HomeMy WebLinkAbout20140957 Ver 2_More Info Received_20180117Strickland, Bev
From: Spencer Trichell <Spencer.Trichell@dominionenergy.com>
Sent: Wednesday, January 17, 2018 4:29 PM
To: Higgins, Karen
Cc: Richard B Gangle
Subject: [External] RE: Impact and Mitigation Numbers
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
report.spam@nc.gov.
Karen, we revisited the impact and mitigation numbers and provide the latest numbers below. These match the
mitigation plan and letters of reservation. Let me know if you have any questions.
IMPACTS:
Type of Impact Amount (units) Amount (units)
Permanent Temporary
404 Wetlands 0.80 (acres) 453.45 (acres)
Perennial Stream 160 linear feet 14,524 linear feet
Non -perennial Stream 606 (linear feet) 20,876 (linear feet)
Open Waters`' 0.00 (acres) 0.44 (acres)
Tar -Pamlico Buffer Sub -basin 03020102
Buffer Zone 1
73,084 (square feet)
0 (square feet)
Buffer Zone 2
54,610 (s uare feet)
0 (square feet)
Tar -Pamlico Buffer Sub -basin 03020101
Buffer Zone 1
71,737 (square feet)
0 (square feet)
Buffer Zone 2
69,590 (square feet)
0 (square feet)
Neuse Buffer Sub -basin 03020203
Buffer Zone 1
52,734 (square feet)
0 (square feet)
Buffer Zone 2
58,274 (square feet)
0 (square feet)
Neuse Buffer Sub -basin 03020201
Buffer Zone 1
114,544 (square feet)
0 (square feet)
Buffer Zone 2
95,141 (square feet)
0 (square feet)
A See below re info needed for open water impacts.
BUFFER MITIGATION:
Compensatory Mitigation
River & Sub -basin
Amount
Number
Tar -Pamlico
301,168 (square feet)
03020102
Tar -Pamlico
318,868 (square feet)
03020101
245,612 (square feet
Neuse
03020203
486,344 (square feet) Neuse
03020201
For purposes of analysis the workspace limit has been used to evaluate the acreage of the open water features
within the planned work area. Permanent impacts to open water ponds are not planned. In a number of cases
where the pond is adjacent to an access road or adjacent to the mainline centerline, it is possible that there will
be no impacts to these open water features, as equipment will likely pass along the edge of the pond and not
cross within the pond unnecessarily.
Thanks,
ff
Pipeline
Single
Feature
Centerline
Complete
MP
County
HUC 8
Project Facility Crossed
ID
Crossing Lengtl
Crossing ID
(Feet)
NC AP -2 026
11.8
ohlc001
Halifax County
03010107
Perm ROW, Temp ROW
1
NC AP -2 049
17.2
ohlp001
Halifax County
03010107
Perm ROW
16
Not Crossed by
Pipeline
NC AP -2 153
54.5
onag003
Nash County
03020101
Perm AR
Centerline
Not Crossed by
Pipeline
NC AP -2 173
62.8
onao003
Nash County
03020203
Perm ROW, Temp ROW
Centerline
Not Crossed by
Pipeline
NC AP -2 173
62.9
onao002
Nash County
03020203
Perm ROW
Centerline
Not Crossed by
Pipeline
NC AP -2 177
64.6
onao001
Nash County
03020203
Temp ROW
Centerline
Not Crossed by
Pipeline
NC AP -2 281
97.2
ojor001
Johnston County
03020201
Perm AR
Centerline
Not Crossed by
Pipeline
NC AP -2 301
104.4
ojoa004
Johnston County
03020201
Temp ROW
Centerline
Not Crossed by
Pipeline
NC AP -2 307
108.1
ojob100
Johnston County
03020201
Temp ROW
Centerline
Not Crossed by
Pipeline
NC AP -2 315
114.1
ojop008
Johnston County
03020201
Perm AR
Centerline
NC AP -2 331
121.9
osao002
Sampson County
03030006
Perm ROW, Temp ROW
102
Not Crossed by
Pipeline
NC AP -2 331
122.5
osag001
Sampson County
03030006
Perm AR
Centerline
Not Crossed by
Cumberland
Pipeline
NC AP -2 388
141.6
ocme020
County
03030004
Temp CPY
Centerline
Not Crossed by
Pipeline
NC AP -2 456
161.8
oroh003
Robeson County
03040203
Temp ROW
Centerline
Perm ROW, Temp ATWS, Temp
NC AP -2 492
177.6
orop001
Robeson County
03040203
ROW
28
Thanks,
Spencer
From: Higgins, Karen [mailto:karen.higgins@ncdenr.gov]
Sent: Wednesday, January 17, 2018 12:29 PM
To: Spencer Trichell (Services - 6)
Subject: [External] Re: Impact and Mitigation Numbers
Spencer -
Do you think you can get me this info by Friday?
