHOWN FOR CLARITY CONN. T _IN a cf) U J O O_ I m r.,) � Q© TYPE HA CONNECTION W BEAM NOTE: HORIZ BRACING NOT SHOWN FOR CLARITY CONN. T A B BOLT DIA MARK (IN) (IN) 1 " = 1'-0" - (IN) HA1 3/8 2 2 3/4 HORIZONTAL BRACING DETAIL rA NTS - 1 " SETBACK 2 I SHEAR TAB 3/8"x4Y "x6" W/ (2)-3/4"0 ASTM A325 BOLTS SIN BEAM BEAM BEAM TO BEAM CONNECTION DETAIL D NTS - (4)-3/4"0 ANCHOR BOLTS WITH NUTS AND WASHER W/ 12" EMBED Y4 PL WASHER Y4"x2"SQ W/ STD HOLES IN WASHERS, OVER -SIZED HOLES IN BASE PLATE AND WELD AFTER COLUMN INSTALLATION - 2'-0" SQ CONC PIER PL Y2"X1'-8"X1'-8" W/ 1Y2" NS GROUT REMARKS Y2" THK BASE PLATE W1OX3 (UNO) COLUMN SHEAR TAB 3/8"x4Y2"x6" W/ (2)-3/4"0 ASTM A325 BOLTS LIN I I ! _ Q 2" F L4x3x3/8 "A" BOLTS @3" OC TYPE HB CONNECTION CONN. MARK T (IN) A B BOLT DIA DETAIL G M� RK (IN) 1 " = 1'-0" - (IN) HB 3/8 2 2 3/4 Pi /P COLUMN SHEAR TAB 3/8"x4Y2"x6" W/ (2)-3/4" 0 ASTM A325 BOLTS rIN I ?BM —IN DKV Y4 >-<� Y4 >-< Y4 Y4 1" SETBACK f 2" SETBACK 2 @ COLUMN FLANGE @ COLUMN WEB BEAM TO COLUMN CONNECTION DETAIL E NTS - 12" TIES k�i #6 BEAM 14 d ae WP @ COLUMN FLANGE L ANGLE t/j/ fE THK "T" - WELD TOP OF CONC COLUMN �Q1 @ COLUMN WEB TYPE VA CONNECTION CONN. T PIER DETAIL BOLT DIA MARK DETAIL G M� RK (IN) 1 " = 1'-0" - 3/8 2 3/4 DESIGNED BY: S. DINESH 8 2 2 DRAWN BY: P. DOUGLASDM SHEET CHK'D BY: J. BOGGS Smith CROSS CHK'D BY: J- ARtVALG 5400 Glenwood Avenue, Suite 400 APPROVED BY: J. BOGGS Raleigh, NC 27612 1 Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 12" TIES k�i #6 BEAM 14 d ae WP @ COLUMN FLANGE L ANGLE t/j/ fE THK "T" - WELD TOP OF CONC COLUMN �Q1 @ COLUMN WEB TYPE VA CONNECTION CONN. T A BOLT DIA MARK (IN) M� RK (IN) VA 3/8 2 3/4 DETAIL rB NTS - L ANGLE IE THK WELD TOP OF CONC STRUCTURAL STEEL DETAILING NOTES MINIMUM THICKNESS FOR GUSSET PLATES AND SPLICE PLATES SHALL BE 3/8". THE STEEL FABRICATOR IS RESPONSIBLE FOR DETERMINING LENGTHS FOR GUSSET PLATES TO FACILITATE CONNECTION FIT. IN ALL CASES, Lmin IS SHOWN FOR DETERMINING WELD LENGTH, SHOULD THE GEOMETRY REQUIRE A LONGER PLATE THAT Lmin, THE INDICATED WELD SHALL BE APPLIED OVER THE FULL LENGTH OF THE GUSSET. U L 4x 3 SIDE TYPE VB CONNECTION TYPE VD CONNECTION CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF VERTICAL BRACING DETAILS DETAIL H NTS - STANDARD DETAILS 3/4" DIA STITCH BOLT W/ WASHER 3/4" DIA STITCH BOLT L BRCG CAP 04 ` eQ 3 PROJECT NO. 6145-217155 FILE NAME: SD04STDT.DWG SHEET NO. SD -4 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION L(IN)MIN A B BOLT DIA M� RK (N) (IN) VB & VD 3/8 8 2 2 3/4 CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF VERTICAL BRACING DETAILS DETAIL H NTS - STANDARD DETAILS 3/4" DIA STITCH BOLT W/ WASHER 3/4" DIA STITCH BOLT L BRCG CAP 04 ` eQ 3 PROJECT NO. 6145-217155 FILE NAME: SD04STDT.DWG SHEET NO. SD -4 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION cn _ J 0 o Q O I U w 0 z O Q N Ir - 0 -O Q z Iw C. w I D N O 1 U) Uj UUj Ld (n 0 Q O A a_ Z w W 0-1 Li w 0 z a PLAN 1/4" = V-0" 12" FOR ELEVATION SEE CIVIL DRAWINGS FOR ELEVATION SEE STRUCTURAL DRAWINGS 0 I DIAGONAL SEE NOTE 9 L2xL2x" (TYPICAL) lamIIIIiI..I NWAS, 0 - -� REINF.: #5@8" EW, T&B UNLESS OTHERWISE 2 -0 `_ z UNLESS OTHERWISE NOTED NOTED _ FOR ELEVATION O / SEE STRUCTURAL DRAWINGS Q o- N (TYP) STRINGER * THICKEN SLAB TO PROVIDE BEARING w BELOW GRADE, ELEVATSECTION L WHERE SLOPESACROSS0 ct 1w" _jo J_FOUNDATION q z w FOR ELEVATION Uj 1/2" (TYP) SEE CIVIL Li D STAIR TREADS DRAWINGS w z 4 / m � o 0 ~ SEE PLAN 11" / N 0 LUcn TREAD w REINF.: #5@8" EW, T&B WELD CLOSURE // 0 - -� REINF.: #5@8" EW, T&B UNLESS OTHERWISE 2 -0 `_ z UNLESS OTHERWISE NOTED NOTED E3: CD Y tY 2 E ��' O J z Q (nI O �-0Ecno >3 U O a l6 co/ f- Li � v 3 N wLR 0. DATE DRWN CHKD REMARKS xw a@nr� PLAN 1/4" = 1 '-0" 2 TYPE "T-4" SECTION 2 1/4" = V-0" - 12" Y2" CAP PLATE WITH 2-5/8"0 BOLTS L2x2x4" BRACING TYPICAL 4 SIDES SEE NOTE 9 TYPICAL 4 SIDES D REINF: #5@8" EW, T&B UNLESS OTHERWISE NOTED J�t1►1 COL SEE NOTE 9 0 cr_ I I w I w � I z rr I O v, Y4 U I Y4 Z 0 o I a _ I 0O SIN I Y4 / 54 GALV FS TYP P JIRED) SEE PLANS FOR TOTAL LENGTH STAIR TREADS 51_____ _ PER SPECIFICATIONS _ N O / Q o- TYPE "T-1 " NOTE: (TYP) STRINGER * THICKEN SLAB TO PROVIDE BEARING BELOW GRADE, ELEVATSECTION / CHANNEL WHERE SLOPESACROSS0 p 1/4" = 1'-0" PAD 3" 1 1 " J_FOUNDATION z w"O 0 1/2" (TYP) o Li D STAIR TREADS z g w PER SPECS 4 / m o LL_ 0 ~ SEE PLAN 11" / 0 LUcn TREAD w o WELD CLOSURE // NOSING (TYP) / Ln w PLATE i / / J Q o- a OPPOSITE CONNECTION / w / WHERE APPLICABLE / z Q O / / / / 3-Y2"MAXIMUM / OPENING ON ALL INTERMEDIATE c< cn (n / / / / STRINGERS (TYP) / 1" NOSING (TYP) o #5@8" T&B, EW -j p" / U 0 5/8"0 316 SS 7,4/ 1/4" KICKPLATE BOLTS STRINGERS PLUS 6" EACH SIDE. AT SLAB / L 2x2x 1 /4" r 2'-0" MINIMUM / a / GRATING ry PLATFORM 3/16 SUPPORT EACH a_ FRAMING STRINGER STAIR z SEE PLANS STRINGER CHANNEL Ld 2L 3x3x1/4" A Q STAIR STRINGER TO PLATFORM Z7 NTS o- w wDETAIL C rn 3 = ° NTSLi - ►- 0 Q 0 NOTES: 0 00� 00 0 U 1. RISERS: 7" MAXIMUM, UNLESS NOTED OTHERWISE. o z 11 " MAXIMUM, PLUS 1 " NOSING UNLESS NOTED OTHERWISE. Uo > 2. MAXIMUM HEIGHT FOR INDIVIDUAL FLIGHT OF STAIRS = 12'-0". LJ w 3. IF STAIR HEIGHT IS LESS THAN 6'-0", STAIR STRINGER SIZE MAY BE REDUCED TO C10x8.64 Q FOR ALUMINUM STAIR AND MC10x22 FOR STEEL STAIR. z O ;L, W 4. TYPICAL PAD WIDTH IS STAIR WIDTH PLUS 6" EACH SIDE. 0 b- 0 5. ALUMINUM EMBEDDED IN CONCRETE MUST BE PAINTED WITH ONE SHOP COAT OF HEAVY BITUMASTIC. m m I z o 6. ALUMINUM SHAPES IN CONTACT WITH CONCRETE MUST BE SEPARATED BY ANEOPRENE 32 0 GASKET OR ANY CASE WHERE TWO DIFFERENT METALS ARE TO BE IN CONTACT, A NEOPRENE v GASKET MUST BE PROVIDED. > o (i cn ° 7. HANDRAILS, GUARDRAILS, POSTS, BRACKETS AND MOUNTINGS SHALL MEET THE INTERNATIONAL z BUILDING CODE (IBC) AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) LOADING 0- 'vcn o REQUIREMENTS. TOP OF ALL GUARDRAILS SHOULD BE 42" HIGH ABOVE THE FINISH FLOOR OR N o o WALKWAY. THE CLEAR DISTANCE BETWEEN THE TOP AND INTERMEDIATE RAILS MEASURED AT RIGHT T o o ANGLES TO THE RAILS SHALL NOT EXCEED 21". N z 0 V) 8. ALL WALKWAYS SHALL USE GRATING UNLESS CHECKERED PLATE IS SHOWN ELSEWHERE ON THE o z DRAWINGS. C14 0 U C) LJ 9. FOR ALUMINUM STAIRS, USE C12x8.64 STRINGERS AND 3" SQUARE x ALUMINUM POST. FOR wo STEEL STAIRS, USE MC10x33.6 STRINGERS AND HSS 3x3x"" POST. w o Ecn a, •- , cn w 10. ASTM F593SS BOLTS SHALL BE USED WHERE CONNECTING ALUMINIUM MEMBERS. E3: CD Y tY 2 E ��' O J z Q (nI O �-0Ecno >3 U O a l6 co/ f- Li � v 3 N wLR 0. DATE DRWN CHKD REMARKS xw a@nr� PLAN 1/4" = 1 '-0" 2 TYPE "T-4" SECTION 2 1/4" = V-0" - 12" Y2" CAP PLATE WITH 2-5/8"0 BOLTS L2x2x4" BRACING TYPICAL 4 SIDES SEE NOTE 9 TYPICAL 4 SIDES D REINF: #5@8" EW, T&B UNLESS OTHERWISE NOTED J�t1►1 COL SEE NOTE 9 0 cr_ I I w I w � I z rr I O v, Y4 U I Y4 Z 0 o I a _ I 0O SIN I Y4 / 54 GALV FS TYP P JIRED) SEE PLANS FOR TOTAL LENGTH STAIR TREADS 51_____ _ PER SPECIFICATIONS \-2 L'S (AS REQUIRED) 2"(TYP) / R 3/s" (AS REQUIRED) 10-1! a I.I -4 TBP O ° d 1 1I ° II Ii d II COLUMN BRACING DETAIL rD NTS - DESIGNED BY: M. KARTHIK DRAWN BY: P. DOUGLAS CDM SHEET CHK'D BY: J. BOGGS Smith CROSS CHK'D BY: J. AREVALO J. BOGGS 5400 Glenwood Avenue, Suite 400 APPROVED BY: Raleigh, NC 27612 1 Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 �/���(2)-3/4"O BOLTS VERTICAL BRACING DETAIL E 1 "=1'-0" - CHANNEL12„ Y2»IL o HSS —� I o 11„ 2 SIN (4)-3/4"0 SS BOLTS 3„ 11 12„ DETAIL F 1 1/2"=V-0" '-0" - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF 1 " (TYP) / / / / / STAIR TREADS PER SPECS - / / / 11" / / / / TREAD WIDTH y4" CLEAR / 1" NOSING (TYP) / 3-Y2"MAXIMUM OPENING ON ALL INTERMEDIATE STRINGERS (TYP) STRINGER CHANNEL STAIR STRINGER TO STEEL/ALUMINUM PLATFORM TOP DETAIL B NTS - 12x8.64 TYP * STAIR TYPE AS NOTED ON DESIGN DRAWINGS KNEE BRACED STAIR LANDING PLAN 1/4" = 1'-0" 3'-9>, SQUARE " 3'-0" 6" STAIR STRINGER (BEYOND) C 12x8.64 TYP + a lip AL 3 ° KNEE BRACE (TYP OF 2) NOTE: 3 „ \ GUARDRAIL NOT /4 SS ° SHOWN FOR CLARITY F593 BOLT 3yl 6 AL U/s"x10"x0'-10" SECTION A -A DETAIL G NTS - 11'2" ALUMINUM GRATING 3/4"0 SS HILTI HIT -RE 500 -SD EPDXY ADHESIVE ANCHORS WITH 4" MINIMUM EMBED CENTERED, SPACED @ 8" OC ANCHOR NOTE: MINIMUM EDGE DISTANCE TO EDGE OF CONCRETE IN ANY DIRECTION IS 4" (4)-3/4" 0 SS HILTI HIT -RE 500 -SD EPDXY ADHESIVE ANCHORS WITH 4" MINIMUM ON 6" GAUGE STANDARD DETAILS 5/8"0 316 SS BOLTS PLATFORM FRAMING SEE PLANS L 3x3x 1 /4" CARO' ........• ,ti0' ?; FESS10*% 3 - T • 0 0` PROJECT NO. 6145-217155 FILE NAME: SD05STDT .DWG SHEET NO. SD -5 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION XA / 1" (TYP) STRINGER / CHANNEL p f- 3" 1 1 " / w"O SS CONCRETE TREAD " o 0 z g = FASTENERS 4 / / / x / Qz o LL_ a —1 LUcn w w o WELD CLOSURE // NOSING (TYP) Ln PLATE i / a J Q I GROUT w o U0 Q O L 3x3xi" #5@8" T&B, EW -j p" PAD LENGTH EQUALS BACK TO BACK OF STRINGERS PLUS 6" EACH SIDE. AT SLAB 2'-0" MINIMUM OR SIDEWALK THICKEN CONCRETE TO 10" MINIMUM STAIR STRINGER TO CONCRETE BASE DETAIL A NTS - \-2 L'S (AS REQUIRED) 2"(TYP) / R 3/s" (AS REQUIRED) 10-1! a I.I -4 TBP O ° d 1 1I ° II Ii d II COLUMN BRACING DETAIL rD NTS - DESIGNED BY: M. KARTHIK DRAWN BY: P. DOUGLAS CDM SHEET CHK'D BY: J. BOGGS Smith CROSS CHK'D BY: J. AREVALO J. BOGGS 5400 Glenwood Avenue, Suite 400 APPROVED BY: Raleigh, NC 27612 1 Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 �/���(2)-3/4"O BOLTS VERTICAL BRACING DETAIL E 1 "=1'-0" - CHANNEL12„ Y2»IL o HSS —� I o 11„ 2 SIN (4)-3/4"0 SS BOLTS 3„ 11 12„ DETAIL F 1 1/2"=V-0" '-0" - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF 1 " (TYP) / / / / / STAIR TREADS PER SPECS - / / / 11" / / / / TREAD WIDTH y4" CLEAR / 1" NOSING (TYP) / 3-Y2"MAXIMUM OPENING ON ALL INTERMEDIATE STRINGERS (TYP) STRINGER CHANNEL STAIR STRINGER TO STEEL/ALUMINUM PLATFORM TOP DETAIL B NTS - 12x8.64 TYP * STAIR TYPE AS NOTED ON DESIGN DRAWINGS KNEE BRACED STAIR LANDING PLAN 1/4" = 1'-0" 3'-9>, SQUARE " 3'-0" 6" STAIR STRINGER (BEYOND) C 12x8.64 TYP + a lip AL 3 ° KNEE BRACE (TYP OF 2) NOTE: 3 „ \ GUARDRAIL NOT /4 SS ° SHOWN FOR CLARITY F593 BOLT 3yl 6 AL U/s"x10"x0'-10" SECTION A -A DETAIL G NTS - 11'2" ALUMINUM GRATING 3/4"0 SS HILTI HIT -RE 500 -SD EPDXY ADHESIVE ANCHORS WITH 4" MINIMUM EMBED CENTERED, SPACED @ 8" OC ANCHOR NOTE: MINIMUM EDGE DISTANCE TO EDGE OF CONCRETE IN ANY DIRECTION IS 4" (4)-3/4" 0 SS HILTI HIT -RE 500 -SD EPDXY ADHESIVE ANCHORS WITH 4" MINIMUM ON 6" GAUGE STANDARD DETAILS 5/8"0 316 SS BOLTS PLATFORM FRAMING SEE PLANS L 3x3x 1 /4" CARO' ........