HomeMy WebLinkAboutCypress Branch Stream Call Ver 1_Stream Determination_20180130Strickland, Bev
From: Mairs, Robb L
Sent: Wednesday, January 31, 2018 8:33 AM
To: 'Mark Hargrove'
Cc: Hall, Christine; Steenhuis, Joanne; 'Capito, Rachel A CIV USARMY CESAW (US)'
Subject: RE: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
Attachments: Cypress Branch Stream Call Jan. 18.pdf
Hey Mark,
Attached is our stream determination letter along with supporting documents. Feel free to let me know if you need any
further assistance.
Thanks,
• • • •
Robb Mairs
Environmental Senior Specialist
Division of Water Resources
North Carolina Department of Environmental Quality
910 796.7303 office
robb.mairs(a)ncdenr.gov
https://deg.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401-wetlands-buffer-
ep rmits
127 Cardinal Drive Extension
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Mark Hargrove [mailto:mhargrove@ec.rr.com]
Sent: Thursday, January 18, 2018 1:39 PM
To: Mairs, Robb L <robb.mairs@ncdenr.gov>
Subject: RE: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
=•
Figured anything out yet?
Based on the elevations, at the % line there should be no way the waters would be tidal .... the elevation of the low spot
based on Lidar topo is elevation 35.
Mark N. Hargrove, PE
1
Port City Consulting Engineers, PLLC
910-599-1744
From: Mark Hargrove [mailto:mhargrove(a�ec.rr.com]
Sent: Wednesday, January 17, 2018 5:52 PM
To: 'hairs, Robb L'
Subject: RE: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
•..
Attached is pdf showing the aerial image along with Lidar Topo that I generated. I drew a % mile radius circle from the
pond outlet.
Let me know if you need anything else.
Mark N. Hargrove, PE
Port City Consulting Engineers, PLLC
910-599-1744
From: Mairs, Robb L [mailto:robb.mairs(d)ncdenr.Qov]
Sent: Wednesday, January 17, 2018 4:49 PM
To: Mark Hargrove
Subject: RE: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
Hey Mark,
Thanks for the email. Can you provide an aerial and topo map with a % mile radius around the project area? Based on
Google Earth, it appears the source to Cypress Branch may be close to HWY 17.
Thanks,
Robb Mairs
Environmental Senior Specialist
Division of Water Resources
North Carolina Department of Environmental Quality
910 796.7427 office
robb.mairs(cancdenr.gov
https://deg.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401-wetlands-buffer-
ep rmits
127 Cardinal Drive Extension
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Mark Hargrove [mailto:mhargrove@ec.rr.com]
Sent: Wednesday, January 17, 2018 2:37 PM
To: Mairs, Robb L <robb.mairs@ncdenr.gov>
Subject: FW: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
Can you tell me where the upper reach of Cypress Branch is located. Gulf Stream Steel is looking at doing an Industrial
Park behind and beside their facility in Holly Ridge.
Attached is a pdf of the preliminary plan.
As you can see below, the interactive map has us farther than % mile from Cypress Branch.
Thanks
Mark N. Hargrove, PE
Port City Consulting Engineers, PLLC
910-599-1744
From: Hall, Christine[mailto:Christine. Hall(a)ncdenr.gov]
Sent: Wednesday, January 17, 2018 2:18 PM
To: Weaver, Cameron; mhararove(a)ec.rr.com
Cc: Mairs, Robb L
Subject: RE: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
Mark,
The extent of the SA waters has not been digitized and, as noted by the disclosure at the top of that website, this
mapping tool is only a guide:
Please check with the DEQ Regional Office if the location is near an important boundary (such as SA Waters) so the
location and applicable design requirements can be verified.
The Division of Water Resources is responsible for confirming the extent of the SA waters. I believe that Robb Mairs
covers Onslow County. Please confirm the extent of the SA waters with him.
Christine Hall
Environmental Engineer
Division of Energy, Mineral and Land Resources — State Stormwater Program
Department of Environmental Quality
910 796 7215 office
910 796 7335 direct
christine.halla-ncdenr.gov
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Weaver, Cameron
Sent: Wednesday, January 17, 2018 2:13 PM
To: Hall, Christine <Christine.Hall@ncdenr.gov>
Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov>
Subject: Fw: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
From Mark Hargrove about SA Water call on this Express request.
Cameron Weaver
Environmental Assistance Coordinator
NCDENR/DEACS
127 Cardinal Drive, Wilmington NC 28405
910-796-7303
http://Portal.nc.gov/ncdenr
From: Mark Hargrove <>
Sent: Wednesday, January 17, 2018 12:25 PM
To: Weaver, Cameron
Subject: [External] RE: Camp Davis Industrial Park - Holly Ridge (Express Request)
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
View below showing the site is farther than % mile from Cypress Branch
4
C.I'--;.-C:-_lr-I S,''C'
Powered by Google Maps Jays
Mark N. Hargrove, PE
Port City Consulting Engineers, PLLC
910-599-1744
From: Mark Hargrove [mailto:mhargroveCcDec.rr.com]
Sent: Tuesday, January 16, 2018 1:54 PM
To: cameron.weaverC�ncdenr.aov
Subject: Camp Davis Industrial Park - Holly Ridge (Express Request)
Cameron,
Attached is the Request for Express form along with a Stormwater narrative and a pdf showing the overall
project.
This will be a high density project with 2 wet ponds.
