HomeMy WebLinkAboutNC0005088_FINAL_CSA_Appendix_F_201801312018 Comprehensive Site Assessment Update January 2018
Cliffside Steam Station SynTerra
APPENDIX F
BORING LOGS, CONSTRUCTION DIAGRAMS, AND
ABANDONMENT RECORDS
Boring Logs
Well Construction Records
Well Abandonment Records
2018 Comprehensive Site Assessment Update January 2018
Cliffside Steam Station SynTerra
BORING LOGS
BELOW IS THE BORING LOG FOR 'GWA-2D'. THIS IS MISLABELED. IT SHOULD BE
GWA-2BRU (SEE ABOVE).
BELOW IS THE BORING LOG FOR 'GWA-22D'. THIS IS MISLABELED. THE BORING LOG
SHOULD READ GWA-22BRU.
BELOW IS THE BORING LOG FOR GWA-30D. THIS IS MISLABELED. THE BORING LOG
SHOULD READ GWA-30BRU.
2018 Comprehensive Site Assessment Update January 2018
Cliffside Steam Station SynTerra
WELL CONSTRUCTION RECORDS
2018 Comprehensive Site Assessment Update January 2018
Cliffside Steam Station SynTerra
WELL ABANDONMENT RECORDS