• ,ti0' ?; FESS10*% 3 - T • 0 0` PROJECT NO. 6145-217155 FILE NAME: SD05STDT .DWG SHEET NO. SD -5 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION S p U W O z 0 Q N_ Fy O S Q z W r- ry w S O S U W O m ry W O Z Q O W ry Q m O W O S z 0 W W m O O z W Q p z Q T p U W O ry W m O ry m W T W ry Q Z_ W W p W _p Q (/) co O O m p ll� (n O / U p Z p Q U W U O j ry W O � i 7 J U Q 7 Z _O W O W / O O m rn m Z p W cn p N � U O N W z m CD N � W O O Z N / Q N O Z \ LLJ r U n \ W O cp Wp / ryW U U J cn W a a E E- cD F-- n Fy E J Q Q Z V)I > �O cr) p p T � >U 0 o > U O O CL 1� W W + / O � N XJQO� FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION U O z 0 a N O z D Q z w w D O U Of c- ry w O z Q a' O LLQ IY O w I O z z Ldcri0 D w m O 0 z w o' a 0 z a 1- 0 U I O m Li 0- 0 ry m w T w Q z w m w 0 w a IL o' O U a, z -0 w m U z w 0 CIO 0 Q z Q o_ U to c � Ld v O n m � o w U 0 a` o on 0 mI z z cn w 0 v � o m z ECf)M .h f- a) . z 0 � 0 0 w mi � o > M o m � U 0 NNS w0 TT ti VJ �� N w �Cn 0 ai w v ELL IL J � Cn w����� aoa Qw E _ N ° �� � ' W o E ow U -a UO ti N a ~ Cn w = 0� Xj Q.. O ry MECHANICAL A AFF PIPING GENERAL ABBREVIATIONS ABOVE FINISHED FLOOR I ID INTERNAL DIAMETER AG ABOVE GRADE TDH IN INCH AHS AIR HOSE STATION EC INS INSULATION, INSULATE APPROX APPROXIMATE TOP OF STEEL lNSTA INSTANTANEOUS APS ASH PUMP SUCTION TYP INSTR INSTRUMENTATION, INSTRUMENT ASD ASH SLURRY DRAIN PLANT WATER INT INTERIOR ASF ASH SLURRY FEED UNDERWRITERS LABORATORY INV INVERT UNLESS OTHERWISE NOTED V V IPS IRON PIPE SIZE B BEND DI VAC VACUUM B BFV BUTTERFLY VALVE J JT JOINT B FLG BLIND FLANGE VERT VERTICAL PVC BHP BRAKE HORSE POWER L L LITER BIT BITUMINOUS WEST LAT LATERAL BLDG BUILDING W/A LB POUND B�4 BENCH MARK LG LONG BOT BOTTOM WEIGH I LLWL LOW LOW WATER LEVEL BV BALL VALVE WHS LONG LONGITUDINAL WL WATER LEVEL LR LONG RADIUS C C TO C CENTER TO CENTER WATER SURFACE LWL LOW WATER LEVEL CB CATCH BASIN WT WATERTIGHT X CEM CEMENT M M MOTOR CFM CUBIC FEET PER MINUTE YARD HYDRANT MAN MANUAL CFS CUBIC FEET PER SECOND MATL MATERIAL CHKD CHECKERED MAX MAXIMUM CL CENTER LINE MCC MOTOR CONTROL CENTER CLR CLEARANCE MEC" MECHANICAL CMU CONCRETE MASONRY UNIT MED MEDIUM CO CLEAN OUT MFR MANUFACTURER CUL COLUMN MGD MILLIUIN GALLONS PER DAY CONC CONCRETE MH MANHOLE CONN CONNECTION MHS METAL HOSE CONST CONSTRUCTION MIN MINIMUM CONT CONTINUOUS, CONTINUE MISC MISCELLANEOUS CONTR CONTRACTOR OR CONTRACT MJ MECHANICAL JOINT CPLG COUPLING MTD MOUNTED CRE CORROSION RESISTANT MTL METAL CSTG CA )II N G CTR CENTER N N NORTH CV CHECK VALVE NAT NATURAL IVC, NORMALLY CLOSED D DBL DOUBLE NIC NOT IN CONTRACT DEMO DEMOLITION NO. NUMBER DEPT DEPARTMENT NO NORMALLY OPEN DIA DIAMETER NOM NOMINAL DIAG DIAGONAL NPW NON -POTABLE WATER DIAP DIAPHRAGM NTS NOT TO SCALE DIM DIMENSION NV NEEDLE VALVE DIR DIRECTION DISCH DISCHARGE 0 0 TO 0 OUT TO OUT DIST DISTANCE OC ON CENTER DIV DOWN OU VU 1 SIDE UTAME I ER DWG DRAWING OED OPEN END OR OPEN EQUIPMENT DRAIN E E EAST OF OUTSIDE FACE E TO E END TO END OR OUTSIDE RADIUS EA EACH OVF CLARIFIER OVERFLOW ECC ECCENTRIC GVHD OVERHEAD EF EACH FACE ELEC ELECTRICAL P P PUMP, PUMPING ELEV ELEVATION P&ID PROCESS AND ELL ELBOW INSTRUMENTATION DIAGRAM EMERG EMERGENCY PL PLATE ENG ENGINEER PLMG PLUMBING EQ EQUAL PV PLUG VALVE EQUIP EQUIPMENT PN PNEUMATIC EW EACH WAY PPM PARTS PER MILLION EWU EYE WASH UNIT PS PUMPING STATION EXH EXHAUST PSF POUNDS PER SQ. FOOT EXIST EXISTING PSI POUNDS PER SQUARE INCH EXP EXPANSION PTD PAINTED EXP JT EXPANSION JOINT PCHV PINCH VALVE EXT EXTERNAL Q Q FLOW F F FARENHEIT QTY QUANTITY FA FLANGE ADAPTER FAB FABRICATED R R RISERS FBI FLUIDIZED BED INCINERATOR RAD RADIUS FC FLEXIBLE COUPLING RC RECIRCULATION OR CONNECTION RED REDUCER FD FLOOR DRAIN REQD REQUIRED FDN FOUNDATION RH RIGHT HAND FIN FINISHED RLG RAILING FIN GR FIN_IS_HED GRADE RND ROUND FLK FLG FLOUR FLANGE RPM RST REVOL'v I iUN PER MIN' I E REINFORCING STEEL c FLGD FLANGED RUB RUBBER FM FORCE MAIN FPM FEET PER MINUTE S S SOUTH FPS FEET PER SECOND SAN SANITARY SCH SCHEDULE G G GROUND SCRN SCREEN, SCREENING GA GAUGE, GAGE SEC SECONDARY GAL GALLON SECT SECTION GALV GALVANIZE, GALVANIZED SG SLIDE GATE (HOT DIPPED) SHT SHEET GLV GLOBE VALVE SIM SIMILAR GPM GALLONS PER MINUTE SLG SLUICE GATE GR GRADE SLV SLEEVE GRTG GRATING SM SHEET METAL GV GATE VALVE SMH SEWER MANHOLE GVL GRAVEL SP STATIC PRESSURE SP STAND PIPE H H 'SIGH I SPEC SPECIFICATION, SPECIFIED HB HOSE BIBB SQ SQUARE HD_ HEAVY DUTY SR SHORT RADIUS HUK HANGER C`C`T JJ 1 C`TAIAII rC`C` C`Trrl J IHIIVLCJJ STEEL CCL HGT HEIGHT STA STATION HORIZ HORIZONTAL STD STANDARD HP HORSEPOWER STG STORAGE HPT HIGH POINT STL STEEL, GENERAL HR HOUR STR STRAIGHT HRL HANDRAIL STRUCT STRUCTURE, STRUCTURAL HS HIGH STRENGTH SUB SUBMERGED HVAC HEATING, VENTILATING SUC SUCTION AND AIR CONDITIONING SURF SURFACE HVY HEAVY SUSP SUSPENDED HWL HIGH WATER LEVEL SW SOCKET WELDED HYD HYDRAULIC SYM SYMMETRICAL HZ HERTZ EI DATE I DRWN I CHKD REMARKS T T TREADS COMPRESSED AIR (NOT DRIED) TA THICKENED ASH CW TDH TOTAL DYNAMIC HEAD DRAIN TEMP TEMPERATURE EC THRD THREADED, THREAD EFFLUENT FLUSHING WATER TOS TOP OF STEEL FE TPG TOPPING INFLUENT TYP TYPICAL U U/S UNDERSIDE PLANT WATER UG UNDERGROUND SD UL UNDERWRITERS LABORATORY SANITARY SEWER UON UNLESS OTHERWISE NOTED V V VALVE VENT V VOLTS DI VAC VACUUM COPPER VB VALVE BOX FRP VE VIBRATION ELIMINATOR GALVANIZED STEEL PIPE VERT VERTICAL PVC VOL VOLUME REINFORCED CONCRETE PIPE VT VENT W W WEST W/ WITH W/A WHERE APPLICABLE W/0 WITHOUT WD WOOD WG T WEIGH I WH WALL HYDRANT WHS WASH HOSE STATION WL WATER LEVEL WP WEATHER PROOF WS WATER SURFACE WS WATER STOP WT WATERTIGHT X X HVY EXTRA HEAVY X STR EXTRA STRONG Y YH YARD HYDRANT PROCESS A FLOW STREAMS: AIR CA COMPRESSED AIR (NOT DRIED) CAD COMPRESSED AIR DRIED CW POTABLE COLD WATER D DRAIN E EMERGENCY WATER FOR EYE WASH EC EMERGEiNC'r CONNECTION EFW (FW) EFFLUENT FLUSHING WATER F FILTRATE FE FINAL EFFLUENT INF INFLUENT LPA LOW PRESSURE AIR OVF OVERFLOW PW PLANT WATER SA SAMPLE LINE SD STORM DRAIN SS (S) SANITARY SEWER VV SER\/'ICE VOA I EK (PRO I El. I ED WA I EK) TKD (D) TANK DRAIN (DRAIN) VT VENT PIPE MATERIALS: CI CAST IRON DI DUCTILE IRON CU COPPER CPUC CHLORINATED POLYVINYL CHLORIDE FRP FIBERGLASS REINFORCED PLASTIC PIPE GALVS GALVANIZED STEEL PIPE PVCS POL' 'i1\41 L CHLORIDE SE'vV'EK PIPE PVC POLYVINYL CHLORIDE PRESSURE PIPE RCP REINFORCED CONCRETE PIPE SS STAINLESS STEEL STL TYPICAL PIPE TAGS (3) 1 " AL -PVC NUMERICAL INDICATOR r FR iIVIULTlF IDENTICAL FLOW 2" D-PSTREAMS d 12" RAS -DI T PIPE MATERIAL TPROCESS FLOY:' STREAIV" NOMINAL PIPE DIAMETER VALVE OPERATOR EXAMPLES PLUG VALVE WITH �--� CYLINDER ACTUATOR u BUTTERFLY VALVE WITH ELECTRIC ACTUATOR OTHER TYPES OF OPERATORS MAY BE SHOWN ON THE DRAWINGS. FOR ADDITIONAL OPERATOR SYMBOLOGY SEE INSTRUMENTATION LEGEND SHEETS. DESIGNED BY: DRAWN BY: SHEET CHK'D BY% CROSS CHK'D BY: APPROVED BY: DATE: J. AREVALO A. EDWARDS M. TAYLOR J. HEALY J. BUTCHER JANUARY 2018 MECHANICAL VALVE DOUBLE LINE PIPING DRAWING SYMBOLOGY: SYMBOLS SINGLE LINE SYMBOLOGY SYMBOLOGY E::W GATE VALVE EV KNIFE GATE VALVE K K E:W PLUG VALVE BU T I ERFLY VALVE q---- BALL VALVE --�- GLOBE VALVE EW PINCH VALVE J CONE VALVE DIAPHRAGM VALVE �•- SWING CHECK VALVE �. SILENT CHECK VALVE DOUBLE DOOR CHECK VALVE E4<*:s �--'<Q� BALL CHECK VALVE SOLENOID VALVE I�l!1 NEEDLE VALVE ON REGULATOR (SELF CONTAINED) BACK PRESSURE KEGULAIUK PRESSURE RELIEF VALVE VACUUM RELIEF VALVE DOUBLE LINE SINGLE LINE SYMBOLOGY SYMBOLOGY FLEXIBLE BELLOWS TYPE COUPLING SLEEVE TYPE PIPE COUPLING COUPLING FOR GROOVED PIPE ENDS. () RIGID TYPE GROOVING K R 0 FLEXIBLE TYPE GROOVING -� t- UNION fV (GENIERAL SOYMBOL) ._.�� QUICK CONNECT TYPE COUPLING ---FH C HOSE CONNECTION Y -STRAINER INSTRUMENT IDENTIFICATION EXAMPLES iP CROSSHATCHING INDICATES DEVICE 100-1 FURNISHED BY EQUIPMENT VENDOR NOTE: MECHANICAL PLAN AND SECTION DRAWINGS SHOW ONLY PRIMARY INSTRUMENT ELEMENTS. FOR ADDITIONAL INSTRUMENT COMPONENTS REFER TO PROCESS & INSTRUMENTATION DIAGRAMS FOR LETTER IDENTIFICATION FE .C.)EE INSTRUMENTATION 308-1 LEGEND SHEETS �- LOOP NUMBER -SEE E16D INSTRUMENTATION LEGEND SHEETS Smith 5400 Glenwood Avenue, Suite 400 Raleigh, INC 27612 1 Tel: (919) 325-3500 NC F-1255 V_ _ DOUBLE LINE MECHANICAL JOINT TIV \11 FLANGED PIPING SHOWN PIPING SHOWN ON ON MECHANICAL DRAWINGS MECHANICAL DRAWINGS. 3" AND SMALLER SINGLE LINE PIPING PUSH -ON JOINT SHOWN ON PIPING SHOWN ON MECHANICAL MECHANICAL DRAWINGS. DRAWINGS. TYPE AS PIPE MATERIAL VARIES SPEC. �- - T--- DOUBLE LINE WELDED PIPING ---------- RC OR PCCP AND FLANGED - PIPING SHOWN ON VALVES SHOWN ON ---------- MECHANICAL MECHANICAL DRAWINGS. TYPE AS DRAWINGS SPEC. DIRECTION OF FLOW EXISTING FACILITIES SYMBOLOGY AND ANNOTATION P - CU SGGRTS EXISTING FACILITIES DEMOLITION SYMBOLOGY AND ANNOTATION W-- REA40VE EXISTING ING 1.2" PW -DI --� GATE Vr 1 "x 12" TEE DEt► OUTION NOTES: 1. DIMENSIONS AND LOCATIONS OF EXISTING EQUIPMENT, APPURTENANCES AND STRUCTURES HAVE BEEN OBTAINED FROM EXISTING RECORD DRAWINGS AND FIELD SURVEY. ALL SHOULD BE FIELD VERIFIED. 2. CERTAIN EXISTING EQUIPMENT AND STRUCTURES NOT DIRECTLY RELATED TO THE WORK PERFORMED UNDER THIS CONTRACT HAVE BEEN OMITTED FOR THE SAKE OF CLARITY. IT IS NOT WARRANTED THAT THE LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT, APPURTENANCES AND STRUCTURES ARE EXACT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND LOCATIONS OF EXISTING PIPING, Enl 11DAAFK1T F1 FrTRlr-AI nnr.InUITS uvAr� nl I�Tc o+� Ac Q�nUIRED Tn QV- Qr7kAnVf7n li(V11 TVI LIV I , LLLV I I IVr1L VVI VV , I I Y V V V�./ J �.. ltr. J 1\L�a( V UL I \LINT \./ LV FOR THE NEW CONSTRUCTION. 3. THE DEMOLITION, MODIFICATION OR ALTERATION OF EXISTING BUILDINGS, EQUIPMENT, PIPING AND STRUCTURES SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LOCAL REGULATIONS AND CODES. REFER TO SPECIFICATIONS FOR FURTHER DETAILS. 4. DEMOLITION AND SALVAGE OF EXISTING EQUIPMENT AND PIPING IS DEFINED ON THE DEMOLITION DRAWINGS AND IN SPECIFICATION SECTION 02 41 00. 5. ALL HOLES CUT FOR NEW PIPING OR EQUIPMENT THROUGH EXISTING CONCRETE OR MASONRY WALLS, SLABS OR ARCHES SHALL BE CORE DRILLED. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT APPROVAL OF ENGINEER. REFER TO SPECIFICATIONS FOR FURTHER DETAILS. 6. FOR MAINTENANCE OF EXISTING PLANT OPERATION AND FOR CONSTRUCTION SEQUENCE REFER TO SPECIFICATION SECTION 01 12 16. 7. WHERE PIPES ARE REMOVED, ISOLATE REMAINING PIPE LINE WITH BLIND FLANGE, PLUG OR CAP AS APPROVED BY ENGINEER. 8. WHERE EXISTING PIPES PENETRATE THE FLOOR AND ARE TO BE REMOVED, THE EXISTING SLEEVE OR CASTING SHALL BE CAPPED AS DETAILED ON THE MECHANICAL DRAWINGS. 9. THE FOLLOWING SYMBOLS AND TERMS ARE USED ON THE DRAWINGS. - EXISTING EXISTING EQUIPMENT, PIPING AND APPURTENANCES TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED. CERTAIN ITEMS OF EQUIPMENT AND PIPING MAY BE DISCONNECTED TEMPORARILY TO ALLOW FOR CONSTRUCTION OF THE NEW FACILITIES. REFER TO CONSTRUCTION SEQUENCE FOR FURTHER DETAILS. NEW OK NEW WORK NEW PIPING, NEW WORK, EQUIPMENT, APPURTENANCES AND EQUIPMENT ARE IDENTIFIED WITH BOLD TYPE NOTES AND DESIGNATED AS NEW OR NEW WORK. RELOCATE REMOVE EXISTING EQUIPMENT, PIPING AND APPURTENANCES AS SHOWN ON THE DRAWINGS, CLEAN, FLUSH AND DRAIN THE INTERIOR OF THE REMOVED ITEMS AND INSTALL IN THE NEW LOCATION AS SHOWN ON THE DRAWINGS. REMOVE EXISTING PIPING, EQUIPMENT AND APPURTENANCES TO BE TAKEN OUT OF SERVICE AINID REPVIOVED. ABANDON EXISTING PIPING, EQUIPMENT AND APPURTENANCES TO BE TAKEN OUT OF SERVICE AND LEFT IN PLACE. 10. NOT ALL PIPE SUPPORTS ARE SHOWN ON THE DRAWINGS. PIPES SUPPORTS INDICATED ON THE DRAWINGS ARE SHOWN ONLY TO CONVEY THE INTENT OF THE DESIGN FOR A PARTICULAR LOCATION AND ARE NOT INTENDED TO REPRESENT A COMPLETE SYSTEM. ALL PIPE SUPPORTS - INCLUDING THOSE SHOWN CONCEPTUALLY ON THE DRAWINGS - SHALL BE DESIGNED, FURNISHED, AND INSTALLED BY THE CONTRACTOR AS SPECIFIED AND TO THE APPROVAL OF THE ENGINEER_ NOTE THAT ALL PIPING ADJACENT TO EQUIPMENT, VALVES, COUPLINGS, INSTRUMENT DEVICES AND OTHER APPURTENANCES SHALL BE PROPERLY SUPPORTED AND/OR ANCHORED ACCORDING TO MANUFACTURERS RECOMMENDATIONS. 11. COORDINATE DEMOLITION FOR NEW WORK TO BE CONNECTED TO EXISTING PIPING. LIMIT OF NEW WORK AND DEMOLITION SHOWN ON PLANS IS APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH THE EXACT LIMITS OF DEMOLITION (AS APPROVED BY THE ENGINEER) TO MAKE THE APPROPRIATE CONNECTIONS OF NEW EXISTING, USING EXISTING FLANGED ENDS OF PIPE, COUPLINGS OR FLANGE ADAPTORS AS APPROVED BY THE ENGINEER_ 12. SEE STRUCTURAL DRAWINGS FOR DETAILS ON REMOVING EXISTING CONCRETE PADS, CURBS, FILL AND RESTORATION OF EXISTING CONCRETE FLOORS. CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF MECHANICAL PIPING GENERAL NOTES: 1. PROCESS EQUIPMENT DIMENSIONS, LOCATIONS AND PIPING SYSTEM LAYOUTS ARE. BASED ON EQUIPMENT SELECTED BY THE ENGINEER. IF THE CONTRACTOR PROPOSES TO FURNISH EQUIPMENT THAT REQUIRES AN ARRANGEMENT OR SPACE DIFFERING FROM THAT INDICATED ON THE DRAWINGS OR SPECIFIED, THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE ENGINEER FOR APPROVAL DETAILED ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, INSTRUMENTATION, HVAC AND ELECTRICAL DRAWINGS AND EQUIPMENT LISTS SHO'vViiNG ALL NECESSARY CHANGES AND EMBODYING ALL FEATURES OF THE EQUIPMENT AND/OR PROCESS SYSTEM HE PROPOSES TO FURNISH. THIS INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO PLANS, SECTIONS, DETAILS AND SCHEMATICS OF ALL APPURTENANCES REQUIRED SUCH AS COMPRESSED AIR SUPPLY, HYDRAULIC SYSTEMS,MAKE-UP WATER SUPPLY, ELECTRICAL CONTROLS, CHEMICAL FEED SYSTEMS etc. SUCH CHANGES IF APPROVED BY THE ENGINEER SHALL BE AT NO EXTRA COST TO THE OWNER.THE CONTRACTOR SHALL ASSUME THE COST OF, AND THE RESPONSIBILITY FOR,SATISFACTORILY ACCOMPLISHING ALL THE NECESSARY CHANGES CORRESPONDING TO THE DIMENSIONS AND CHARACTERISTICS OF THE EQUIPMENT SUBMITTED AND APPROVED BY THE ENGINEER. REFER TO SPECIFICATIONS FOR FURTHER DETAILS. 