Thanks -
Karen
Karen Higgins
401 & Buffer Permitting Branch Supervisor
Division of Water Resources
Department of Environmental Quality
919 807-6360 office
karen.higgins(c�r�,ncdenr.gov
512 N. Salisbury Street, Suite 942-E, Raleigh, NC 27604
1617 Mail Service Center, Raleigh, NC 27699-1617
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties.
From: Higgins, Karen
Sent: Tuesday, January 16, 2018 3:50:09 PM
To: Spencer TrichelI
Subject: Impact and Mitigation Numbers
Spencer -
Can you double check that these numbers match the numbers you all have for impacts and buffer
mitigation?
IMPACTS:
Type of Impact
Amount (units)
Permanent
Amount (units)
Temporary
404 Wetlands
0.80 (acres)
453.49 (acres)
Perennial Stream
160 (linear feet)
15,068 (linear feet)
Non -perennial Stream
606 (linear feet)
20,771 (linear feet)
Open WatersA
## (acres)
## (acres)
Tar -Pamlico Buffer Sub -basin
03020102
Buffer Zone 1
130,594 (square feet)
0 (square feet)
Buffer Zone 2
87,029 (square feet)
0 (square feet)
Tar -Pamlico Buffer Sub -basin 03020101
Buffer Zone 1
227,188 (square feet)
0 (square feet)
Buffer Zone 2
149,259 (square feet)
0 (square feet)
Neuse Buffer Sub -basin 03020203
Buffer Zone 1
139,975 (square feet)
0 (square feet)
Buffer Zone 2
97,327 (square feet)
0 (square feet)
Neuse Buffer Sub -basin 03020201
Buffer Zone 1
151,081 (square feet)
0 (square feet)
Buffer Zone 2
121,757 (square feet)
0 (square feet)
A See below re info needed for open water impacts.
BUFFER MITIGATION:
Compensatory Mitigation Amount
River & Sub -basin Number
Feature
Tar -Pamlico
289,519.5 (square feet)
Project
PipelineTemporary
Centerline
03020102
Permanent
Tar -Pamlico
304,210.5 (square feet)
County
03020101
Facility
Neuse
244,143.0 (square feet)
Impacts
Crossing ID
03020203
ID
Neuse
397,866.0 (square feet)
Crossed
Crossing
03020201
Also, I need temporary and permanent impacts for open waters (in acres) for the 15 open water impacts; right
now the impacts are listed as N/A in the application. Please provide a spreadsheet as follows:
Single
Feature
Project
PipelineTemporary
Centerline
Permanent
Complete
MP
County
HUC 8
Facility
Impacts
Impacts
Crossing ID
ID
Crossed
Crossing
(acre)
(acre)
Length (Feet)
If you have any questions let me know. I'm anticipating being out of the office Wednesday and Thursday this
week due to weather but should be back on Friday.
Thanks -
Karen
Karen Higgins
401 & Buffer Permitting Branch Supervisor
Division of Water Resources
Department of Environmental Quality
(919) 807-6360 office
karen.higgins(a�ncdenr.gov
https:Hdeg.n-wetlands-buffer-
permitsc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401
512 N. Salisbury Street (Archdale Building), Suite 942-E, Raleigh, NC 27604
1617 Mail Service Center, Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or
privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the
sender without an additional express written confirmation to that effect. The information is intended solely for the
individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any
disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you
have received this electronic transmission in error, please reply immediately to the sender that you have received the
message in error, and delete it. Thank you.