From: Scarbraugh, Anthony
Sent: Wednesday, January 31, 2018 3:29 PM
To: Beecher, Gary H CIV USARMY CESAW (US); John Jarrell
Subject: RE: [EXTERNAL] RE: [External] Kinston Briery Run Sewer NWP 12 project
Mr. Jarrell,
The Division of Water Resources has not received any subsequent information following the additional information
requested issued on November 30, 2017. Please forward two copies of the information that was discussed during our
site visit on January 30, 2017.
Thanks,
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Scarbraugh, Anthony
Sent: Thursday, December 07, 2017 8:25 AM
To: Beecher, Gary H CIV USARMY CESAW (US)<Gary.H.Beecher@usace.army.mil>; John Jarrell
<John.Jarrell@ci.kinston.nc.us>; Pullinger, Robert C <chris.pullinger@ncdenr.gov>
Subject: Re: [EXTERNAL] RE: [External] Kinston Briery Run Sewer NWP 12 project
I have it on my calendar.
From: Beecher, Gary H CIV USARMY CESAW (US) <Gary.H.Beecher@usace.army.mil>
Sent: Thursday, December 7, 2017 7:17:11 AM
To: John Jarrell; Scarbraugh, Anthony; Pullinger, Robert C
Subject: RE: [EXTERNAL] RE: [External] Kinston Briery Run Sewer NWP 12 project
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
Sounds good lets meet on January 3, 2018 at the site in Kinston, 10:00?
Gary
-----Original Message -----
From: John Jarrell fmailto:John.Jarrell(@ci.kinston.nc.us
Sent: Wednesday, December 06, 2017 6:13 PM
To: Anthony Scarbraugh<anthony.scarbraugh@ncdenr.gov>; Robert C Pullinger <chris.pullinger@ncdenr.gov>; Beecher, Gary H CIV
USARMY CESAW (US) <Gary.H.Beecher@usace.army.mil>
Subject: [EXTERNAL] RE: [External] Kinston Briery Run Sewer NWP 12 project
Anthony,
I would like to get it done as soon as possible. January 3, 2018 will be fine. I will be coming off of Holiday vacation. So it would be
good to do this before I get caught up in everything else.
Thanks,
John A. Jarrell, III
City Engineer
>>> "Scarbraugh, Anthony" <anthony.scarbraugh@ncdenr.gov> 12/6/2017 2:00 PM >>>
Mr. Jarrell,
I am available either day.
Thanks,
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources - Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
-----Original Message -----
From: Beecher, Gary H CIV USARMY CESAW (US)[mailto:Gary.H.Beecher@usace.army.mil]
Sent: Wednesday, December 06, 2017 9:06 AM
To: John Jarrell <John.Jarrell@ci.kinston.nc.us>; Scarbraugh, Anthony<anthony.scarbraugh@ncdenr.gov>; Pullinger, Robert C
<chris.pullinger@ncdenr.gov>
Subject: [External] Kinston Briery Run Sewer NWP 12 project
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
All,
Since we've got several items that need to be ironed out for this NWP 12 project, I propose that we meet onsite and look at some of
the areas that could be potential "sticking points" for writing the permit.
-The first is the stream bank that is being proposed to be levelled to better accommodate the stream crossing.
-We can also look at some of the other crossings that will be impacted by this NWP.
Unfortunately my month of December is already full. My earliest availability for a site visit would be January 3 or January 10, 2018.
Respectfully,