2. SIZES OF Eni llPK1.AENT FOL NinATIONS INDICATED ON THE DRAWINGS ARE APPROXIMATE. EXACT DIMENSIONS SHALL BE DETERMINED BY THE CONTRACTOR FOR THE EQUIPMENT FURNISHED BY HIM.ALL FLOOR MOUNTED EQUIPMENT SHALL BE SET ON CONCRETE PADS CONFORMING TO DETAILS SHOWN ON THE STRUCTURAL AND/OR MECHANICAL DRAWINGS. 3. EXTERIOR PIPING IS GENERALLY SHOWN ON THE YARD PIPING DRAWINGS. 4. PROTECTED WATER SUPPLY CONNECTIONS TO PROCESS EQUIPMENT AND PROCESS PIPES ARE SHOWN ON THE MECHANICAL DRAWINGS. DETAILS OF CONTROL VALVE STATIONS, MAKE-UP WATER CONNECTIONS, FLUSHING CONNECTIONS etc. ARE SHOWN ON THE MECHANICAL DRAWINGS. IF APPLICABLE, LIMITS OF WORK ARE SHOWN ON THE MECHANICAL AND THE PLUMBING DRAWINGS. 5. AIR HOSE STATIONS FOR COMPRESSED AIR, DETAILS AND PIPING ARE SHOWN ON THE MECHANICAL DRAWINGS. 6. DIELECTRIC COUPLINGS, FLANGES OR UNIONS SHALL BE INSTALLED AT ALL CONNECTIONS OF COPPER PIPE TO OTHER TYPES OF METALLIC PIPING. 7. MECHANICAL PIPING DRAWINGS DO NOT SHOW ALL VALVES, GAUGES, SWITCHES, OPERATORS, DRAINS, VENTS, etc. REQUIRED FOR THE COMPLETE SYSTEM. CERTAIN SMALL DIAMETER PROCESS PIPING RUNS (3" AND SMALLER) MAY NOT BE SHOWN IN THEIR' ENTIRETY. GENERALLY SMALL PIPING IS SHOWN DIAGRAMi�iATICALLY. FIELD ROUTE TO AVOID INTERFERENCES, SUBJECT TO THE APPROVAL OF THE ENGINEER. APPURTENANCES MAY BE OMITTED FOR THE SAKE OF CLARITY. THE CONTRACTOR SHALL FURNISH, INSTALL AND TEST ALL PIPING SYSTEMS) AS INDICATED ON THE P&ID'S) AND/OR AS DEFINED IN THE SPECIFICATIONS TO PROVIDE THE COMPLETE SYSTEM. 8. UNLESS OTHERWISE SHOWN ON THE MECHANICAL DRAWINGS ALL FLOOR SLAB, WALL AND TANK PENETRATIONS SHALL BE AS SHOWN ON THE PENETRATION DETAILS INCLUDED IN THE MECHANICAL CONSTRUCTION DETAILS. ABOVE GROUND EXTERIOR WALL AND ROOF PENETRATIONS SHALL BE AS SHOWN ON THE MECHANICAL DRAWINGS. IF APPROVED BY THE ENGINEER, THE CONTRACTOR MAY SUBSTITUTE ALTERNATE METHODS PROVIDING THEY MEET INTENDED DESIGN REQUIREMENTS. 9. NOT ALL AND ONLY CERTAIN TYPES OF SUPPORTS ARE SHOWN ON THE MECHANICAL DRAWINGS. UNLESS OTHERWISE DETAILED ON THE DRAWINGS ALL PIPE SUPPORTS SHALL BE DESIGNED, FURNISHED AND INSTALLED BY THE CONTACTOR AS SPECIFIED AND TO THE APPROVAL OF ENGINEER. NOTE THAT ALL PIPING ADJACENT TO EQUIPMENT, VALVES, COUPLINGS, INSTRUMENT DEVICES AND OTHER APPURTENANCES SHALL BE PROPERLY SUPPORTED AND/OR ANCHORED ACCORDING TO MANUFACTURERS RECOMMENDATIONS. 10. ALL EQUIPMENT BASES AND PIPING HAVING DRAIN OUTLETS SHALL BE PIPED TO THE NEAREST OPEN END DRAIN �OED) OR TRENCH DRAIN USING GALVANIZED STEEL PIPE OF APPROPRIATE DIAMETER INDICATED ON THE DRAWINGS OR AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. 11. UNLESS OTHERWISE SHOWN ALL PIPES UNDER CONCRETE SLABS SHALL BE ENCASED IN CONCRETE AS SHOWN ON THE STRUCTURAL DRAWINGS. 12. NOT ALL VALVE AND GATE OPERATORS ARE SHOWN (I e. HANDWHEELS, CRANKS, CHAINWHEELS, MOTORS OR LEVERS). OPERATORS SHALL BE LOCATED TO ALLOW CONVENIENT OPENING AND CLOSING OF VALVES OR GATES. ORIENTATION OF OPERATORS SHALL BE TO APPROVAL OF ENGINEER. NO VALVE SHALL BE INSTALLED WITH THE OPERATING STEM IN THE VERTICAL DOWNWARD POSITION. 13. PIPING SHALL BE INSTALLED SO THAT ANY PIPE, LAYER OF PIPING OR EQUIPMENT CAN BE REMOVED WITHOUT DISTURBING REMAINING PIPES AND SUPPORTS. 14. THE NUMBER OF UNIONS AND OTHER TYPES OF DISMANTLING COUPLINGS SHOWN IS APPROXIMATE. THE CONTRACTOR SHALL PROVIDE UNIONS OR DISMANTLING COUPLINGS WHETHER THEY ARE SHOWN ON THE DRAWINGS OR NOT ON ALL PIPELINES WITH WELDED, THREADED OR SOLVENT CEMENTED JOINTS: AT ALL EQUIPMENT CONNECTIONS, AT A MINIMUM EVERY 50 FEET AND IN BRANCH LINES TO ALLOW CONVENIENT REMOVAL OF PIPING, EQUIPMENT AND APPURTENANCES. 15. FURNISH AND INSTALL ESCUTCHEON PLATES OF SUITABLE SIZE ON ALL PROCESS LINES PASSING THROUGH INTERIOR WALLS OF NON -PROCESS AREAS SUCH AS OFFICES, LABS, LOCKER ROOMS, TOILETS AND PUBLIC CORRIDORS. ESCUTCHEON PLATES SHALL BE INSTALLED ON THE INTERIOR SIDE OF THE NON -PROCESS ROOMS. EXTERIOR, ABOVE GROUND WALL PENETRATIONS SHALL SPLIT AND MADE OF 316 SS UNLESS OTHERWISE SHOWN. 16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING AND TAGGING ALL PROCESS \/Ai VES. PROCESS \JAL VE IDENTIFICATION SYSTEM SHALL BE AS DETAILED ill THE SPECIFICATIONS. 17. ALL PIPING ENCASED IN CONCRETE SHALL HAVE MECHANICAL JOINTS AT ALL STRUCTURAL EXPANSION JOINTS. 18. ALL PIPING AND PROCESS SYSTEMS SHALL BE CAPABLE OF BEING VENTED AND DRAINED. TYPICAL LOCATIONS ARE INDICATED BY (V) OR (D) ON THE DRAWINGS. 19. ALL DIMENSIONS MARKED WITH * INDICATE CONTRACTOR TO COORDINATE DIMENSION WITH MANUFACTURER OF APPROVED EQUIPMENT. 20. ALL DIMENSIONS MARKED WITH C INDICATE CONTRACTOR TO COORDINATE DIMENSION IN THE FIELD TO APPROVAL OF ENGINEER 21. � INDICATES PIPE SUPPORT LOCATION FOR ADDITIONAL PIPE SUPPORT INFO. REFER TO NOTE No. 10 THIS SHEET FOR DETAILS OF CONCRETE PIPE SUPPORTS SEE STRUCTURAL DRAWINGS. j%k CARO��ii� ;ate SEAL • 3366-17 ' I < REFERENCE ✓1, G2IN�� ;l�e /Z- A r/s+ M 64���`1REFERENCE ..u 1 M-10 SHEET WHERE M- SHEET WHERE DETAILS IS SHOWN SECTION IS SHOWN ' REFERENCE DETAIL SYMBOL SEMON SECTION SYMBOLS SECTION S TAKEN MECHANICAL SYMBOLS & ABBREVIATIONS, NOTES AND LEGEND PROJECT NO. 6145-217155 FILE NAME: M001 NFAB.DWG SHEET NO. M-1 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION z 75 CIOU I O z O Q N_ ry O Q z w ry Li 7- 0 O U O ry CL ry w O z Q ry O w ry Q m ry O w I O z 0 W w m O p -- O z w Q 0 z Q V1 C) U L_ O ry III n O m m w T f— w ry 3 Q —1 Z n- W U ry � w N = O 0 0 :2 w / Q o ry O n m O o U z_ U_ L1J _U > U � � W U) J 0'l Q Q) z U O O V) n (n W Ln w L / n- n U m � o �I m E Z Q W � Q N � U O C) i iL m ) n �I a_ c z 00 CD N cn U7 L D U oo Q o J N Q W Ci \/ >D ry � Wo Q) w U E ! mw O J (n O n � W O w I =�_ 3:Ccfl a Q e __jz Q �D co >. U) O E Co U-0 > UO 0 Q- V) �w w cn / o� X J (1 @ n - ALUMINUM STAIRS (SEE STRUCTURAL DRAWINGS FOR DETAILS) EV I DATE I DRWN I CHKD j n" Kinui REMARKS DESIGNED BY DRAWN BY SHEET CHK'D BY:. CROSS CHK'D BY: J. AREVALO A. EDWARDS M. TAY LO R J H EALY APPROVED BY: J. BUTCHER DATE: JANUARY 2018 PLAN 3/8" = 1'-0" cmith 5400 Glenwood Avenue, Suite 400 Raleigh, INC 27612 1 Tel: (919) 325-3500 NC F-1255 6 CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS I�Li�y3i] V61,I= Kq V 2 VC CONNECT TO 3" NPW ')TING ASH PUMP STATION . SHEETS FOR CONTINUATION) ESSED AIR -SST TO ASH ,TION (SEE CIVIL SHEETS 'INUATION) �EEZE rA 45SEMBLY D- - PVC L VALVE ;PVC FROM DUMP OTE 5 AND -CPVC CTE 5 AND T FLANGED WALL e / WATER STOP D-1 721.50 DM EXPANSION JOINT 16" ASF-CPVC INV EL 721.65± (SEE M-4 FOR CONTINUATION) 6" PRESS DRAIN-CPVC INV EL 721.65± (SEE M-4 FOR CO STI INI UATIO 1K 41 ) 11.25° BEND (TYP OF 3) 6" EPDM FLANGED EXPANSION JOINT 6" SS T FLA VGE VVMLL f r` PIPE W/ WATER STOP MD -1 INV EL 721.50± 6" PRESS DRAIN—CPVC (SEE NOTE 5) NOTES: 1. CLARIFIER MANUFACTURER SHALL PROVIDE THE CENTER COLUMN AND WALKWAY BRIDGE ACCESS TO THE EDGE OF THE TANK AS SHOWN ON THE DRAWINGS. THE GENERAL CONTRACTOR SHALL PROVIDE THE ELEVATED WALKWAY TO THE WALKWAY BRIDGE ACCESS AND STAIRS, WHICH ARE DETAILED IN THE STRUCTURAL SHEETS. 2. CONTRACTOR SHALL PROVIDE SCHEDULE 40 PVC AND SCHEDULE 40 GALVANIZED STEEL WATERLINES, CONNECTED TO THE NON—POTABLE WATER SYSTEM, TO SUPPLY WASH WATER TO THE HOSE BIB MOUNTED ON THE TANK WALKWAY RAILING WHEN ABOVE GRADE, LINES SHALL BE SUPPORTED VN I HE IANK i�iIALL. SEE DETAIL F/MD-2 3. FIELD ADJUST VERTICAL AND HORIZONTAL LOCATION OF NON -POTABLE WATER LINES, INCLUDING ADDITIONAL FITTINGS AS NEEDED TO AVOID CONFLICTS WITH OTHER LINES, APPURTENANCES AND STRUCTURES. 4. OUTDOOR WASHDOWN ASSEMBLY SHALL BE PLACED ADJACENT TO THE HOSE BIB. SEE SPECIFICATION SECTION 22 30 00. 5. PROVIDE iN I ERMEDIATE SUPPORTS (5' O.C.) AIVD SUPPORT PIPES FROM WALKWAY. 6. EXPOSED 2" DRAIN (D) PIPE FROM SUMP PUMPS AND 3" RECIRCULATION (RC) PIPES SHALL BE INSULATED AND HEAT TRACED PER SECTIONS 40 42 10 AND 40 41 13. 7. EXPOSED NPW PIPES SHALL BE INSULATED AND HEAT TRACED PER SECTIONS 40 42 10 AND 40 41 13. \\\`�\CARO°f°°i ,�� Q` • ' " • O y SEAL • 3366 `4%^� v�9,�•:�GiNE� 111 p ll►� PROJECT NO. 6145-217155 FILE NAME: M002PCPL.DWG ASH CLARIFIER PLANSHEETI NO. M-2 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION u U w O Z O _N O O Z w w F- F- D O z I— U W O n ry W O Z ry O w ry w ry O w O A 0 Li w m O O z w ry a z z F-- 0 U LI O ry w w O ry w W w ry z w ry W 0 w ry O w Cy O u a, z 3 U W U Q ry M W O (n O � Z Q _O U (n cn .= W ry w co ry m m o � � Li m U a` o uo co p o w a �I mi Z CD N Z (n I N w U � i c; a- ¢ CL �, . cm cn 0 � CD o W �r W co a r� u')v O Lo wO O N W O N (� W CL L a. E _ J LLQ al �cn aoa aw co o =� cnl W c o 0 0 w U 00 W -� n �D X -j aLLJ Ory FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION a w v z 0 N o' z w a� z c� w a- ctfw v z v ry v w 0 z w w c� v 0 z w b (10 a C) LLQ Ld IL 0 VIEW FOR DEMOLITION PHOTO 12"x45' BEND (ROTATED DOWN) 16"002" RED WYE B FLUSH D,— CONNECTION 0. a. LL - a_ 16"x11.25' BEND (ROTATED UP). a � � Li c) CL 2 INV EL 721.77 coz 0 0 - W Ln z co v I Q� CD w Q D z cn � Ww s c v a vi .< J' 0 iL CL c ce)' cm U7 w �uCL 1, c r-)Ld J ...c >� nN (PLO env JAL v w Ln C jZw Z: a�L Lj Li E s 0 J 0" E LL CL W U5 3: J '-- CLd Q w a. r� C14 ~ ZNo n - Iw (A0 0 I � c a E) :�'LL- v 7' 04 cnl -j w v 16" FLANGE ADAPTER W " = c,DATE W M �: w a. DRWN CHKD (SEE M-2 FOR Li CONTINUATION) �-- --- CD Q 0 6" FLANGE ADAPTER v INV EL 721.65± o_ cn w � (SEE M-2 FOR C) ry CONTINUATION) 0. a. co m m v a � � c) CL 2 m If 0 0 - W Ln z I Q� CD D z cn � Ww v a vi .< J' iL CL c ce)' cm U7 �uCL 1, c r-)Ld J ...c >� (PLO env JAL v Ln C jZw Z: a�L Lj E s 0 J 0" LL CL W U5 3: J '-- CLd Q w a. C14 ~ ZNo - - Iw (A0 a E) :�'LL- Q 78 as ori co ti w U- W 0 -REV. W " = c,DATE W M �: w NO. DRWN CHKD X J a @ r: 6" PRESS DRAIN–CPVC REMARKS 10 " CPVC PIPE TO EXISTING ASN CLARIFIER 12 " CPVC PIPE TO EXISTING .4.5N CLARIFIER (000B FLUSH VD—y CONNECTION CUT INTO EXISTING 10" 1 CPVC PIPE. INSTALL 12"x10" M_5 REDUCER, 1 2" SPOOL PIECE WITH ROLLED GROOVE FOR VICTAULIC TYPE COUPLING CUT INTO EXISTING 12""' PIPE. INSTALL 12" VICTAULIC COUPLING W,/' CAP (TYP OF 2)--(0'_2' ) M 2 ®5 12" REDUCING TEE. CONNECT TO EXISTING 6"°'DRAIN AND EXTEND VENT TO EL 760.00. PROVIDE 1/2" 316 SST MESH BIRD SCREEN ON'' END. 12" TEE (HORIZONTAL) 12" TEE (VERTICAL) W/ FLANGED ADAPTER. CONNECT TO EXISTING FLANGED WALL PIPE. INSTALL NEW 6" VENT INV EL 734.25±. END VENT AT EL 760.00 PROVIDE 1/2" 316 SST MESH BIRD SCREEN ON END. PIPE RACK (SEE NOTE 1) 12" ASF DRAIN—CPVC y INV EL 723.30± ll - - 12x90' BEND INV EL 724.00 4 16"x11.25° BEND (ROTATED DOWN). 