Let me know when we could schedule a submittal.
Thanks
Mark N. Hargrove, PE
Port City Consulting Engineers, PLLC
910-599-1744
Q Virus -free. www.avast.com
Environmental
Quality
January 30, 2018
Mark Hargrove
c/o Port City Consulting Engineers, PLLC
6216 Stonebridge Road
Wilmington, N.C. 28409
Subject: Stream Determination # Pender 2018.002
Camp Davis Industrial Park, Inc, Holly Ridge, Onslow County
Cypress Branch
Dear Mark:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
On January 18, 2018 and again on January 23, 2018, at your request, Joanne Steenhuis and Robb Mairs, NC Division
of Water Resource (NCDWR) staff, conducted an on-site determination to determine the ephemeral/intermittent (E/1)
points of stream sources to Cypress Branch at the Camp Davis Industrial Park. The enclosed aerial photograph with
drawing depicts the approximate E/I points and sample location, and whether a feature has been determined to be a
stream or not. This drawing has been signed and is valid for 5 years.
This on-site determination shall expire five (5) years from the date of this letter. Landowners or other affected
parties that dispute a determination made by DWR or a delegated Local Authority may request a determination
by the Director. An appeal request must be made within sixty (60) calendar days of the date of this letter or
from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A
request for determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR
401 & Buffer Permitting Unit, 1617 Mail Center, Raleigh, NC 27699.1617.
This determination is final and binding unless you ask for a hearing within 60 days. The owner/future owners should
notify the Division (including any other local, state and federal agencies) of this determination concerning any future
correspondence regarding the subject property. This project may require a Section 404/401 Water Quality Certification
for the proposed activity. Any inquiries should be directed to Robb Mairs of DWR at 910.796.7215 and Rachel Capito
of the U.S. Army Corps of Engineers at 910.251.4487.
Please contact Robb Mairs at 910.796.7215 or Robb. Mairs anncdenr.gov if you have any questions or concerns.
obb Mairs
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDWR
Enclosures
Cc: Rachel Capito, US Army Corps of Engineers, Wilmington Field Office
Karen Higgins, 401 Wetlands and Buffers Unit
WiRO
-:5>-Nothing Compares;..._
State of North Carolina I Environmental Quality
1617 Mail Service Center I Raleigh, North Carolina 27699-1617
``�
N
NC Division of Water Quality -Methodology for Identification of Intermittent and
Perennial Streams and Their Origins v. 4.11
TTI+ TlllQL......m T.1,...NP...,.4:.... P'nv... V..vcinv A 11
Date: V C.
A. Geomor holo (Subtotal=_) Absent Weak
Project/Site:
Latitude:
Evaluator: M
A't✓
County: N
Longitude:
Total Points:
Stream Determination (circle one
Other
is at least intermittent �Oial
Ephemeral Intermitten Perenn
e. g. Quad Name:
if>_ 19 or perennial if>_ 30'
3
artificial ditches are not rated; see discussions in manual
12. Presence of Baseflow
0 1
313.
Iron oxidizing bacteria
Strong
1a. Continuity of channel bed and bank
0
1
4cb
015.
Sediment on plants or debris
2. Sinuosity of channel along thalweg
0
1
3
3. In -channel structure: ex. riffle -pool, step -pool,
ripple -pool sequence A l
No = 0
1
IM:
3
4. Particle size of stream substrate
0
1
1
3
5. Active/relict Floodplain
0
1
3
6. Depositional bars or benches
0
1
C�_
3
7. Recent alluvial deposits
1
2
3
8. Headcuts
03
1 1
2
3
9. Grade control
0
140.5
1
1.5
10. Natural valley
00.5
1.5
11. Second or greater orderchannel
o = 0
Yes = 3
artificial ditches are not rated; see discussions in manual
12. Presence of Baseflow
0 1
313.
Iron oxidizing bacteria
0 1
314.
Leaf litter
1.5
4cb
015.
Sediment on plants or debris
0' 0.
1.5
16. Organic debris lines or piles
0 0.5
1.5
17. Soil -based. evidence of high water table?
No = 0
es =
r 0; i,.,.., rc„r.r..r.,i-
18. -
18. Fibrous roots in streambed
2
1
0
19. Rooted upland plants in streambed
3
2
1
0
20. Macrobenthos (note diversity and abundance)
0
1
2
3
21. Aquatic Mollusks
0
1
3
22. Fish
- 0
0.
1
t5
23. Crayfish
0
1
1.5
24. Amphibians
0
0.51
1.5
25. Algae
0.5
1
1.5
26. Wetland plants in streambed
FACW = 0.75,
OBI = 1.5 Other = 0
'perennial streams may also be identified using other methods.
See p. 35 of manual.
Notes:
Sketch: J"I f• v I
41
r
4� ', - f/ � I f '�. •. / �r _w-� '-'-"�-. 1"1' I y � :� � r fir`, `S��'P'*�+'.SC;�
Ol n
.HoIIy Reidge rI,o,lly Rldge; f - �.,z__._ t > Rai
Sampling point'y
j
400
u
:♦ � � {> � ♦ �/Jed t` �
Gi �/_ •.�' iia.' '� .6r ss
k 7c
Ord
d x
Approximate E/1 Point
01\ CY
'c
o sae o�• <
y jl
ray
i,
C�7
T �o u '
Ok ,k xy. E. M_ 10 i
1 C
G
'y k
r� 1
n
Y^