Loading...
HomeMy WebLinkAboutAddInfoRequest2_RROEnergy. Mineral & Land Resources ENVIRONMENTAL QUALITY December 20, 2017 Ms. Leslie Hartz Atlantic Coast Pipeline, LLC c/o Dominion Energy Transmission, Inc. 707 East Main Street Richmond, VA 23219 Subject: Request for Additional Information #2 Stormwater Project No. SWG040095 Atlantic Coast Pipeline Project Nash County Dear Ms. Hartz: ROY COOPER Governor MICHAEL S. REGAN secz eras y TRACY DAVIS Director The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for the subject Stormwater Management Permit Application for the subject project on November 16, 2017. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Provide a breakdown of BUA that shows the existing, proposed total, and net increase of BUA. At the scale of the drawings provided, it is not possible to determine this information. [15A NCAC 02H .1042(2)(g)] 2. Provide a description in the narrative of the BMPs and/or SCMs used to treat stormwater runoff from BUA. This was included for erosion control BMPs, but not post - construction BMPs/SCMs applicable to this stormwater permit application. (ex. Sheet flow and/or vegetated swales, etc.) [15A NCAC 02H .1041(h)(5)] 3. Valve site plans sht. 4646E: a. These plans must be sealed, signed, and dated. [ 15A NCAC 02H .1042(2)(g)] b. Show all proposed contours/grading and drainage patterns. [15A NCAC 02H .1042(2)(g)] 4. Revise all road cross-sections to show all side slopes no steeper than 3:1; and that swales must be vegetated. [15A NCAC 02H .1003(2)(c) & SWG040000] Nothing Compares_-._�_ SState of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 512 N. Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612 919 707 9200 5. Show details of the drainage to be added per note 9 of the access roads. Any new or modified swales must have supporting calculations to demonstrate non-erosive now for the 10 -yr storm. [15A NCAC 02H .1003(2)(c)] 6. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. [ 15A NCAC 02H .1042(2)] Pdfs must be uploaded using the form at: https://edoes.deq.nc.gov/Fonns/SW_Project Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 20, 2017, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SWG040095 on all correspondence. If you have any questions concerning this matter please feel free to contact me at Robert.Patterson(ii)ncdenr.gov or (919) 807-6369. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Program ec: Bill Denton, PE - Raliegh Regional Office Tiffini Smith - ERM Nothing Compares---,- State ompares.. State of North Carolina Environmental Quality l Energy, Mineral and Land Resources 512N. Salisbury Street 11612 Mail Service Center Raleigh, North Carolina 27699-1612 919 707 9200