16%12" REDUCER INV EL 723.30 12x90' BEND INV EL 724.00 3"x90' BEND (TYP OF 4) SEE NOTE 2 — 3" TA,–CPVC (BELOW GRADE. SEE CIVIL FOR CONTINUATION) 12" VICT UIC C.OUPLIING W/ CAP (Tt I N YP O 12"x 10"RED TEE INV EL 734.5 ± 10" TEE (VERTICAL) 10"' CPVC PIPE DRAIN FROM FBI NO. 1 SCRUBBER 10" 'FALL PIPE CPVC. D (2) 10" FLANGE ADAPTERS D_ a CONNECT TO EXISTING PIPING 12" DIA x24" LONG SPOOL PIECE WITH ROLLED GROOVE. (2) 1.2" SST VICTAULIC COUPLINGS (TYPE 77S W/ EPDM GASKET) I: (TYP OF 2 ASSEMBLIES) - 4" CPVC- PIPE DRAIN 4� EL 751.33 EXISTING PIPE SUPPORTS 12"' CPVC PIPE DRAIN FROM FBI NO. 2 SCRUBBER 12" SPOOL PIECE WITH ROLLED GROOVE FOR VICTAULIC TYPE COUPLING PIPE SUPPORTS G (TYP) D 12" ASF DRAIN—CPVC B FLUSH CONNECTION p_ INV EL 732.50± 12"' TEE. INSTALL 6" VENT. END VENT AT EL 760.00, PROVIDE 1/2" 316 SST MESH BIRD SCREEN ON END rB FLUSH CONNECTION_ INV EL 732.50± 12" TEE INSTALL 6" VENT END VENT AT EL 760.00 PROVIDE 1/2" 316 SST MESH BIRD SCREEN ON END D - PIPE PENETRATION D_ 1 3" FLANGE ADAPTER W/ BLIND FLANGE EL 725.00 - (SEE VOLUME 1 FOR CONTINUATION) SOLIDS BUILDING 6"x90' BEND \ INV EL 722.50 4 J B--,• FLUSH CONNECTION D A 6"x90' BEND M_5 INV EL 722.66 ith R GS S G HKD B - APPROVED BY: J. BUTCHER DATE: JANUARY 2.01 S DESIGNED BY: J. AREVALO DRAWN BY: A. EDWARDS ;, CDM,, SHEET CHK'D BY: M. TAYLOR Sm C 'Y J. HEALY - 5400 Glenwood Avenue, Suiite 400 Raleigh, INC 27612 1 Tel: (919) 025-3500 NIC F-1255 SOLIDS BUILDING PLAN TO BE DEMOLISHED DEMOLITION NOTES: 1. REFER TO DRAWING S-6 FOR PIPE RACK DETAILS. CONTRACTOR SHALL PROVIDE PIPE SUPPORT'S AS REQUIRED, TO SUPPORT INDIVIDUAL PIPES FROM PIPE RACK. 2. EXPOSED TA PIPE SHALL BE INSULATED AND HEAT TRACED PER SPECIFICATION' SECTIONS 40 42 10 AND 40 41 13. 3. NOTIFY ENGINEER AND PLANT STAFF ONE WEEK IN ADVANCE BEFORE MODIFYING ANY ACTIVE PIPING AND SYSTEMS. REFER TO SPECIFICATION SECTION 01 12 16 FOR MORE DETAILS. 4. PROVIDE SUPPORTS FOR ASH PIPES AND VENTS. MAXIMUM SPACING BETWEEN SUPPORTS 5' O.C. B - FLUSH CONNECTION D- - 6"x4" TEE INSTALL 44" VENT, END VENT AT EL 760.00 PROVIDE 1/2" 316 SST MESH BIRD SCREEN ON END Cx90` BEND INV EL 723.83 6" FLANGE ADAPTER 6"x90° BEND INV EL 724.25 �- ITRACT SEE ' VOLUME 1 No IM -5 CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF 0 PROPOSED BELT FILTER PRESS (SEE VOLUME 7 DRAWINGS) i E10-11-ii-1161113W.Simp il►. ILI SOLIDS BUILDING DEMOLITION AND PROPOSED PARTIAL PLAN C ARO///i SEAL • 3366 ' GINS J/�Jr�ow,�,�tii PROJECT NO. 6145-217155 FILE NAME: M004SHPL.DWG SHEET NO. MI -4 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION r) U I O z O Q _N O H Q z w ry w O U w O ry w ry w O z Q ry O 1 ry Q CL ry O w I O z 0 w m w m O O z w Q 0 Z Q V) U I O ry w m O ry m w w ry Q z w ry w 0 w Q O w ry O U p) Z 3 a U w U 0 2 > o E Q Z p < O m U (n � o � w M L1 N U ry U' m n U m _ o Li 0 0 0 O O ry o m U [0 V) n � Z C) _U o Z (n CL w U r) r) (n Q J a G _ o (n U N .71 CL Lu C+') 0 nLLi � � w > J u •- t1) � U J p 'n w O L Wo cn 04 w ~CD J ry L` a cri LU 0 aw Q E co U (� I Lu cf) U a UO U- muj a ~ (n W �- % O � cq X -1 a Ory FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION ry W O z Q m O 1 F- m Q n ry O w J O r - w i� W m O O Z W Q z a VJ U O W n O ry n W T_ W ry Q Z_ W ry W W Q ry O a_ ry O U � Z a J W H U ry � W O cn Q � Z O U cn o cn w w co O U_ Of C co L U � m N r-) N W N U O L a O m o m m � I Z U z Ul N w N � O U > r-) � O Z d c:Q co E cr) ,a) cf) Cr) 0 0 LLJ � coM _� � Lr) U Lo w N N — V O N ti W 0 U) N (N ry W Lo cn cn 0 W T V J ry LL wU) �_� aoaQW M I Q O = N U f (1?I LV V) O 0 E 0 o U UO vi co 3 r-- w LL CL T- O� cn N X -j a Ory FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION Z ri U w O Z O Q N_ ry O Q z w I— ry w O F-- v w O m m ry w O z Q ry O W a w v� W m P XX W O ry III n O ry w w z w m Q z Li ry w 0 w Q O w m O U � Z a � w F- U ry O W Q 0 Z Q O U Ul ,� cn w w O ry w U N m � D N W N � U 0- a- a O Lo IK CD m °0, z g' 0 z v) w m o O U > 0 U Q � a � E oo t— „ M( o Lo � U N 04 T � O N W 0 CD ry LL. 1i i cn aoa Qw v� Q E _ N ° cn� w �' a oW U -0 iri c'u 3 ti w LL, �� 04 X -i a Ory FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION .�I 0 COVER' on z 1� 1 aI a oaooaoaaoQcaaacaaa a a �= P� ao Q j a� N Q O O a 0 o a � gaoaaao aaaaaq as <SKID RESISTANT a aoaQ MATERIAL SHALL BE z SURFACE LIGHT WEIGHT POLYMER CONCRETE ILI PULL SLOT (2) BY HUBBELL POWER SYSTEMS, OR EQUAL. = PENTA HEAD LOCKING BOLTS (2) f - D A 11-3/4" B 21-1/4" O NOTE: 0 °0, cn z TO ENSURE POSITIV � DRAINAGE, THE VAUI CD VVERTICAL SHALL HAVE AN W, OPEN BOTTOM TO � W/ BELOW GROUND OPERATOR ALLOW DRAINAGE CL Q TI-IRQUGI-I CTII�IE � w E O 0 o w NTS - M z Q O r DIMENSIONS (INCHES) A 11-3/4" B 21-1/4" Q O w J O z 0 w LU m O I— 0 w ry Q 0 z Q z 0 U LL. O ry W n O n w 2" SQUARE AWWA w OPERATING NUT--- < 6" z 11 w m w a Q �\\' ry O al w ry > O o U U c z .o z J w C) w � C o0 o a �Oo o z O U to cn w t O )oQ o ,O QAC a� m N LLJ a` o UNDISTURBED EARTH 4 MOUSE HOLES (2) 4"x4" OPENING WITH 4"x4" KNOCKOUT ABOVE OPENING Qv VALVE BOXrE WITH COVEP. I — FINISH GRADE CAST IRON EXTENSION TYPE VALVE BOX NO 57 STONE MI O Lo co 2 Ld U N N j w 0 ctrl cy w LO cncn D a), - 0 i, -0 E Sq /=/-n 7— T 0 J ry U_ 5- V7 W 0 ?� f— a 0 a Q W ¢ E _ N 3: ° 04I w cn0 N p u E �w U .0 -s 80 O LLCoLLJ U) Q ~ W 4, - REV. DATE DRWN CHKD REMARKS X _j a O � N0. 24„ FINISHED GRADE DISTANCE AS SHOWN i ON DRAWINGS (NP) 2" TEE—PVC BLOCKING NPW PIPE) DRAIN BOX: 13" X 24" POLYMER CONCRETE BOX 2" GATE VALVE, THREAnEn INLET/OUTLET DISTANCE AS SHOWN ON DRAWINGS (NP) 2" SCHEDULE 40 PVC PIPE (ALL JOINTS ARE RESTRAINED) DfCHJJ i CC RI nr�lr\Ir CONTINUE AS SHOWN ON DRAWINGS. NPW PIPING ABOVE GRADE TO HOSE BIBS SHALL BE SCHEDULE 40 GALV STEEL, SEE DETAIL C/MD-3. PROVIDE TRANSITION COUPLING AS NEEDED CONCRETE BLOCKING MINIMUM 1/3 CUBIC YARDS AT 3000 P.S.I. 1. ALL BOXES AND LIDS SHALL BE TRAFFIC RATED FOR H-20 LOADING AND APPROVED BY ENGINEER. 2. ALL COMPONENTS SHALL MEET THE MININUM REQUIREMENTS IN THE SPECIFICATIONS FOR WATER MAIN PIPE AND PRESSURIZED WATER CONVEYANCE. 3. ONE 2" OR 6" GRADE ADJUSTER MAY BE UTILIZED WHEN NEEDED TO MEET FINAL GRen� (nlr� (`RAn� f/1in IUC`,T�RC AA AV RE UC�n nil n��1AI r(�1�ICTPI I('Tinf\i ED IF(`Tc) I \/1V L I v VI \ VL VV I LI \+J IVIlI I U JLV M Y 1 L1Y V I VJ I I\ V V I I V I V 1 i VV LV I .,,J GRADE ADJUSTER AND BOX SHALL BE BY THE SAME MANUFACTURER. 4. ALL PIPE JOINTS, FITTINGS, COUPLINGS, AND VALVES ARE TO BE RESTRAINED 5. PROVIDE FITTINGS AND REDUCERS AS NEEDED TO AVOID CONFLICTS WITH OTHER UTILITIES. NON -FREEZE DRAIN ASSEMBLY 6. THIS DETAIL SHOWS THE ASSOCIATED FITTINGS AND VALVE TYPES NECESSARY TO PROVIDE A NON—FREEZE DRAIN ASSEMBLY ON A 2" PVC PIPE. DETAIL rA 3" DIA ANODIZED CAST IRON STAY — PUT COVER RAISED LETTERS MARKED ALUMINUM BRONZE DISC FOR UTILITY 6" ANCHOR IN CONC PAD, ASPHALT SURFACE STAMP AS NEEDEDffrrrrrrr,rrW 2 H00KED ANCH0R r �rr rri rri �ri fri r!12TYP 2" SQUARE AWWA. 12" OPERATING NUT B FV LLSIZE OF VALVELIMEROCK BASE SLIDE TYPE T.,�\AI\,20 PE E OF VALVETBOX VALVE BOX SERVICE"`�yDIRECTION & VALVE BOX — TYPE I NO. OF TURNSE FINISH GRADETO OPEN 24" X 24" X 6" THICK CONCRETE g" PAD AT EACH VALVE BOX — RETE VALVE PAD 6" CONCRETE PAD , 3" ANODIZED j ALUMINUM DISC 2,f i v� av CO Iq 1° v° Iq �v ANCHORS DISC DETAIL DETAIL E NTSL - SLIDE TYPE VALVE BOX CONCRETE PAD (CAST IRON) 2" SQUARE AWWA PROVIDE EXTENSION OPERATING NUT AS REQUIRED TYP. CONNECT TO VALVE VALVE BOX -TYPE II DESIGNED BY: J. AREVALO DRAWN BY: A. EDWARDS SHEET CHK'D BY: M. TAYLOR ith CROSS CHK'D BY: J. HEALY APPROVED BY: J. BUTCHER DATE: JANUARY 2018 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 12" TYP. 16" RADIUS Y4" ALUM PLATE I,I � !t 11 1 I Y4" RADIUS (TYP) 4—Y2" x 6„ SST EXP 14" DIA CONCRETE SUPPORT —� NOTES: 1 " PLUG VALVE (OR AS SHOWN) BLIND FLANGE TAPPED FOR 5 1 " N P T - MATCH INV 1 " CLOSE NIPPLE (OR AS SHOWN) FEMALE QUICK CONNECT CPLG, KAMLOK OR EQUAL (INSTALL FOR AIR AND WATER) (END MOUNTED) 9" RADIUS Y4" ALUM HOSE RACK WELD PLATE & AL - 3" ALUM PIPE Y2" ALUM PLATE WELD TO PIPE FLUSHING COCK ONE DETAIL rB NTS — FEMALE nl Ilnv nnnIt, l CT COUPLING (SIDE MOUNTED) HALF C P LG INSTALL BEFORE PIPE IS LINED z_ 0 I 1 1/4" FREEZEPROOF YARD HYDRANT BY WOODFORD MFG CO OR EQUAL 1 1/4" BRASS HOSE VACUUM BREAKING VALVE (TYP) i - 6"X6" PRE CAS T CONCRETE POST NO. 4 BAR SLOPE UP 1" FINISH GRADE 18" DIAMETER CONCRETE FILL 1 1/4" ELBOW AND DRAIN PIPE (TYP) 1 ) I �4"d 4�g44Un4gdn4"d4d�a1 1 V d d 4 4 d qv 4 d 4 d 4 d 1 4 4 4 44 4 44 4,44 d 44 4 44 4 4 44 4 4 V V dq 4 4 4q 4 4444 d 44 4 4 4d 4 44a 4 4d v v \ 4 'a A4 444444 44 In 44 4444 4 4 44 d4 4d 4 444 44444444 44 4 4 4444 44 4444 '4444x4444444444444 4 a 1 CU. FT. 0E--' GRAVEL FOR TYPICAL 1 1/4" POST HYDRANT DRAIN (TYP) TOP VIEW DETAIL C Nr_; USSET PLATES ;CH) 1—Y„ 1 Y„ 2 -2 6" 5Y8" DRILL (4 HOLES) I o IT - CU (D N 6) o o 14?Y, 4Y2„ g„ SECTION rA �\\'/�\ 2,-8„ 1/4„ ALUM BACKING PLATE L 1-1/2" HANDRAIL - -------------------�--- (TYP) 16" RADIUS STAND-ALONE RACK o 9 RADIUS I 1. HOSE RACK SHOWN IS USE FOR THE "OUTDOOR WASHDOWN ASSEMBLY (1-1/2" AND SMALLER)", AS DESCRIBED IN SPECIFICATION SECTION 22 30 00. 2. NO DRAWING DETAIL IS PROVIDED FOR THE HOSE RACK ASSOCIATED WITH THE "OUTDOOR WASHDOWN ASSEMBLY (2" AND LARGER)", AS DESCRIBED IN SPECIFICATION SECTION 22 30 00. N ii1 �� 2 " 4 tr I I t► It 1/2" DIA HOLES SST U -BOLT BRACKET, FOR PIPE SIZE 1-1/2" (TYP OF 3) HOSE RACK INSTALLATION ON HANDRAIL (STAND-ALONE AND HANDRAIL MOUNTED) DETAIL K"NIF NTS — CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF MISCELLANEOUS NAECHANICAL DETAILS CARO��'i�j \\ a • se SEAL 6 ° GIN ti0c PROJECT NO. 6145-217155 FILE NAME: MD03MDTL.DWG SHEET NO. MD -3 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION O � 0 °0, cn z z CD VVERTICAL VALVE INSTALLATION o Lj W/ BELOW GROUND OPERATOR Z cm Q DETAIL rD E o 0 o w NTS - M O > MI O Lo co 2 Ld U N N j w 0 ctrl cy w LO cncn D a), - 0 i, -0 E Sq /=/-n 7— T 0 J ry U_ 5- V7 W 0 ?� f— a 0 a Q W ¢ E _ N 3: ° 04I w cn0 N p u E �w U .0 -s 80 O LLCoLLJ U) Q ~ W 4, - REV. DATE DRWN CHKD REMARKS X _j a O � N0. 24„ FINISHED GRADE DISTANCE AS SHOWN i ON DRAWINGS (NP) 2" TEE—PVC BLOCKING NPW PIPE) DRAIN BOX: 13" X 24" POLYMER CONCRETE BOX 2" GATE VALVE, THREAnEn INLET/OUTLET DISTANCE AS SHOWN ON DRAWINGS (NP) 2" SCHEDULE 40 PVC PIPE (ALL JOINTS ARE RESTRAINED) DfCHJJ i CC RI nr�lr\Ir CONTINUE AS SHOWN ON DRAWINGS. NPW PIPING ABOVE GRADE TO HOSE BIBS SHALL BE SCHEDULE 40 GALV STEEL, SEE DETAIL C/MD-3. PROVIDE TRANSITION COUPLING AS NEEDED CONCRETE BLOCKING MINIMUM 1/3 CUBIC YARDS AT 3000 P.S.I. 1. ALL BOXES AND LIDS SHALL BE TRAFFIC RATED FOR H-20 LOADING AND APPROVED BY ENGINEER. 2. ALL COMPONENTS SHALL MEET THE MININUM REQUIREMENTS IN THE SPECIFICATIONS FOR WATER MAIN PIPE AND PRESSURIZED WATER CONVEYANCE. 3. ONE 2" OR 6" GRADE ADJUSTER MAY BE UTILIZED WHEN NEEDED TO MEET FINAL GRen� (nlr� (`RAn� f/1in IUC`,T�RC AA AV RE UC�n nil n��1AI r(�1�ICTPI I('Tinf\i ED IF(`Tc) I \/1V L I v VI \ VL VV I LI \+J IVIlI I U JLV M Y 1 L1Y V I VJ I I\ V V I I V I V 1 i VV LV I .,,J GRADE ADJUSTER AND BOX SHALL BE BY THE SAME MANUFACTURER. 4. ALL PIPE JOINTS, FITTINGS, COUPLINGS, AND VALVES ARE TO BE RESTRAINED 5. PROVIDE FITTINGS AND REDUCERS AS NEEDED TO AVOID CONFLICTS WITH OTHER UTILITIES. NON -FREEZE DRAIN ASSEMBLY 6. THIS DETAIL SHOWS THE ASSOCIATED FITTINGS AND VALVE TYPES NECESSARY TO PROVIDE A NON—FREEZE DRAIN ASSEMBLY ON A 2" PVC PIPE. DETAIL rA 3" DIA ANODIZED CAST IRON STAY — PUT COVER RAISED LETTERS MARKED ALUMINUM BRONZE DISC FOR UTILITY 6" ANCHOR IN CONC PAD, ASPHALT SURFACE STAMP AS NEEDEDffrrrrrrr,rrW 2 H00KED ANCH0R r �rr rri rri �ri fri r!12TYP 2" SQUARE AWWA. 12" OPERATING NUT B FV LLSIZE OF VALVELIMEROCK BASE SLIDE TYPE T.,�\AI\,20 PE E OF VALVETBOX VALVE BOX SERVICE"`�yDIRECTION & VALVE BOX — TYPE I NO. OF TURNSE FINISH GRADETO OPEN 24" X 24" X 6" THICK CONCRETE g" PAD AT EACH VALVE BOX — RETE VALVE PAD 6" CONCRETE PAD , 3" ANODIZED j ALUMINUM DISC 2,f i v� av CO Iq 1° v° Iq �v ANCHORS DISC DETAIL DETAIL E NTSL - SLIDE TYPE VALVE BOX CONCRETE PAD (CAST IRON) 2" SQUARE AWWA PROVIDE EXTENSION OPERATING NUT AS REQUIRED TYP. CONNECT TO VALVE VALVE BOX -TYPE II DESIGNED BY: J. AREVALO DRAWN BY: A. EDWARDS SHEET CHK'D BY: M. TAYLOR ith CROSS CHK'D BY: J. HEALY APPROVED BY: J. BUTCHER DATE: JANUARY 2018 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 12" TYP. 16" RADIUS Y4" ALUM PLATE I,I � !t 11 1 I Y4" RADIUS (TYP) 4—Y2" x 6„ SST EXP 14" DIA CONCRETE SUPPORT —� NOTES: 1 " PLUG VALVE (OR AS SHOWN) BLIND FLANGE TAPPED FOR 5 1 " N P T - MATCH INV 1 " CLOSE NIPPLE (OR AS SHOWN) FEMALE QUICK CONNECT CPLG, KAMLOK OR EQUAL (INSTALL FOR AIR AND WATER) (END MOUNTED) 9" RADIUS Y4" ALUM HOSE RACK WELD PLATE & AL - 3" ALUM PIPE Y2" ALUM PLATE WELD TO PIPE FLUSHING COCK ONE DETAIL rB NTS — FEMALE nl Ilnv nnnIt, l CT COUPLING (SIDE MOUNTED) HALF C P LG INSTALL BEFORE PIPE IS LINED z_ 0 I 1 1/4" FREEZEPROOF YARD HYDRANT BY WOODFORD MFG CO OR EQUAL 1 1/4" BRASS HOSE VACUUM BREAKING VALVE (TYP) i - 6"X6" PRE CAS T CONCRETE POST NO. 4 BAR SLOPE UP 1" FINISH GRADE 18" DIAMETER CONCRETE FILL 1 1/4" ELBOW AND DRAIN PIPE (TYP) 1 ) I �4"d 4�g44Un4gdn4"d4d�a1 1 V d d 4 4 d qv 4 d 4 d 4 d 1 4 4 4 44 4 44 4,44 d 44 4 44 4 4 44 4 4 V V dq 4 4 4q 4 4444 d 44 4 4 4d 4 44a 4 4d v v \ 4 'a A4 444444 44 In 44 4444 4 4 44 d4 4d 4 444 44444444 44 4 4 4444 44 4444 '4444x4444444444444 4 a 1 CU. FT. 0E--' GRAVEL FOR TYPICAL 1 1/4" POST HYDRANT DRAIN (TYP) TOP VIEW DETAIL C Nr_; USSET PLATES ;CH) 1—Y„ 1 Y„ 2 -2 6" 5Y8" DRILL (4 HOLES) I o IT - CU (D N 6) o o 14?Y, 4Y2„ g„ SECTION rA �\\'/�\ 2,-8„ 1/4„ ALUM BACKING PLATE L 1-1/2" HANDRAIL - -------------------�--- (TYP) 16" RADIUS STAND-ALONE RACK o 9 RADIUS I 1. HOSE RACK SHOWN IS USE FOR THE "OUTDOOR WASHDOWN ASSEMBLY (1-1/2" AND SMALLER)", AS DESCRIBED IN SPECIFICATION SECTION 22 30 00. 