HomeMy WebLinkAbout20181192 Ver 1_C540_Noise_1217_Draft_20180122� �iORTH CAROLINA
,� �Turx�pi�C� Authority
TRAFFIC NOISE REPORT ADDENDUM
VOLUME I
Complete 540
Triangle Expressway Southeast Extension
Wake and Johnston Counties
STIP Project Nos. R-2721, R-2828, and R-2829
State Project Nos. 6.401078, 6.401079, and 6.401080
Federal Aid Project Nos. STP-0540(19), STP-0540(20), and STP-0540(21)
WBS Nos. 37673.1.TA2, 35516.1.TA2, and 35517.1.TA1
�
Prepared for:
North Carolina Department of Transportation
North Carolina Turnpike Authority
Prepared By:
H.W. Lochner, Inc.
L Q C�-1 N E R
December 2017