Loading...
HomeMy WebLinkAbout20140957 Ver 2_More Info Received_20180117Strickland, Bev From: Spencer Trichell <Spencer.Trichell@dominionenergy.com> Sent: Wednesday, January 17, 2018 4:29 PM To: Higgins, Karen Cc: Richard B Gangle Subject: [External] RE: Impact and Mitigation Numbers CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Karen, we revisited the impact and mitigation numbers and provide the latest numbers below. These match the mitigation plan and letters of reservation. Let me know if you have any questions. IMPACTS: Type of Impact Amount (units) Amount (units) Permanent Temporary 404 Wetlands 0.80 (acres) 453.45 (acres) Perennial Stream 160 linear feet 14,524 linear feet Non -perennial Stream 606 (linear feet) 20,876 (linear feet) Open Waters`' 0.00 (acres) 0.44 (acres) Tar -Pamlico Buffer Sub -basin 03020102 Buffer Zone 1 73,084 (square feet) 0 (square feet) Buffer Zone 2 54,610 (s uare feet) 0 (square feet) Tar -Pamlico Buffer Sub -basin 03020101 Buffer Zone 1 71,737 (square feet) 0 (square feet) Buffer Zone 2 69,590 (square feet) 0 (square feet) Neuse Buffer Sub -basin 03020203 Buffer Zone 1 52,734 (square feet) 0 (square feet) Buffer Zone 2 58,274 (square feet) 0 (square feet) Neuse Buffer Sub -basin 03020201 Buffer Zone 1 114,544 (square feet) 0 (square feet) Buffer Zone 2 95,141 (square feet) 0 (square feet) A See below re info needed for open water impacts. BUFFER MITIGATION: Compensatory Mitigation River & Sub -basin Amount Number Tar -Pamlico 301,168 (square feet) 03020102 Tar -Pamlico 318,868 (square feet) 03020101 245,612 (square feet Neuse 03020203 486,344 (square feet) Neuse 03020201 For purposes of analysis the workspace limit has been used to evaluate the acreage of the open water features within the planned work area. Permanent impacts to open water ponds are not planned. In a number of cases where the pond is adjacent to an access road or adjacent to the mainline centerline, it is possible that there will be no impacts to these open water features, as equipment will likely pass along the edge of the pond and not cross within the pond unnecessarily. Thanks, ff Pipeline Single Feature Centerline Complete MP County HUC 8 Project Facility Crossed ID Crossing Lengtl Crossing ID (Feet) NC AP -2 026 11.8 ohlc001 Halifax County 03010107 Perm ROW, Temp ROW 1 NC AP -2 049 17.2 ohlp001 Halifax County 03010107 Perm ROW 16 Not Crossed by Pipeline NC AP -2 153 54.5 onag003 Nash County 03020101 Perm AR Centerline Not Crossed by Pipeline NC AP -2 173 62.8 onao003 Nash County 03020203 Perm ROW, Temp ROW Centerline Not Crossed by Pipeline NC AP -2 173 62.9 onao002 Nash County 03020203 Perm ROW Centerline Not Crossed by Pipeline NC AP -2 177 64.6 onao001 Nash County 03020203 Temp ROW Centerline Not Crossed by Pipeline NC AP -2 281 97.2 ojor001 Johnston County 03020201 Perm AR Centerline Not Crossed by Pipeline NC AP -2 301 104.4 ojoa004 Johnston County 03020201 Temp ROW Centerline Not Crossed by Pipeline NC AP -2 307 108.1 ojob100 Johnston County 03020201 Temp ROW Centerline Not Crossed by Pipeline NC AP -2 315 114.1 ojop008 Johnston County 03020201 Perm AR Centerline NC AP -2 331 121.9 osao002 Sampson County 03030006 Perm ROW, Temp ROW 102 Not Crossed by Pipeline NC AP -2 331 122.5 osag001 Sampson County 03030006 Perm AR Centerline Not Crossed by Cumberland Pipeline NC AP -2 388 141.6 ocme020 County 03030004 Temp CPY Centerline Not Crossed by Pipeline NC AP -2 456 161.8 oroh003 Robeson County 03040203 Temp ROW Centerline Perm ROW, Temp ATWS, Temp NC AP -2 492 177.6 orop001 Robeson County 03040203 ROW 28 Thanks, Spencer From: Higgins, Karen [mailto:karen.higgins@ncdenr.gov] Sent: Wednesday, January 17, 2018 12:29 PM To: Spencer Trichell (Services - 6) Subject: [External] Re: Impact and Mitigation Numbers Spencer - Do you think you can get me this info by Friday? Thanks - Karen Karen Higgins 401 & Buffer Permitting Branch Supervisor Division of Water Resources Department of Environmental Quality 919 807-6360 office karen.higgins(c�r�,ncdenr.gov 512 N. Salisbury Street, Suite 942-E, Raleigh, NC 27604 1617 Mail Service Center, Raleigh, NC 27699-1617 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Higgins, Karen Sent: Tuesday, January 16, 2018 3:50:09 PM To: Spencer TrichelI Subject: Impact and Mitigation Numbers Spencer - Can you double check that these numbers match the numbers you all have for impacts and buffer mitigation? IMPACTS: Type of Impact Amount (units) Permanent Amount (units) Temporary 404 Wetlands 0.80 (acres) 453.49 (acres) Perennial Stream 160 (linear feet) 15,068 (linear feet) Non -perennial Stream 606 (linear feet) 20,771 (linear feet) Open WatersA ## (acres) ## (acres) Tar -Pamlico Buffer Sub -basin 03020102 Buffer Zone 1 130,594 (square feet) 0 (square feet) Buffer Zone 2 87,029 (square feet) 0 (square feet) Tar -Pamlico Buffer Sub -basin 03020101 Buffer Zone 1 227,188 (square feet) 0 (square feet) Buffer Zone 2 149,259 (square feet) 0 (square feet) Neuse Buffer Sub -basin 03020203 Buffer Zone 1 139,975 (square feet) 0 (square feet) Buffer Zone 2 97,327 (square feet) 0 (square feet) Neuse Buffer Sub -basin 03020201 Buffer Zone 1 151,081 (square feet) 0 (square feet) Buffer Zone 2 121,757 (square feet) 0 (square feet) A See below re info needed for open water impacts. BUFFER MITIGATION: Compensatory Mitigation Amount River & Sub -basin Number Feature Tar -Pamlico 289,519.5 (square feet) Project PipelineTemporary Centerline 03020102 Permanent Tar -Pamlico 304,210.5 (square feet) County 03020101 Facility Neuse 244,143.0 (square feet) Impacts Crossing ID 03020203 ID Neuse 397,866.0 (square feet) Crossed Crossing 03020201 Also, I need temporary and permanent impacts for open waters (in acres) for the 15 open water impacts; right now the impacts are listed as N/A in the application. Please provide a spreadsheet as follows: Single Feature Project PipelineTemporary Centerline Permanent Complete MP County HUC 8 Facility Impacts Impacts Crossing ID ID Crossed Crossing (acre) (acre) Length (Feet) If you have any questions let me know. I'm anticipating being out of the office Wednesday and Thursday this week due to weather but should be back on Friday. Thanks - Karen Karen Higgins 401 & Buffer Permitting Branch Supervisor Division of Water Resources Department of Environmental Quality (919) 807-6360 office karen.higgins(a�ncdenr.gov https:Hdeg.n-wetlands-buffer- permitsc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401 512 N. Salisbury Street (Archdale Building), Suite 942-E, Raleigh, NC 27604 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.