2. NO DRAWING DETAIL IS PROVIDED FOR THE HOSE RACK ASSOCIATED WITH THE "OUTDOOR WASHDOWN ASSEMBLY (2" AND LARGER)", AS DESCRIBED IN SPECIFICATION SECTION 22 30 00. N ii1 �� 2 " 4 tr I I t► It 1/2" DIA HOLES SST U -BOLT BRACKET, FOR PIPE SIZE 1-1/2" (TYP OF 3) HOSE RACK INSTALLATION ON HANDRAIL (STAND-ALONE AND HANDRAIL MOUNTED) DETAIL K"NIF NTS — CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF MISCELLANEOUS NAECHANICAL DETAILS CARO��'i�j \\ a • se SEAL 6 ° GIN ti0c PROJECT NO. 6145-217155 FILE NAME: MD03MDTL.DWG SHEET NO. MD -3 FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION T b • z w w w 0 n w c� n- 0 ry 0 W 0 z w Ln w 0 0 z w <t a z c� Li c� 0 I ry 0 J w H 0 ry 4T w cna z d 0 co � w m r -,)Li 2 > o� 0 �- U) CD m co CIO 0 maw Q 'cm cn r I— z opo a � ' :D iC,2 � 04 ti wa C14 r�l U) Lu cf) cn QQ7 t � W U _E Sq =� 1— ~ J tY LU _j [] t Q w 04 (? cR� '� = Ln 0 20 .0 u� w U cru U_ (n �OL P w —� � D [ CO `�'� w. xJ a@fy 1 „ SCH 4'f"% r%A11 1! 1 1n 2"X XV, SCF REDUCER 2" SCH 4C V i c—• (TYP) 1. INSULATE AND HEAT TRACE ALL EXPOSED SCH 40 GALV PIPING. HOSE BIBB &HIGH VOLUME HOSE CONNECTION DETAIL rA NTS — BRASS SPRAY NOZZLE 1. ANCHOR WASH HOSE STATION TO WALL OR GUARDRAIL WITH STAINLESS STEEL HARDWARE AS REQUIRED WASH HOSE STATION DETAIL B NTS — NO. REV - V DATE I D'RWN CHKD EXISTING FILTRATE PUMP STATION DETAIL rD NTS ks. — REMARKS DESIGNED BY: - A. EJ. AREVALQ DRAWN BY: -- - _ 'DWA'RDS SHEET CHK"D BY: M. TAYLOR CROSS CHWD BY: J. HEAL`( APPROVED BY: J. BUTCHER DATE: JANUARY 201$ Smith 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (9 19) 325-3500 NC F-1255 0OF 1" EINE. RUBBER OSE SEE DETAIL F FOR '"h"1L'n1 CONE, RING, AND 2" FLANGED OUTLET, OR WEL'DOLET WITH WELD NECK FLANGE MAIN P I P E-----' �, rr I IAI.If1Al Rog 2"—FLG'D AIR—VACUUM AND, AIR RELEASE VALVE 2" ECCENTRIC PLUG VALVE 1" GALV STEEL PIPE TO DRAIN' SUPPORT AS NECESSARY -AIR GAP H,UB DRAIN, SCRUPPER, OR DRAIN AIR RELEASE AND VACUUM DETAIL C NTS — 1VI 1111. V v' I 1 I`1J Id •• , `• � ,..• � • •— REQUIRED BY ENGINEER CROSS-SECTION \SE 1. MANHOLE TO BE SET ON CONCRETE BASE AND BASE TO BE ONE POUR. 2. FOR VITRIFIED CLAY PIPE, CONCRETE SHALL BE POURED TO NEXT EXISTING JOINT (BOTH SIDES OF MANHOLE). 3. PIPEOPENING SHALL BE PRECAST BY MANUFACTURER. 4. FLOW SHALL BE MAINTAINED DURING CONSTRUCTION. 5. MINIMUM OF 4000 PSI' CONCRETE REQUIRED.. 6. THE CONTRACTOR SHALL PROVIDE A MINIMUM 6" COMPACTED #57 STONE BASE. 7. INVERT TO BE BUILT FROM PROPOSED PIPE TO EFFLUENT PIPE, ACCORDING TO DETAIL ON INVERTS. DOGHOUSE MANHOLE DETAIL rE NTS — CIN OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WI,RF MANHOLE RING AND COVER (SEE NOTE- 1 r) MANHOLE STEP NOTES; FENT 1. ALL PRE CAST CONCRETE MANHOLES SHALL CONFORM TO THE LATEST REVISION OF ASTM 0478. 2. CONCRETE SHALL BE 4000 PSI AT 28 DAYS MINIMUM. 3. STEEL REINFORCEMENT SHALL BE GRADE 40 BILLET STEEL CONFORMING TO THE LATEST REVISION OF ASTM—A-185 FOR 'FALL REINFORCEMENT, AND THE LATEST REVISION OF ASTM—A615 FOR THE BASE REINFORCEMENT. 4. STANDARD JOINTS SHALL BE; SEALED WITH PUTTY TYPE PLASTIC CEMENT PER FED. SPEC. SS—C-153 OR AN O—RING TYPE JOINT CONFORMING TO THE LATEST REVISION OF ASTM—C443. 5. MANHOLE INLETS AND OUTLETS SHALL BE CAST IN PLACE FLEXIBLE RUBBER SLEEVES BOOTS PER THE LATEST REVISION OF ASTM—C923. 6. INVERTS TO BE CONSTRUCTED OF BRICK WITH A CONCRETE BENCH. 7. THE MAXIMUM SEPARATION OR INVERT IN TO INVERT OUT WITHIN A MANHOLE IS 0.50 FEET. WHEN THE SEPARATION IS GREATER THAN 0.5 FEET A DROP MANHOLE MUST BE USED. 8. MANHOLES GREATER THAN 18 FEET IN DEPTH SHALL HAVE AN INSIDE DIAMETER OR 5'-0". FOR SANITARY SEWER MAINS GREATER THAN EIGHTEEN INCHES (18") IN DIAMETER, MANHOLES SHALL BE A MINIMUM OF 5-0" IN DIAMETER. 9. RIM ELEVATIONS SHALL BE AT GRADE IN STREETS & PARKING LOTS. 10. REFER TO SECTION 33 05 61 FOR MANHOLE RING AND COVER REQUIREMENTS. PRECAST CONCRETE SANITARY SEWER MANHOLE DETAIL F NTS — MISCELLANEOUS MECHANICAL DETAILS CAR0�Ix 0 y. Ax SEAL �" • . 3„„6 `moi-9�� ������ • ��`� �� P$ M. PROJECT NO. 61 45-21 71 55 FILE NAME: MD04MDTL.DWG SHEET NO. FINAL DRAWING -FOR REVIEW PURPOSES ONLY -NOT RELEASED FOR CONSTRUCTION z V) 0 U L_ 0 z 0 Q N ry O Q z w o- s w 0 U w O w O z Q O Q CL O w J O z 0 w D w M O 0 z w Q 0 z Q F-- 0 U 0 w IL 0 o- a_ w w o- Q z w w 0 w Q O J af O z � z 0 O L w o 0 w U � O J Q j z O U U) V) w o w o- 0)IL j m b\ 0 0 Q0 w 0 �I o Z 0 Q (D N U (n z V) o 0 o Q 0 cn co j z ow >> � LJv `— N W ~ Ln Ll!� LL cnw E W J z _ J n U' I J M D Q W 0 N 0 n :D �Io Co > Q O a %t--w Ld o ma N X JLi d @ nr- ONE LINE OR PLAN DESCRIPTION CONTROL DIAGRAM WHM - WATTHOUR METER WHDM - WATTHOUR DEMAND METER MEDIUM VOLTAGE DRAWOUT TYPE POWER 52 CS PF CIRCUIT BREAKER Y - DIGITAL METERING UNIT CS=CONTROL SWITCH X ILOW B - BLUE TG TG 1 FSE CB VOLTAGE AIR OR MOLDED CASE CIRCUIT BREAKER, 3 POLE UNLESS A - AMBER J OTHERWISE NOTED. COMBINATION MOTOR CIRCUIT PROTECTOR AND T MAGNETIC MOTOR STARTER, FULL VOLTAGE —O NON -REVERSING UNLESS OTHERWISE NOTED: TB I FULL VOLTAGE REVERSING RAN RVNR - REDUCED VOLTAGE NON -REVERSING * RVAT - REDUCED VOLTAGE VE OR AUTOTRANSFORMER DM DM RVSS - REDUCED VOLTAGE SOLID STATE ETM 2S1W - TWO SPEED, ONE WINDING M M 2S2W - TWO SPEED, TWO WINDING (DIAGRAMMATICALLY SHOWN, CONTRACTOR SHALL —0— FIELD LOCATE) NOTC NON -FUSIBLE DISCONNECT SWITCH, 600 VOLT, 3 POLE . /* * AMPERE RATING NOTED IF OTHER THAN 30A r (DIAGRAMMATICALLY SHOWN, CONTRACTOR SHALL NO�T0 FIELD LOCATE) _07—NCTC FUSIBLE DISCONNECT SWITCH, 600 VOLT, 3 I POLE, * - ## AMPERE RATING AND FUSE SIZE AS NOTED j� Eli * AMPERE RATING NOTED IF OTHER THAN 30A * FUSE RATING (DIAGRAMMATICALLY SHOWN, CONTRACTOR SHALL LS OR FIELD LOCATE) —O� b` MANUAL MOTOR STARTER WITH THERMAL 2 OVERLOAD HEATER, 1 POLE UNLESS OTHERWISE NOTED "P" INDICATES WITH PILOT LIGHT "2" PS OR INDICATES TWO POLE (DIAGRAMMATICALLY SHOWN, CONTRACTOR SHALL FIELD LOCATE) -{� >%>- DRAWOUT TYPE EQUIPMENT OR DEVICE —�- MEDIUM VOLTAGE CABLE TERMINATION PRESSURE —0 MEDIUM VOLTAGE AIR INTERRUPTER SWITCH MEDIUM VOLTAGE FUSED AIR INTERRUPTER TS OR O OR SWITCH * * FUSE RATING -<<d H� MEDIUM VOLTAGE FUSED MOTOR CONTROLLER 480V TRANSFORMER, RATINGS AND CONNECTIONS AS NOTED. UNLESS OTHERWISE NOTED ON THE KVA FT SINGLE LINE DIAGRAMS, ALL DRY TYPE TRANSFORMERS SERVICING ADMINISTRATIVE AND 120/208V LABORATORY SPAC ES SHALL HAVE A K FACTOR 3P, 4W OF 4. ISOLATION TRANSFORMERS SHALL HAVE - FS OR E A K-20 RATING A TO 5 CURRENT TRANSFORMER -- * QUANTITY ZS OR E A = PRIMARY AMPERES V TO 120 POTENTIAL TRANSFORMER -- --- * QUANTITY V = PRIMARY VOLTAGE O O GENERATOR, RATINGS AND CONNECTIONS AS WS OR NOTED —O)V0— NORMALLY OPEN, CLOSES ON HIGH TORQUE ATS rAUTOMATIC OR MANUAL TRANSFER SWITCH NO.1 (ATS -1), (MTS -1) "N" INDICATES NORMAL OR N S PREFERRED SOURCE "S" INDICATES STANDBY OR E ALTERNATE SOURCE 100A INDICATES CONTINUOUS CURRENT RATING 100A SEE LOCATION LEGEND ON DRAWING VARIABLE SPEED DRIVE CONTROLLER T + D. C. = D.C. DRIVE CONTROLLER ------ SCR = SILICON CONTROLLED RECTIFIER VFD = VARIABLE FREQUENCY DRIVE �1 UNIT HEATER - ELECTRIC HEATING COIL AND FAN #KW FOE II # - RATING UNIT HEATER - GAS FIRED, STEAM OR WATER I5 HEATING COIL AND FAN OO MOTOR, NUMERAL INDICATES HORSEPOWER VS VM VOLTMETER WITH SWITCH, 3 PHASE AS AM - AMMETER WITH SWITCH, 3 PHASE EV I DATE I DRWN I CHKD REMARKS ONE LINE OR PLAN CONTROL DIAGRAM _4L DESCRIPTION METER TOP CONIACI WM - WATTMETER WHM - WATTHOUR METER WHDM - WATTHOUR DEMAND METER WHDR - WATTHOUR DEMAND RECORDER PF - PO..'ER FACTOR METER DMU - DIGITAL METERING UNIT TRANSDUCER AX - CURRENT TRANSDUCER WX - WATT TRANSDUCER WHX - WATTHOUR TRANSDUCER RELAY, NO. AS INDICATED 25 — SYNCHRONISM CHECK RELAY 27 — UNDERVOLTAGE RELAY 32 — DIRECTIONAL POWER RELAY 38 — BEARING PROTECTIVE DEVICE 40 — LOSS OF EXCITATION RELAY 42 — RUNNING CONTACTOR/PILOT RELAY 46 — REVERSE PHASE/PHASE BALANCE/CURRENT RELAY 47 — PHASE SEQUENCE VOLTAGE RELAY 49 — MACHINE OR TRANSFORMER THERMAL RELAY 50/51 — INSTANTANEOUS/TIME OVERCURRENT RELAY 50G — INSTANTANEOUS GROUND 51 — TIME OVERCURRENT RELAY 51G — TIME OVERCURRENT RELAY, GROUNDING RESISTOR TYPE all, — TIME OVERCURRENT RELAY, RESIDUAL TYPE 51V — TIME OVERCURRENT RELAY WITH VOLTAGE ORESTRAINT 51X — AUXILIARY RELAY (TRIPS CB AND ALARMS) 59 — OVERVOLTAGE RELAY 60 — NEGATIVE SEQUENCE VOLTAGE RELAY 62 — TIME DELAY RELAY 63 — OVERPRESSURE RELAY 64 — GENERATOR FIELD GROUND RELAY 67 — AC DIRECTIONAL OVERCURRENT RELAY 74 - ALARM LATCHING RELAY 83 — AUTOMATIC SELECTIVE CONTROL OR TRANSFER RELAY 86 - LUCKING -OUT RELAY 87 — DIFFERENTIAL PROTECTIVE RELAY B — SUFFIX INDICATES "BUS" G — SUFFIX INDICATES "GENERATOR" GF — GROUND FAULT ST — SHUNT TRIP T — SUFFIX INDICATES "TRANSFORMER" X — SUFFIX INDICATES "AUXILIARY" SPECIAL CAPACITOR SC - SURGE CAPACITOR PF __ POWER FACTOR CORRECTION CAPACITOR TUNED POWER FACTOR CORRECTION CAPACITOR PUSHBUTTON, MOMENTARY CONTACT, SPRING RETURN, NORMALLY CLOSED PUSHBUTTON, MOMENTARY CONTACT, SPRING RETURN, NORMALLY OPEN EMERGENCY STOP PUSHBUTTON WITH RED n I n ES MUSHROOM HEAD OPERATOR (MAINTAINED CONTACT) START START -STOP PUSHBUTTON CONTROL STATION STOP _ PBL (MOMENTARY CONTACT) WITH LOCKOUT DEVICE ON STOP START -STOP PUSHBUTTON CONTROL STATION, PBM MAINTAINED CONTACT WITH LOCKOUT DEVICE ON STOP OFF ON \/_ S S OFF/ON SELECTOR SWITCH L R (XO) LR 0 OX) ((X00) ___0 10— (OXO) ) 0 —0 ( ox) LOCAL/REMOTE SELECTOR SWITCH 3 POSITION SELECTOR SWITCH, MAINTAINED CONTACT O -OPEN X -CLOSED POSITION TOP CONIACI MIDDLE CONTACT BOTTOM CONIACT A X 0 0 B 0 X 0 C 0 0 X NAMEPLATE (A/B/C) HOA - HAND/OFF/AUTO HOR - HAND/OFF/REMOTE LOR - LOCAL/OFF/REMOTE RSL - RAISE/STOP/LOWER TOA - TEST/OFF/AUTO GD/VF GD/VF GAS DETECTOR / VENTILATION FAILURE ALARM # INDICATES TYPE OF UNIT 1 =MASTER, 2=REMOTE DESIGNED BY: J. DOUGHNEY DRAWN BY: P. MATHI SHEET CHK'D BY: J. CHEN CROSS CHK'D BY: J. HEALY APPROVED BY: J. DOUGHNEY DATE: JANUARY 2018 MOTOR STARTER COIL, NUMBER AS INDICATED TO DENOTE INTERLOCKING ONLY CONTROL RELAY COIL, NUMBER AS INDICATED Smith 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 ONE LINE OR PLAN DESCRIPTION CONTROL DIAGRAM LIGHTNING ARRESTER -'- �• PILOT LIGHT, COLOR AS NOTED 30A R - RED HTR G - GREEN B - BLUE TG TG W - WHITE -� A - AMBER CONTACT, NORMALLY CLOSED (NC) OVERLOAD RELAY HEATER _0 PILOT LIGHT, PUSH -TO -TEST TYPE, COLOR AS —O NOTED ABOVE. TB I TIME DELAY RELAY RAN RANGE AS NOTED SETPCGEINT SETPOINT AS NOTED VE OR # NUMBER AS INDICATED DM DM TIDE - TIME DELAY AFTER ENERGIZATION ETM ON DELAY M M TDD - TIME DELAY AFTER DE-ENERGIZATION OFF DELAY —0— NOTC- NORMALLY OPEN, TIMED CLOSING WHEN NOTC ENERGIZED NCTO- NORMALLY CLOSED, TIMED OPENING WHEN ENERGIZED NCTO NOTO- NORMALLY OPEN, TIMED OPENING WHEN DE NO�T0 -ENERGIZED _07—NCTC - NORMALLY CLOSED, TIMED CLOSING NCTC WHEN DE -ENERGIZED - ## FIELD INSTRUMENT, TAG NO. AS INDICATED INDICATES INSTRUMENT TYPE DEFINED ON - LOOP SHEETS OR P & ID ## INDICATES LOOP NO. LS OR LIQUID LEVEL (FLOAT) SWITCH —O� b` NORMALLY OPEN, CLOSES ON RISING LEVEL NORMALLY CLOSED, OPENS ON RISING LEVEL PS OR PRESSURE OR VACUUM SWITCH NORMALLY OPEN, CLOSES ON RISING PRESSURE NORMALLY OPEN, CLOSES ON DROPPING PRESSURE NORMALLY CLOSED, OPENS ON RISING PRESSURE NORMALLY CLOSED, OPENS ON DROPPING PRESSURE TS OR O OR TEMPERATURE SWITCH OR THERMOSTAT NORMALLY OPEN, CLOSES ON RISING -i'EMPERATURE NORMALLY OPEN, CLOSES ON DROPPING TEMPERATURE NORMALLY CLOSED, OPENS ON RISING TEMPERATURE NORMALLY CLOSED, OPENS ON DROPPING TEMPERATURE FS OR E FLOW SWITCH (AIR, WATER, ETC.) NORMALLY OPEN, CLOSES ON INCREASED FLOW NORMALLY CLOSED, OPENS ON INCREASED FLOW ZS OR E POSITION (LIMIT) SWITCH NORMALLY OPEN NORMALLY OPEN - HELD CLOSED NORMALLY CLOSED —O�a— NORMALLY CLOSED - HELD OPEN WS OR TORQUE SWITCH —O)V0— NORMALLY OPEN, CLOSES ON HIGH TORQUE NORMALLY CLOSED, OPENS ON HIGH TORQUE UTILIZED IN CONJUNCTION WITH OTHER CONTROL SCHEMATIC SYMBOLS TO DEPICT THE PHYSICAL E LOCATION OF THE DEVICE # REPRESENTS LOCATION SEE LOCATION LEGEND ON DRAWING CONDUCTORS OR CONDUITS CROSSING PATHS T + BUT NOT CONNECTED ------ CONDUCTORS ELECTRICALLY CONNECTED SOLENOID VALVE CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEI"V11ENTS T.Z. OSBORNE WRF ONE LINE OR CONTROL DIAGRAM PLAN DESCRIPTION —0 LA 0-111 LIGHTNING ARRESTER -'- �• GROUND OR GROUND ROD 30A FUSE, AMPERE RATING AS NOTED HTR STRIP HEATER OR HEATING ELEMENT INDUCTOR TG TG TACHOMETER GENERATOR -� CONTACT, NORMALLY OPEN (NO) CONTACT, NORMALLY CLOSED (NC) OVERLOAD RELAY HEATER - * - K = KFY INTFRI nC'K E = ELECTRICAL INTERLOCK TB I TERMINAL OR TEST BLOCK RTD RESISTANCE TEMPERATURE DETECTOR VE VE OR VIBRATION DETECTOR DM DM DAMPER MOTOR ETM ELAPSED TIME METER M M MOTOR OPERATED VALVE OR GATE INDICATES LIMITS OF ELECTRICAL EQUIPMENT OR WIRING ENCLOSURE EXISTING NEW FUTURE WORK WORK EXPANSION Y - - EXISTING. NEW OR FUTURE CONDITION DESIGNATION COMPARTMENT DESIGNATION (SEE MCC FRONT ELEVATION) 1 INDICATES CONDUIT IS ALL OR PARTIALLY LOCATED UNDERGROUND. I I CONDUIT SIZE SHOWN INDICATES THE SIZE WITHIN STRUCTURE. \\ UNDERGROUND CONDUIT SIZE IS MCPJ I SHOWN ON DUCT BANK SECTIONS. SIZE RVNR MCC1-1: (2) 3"C., 3#3/0, 1#2G DENOTES 6 A QUANTITY OF TWO (2) 3 -INCH CONDUITS EACH CONTAINING THREE NO. 3/0 AWG CONDHCTORS AND 1 NO. 2 AWG GROUND CONDUCTOR, FROM NEMA SIZE 6 STARTER IN MCC -1 TO 250HP MOTOR LOAD. MCC 1 -1 A: 3/4"C., 7#14, 1#14G DENOTES N 0 ONE 3/4 -INCH CONDUIT CONTAINING SEVEN NO. 14 AWG CONTROL CONDUCTORS AND 1 NO. 14 AWG GROUND CONDUCTOR. d MCC1-1 AND MCC1-1A: DENOTES CONDUIT - IDENTIFICATION (ID) (TYPICAL) NOTES: 0 1. PROTECTIVE/CONTROL DEVICE AS SHOWN. Q _ 2. CONTROL/AUXILIARY DEVICES AT OR T NEAR EQUIPMENT. EQUIPMENT SHALL BE INSTALLED AND WIRED AS REQUIRED BY v EQUIPMENT FURNISHED AND/OR P CONTROL DIAGRAM. 250 TYPICAL ONE LINE DIAGRAM SHOWING POWER AND CONTROL TO EQUIPMENT ELECTRICAL LEGEND I NOTES: 1. IN GENERAL CONDUIT ROUTING FOR EQUIPMENT AND DEVICES IS NOT SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ROUTING ALL CONDUITS WHICH SHALL INCLUDE CONDUITS SHOWN ON ONE -LINE AND RISER DIAGRAMS AND HOME -RUNS SHOWN ON PLAN DRAWINGS. REFER TO SPECIFICATIONS FOR MATERIALS AND INSTALLATION REQUIREMENTS. 2. THE WIRING DIAGRAMS, QUANTITY AND SIZE OF WIRES AND CONDUITS REPRESENT A SUGGESTED ARRANGEMENT BASED UPON SELECTED STANDARD COMPONENTS OF ELECTRICAL EQUIPMENT. MODIFICATIONS ACCEPTABLE TO THE ENGINEER MAY BE MADE BY THE CONTRACTOR TO ACCOMMODATE EQUIPMENT ACTUALLY PURCHASED. THE BASIC SEQUENCE AND METHOD OF CONTROL MUST BE MAINTAINED AS INDICATED ON THE DRAWINGS AND/OR SPECIFICATIONS. 3. SWITCHGEAR AND MOTOR CONTROL CENTER COMPARTMENT DESIGNATIONS AS INDICATED BELOW: BLANK: NOT INTENDED FOR USE. PLATE ONLY SPACE: EQUIPPED WITH REQUIRED BUS AND HARDWARE FOR THE FUTURE ADDITION OF BREAKERS AND/OR STARTERS WITHIN THE SIZE AND RANGE SHOWN SPARE: CONTAINS A COMPLETELY INSTALLED BREAKER AND/OR STARTER OF SIZE AND TYPE INDICATED FOR FUTURE USE. 4. INTERPRETATION OF ELECTRICAL DRAWINGS: CIRCUIT IDENTIFICATION, ROUTING, AND SIZES OF CONDUITS AND WIRES ARE SHOWN ON THE FOLLOWING DRAWINGS: A. POWER ONE LINE DIAGRAMS: POWER, CONTROL AND SIGNAL WIRING REQUIREMENTS FOR ELECTRICAL DISTRIBUTION EQUIPMENT AND UTILIZATION EQUIPMENT POWERED FROM SWITCHGEAR, SWITCHBOARDS, MOTOR CONTROL CENTERS AND MAJOR POWER DISTRIBUTION PANELBOARDS ARE TYPICALLY SHOWN ON THE ONE LINE DIAGRAMS. THE PARAMETERS IDENTIFIED ON THE ONE LINE DIAGRAMS ARE: CIRCUIT IDENTIFICATION, CIRCUIT ORIGIN AND DESTINATION, CONDUIT SIZE, WIRE SIZE AND QUANTITY FOR COMPLETE CIRCUIT LENGTH, AND AUXILIARY DEVICES ASSOCIATED WITH THE CONTROL/PROTECTION OF THE POWERED EQUIPMENT, AND SIZE OF THE GROUNDING ELECTRODE CONDUCTORS. B. INSTRUMENTATION AND CONTROL RISER DIAGRAMS: POWER, CONTROL, SIGNAL AND DATA HIGHWAY WIRING REQUIREMENTS FOR INSTRUMENTS AND CONTROL DEVICES CONTROLLED/MONITORED FROM INSTRUMENTATION AND CONTROL PANELS SUCH AS RTUS, PLCS, TERMINAL CABINETS, AND REMOTE 1/0 PANELS ARE TYPICALLY SHOWN ON THE INSTRUMENTATION AND CONTROL ONE LINE DIAGRAMS. THE PARAMETERS IDENTIFIED ON THE ONE LINE DIAGRAMS ARE: CIRCUIT IDENTIFICATION, CIRCUIT ORIGIN AND DESTINATION, CONDUIT SIZE, WIRE SIZE, QUANTITY AND TYPE FOR COMPLETE CIRCUIT LENGTH, AND AUXILIARY DEVICES ASSOCIATED WITH THE CONTROL/PROTECTION OF THE POWERED EQUIPIVIEN T . C. FLOOR PLANS: FOR DETERMINING THE LENGTH OF CIRCUITS LOCATED WITHIN STRUCTURES, FLOOR PLANS SHOW THE LOCATION OF ELECTRICAL DISTRIBUTION EQUIPMENT, CONTROL PANELS, UTILIZATION EQUIPMENT, INSTRUMENTS, ANCILLARY EQUIPMENT AND DEVICES AND THE ANTICIPATED PENETRATION LOCATIONS WHERE CONDUITS EXIT/ENTER THE STRUCTURE. HOMERUNS MAY ALSO BE SHOWN FROM MISCELLANEOUS EQUIPMENT NOT SHOWN ON A ONE LINE OR RISER DIAGRAM. D. SITE PLANS: FOR DETERMINING THE LENGTH OF CIRCUITS EXTERIOR TO STRUCTURES AND TO IDENTIFY THE SPECIFIC REQUIREMENTS OF THE UNDERGROUND CONDUITS OR DUCT BANKS, SITE PLANS SHOW THE GENERAL ROUTING OF UNDERGROUND CONDUITS AND DUCT BANKS WITH SECTIONS INDICATING THE CONDUIT SIZE, ARRANGEMENT AND CIRCUIT ROUTING. E. NOTE THAT CONDUIT SIZE WITHIN STRUCTURE IS INDICATED ON ONE -LINE DIAGRAM AND UNDERGROUND SIZE IS INDICATED ON DUCT BANK SECTIONS. GENERAL NOTE THIS IS A STANDARD LEGEND. SOME SYMBOLS MAY NOT APPEAR ON THE DRAWINGS `�fffft f f t t► i tH�yt�', z SEAL ✓, %� PROJECT NO. 61 45-21 71 55 FILE NAME: E001 NFLG.DWG SHEET NO. E-1 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION U) 0 U LL - O z O a N_ Fy O Q z w ry w 0 0 w O ry w ry w O Z Q ry O w ry Q w rj� O w J O z w Ln D w m O O Z w ry Q Z Q U LL O w [I- 0 ry w w w ry Q z w w 0 w rn Q O n J O LL- U Z z N — O O Li W U D ry w Q U) U O -J Q j z O O v � w U w O w ry w rn O X / m O 0 �p w O Z ry < Q w� U (n Z CD W c D m r) r � z a o Q 0 F� co % z Lc) LLJ �5 Ln >Z I� U w ^— E N w o iii �- u/7 (K w Cf) LLJ w Z J ry r7 00 m ¢ W N D �I �o < 00 > Q � O o U cn % r-- w LJ / p � p 3 N w X J a @ rr- FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION � e Q) f E \ 2 \ 0 % o a / k 2 0 0 o \ 0 k \ m 6 G q / � E o \ / z o g E ƒ Q < c: \\' / E 6 / � \ � offo/ a o - 3 \ 04 Ln / O - / / ƒ ± e > V) � c 0 s 0 z O \ N y 0 / \ z \ 3 ¥ s / \ 0 / « \ u 0 3 E z s 0 x f 3 0 c n m ± 0 \ 0 / z 3 e 3 e e I 0 R 0 z s 3 < c \ / 3 2 � 0 0 c 0 \ 3 g m 0 3 E s / s / z G I / / \ I 0 ƒ 0 0 z FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION \ « U) � c O I 0 z 0 \ N i 0 / / z / 3 * a / \ 0 / 4 \ u 0 2 E 3 e / 0 y z < 3 0 c / c a 0 s I 0 ± x 2 3 s e a c m 0 + 0 z s E < c / / 3 U) > c 0 LL - 0 \ a s c 0 2 c s / Li / z 3 3 c c + » g / $ \ \ / © \ / > / \ 0 o a \< 0 3 / / LLJ 0 I e ± 0 M z c c \ 0 / E Q) c > ® ® c: z \ � \ 6 / o \ < .z �LLJ\ �� \c/ \� \/\o\ ± a- \ + / E / 3 � / ( \ \ wry U) 7 E © o � \ 6 /4 c© a m - 2 s EU) \ / \ \ \ FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION wI O z w c� w - 0 3 � o AMERICAN ELECTRIC LIGHTING -p Q c o w 36 N_ CD ~ (n h a D o d D \ � U O CD O J =) U Q Z � w I Q N U \ c. N I z w N f i LLI cf)I > ai O E cn U U 1 o / N a U U U U Li U - N \ \ \ \ r7 r7 z DATE JUNCTION BOX J Q ca- 0n-- 0 LLJ Q ASH CLARIFIER DUPLEX SUMP z Q I CONTROL PANEL CP -0800 � U I PUMP CONTROL PANEL LCS-0820 I I ASH SLURRY I PUMP VFD VFD-0810 Li D 00 0 1 _ U _ o � \ � a N t Li U w 01 ~ o U _ It \ cf) z Q C) � 0 � N w � N JUNCTION BOX Of \ N Q n U C7 Of O w O z LOCATED ON EXTERIOR WALL OF SLUDGE HANDLING BUILDING (TYP) LOCATED ON ASH CLARIFIER CONTROL PANEL AND ASH SLURRY PUMP VFD EQUIPMENT RACK (TYP) U w c� w Ln Un 3 � o AMERICAN ELECTRIC LIGHTING -p p c o w 36 = CD ~ h a (NOTE 1) d Q� \ � U O CD O J =) U Q Z � w I N N N m N I N w w CO N cf)I > ai O E cn U U O o / N a U U U U > U U (Y \ \ \ \ r7 r7 z DATE U J Q ca- 0n-- LLJ Q ASH CLARIFIER DUPLEX SUMP z Q I CONTROL PANEL CP -0800 � I I PUMP CONTROL PANEL LCS-0820 I I ASH SLURRY I PUMP VFD VFD-0810 �0_ o I = 00 0 1 _ _ _� a p O � U � N w O \ N U C7 w \ 0 w w O p w O J LS> w 0-1N Q I— J O z w TO PLC -12 TO BELT FILTER PRESS PLC U w WATT w Ln Un 3 � o AMERICAN ELECTRIC LIGHTING -p p DURABILITY AND CORROSION RESISTANCE; MAST ARM MOUNT; o w 36 = CD ~ Un a (NOTE 1) 0 Q� LED, RUGGED DIE-CAST ALUMINUM HOUSING; POWDER -COATED FOR � U O CD O J =) U Q Z � w S2 0 0_ �D N o 0 CONTROL; IP66 RATED. w w z cf)I > ai O E cn p o / z a a w U U > > UO a O (Y j w REV Un Ld N w OffXJ DATE U J Q ca- 0n-- U z O WATT w Ln Un 0)w 0 � o AMERICAN ELECTRIC LIGHTING >\ ry DURABILITY AND CORROSION RESISTANCE; MAST ARM MOUNT; o w 36 0 CD ~ I m (NOTE 1) z p w LED, RUGGED DIE-CAST ALUMINUM HOUSING; POWDER -COATED FOR � U o CD O J =) U Q Z DURABILITY AND CORROSION RESISTANCE; MAST ARM MOUNT; 0 S2 a u) 120-277V; TYPE 3 OPTICAL DISTRIBUTION; WITH PHOTOCELL �D N o � CD CONTROL; IP66 RATED. p w p cf)I > ai O E cn O o / z a ASH CLARIFIER RISER DIAGRAM NTS CONDUIT PROVIDED IN VOLUME I DRAWINGS SOLIDS HANDLING BLDG DUCTBANK DUCTBANK PUMP ENCLOSURE NEMA 4X 316 STAINLESS STEEL rrct�� rl_� LCS-0820 ELEMENTARY CONTROL DIAGRAM NTS LIGHTING FIXTURE SCHEDULE TYPE WATT DESCRIPTION MFR (OR APPROVED EQUAL) Ld Ln >� LED, RUGGED DIE—CAST ALUMINUM HOUSING; POWDER—COATED FOR AMERICAN ELECTRIC LIGHTING Ljp DURABILITY AND CORROSION RESISTANCE; MAST ARM MOUNT; PART #: ATBO 20LEDE53 MVOLT R2 BZ S1 36 120-277V; TYPE 2 OPTICAL DISTRIBUTION; WITH PHOTOCELL CD ~ w w � CONTROL; IP66 RATED. (NOTE 1) LED, RUGGED DIE-CAST ALUMINUM HOUSING; POWDER -COATED FOR AMERICAN ELECTRIC LIGHTING CD O J =) U Q Z DURABILITY AND CORROSION RESISTANCE; MAST ARM MOUNT; PART #: ATBO 20LEDE53 MVOLT R3 BZ S2 36 120-277V; TYPE 3 OPTICAL DISTRIBUTION; WITH PHOTOCELL �D CONTROL; IP66 RATED. (NOTE 1) N Uj OU) N LJ Ld Ln >� E O Ljp vi w Li CD ~ w w � _ E J CD O J =) U Q Z N (D _c� �D cf)I > ai O E cn O > UO a w REV Ld N w OffXJ DATE DR WN CHKD ca- 0n-- NOTES: 1. PROVIDE 8" NON -DECORATIVE HORIZONTAL ARM FOR CONNECTING LIGHT FIXTURE TO 2" CONDUIT FOR STANCHION MOUNTING AS SHOWN ON DETAIL 'E' ON SHEET ED -1. PROVIDE ALL NECESSARY INCIDENTALS FOR A COMPLETE AND OPERATIONAL INSTALLATION. 