Loading...
HomeMy WebLinkAbout20040047 Ver 6_Approval Letter_20180130Wu ter Res�,,,)w ce-s L N V 1 U 0 N W E, NI A L is J A L January 30, 2018 AFTEW Properties, LLC Attn: Dr. Arnold L. Sobol 2020 South Churchill Drive Wilmington NC 28403 R 0 Y (J)01'1:1 MICHAI 1, S. RFGAN t-INDAC"LJ1.1'III 1'4 It DWR # 04-0047 v6 New Hanover County Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions — ZirsTATRWYA Mok The Village at Mott's Landing USAGE Action ID. No. SAW -2009-01847 Dear Dr. Sobol- Attached hereto is a copy of Certification No. 3641 issued to AFTEW Properties, LLC, dated January 30, 2018. This Certification replaces the Certification issued to you on January 16, 2013. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in General Statute 15013, by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the CIAH at http://www.ncoah.com/ or by calling the CIAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. State ofNorIh Carolina EnvironnientalQuality i: Water Resources 1677 Mail St-.niue Cenler I Raleigh. Nomh Carolina 27699-1617 919 8076300 If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Village at Mobs Landing DWR# 2004-0047 v6 January 30, 2018 Page 2 of 7 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Please contact Chad Coburn at 910-796-7379 or chad.coburn@ncden_r.gov or me at karen.higgins@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: David Syster — SEGi (via david.syster@segi.us) LISACE, Wilmington Regulatory Field Office DWR WiRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 040047v6Wil I ageAt M otts Land i ng(N ewH a nover)_401—IC—MO D Village atMotts Landing DVVR#2004-0047vU January J(l2Q18 Page 3 of 7 CERTIFICATION #3641 is issued in conformity with the requirements of Section 401, Public Laws 92-5O0and 95-Zl7ofthe United States and subject bJNorth Carolina's Regulations iml5NCAC OIN.D5OOand 15ANCACO20.O20O,toAFTEVVProperties, LLC, who have authorization for the impacts listed below, as described within your application received bythe N.[Division 0fWater Resources /Qivisi0n\unSeptember 2O,2O12,byPublic Notice issued bythe U.3.Army Corps of Engineers and received bythe Division unNovember 20,2OI2and September 22,2O17,and modification request dated July 7,Z817and received bythe Division onDecember l,ZOI7with subsequent information received December l5,2O17. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 3OI,302,383,3U6,3O7ofthe Public Laws 9I-50Oand PL95-2l7ifconducted hn accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions ofCertification: Impacts Approved The following additional impacts are hereby approved provided that all 8fthe conditions of this Certification are met. Noother impacts are approved, including incidental impacts. Type of Impact Amount Approved Permanent (units) Amount Approved Temporary (units) Stream 125 (linear feet) 0 (linear feet) Wetland 0.80 (acres) 0 (acres) The following impacts were previously approved on January 16, 2013: Type of Impact Amount Approved Permanent (units) Amount Approved Temporary (units) 404/401 Wetlands 1.39 (acres) 0 (acres) 2. Compensatory. M,it.igation A total of 3.25 acres of wetland credits have been purchased from the NC Ecosystem Enhancement Program (now Division of Mitigation Services) by receipt dated April 2U,2O86 to meet the mitigation requirement for previously approved wetland impacts. Because mitigation paid for previously approved wetland impacts exceed the Division's requirement for mitigation at a 1:1 ratio, no mitigation is required for the additional wetland impacts. Viliage at Motts Landing DVVR#2VD4<047w6 January 30,2018 Page 4 of 7 3. Stormwater Management Plan A StVrrnvvater Management Plan (SMP) must be approved by the Wetlands, Buffers, StOrnnvvGter—Cmrnp|iance and Permitting Unit Or if the project is subject to another State storrnVvaterprDgrarn, a copy Vfthe approval letter and approved SMP must besubmitted to this Office before any impacts authorized under this 401 Water Quality Certification may 4. 0Owaste, spoil, solids,orfillofanykindsha|loccurinvvetlands,vvatens,orhpahan@reas beyond the footprint of the impacts depicted N the Pre -Construction Notification for this project. All construction activities, including the design, installation, operation, and maintenance ofsediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts Qfthis permit. [15AN[A[02H .8501 and .85021 5. Protective Fencing All wetlands, streams, surface waters, and riparian buffers located within 50feet ofthe construction area on the project site shall be clearly marked (exarnp|e-orangefabhc fencing) prior to any land disturbing activities and must be nn2imƒ8|ned on the property until the project phasehsconnp|pted. [15AN[A[O2H.O585(b)(2\and (c)(Z) and 15/\NCACO2H 6. Sediment and Erosion Control Erosion and sediment control practices must be infull compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. Vfapplicable, the project rnustconnp|yvviththe specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements [I5AN[ACQ2H,O5,U6(6)(3\and /cV3\]: a. Design, installation, operation, and maintenance ofthe sediment and erosion control measures must besuch that they equal 8rexceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control K4anom/. The devices shall bemaintained onall construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must bedesigned, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. o. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements ofthe Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair oferosion control Village at K4olts Landing DWR#2004-0�047vG January 38,2018 Page 5of7 e. For SA, HQWwaters. The sediment and erosion control designs must comply with the requirements set forth in 15A NCA[ 0413.0124 Design Standards inSensitive 7. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions tothis condition require application submittal to and written approval by the Division. |fplacement Ofsediment and erosion control devices inwetlands and waters is, unavoidable, then design and placement of temporary erosion control measures shall not beconducted inamanner that may result indis-equiUibriurnofwetlands, stream beds, or banks, adjacent tonrupstream and downstream ofthe above structures. All sediment and erosion control devices shall beremoved and the natural grade restored within two (2) months ofthe date that the Division of Energy, Mineral and Land Resources (DEK1LR)or locally delegated program has released the specific area within the project, [15/\ NCAC 02H .85OIand .Q5OZ] 8. Construction Stormwater Permit NCGO10000 An NPDESConstruction 5tOrnmvvaterPermit hSrequired for construction projects that disturb one /l\ or more acnes of land. This Permit allows storrmvvatertn be discharged during land disturbing construction activities asstipulated inthe conditions ofthe permit. If your project is covered by this permit, full compliance with permit conditions including the emQsion& sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. Acopy Ofthe general permit /N[GO1OOOO1,inspection log sheets, and other information may befound at: . [15ANCACQ2H.O505/bV5\and 9. |fconcrete isused during the construction, then all necessary measures shall betaken to prevent direct contact between uncured orcuring concrete and waters Ofthe state. Water that inadvertently contacts uncured concrete shall not be discharged towaters ofthe state due tothe potential for elevated pH and possible aquatic life/fish NUs. [15A N[AC 028 .0200] 10. Construction Plans Any final construction plans for this project nnustincludeor[ef2nencetheappHcationand plans approved bythe Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent and all relative impacts are accounted for and shown mnthe construction plans. 11. Fueling, lubrication and general equipment maintenance should not take place within 5Ofeet of3vvaterbudyorwetlands toprevent contamination 6vfuel and oils. [154NCAC82H.0506 ViHage at Motts Landing DWR#2004QO47m5 January 3L\2O1D Page 6of7 12. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids Orother potential toxic chemicals. |nthe event ofahydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours 0f8 anmto5pmnalthe Wilmington Regional Office at 92O.79673O6and after hours and Onweekends call (800)858-Q368. Management ofsuch spills shall comply with provisions ofthe North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCA[ 02H .0506 /b\(5) and /cV3\, 15A NCA[02B .0280 (3)(R, and GS 143 Article 21A] 13. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers within the project boundohesinOrdertoas3ure compliance for future wetland, water and buffer impact. These mechanisms Sh@U be put in place atthe time ofrecording ofthe property, oroFindividual lots, whichever isappropriate. Asample deed notification can bedownloaded from the 4D1 &8uferPermitting Branch website at . The text Ofthe sample deed notification may bemodified asappropriate tosuit t0this project. Documentation ofdeed notifications shall be provided to the Division upon request. [15A N[ACO2H.05OIand.U5O2] I4.This Certification does not relieve the applicant of the responsibility tuobtain all other required Federal, State, or Local approvals. 15,. Continuing Compliance AFTEVVProperties, LLC shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met (including the failure tosustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify AFTEW Properties, LLC and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NC/\CO2H .0504. Any new Drrevised conditions shall he provided to AFTEW Properties, LLC in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions ofthe 4O4Permit for the project. F15ANCACO2B.D2ODl Village at Motts Landing DWR# 2004-0047 v6 January 30, 2018 Page 7 of 7 16. This approval is for the purpose and design described in your application and as described in the Public Notice•'. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. if you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. if the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name. [15A NCAC 02H .0501 and .0502] 17. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Branch within ten days of project completion (available at: http://r)ortal,ncdenr,org/web/wq/swp,/wsZ40l/certsandpermits/apply/forms). [15A NCAC 02H .0502(f)] 18. This certification grants permission to the Director, or an authorized representative of the Director, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H.0506] Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and/or civil penalties. This the 30th day of January 2018 Karen Higgins, Supervisor 401 & Buffer Permitting Branch 3641