HomeMy WebLinkAboutU-6074 draft Project Data Sheet.docPROJECT DATA SHEET
Date: 7/3/10
Rev.: 9/24/12
TIP No.: U-6074 County: Forsyth
Federal-aid No.: N/A WBS No.: 47498.1.1
NCDOT Division: 9 Scoping Meeting Date: TBD
Project Description:
• US 421 at SR 1122 (Jonestown Road) in Winston-Salem
• Length: 1 mile
• MPO / RPO: Winston-Salem MPO
• NEPA / 404 Merger Candidate? ❑ Yes ❑ No � To Be Determined
• General Project Need: Upgrade Interchange
Desiqn Data (Existinq Conditions�
• Functional Classification: Freeway
• Strategic Highway Corridor: No
• CTP Designation (Facility Type): Major thoroughfare
• Type of Access Control: Partial
• Typical Section: 4-lane, 2-way.
• Right of Way: Varies, 80 to 90 feet
• Posted Speed: 45 mph (existing proposed design speed same)
• Structure Inventory (bridges, RCBC, Walls, etc):
One continuous bridge over US 421
• Other STIP Projects in the Area
SPOT ID B142158 — SR 1122 (Jonestown Road), SR 3153 (Hanes Mall Boulevard) to SR
1001 (Country Club Road) in Winston Salem. Construct Sidewalk.
R-2247 CA and CD — Winston-Salem Northern Beltway — CA-South of US 421 interchange
to north of US 421 interchange; CB-North of US 421 interchange to Robinhood Road.
EB-5750 — 7th Avenue NE to 9th Street NW, construct greenway with park nodes and
pedestrian bridqe over NC 127.
• Railroad Involvement: None
• Utility Involvement: High
• Quad Map: Winston Salem West
• Potential Environmental Justice concerns; trailer park
• Existing Cemetery
rev. 7/21/ 10
No NRHP Listed Sites in vicinity
Listed T&E species: NLEB, small anthered bittercress (historic) and bog turtle (T S/A)
Lonq Ranqe Plan History:
• In compliance with Conformity (Exempt Project)
Traffic Data (AADT�
Current Year 2016 15,000 to 20,000 on SR 1122 (Jonestown Road)
57,000 to 66,000 along US 421 within project limits
Design Year 2040 TBD
Source of Traffic Data:
Design Standards AASHTO
Cost Estimates:
Prior Year Construction Right-of-Way Total
STIP Estimate $74,100,000 $31,920,000 $106,020,000
Project Schedule:
Environmental Document CE — 2019
Right-of-Way 2024
Let 2026
Initial Scopinq Comments:
rev. 7/21/ 10
Figure 1: Vicinity Map
(Insert here)
rev. 7/21/ 10
Figure 2: Environmental Features Map with
Study Area — as Recommended by NCDOT
(Insert here)
(Include data on map that will help P&N discussion)
rev. 7/21/ 10