2. THE PROPOSED DEVELOPMENT COMPLIES WITH THE OUTDOOR LIGHTING STANDARDS OF THE ORDINANCE, INCLUDING COMPLIANCE WITH THE LIGHT TRESPASS REQUIREMENTS IN 30-9-6.6. DESIGNED BY: J. DOUGHNEY DRAWN BY: P. MATHI DM_ SHEET CHK'D BY: J. CHEN Smith CROSS CHK'D BY: M. GRAHAM 5400 Glenwood Avenue, Suite 400 APPROVED BY: J. DOUGHNEY Raleigh, NC 27612 1 Tel: (919) 325-3500 REMARKS DATE: JANUARY 2018 NC F-1255 0 CR1 0731 FEEDBACK 4-2OmA TO DCU SPEED SIGNAL 4-20mA FROM DCU VFD RUN JVFD RUN CPT YY -'1480V TO 120V FREQUENCY DRIVE (VFD) CR2 PROGRAMMABLE AUTO I INPUT ENABLE CR1 START SIGNAL CR—Y I CR—X VFD CR—Y FAILURE I 2 0 H R PERMISSIVE 0 STOP STOP START FROM BFP CR -4 X00 3 CR1 CR -3 CR -6 4 I I I BFP PLC START/STOP ' COX 5 I I 6 I I I I I COX 7 I CR -X I 8 I I RESET 19 1 I PSH D 10 I I TDD -1 11 I I I CR -4 12 I MOTOR TEMP 13 I I I I 14 CR -5 I i CR -6 I I ' I I CR -1 i PSL Q I I I TDE-1 I I I ' I CR -6 I I CR -4 CR -Y OOX CR -3 TDE-1 I RUNNING REMOTE COMMON FAULT TO BELT FILTER PRESS PLC NEMA 4X 316SS VFD ENCLOSURE OFF G PTT ON R PTT TDE-1 RUN (��jCR 1/ AUTO ENABLE CR 2 AUTO � CR 3 VFD FAULT � PTT rb —0-60 SE CR 1 HIGH PRESSURE A PTT CR CR 5 6 HIGH TEMP A PTT 0-60 SEC TDE 1 TTD�E-1 LOW PRESSURE PTT ASH SLURRY PUMP ELEMENTARY CONTROL DIAGRAM NTS CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF — — — TO PLC — — — — — — — CP -0850 __NEMA 4X 316 ELEMENTARY CONTROL DIAGRAM STAINLESS STEEL NTS I I GENERAL NOTES: 1. THE CONTROL DIAGRAMS, ALONG WITH ANY WRITTEN OPERATION DESCRIPTIONS IN THE SPECIFICATIONS AND/OR LOOP DIAGRAMS, SHOW THE INTENDED FUNCTIONS OF THE SYSTEMS CIRCUITS. I 2. ALL MOTOR STARTER CONTROL TRANSFORMERS SHALL BE A MINIMUM OF 100VA AND, IF NECESSARY, BE INCREASED IN SIZE SO AS TO PROVIDE SUFFICIENT VOLT-AMPERE CAPACITY FOR OPERATING ALL ELECTRICAL DEVICES ASSOCIATED WITH THE CONTROL OF THE MOTOR. THIS SHALL INCLUDE STARTER COIL, RELAYS, TIMERS, MOTOR HEATERS, INDICATING LIGHTS, ETC. KEYED NOTES: 01 PUMP ALTERNATING RELAY IS BASED UPON EATON 'D85 SERIES' RELAY (DPDT FOR LEAD/LAG OPERATION). THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND INCIDENTALS REQUIRED TO PROVIDE A COMPLETE AND OPERABLE SYSTEM AT NO ADDITIONAL COST. RISER DIAGRAMS AND SCHEDULES rrrprrrrrrrr#"", A CAR 2a SEAL 0449.9a, J.<©O4 PROJECT NO. 61 45-21 71 55 FILE NAME: E005RDSH.DWG SHEET NO. E-5 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION 0 U I 0 z 0 Q N_ ry 0 a z w r_ ry LJ F_ O U w O ry n ry w O z Q ry 0 w ry Q w ry O w J O z 0 w D III m 0 I- 0 z w ry a 0 z Q 0 U I O Of w m 0 ry n w w ry Q z w ry LL] rn = 3 � J � V) ry n o ch O O w U z o - 0 U w U o > ry w a U J L) z co O u W cn o O v ry E o o_ �I m z o LLI o a O v a O cy_ wQU) U) oz O ago 0 Q ooh V) N �r z N b LLJ Ul N O� U (L,,rj)O tDLLJ E/mow OO J W z �� D' i E cn U o Z (n Q N o _Sw �D o E u' 0 > 0 0 > 3 UO 0 w ocn N X J a Dry EI DATE I DRWN I CHKD REMARKS DESIGNED BY: J. DOUGHNEY DRAWN BY: P. MATHI DMith SHEET CHK'D BY: J. CHEN Sm CROSS CHK'D BY• J. HEALY APPROVED BY: J. DOUGHNEY DATE: JANUARY 2018 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 GENERAL NOTES: 1. ASH CLARIFIER CONTROL PANEL IS LOCATED OUTSIDE THE PUMP ENCLOSURE. 2. ASH PUMP ENCLOSURE LOAD CENTER (MPZ-01), LIGHTS, HVAC EQUIPMENT, AND RECEPTACLES SHALL BE PROVIDED AND PRE -WIRED BY VENDOR. 3. REFER TO SITE PLAN FOR DUCTBANK ROUTING. 4. THE PROPOSED DEVELOPMENT COMPLIES WITH THE OUTDOOR LIGHTING STANDARDS OF THE ORDINANCE, INCLUDING COMPLIANCE WITH THE LIGHT TRESPASS REQUIREMENTS IN 30-9-6.6. PROVIDE FULLY OPERATIONAL HEAT TRACE SYSTEMS FOR EXPOSED NPW PIPING FOR HOSE REEL, SUMP PUMP DISCHARGE PIPING, AND RC PIPING PER SECTION 40 41 13. HEAT TRACE SHALL START WHERE PIPING STUBS UP ABOVE GROUND FOR ENTIRE LENGTH OF EXPOSED PIPING. MPZ01 -1 EXOTHERMIC WELD (TYP) MPZ01-3 WP/GFI MPZO1 -3 WP/GFI REFER TO SITE PLAN FOR CONTINUATION BOND TO DUCTBANK GROUND WIRE (TYP) MPZ01 -3 MPZ01-1 WP/GFI RECEPTACLES PRE -WIRED BY PUMP ENCLOSURE VENDOR (TYP) D PANEL MOUNTING 7,_ INDOOR LED LIGHT PRE -WIRED BY PUMP ENCLOSURE VENDOR (TYP) ES MPZ01 -1 / • m�lum �n— ,H-( LL -1 - #4/0 BARE COPPER WIRE (TYP) F GROUND ROD ED -1 (TYP) CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF ASH SLURRY PUMP P-0810 SH -0810- SUMP PUMPS P-0850-1 P-0850-2 MPZ01-3 WP/GFI M KEYED NOTES: OCOORDINATE WITH PRE -FAB BUILDING PROVIDER FOR LOCATION OF MPZ-01. PROVIDE CIRCUIT BREAKERS AND WIRING AS SHOWN ON THE PANEL SCHEDULE ON SHEET E-4. OBOND DUCTBANK GROUND WIRE TO ELECTRICAL EQUIPMENT, STRUCTURAL STEEL, AND HANDRAILS WITH #4/0 BARE COPPER WIRE. O3 PROVIDE TWO NEMA 4X 316 SS JUNCTION BOXES ON EQUIPMENT RACK BENEATH PANELS FOR ROUTING CONTROL AND INSTRUMENTATION WIRING AS SHOWN ON SHEET E-5 RISER DIAGRAM. OALL ELECTRICAL PANELS SHALL BE LOCATED TO ENSURE COMPLIANCE WITH REQUIRED NEC CLEARANCES. OELECTRICAL CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PUMP MOTOR, DEVICES, AND INSTRUMENTS WITH PUMP ENCLOSURE PROVIDER. NEMA 4X 316 SS ASH CLARIFIER NO.2 CONTROL PANEL CP -0800 NEMA 4X 316 SS ASH SLURRY PUMP VFD VFD-0810 — f—t..$: O PANEL MOUNTING (TYP) M PZ01 -1 ion—vo i v — SOLENO -0810- S PSH -0810 pcu_nsz�n NEMA 4X 316 SS SUMP PUMP CONTROL PANEL CP -0850 MPZ01-3 WP/GFI MPZ01 -1 C\ EQUIPMENT DD -1 MOUNTING (TYP) MPZ-01 O PUMP ENCLOSURE ELECTRICAL PLAN 4 5 PLAN I = , • m VALVE ASH CLARIFIER AND PUMP ENCLOSURE ELECTRICAL PLANS t - - --4 NEMA 4X 316 SS LCS-0820 REFER TO SITE PLAN FOR CONTINUATION MPZ01-1 LIGHT PUMP .LNDOR (TYP) ,,,,.,off OF Essig+".. , z Q�" SEAL 1R7 PROJECT NO. 61 45-21 71 55 FILE NAME: E006ASPL.DWG SHEET NO. E-6 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION FINISHED GRADE EXISTING GROUND SURFACE w O COMPACTED NOTES: z 0 COMMON FILL cn D N_ PAVING AND Li m SUB -BASE MATERIAL -I-I-I-I-I-I-�-I- O I-I-I-1-I-1-I-I-1-11 I -I -I -1 -I -I -I -I -I -I- / ------- ry oz I�II-I-1�I11-1I�I11I11I11I11I11I1I '-'-'-'-'-'-'-'-'-'-' i\ COMPACTED IlI�I�III�I�I�I�I�I�- Z z I -I -I -I -I -I -I -I -I- '-'-'-'-'-'-'-'-'-' GRANULAR FILL I -I -I -I -I -I -I -I I� HANDRAIL I -I -I -I -I -I -I- 1- 1-1-1-1-1- I -I -I -I -I -I Q z N w LIJ (TYP) REINFORCEMENT I- #4 @ 12" AROUND D PERIMETER #3 @ 12" TIES w PLASTIC CONDUIT SPACERS 4 FT. OC ---"- 0 d' 12" MIN. w 0 >_ CONTINUOUS #4/0 BARE zCOPPER STRANDED GROUND < CONDUCTOR RUN UNDER o CONCRETE ENCLOSURE Of NOTES: Q w UNPAVED PAVED mss._. �. •<><:.•:;..�.. • � � • UNDISTURBED EARTH 1. REBAR REINFORCEMENT CONCRETE ENCASED ELECTRICAL DUCTBANK Of SHALL BE PROVIDED AS w SHOWN WHERE DUCTBANK o ROUTES UNDER ROADWAYS, DETAIL rA CROSSED PIPING, OR IN NTS - z OTHER HIGH TRAFFIC AREAS. 0 Li DETECTABLE POLYETHYLENE NOTES: WARNING TAPE FLOOR SLAB cn D PAVING AND Li m SUB -BASE MATERIAL -I-I-I-I-I-I-�-I- O I-I-I-1-I-1-I-I-1-11 I -I -I -1 -I -I -I -I -I -I- / ------- FILL VOID WITH FIRE I�II-I-1�I11-1I�I11I11I11I11I11I1I '-'-'-'-'-'-'-'-'-'-' w cn COMPACTED IlI�I�III�I�I�I�I�I�- Z BREAKAWAY FLANGE ABOVE I -I -I -I -I -I -I -I -I- '-'-'-'-'-'-'-'-'-' GRANULAR FILL I -I -I -I -I -I -I -I I� HANDRAIL I -I -I -I -I -I -I- 1- 1-1-1-1-1- I -I -I -I -I -I Q 1 -I -I -I -I- -I 1 -1 -1 -1 -1 -1 -1 -I -I -I- I -I -I -I -I -I -I -I -I-' U I -I -I -1 -I -I -I -I 7 1/' ±71 mL -I-I I -I -I 141! �;!;!; Q -1-1-1-1-I-I-I-I- T__ 3 COVER (TYP) I-I-I-I--I-I-I 1-I-I-I-I-I-I-I-I- !T�T!T�T�T�T�T�T mss._. �. •<><:.•:;..�.. • � � • UNDISTURBED EARTH 1. REBAR REINFORCEMENT CONCRETE ENCASED ELECTRICAL DUCTBANK Of SHALL BE PROVIDED AS w SHOWN WHERE DUCTBANK o ROUTES UNDER ROADWAYS, DETAIL rA CROSSED PIPING, OR IN NTS - z OTHER HIGH TRAFFIC AREAS. 0 Li U z NOTES: o FLOOR SLAB cn D Li m U w U_ O 0 FILL VOID WITH FIRE / w cn PROVIDE BREAKAWAY FLANGE ABOVE 0 z HANDRAIL FOR LIGHT REPLACEMENT - Q NOTES: U z O COMPLETE PITCH AWAY 2" ALUMINUM CONDUIT Q 1. ALL HARDWARE SHALL BE 316 0) w STAINLESS STEEL. O AS SMOOTH AND STRAIGHT o cn 2. PROVIDE ALL BRACKETS, CLAMPS, o STRUT, CHANNELS, POSTS, rn U BOLTS, ETC. AS NECESSARY TO o PROPERLY MOUNT AND SUPPORT z o LIGHT FIXTURES SO AS NOT TO PROVIDE EXTRA SUPPORT - w SACRIFICE THE STRUCTURAL CHANNELS, POSTS, ETC. W INTEGRITY OF THE HANDRAILS. (SEE NOTE 2) 0 ALL ITEMS SHALL BE 316 Of a_ STAINLESS STEEL. cn w o c 'cn FIXTURE MOUNTING 8'-0" ABOVE FINISHED GRADE HANDRAIL -VERTICAL RISER 316 STAINLESS STEEL U -BOLTS, NUTS, AND LOCK WASHERS ~ 316 STAINLESS STEEL BOX ---[JL Q BOLTED/SECURED TO WALKWAY OR PLATFORM PLATFORM z Li = TYPICAL STANCHION MOUNTED LED LIGHTING FIXTURE WITH RECEPTACLE 3 0 ° w DETAIL rE_'*� o NTS - o O w / U z NOTES: o FLOOR SLAB PROVIDE BOXOUT U w U_ O > FILL VOID WITH FIRE / w cn FOR ALL NON CAST-IRON ENCLOSURES OR U J BOXES. Q (TYP) U z O COMPLETE PITCH AWAY w cn OPENING IN BRICK OR 0) w CMU SHALL HAVE EDGES O AS SMOOTH AND STRAIGHT o AS POSSIBLE rn m z o - -- 13 w o o WATERTIGHT SEAL AS SPECIFIED cn o c 'cn V) z BRICK OR CMU WALL 00 u, a� w N o PVC SLEEVE WITH WATERSTOP, o o DIAMETER AS REQUIRED BY o / � Q SEAL MANUFACTURER N cn z N mw U �� U "J O N C) vim/ofw J c W E �~ w a = E �-- C D O J cii J d U Q Z O '' N f_=17114 - � �I >, E o U � � o Q w > 3 UO v vi ( j LL_ m I__ w D Rte' DATE DRWN CHKD x J a Owl N0. 1 5/8"MIN CONDUITS AS SPECIFIED COUPLING (TYP) MONMUM 3/8'P ANSIODIAMENERN S ZOED PROVIDE RAISED CONCRETE LARGER AS REQUIRED BASED PVC COATED RGS CURB IN WET LOCATIONS ON SUPPORTED LOAD OR TO COVER PENETRATIONS MADE FINISHED FLOOR THROUGH EXISTING FLOORS. 6" MIN WALL r07D 4 q q' 4 d'. .. �i '.Q--..: q q ',, qq .p •�• 'Q`� � Q P 13/32" DEPTH x 13/16" WIDE UNISTRUT P7000 OR EQUAL GALVANIZED OR _ / STAINLESS BOLT, NUT & WASHER AS REQUIRED i PHENOLIC 3/81'_T�NAMEPLATE PPRPX YP) EQUIPMENT ENCLOSURE WITH EXTERNAL MOUNTING FEET (SIMILAR MOUNTING FOR ENCLOSURES WITH INTERNAL MOUNTING HOLES) STRUCTURAL NOTES: FLOOR SLAB PROVIDE BOXOUT IN FLOOR SLAB FILL VOID WITH FIRE 1. APPLICABLE FOR ALL NON CAST-IRON ENCLOSURES OR RETARDENT FILLER AFTER LONG SWEEP ELBOW BOXES. CONDUIT INSTALLATION IS (TYP) COMPLETE PITCH AWAY 2. INSTALL STRUT IN VERTICAL ORIENTATION TO FINISHED FROM CONDUITS FLOOR FOR EQUIPMENT WITH EXCESSIVE WEIGHTS. TYPICAL CONDUIT FLOOR PENETRATION DETAIL rB NTS - I I #4/0 BARE COPPER I 3/4"x10'-0" COPPER CLAD GROUND ROD SECTION "A" - "A" CIAIIC`1 i nnnnr GROUND ROD DETAIL rF NTS - ER CLAD FIELD VERIFY MOUNTING REQUIREMENTS. PROVIDE ALL NECESSARY SUPPORTS, PVC SLEEVE, DIAMETER HARDWARE, ETC. ALL MOUNTING HARDWARE AS REQUIRED BY SEAL AND EQUIPMENT SHALL BE 316 SS. (TYP) - _ MANUFACTURER SEE NOTE 1 - �-PACK AND CONDUIT SEAL PACK AND CORE DRILL EXISTING WALL SEAL OPENING FOR CONDUIT PENETRATIONS. REFER TO WATER TIGHT PENETRATION DETAIL FOR SEALING REQUIREMENTS (TYP) CONDUIT CONCRETE WALL WATERTIGHT GROUT SLEEVE IN A MECHANICAL . NEAT AND WORKMANLIKE SEAL AS MANNER WITH SMOOTH SPECIFIED SURFACES WATER TIGHT PENETRATION DETAIL I NTS - NOTES: 1. SPARE CONDUIT TO BE STUBED 24" INSIDE BUILDING WALL AND CAPPED. DESIGNED BY: J. DOUGHNEY DRAWN BY: P. MATHI DM_ SHEET CHK'D BY: J. CHEN Smith CROSS CHK'D BY: J. HEALY J. DOUGHNEY 5400 Glenwood Avenue, Suite 400 APPROVED BY: Raleigh, NC 27612 1 Tel: (919) 325-3500 REMARKS DATE: JANUARY 2018 NC F-1255 3. PROVIDE ALL MATERIAL, LABOR, AND INCIDENTALS REQUIRED FOR MOUNTING ENCLOSURE TO WALLS OTHER THAN CONCRETE. EQUIPMENT ENCLOSURE MOUNTING DETAIL C NTS - 3/8" 316 STAINLESS STEEL PLATE FASTENED ON 316 STAINLESS WELD 6"TALL X 3"WIDE X 1/2" PLATE TO THE CHANNEL FLANGES. CONNECT CHANNELS TO SQUARE POSTS THROUGH VERT FILLET WELDS ALONG PLATE SIDES. (TYP AT 4 LOCATIONS) 1 -1 /4" (TYP) 316 STAINLESS STEEL SUNSHIELD (SEE NOTE 2) I I I I I I I I I I I I I I I I I I I I I I I I I I STEEL CHANNEL WITH 316 REFER TO PLANS FOR ACTUAL STAINLESS STEEL HARDWARE EQUIPMENT TO BE MOUNTED ON HANDRAIL. EQUIPMENT SHOWN HANDRAIL HERE IS ONLY AS AN EXAMPLE. � o BOLT/SECURE MOUNTING CHANNEL/STRUT TO PLATFORM WITH 316 SS HARDWARE 316 STAINLESS STEEL STRUT/CHANNEL (TYP) -PLATFORM CONDUITS) AS REQUIRED NOTES: 1. ALL HARDWARE SHALL BE 316 STAINLESS STEEL. 2. EXTRA ITEMS (CLAMPS, STRUT, CHANNELS, BOLTS, ETC) SHALL BE PROVIDED AS NECESSARY TO PROPERLY MOUNT AND SUPPORT EQUIPMENT. SUPPORTING FROM HANDRAIL SHALL NOT BE ACCEPTABLE. 3. REFER TO DETAIL 'D' ON THIS SHEET FOR SUNSHIELD FOR INSTRUMENTS AND DEVICES WITH INDICATING SCREENS. EQUIPMENT MOUNTING ON PLATFORM DETAIL G NTS - NEMA 4X 316 SS PULL BOX SIZED PER NEC W/HINGED ` PAD LOCKABLE COVER 1 X11 i�, i1, i11 19, t 0 r' NEMA 4X 316 SS PULL BOX SIZED PER NEC W/HINGED PAD LOCKABLE COVER Ir ft Li MYERS HUB (TYP) w1\4UUII rtK art(_IrICATIONS (TYP) WALL MTD P U LLBOX ES DETAIL rT� NTS - CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORN E WRF x Q FULL PENETRATION BUTT WELD (TYP) FINISHED GRADE 30" 1-1/4" (TYP) L7 6" 316 STAINLESS STEEL CHANNEL, LENGTH AND NUMBER AS REQUIRED (4)-5/8" DIAMETER HILTI KB -TZ SS 316 ANCHORS, OR APPROVED EQUAL, WITH 4.438" EMBEDMENT 12" x 12" x 3/4" MINIMUM 316 STAINLESS STEEL PLATE (TYP OF 2) 4" SQUARE 316 STAINLESS STEEL CAP (TYP OF 2) PANEL 72" X 4" SQUARE X 0.5" THICK 316 STAINLESS STEEL POST (TYP OF 2) _ _ _ 1/2" 316 STAINLESS STEEL THRU BOLT (TYP) CONCRETE FASTENER. SEE PLAN. PLATE (3/4" THICK MIN) CONCRETE SLAB (SIZE AS REQUIRED). REFER TO DETAILS ON STRUCTURAL DRAWINGS. ° P 12" MIN NOTES: a P 1. ALL HARDWARE SHALL BE 316 STAINLESS STEEL. 12" 2. A SUNSHIELD SHALL BE PROVIDED PANEL MOUNTING FOR EQUIPMENT RACK WITH ASH CLARIFIER PANEL AND PUMP VFD. DETAIL rD NTS - BILCO TYPE JAL -H20 AND JDAL-H20 ALUMINUM HORIZONTAL VAULT ACCESS DOORS. THE COVERS SHALL BE DIAMOND PATTERN PLATE AND REINFORCED FOR H-20 WHEEL LOADING. FINISHED GRADE BIND CIRCUIT CONDUCTOR IN EACH CONDUIT WITH a NYLON STRIPS HOT DIPPED GALVANIZED STEEL CABLE RACK & SUPPORTS AS MANUFACTURED BY LINE -� MATERIALS COMPANY #2/0 BARE COPPER CONDUCTOR PULLING -IN EYE OPPOSITE DUCT ENTRANCE n 4'-0" x 4'-0" x 4'-0" (MIN) PRECAST CONCRETE HANDHOLE BY CAROLINA PRECAST CONCRETE INC OR EQUAL 3/4" x 10' GND ROD COVER SHALL BE MARKED "ELECTRIC" (MINIMUM 4" HIGH LETTERING) - TO STEEL CONDUITS OR BOND WIRES SEAL WITH NON -SHRINK GROUT I CLOSED SUMP °o % NOTES: 1. DO NOT SPLICE CABLES IN HANDHOLE UNLESS OTHERWISE NOTED. 2. ALL MOUNTING HARDWARE SHALL BE 316 STAINLESS STEEL. 3. HANDHOLE TO BE PLACED ON 6" BASE OF GRAVEL. 4. PROVIDE PERMANENT LADDER FOR EASY ACCESS INTO HANDHOLE. ELECTRICAL/INSTRUMENTATION HANDHOLE DETAIL rH*'� NTS - ELECTRICAL DETAILS CA Q-".* 'ESS... z Q� ti -%,q SEAL �- 04499 • NE.cy •�N I PROJECT NO. 6145-217155 FILE NAME: ED01 NFDT.DWG SHEET NO. ED -1 FINAL DRAWING —FOR REVIEW PURPOSES ONLY —NOT RELEASED FOR CONSTRUCTION Z W ry W S O S U W D O ry n ry w S O Z O LL- ry ry ¢ w m O LJ J O S z 0 w w m O O z w ry ¢ 0 z ¢ S 0 U w O ry w w O m w w S w m z w ry w S 0 w O w ry O U Z W U W J Z O W L, O ry n D7 W O ry W V) Z _O W n C) Z . Z n W W ry C) w U U O w� ryw �w S= OF- Fy J J ~ ¢ Z W S :E H :D � U �O �W U O i. w o � N LdLd © r' FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION z w r w S 0 0 LJ 0 ry w ry w S O z Q ry 0 w FZ ry Q n ry O w J O S Z W co D W m O F- O z W ry Q Z Q S H n O W O ry I w 0 m w w S w ry Q z w ry w S 0 w F -- Q 0 n m 0 0 z J 0 ry w J Q Z 0 C!) W w O Of a m 0 w n O ry m cn z CD U) w 0 0 z Q cn .z ow w=> r� w O WO w� ryw �cf) �w S= c) ~ E J JI-- Q Z W D � U O O I� W O cn 04 0 ry FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION z w w O U w D 0 ry m m w _ 0 z Q m O ry Q cy O w J 0 z 0 w w m 0 0 z Li ry Q 0 z Q 0 U w O w m 0 w _ LLA Q z W ry w _ 0 Li Q O m ry 0 U z w U w J Q z 0 cn L w O m m 0 w 0 O 0-1m z CD w 0 0 z Q J � J � Q z w �C) c„ o 0 �w O U nw ocn N D O� OPERATOR WORKSTATION NO. 1 OPERATOR WORKSTATION NO. 1 ADMIN BUILDING LOWER CONTROL ROOM ADMIN BUILDING UPPER CONTROL ROOM s POINT Hue FOC OPERATOR WORKSTATION NO. 2 ADMIN BUILDING UPPER CONTROL ROOM FIBER OPTIC UPLINK TO SERVER "HUFFINE" NORTH BUFFALO CREEK ETHERNET SWRCH ❑ 0000 �� 0❑0 -- ---4d -- -- ht PLC -3 PLC -3 -LI PLC -3-R1 PLC -3-R2 BLOWER NO. 3-4 BLOWER NO. 1-2 AERATION TANKS AERATION TANKS CONTROLS CONTROLS 1-8 9-12 SERVER "OSBORNE" CAT -5 CABLE PLC -11 PLC -11-R1 F- - COMMUNICATIONS PANEL r - - - REEDY FORK PUMP REEDY FORK PUMP I (MOUNTED NEXTI I ; STATION LIFT STATION STATION LIFT STATION TO PLG -10)i I ETHERNET "frCH ❑❑0000000❑ I ETHERNET swrrCH ❑0000❑❑ 0000000 (! I II I I I I 1 CAT -5 CABLE F-------'� I I 11 Um PLC -1 O -R* i PLC -1 O-* PATCH (( ase s ss EFFLUENT FILTERS 1 EFFLUENT FILTERS I PANEL II 1 r----- ____--�---- --�------------------� 0000000 ! I 0000 ❑0❑ I I I I I I i 1 i ' PLC -17 ' I BACKWASH DRAIN 1 PUMP STATION f L—. -----------J ---------------------- PLC-6-R1 -------------------- PLC-6-R1 MULTIPLE HEARTH INCINERATOR i I ! i I I I I 1 I I i i 1 ! I I i ! i I EV I DATE I DRWN I CHKD PLC -1-R1 INFLUENT PUMPING STATION PLC -1 INFLUENT PUMPING STATION ETHERNET SWITCH GENIUS 1/0 BUS NOTES: 1. MODIFY AS NECESSARY INCLUDING NEW 1/0 MODULES, POWER SUPPLIES, RELAYS, TERMINAL BLOCKS, AND ANCILLARY EQUIPMENT TO INCORPORATE THE NEW 1/0 SIGNALS. 2. ASH PLC SHALL BE REPLACED WITH THE BELT FILTER PRESS PLC CONTROL PANEL (SEE VOLUME I FOR DETAILS). EXISTING PRESS SHALL REMAIN IN OPERATION AND SHALL USE THE EXISTING ASH SLURRY PUMP UNTIL THE NEW BELT FILTER PRESS IS ONLINE. NEW ASH SLURRY PUMP SHALL BE CONTROLLED BY THE NEW BELT FILTER PRESS PLC. GENIUS 1/0 BUS PLC -5 PLC -5-R1 PLG -5-R2 PLC -5-R3 EFFLUENT DISINFECTION EFFLUENT DISINFECTION EFFLUENT DISINFECTION EFFLUENT DISINFECTION PLC -2-R2 PLC -2-R1 PLC -2 SLUDGE THICKENING PRIMARY SETTLING GRIT AND PRE -AERATION PLC -4 PLC -4-R1 PUMP STATION PUMP STATION PUMP STATION RAS PUMPING RAS PUMPING STATION NO. 1 STATION NO. 2 ------------------------------------.-----------.__.-----------------_._.-._-.__._. _._..___._-----------.------_-_..---- EhlERNET SWITCH 0000000 PLC-6-R2 PLC -6 °❑❑ GRIT BELT FILTER PRESSES 11 11' ASH PLC FOURNIER PRESS PLC PANEL (NOTE 1 & 2) PLC -13 PREHEAT BURNER SYSTEM NO. 2 PLC -8 FLUIDIZED BED INCINERATOR NO. 1 SLUDGE CAKE PUMP 102 OIT PLC -16 ��+ SLUDGE CAKE PLL -12 PUMP 102 FLUIDIZED BED INCINERATOR NO. 2 (NOTE 1) REMARKS DESIGNED BY: G. CZERNIEJEWSKI DRAWN BY: N. MELLINDMith SHEET CHK'D BY: G. CZERNIEJEWSKI Sm CROSS CHK 'D BY J. AREVALO APPROVED BY: G. CZERNIEJEWSKI DATE: JANUARY 2018 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 1 Tel: (919) 325-3500 NC F-1255 PLC -7 CENTRIFUGES EMONET SWITCH PLC -14 CEMS SYSTEM NO. 2 PLC -9 CENTRIFUGES OPERATOR WORKSTATION SOLIDS HANDLING CONTROL ROOM GENIUS 1/0 BUS CP9001 CP9002 CP9003 SLUDGE CAKE PUMP PLG-CEMS CONTROL PANEL PLC -15 SLUDGE CAKE PUMP 101 CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF SLUDGE CAKE PUMP 101 OIT ------------------- SOLIDS HANDLING BUILDING I I ! i I i I I i I SYSTEM ARCHITECTURE ````,\1111{111111" I" o CARP �oFESSipL�94-y i SEA 0 0 - 0 7ERN� p //111111, PROJECT NO. 6145-217155 FILE NAME: 1003PIDI.DWG SHEET NO. 1-3 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION z wry . o w o z o j (NOTE 2) 00 co w w z0 O � � D U z O O O 1= W I\- (n O Z W W U D Y _ z O Q w W O J Q O �_ z m Q 0 � 0 0 = a Z D O lai J �' J W W Q Z � > cn co U) N 1 o Z W W J W p p = N W L7 tY z z QLi 0 n I J J p U p U C� C W W O O W W W cn Z > O O Lti lL li li Q Z 4 Q o Q Q O \ U U Z Z Z z = = W _ _ � � W Z W W r IW- W W W W = W W Z W W W Z W Z W J Q Q g g g g g Q a a Q o z :2 Ld LJ 0 z J W ? J z z � Z U U = = U U U � � W cn U cn cn 0_ a z on 0 > > a Of a_ W ccn of r- � � � BELT FILTER of Z PRESS PLC Li I I I I I I I I I PLC -12 NOTE 2 PLC -12 I I I I I I I I I I I I ( I I I I I I I I I I I I I I I ( I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 'L/ R START STOP I I I I I I I I I I I I I I I I I I I I I I HSSHHS WLH WLHH o I 0800 0800 08C00 0800 0800 0800 0800 08A00 O B O i I I I I I I I I I I I I I I I I I I I I I I I I I wI (NOTE 3) HS LIFT RAISE H/0/R I I I I I I H/0 A H/0 A , ZIT CP -08O0 0800 ' HS rXL RL PLH TLH PLL S�SC ' i i i i HS XL RL HS XL RL LLHH z 0800 ASH CLARIFIER NO. 2 CONTROL PANEL LIFT LOWER I I 08100810 0810 0810 0810 0810 0810 0810 I I I 0850 0850 0850 0850 0850 0850 0850 Q (DIV. 46) HS , I I ( 1 1 1 2 2 2 rr, Ms MS o f VFD-0810 i i i CP -0850 ``ASH SLURRY PUMP VFD P CONTROL PANEL ) (DIV. 26 HS LIFT STOP i I DIV. 26 I I I I I SUMP PUMP I I I I I I 0800 , I I I i ) o I I MS MS i I I I I Li rWSH WSH ( I I 0800 0800 I I I I � I I I I I I I I ► I i I I I I � z I I I I I I I I I I I I I I I i I I I TORQUE SWITCHESI I LCS-0820cn ASH SLURRY FROM I I I I I I LOCAL CONTROL STATION I I I I I FBI N0. 2 E-STOPII ,(DIV. 26)Llim �NOTE 5) HS I i 10"X 12 120 VAC TEET G I 0800 I I I I I I I I I PRESS/RECIRC/REMOTE I I I I I I I I o ASH SLURRY FROM 10"-CPVC 12"-CPVC I I I I I I I I HS I I I I z FBI NO. 1 1 U UjI I FILTRATE FROM I I I I I I i 0820 I I I I I I Li (NOTE 5) i -- J 6 -CPVC BELT PRESS I I I I I I I (NOTE 6) I Q U)3. Q CLARIFIER MOTOR CURRENT SHALL BE MONITORED BY A CURRENT TRANSFORMER (CT) IN CP -0800 AND SHALL BE USED TO MANUALLY ADJUST N a o RAKE ARM POSITION FROM THE HMI/SCADA SYSTEM. RAKE ARM Q 4. CONTRACTOR TO PROVIDE AN AIR STATION AND HOSE TO CHARGE THE ASH PUMP PULSATION DAMPENER. 00 I: z 5. 12" D x 24" LONG REMOVABLE SPOOL PIECE W/ VICTAULIC CONNECTIONS, TYPICAL OF 2. > > 6. ZT LIFT MOTOR 0 I w Of 7. I I I I I I I I IF THE PRESSURE SWITCH IS TRIPPED, THE PINCH VALVE IS CLOSED. IF THE PRESSURE SWITCH IS NOT TRIPPED, THE PINCH VALVE IS OPEN. I I I I I I I U04 CD 0800 I I I I I I PG PSH 1 ' I I I I I 0810 0810 I I I I I I I PSL PG I I I I I I I � l I 1 0810 0810 A A I I ( I I i s ► I EXHAUST I I I I I w TO ASH CLARIFIER 12" -CPC TO PLANT I I 1 -AIR -SS I I o NO. 1 (EXISTING) DRAIN I I I (NOTE 4) SUPPLY I I I I C_Qg��_2 I I E -STOP I TSH ' VACUUM ASH CLARIFIER NO. 2 I I SWITCH (NOTE 4) HS 0810 PULSATION I I (DIV. 46) 0 810 DAMPENER PCHV — I I I i 2" FLUSHING , 2" FLUSHING Q CONNECTION i PULSATION 4"-TA-CPVC ' CONNECTION 4"-TA-CPVC I 3"-TA-CPVC TO BELT PRESS o, w I DAMPENER I I PV -0810 1 I I I FILTER NOTE 6 3p W = „ ' 4-APS-CPVC ' I I 4"-APS-CPVC , 4"X3" II t1810I I I I I 0 o oQ PCHV-0800-2 PSHI LSHH LSH LSLL i i - IO BV -0810 c� 0820I I I 0850 0850 0850 0 o Q U o 0. o U BV -0800 I LDIVISION ASH SLURRY PUMP (DIV. 46) PROVIDED BY I PUMP MANUFACTURER a0 o 1 ' TO ASH I 2"-D-CPVC �` z , ( 46 ) = CLARIFIER N0. 2 0 j - ' -- -- -- -- -- -- -- -- -- � o 0 0 N i I L U O L0 01 Ln O a w NON—POTABLE WATER 2"—NPW—PVC 2"—NPW—PVC I 2"—NPW—PVC > 00 00 0I 0 (n mp FROM PLANT WATER , > > J U U I Z 0 -- -- -- -- -- -- -- -- -- -- -- -- -- -- --� c cn P-0850-1 P-0850-2 3"—RC—CPVC SUMP PUMP NO. 1 SUMP PUMP NO. 2 0 mI m NOTES: PUMP STATION SUMP z U, o 0 1. THE COMMON FAIL ALARM SHALL INCLUDE VFD FAILURE, LOW SUCTION PRESSURE, HIGH DISCHARGE PRESSURE AND MOTOR HIGH TEMPERATURE AND SHALL SHUTDOWN THE PUMP WHEN ACTIVATED. PROVIDED BY 4) cn o a 2. REFER TO VOLUME I FOR WIRING TERMINATION DETAILS. I ' , PUMP STATION SYSTEM SUPPLIER (PSSS) ' SEE SPECIFICATION SECTION 46 33 42 AND 13 34 2� :2c z _ Q U)3. CLARIFIER MOTOR CURRENT SHALL BE MONITORED BY A CURRENT TRANSFORMER (CT) IN CP -0800 AND SHALL BE USED TO MANUALLY ADJUST o o RAKE ARM POSITION FROM THE HMI/SCADA SYSTEM. N 0 Q 4. CONTRACTOR TO PROVIDE AN AIR STATION AND HOSE TO CHARGE THE ASH PUMP PULSATION DAMPENER. 00 I: z 5. 12" D x 24" LONG REMOVABLE SPOOL PIECE W/ VICTAULIC CONNECTIONS, TYPICAL OF 2. > > 6. FOR CONTINUATION, REFER TO VOLUME I DRAWINGS. 0 `-' QD ui ' w Of 7. ASH PUMP SHALL BE LOCKED OUT IN PRESS MODE IF THE BELT FILTER PRESS IS NOT RUNNING. REFER TO VOLUME I CONTROL DESCRIPTIONS. v a1 = = 8. IF THE PRESSURE SWITCH IS TRIPPED, THE PINCH VALVE IS CLOSED. IF THE PRESSURE SWITCH IS NOT TRIPPED, THE PINCH VALVE IS OPEN. Ewa CD z z E rr w Q w N� E U' o u0-00 oL > 3 00 v N ���� w u N � Rte' DATE DRWN CHKD REMARKS Of .° a O � N0. DESIGNED BY: G. CZERNIEJEWSKI DRAWN BY: N. MELLIN DIMith SHEET CHK'D BY: G. CZERNIEJEWSKI Sm CROSS CHK'D BY: J. AREVALO G. CZERNIEJEWSKI 5400 Glenwood Avenue, Suite 400 APPROVED BY: Raleigh, NC 27612 1 Tel: (919) 325-3500 DATE: JANUARY 2018 NC F-1255 CITY OF GREENSBORO NORTH CAROLINA ASH CLARIFIER IMPROVEMENTS T.Z. OSBORNE WRF PROCESS AND INSTRUMENTATION DIAGRAM ASH CLARIFIER AND PUMP SEAL - 0 -,,,, "IIli E PROJECT NO. 6145-217155 FILE NAME: 1004PIDI.DWG SHEET NO. 1-4 FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION F - v, 0 v 0 z O Q N y O S a z w w S F- D O S F- U W D O n rilw S (D z Q O W F- ry Q m O w O S Z 0 W V) D W m O O z W ry Q 0 Z Q S 0 U I O ry w w O 0-1w w S F - w m Q z Li w S 0 w <t O w ry O U Z W _U W U) J Q z O W I O m m 0 w Cl O of w z cD U5 Li 0 0 z Q .z ow w� r� wv V)O w� ryw �w S= CD ~ E J � J Q Z W =:2 F- D U �O D �w 0 O U P- W O cn N LiiD © ry FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION