HomeMy WebLinkAboutNCG070112_Renewal Application Form_20180124Permit Coverage
ALTX.WA Renewal Application Form
�CDENR National Pollutant Discharge Elimination System
Stormwater Individual Permit
NPDES Permit Number
NCS NCG070112
Please provide your permit number in box in the upper right hand comer, complete the information in the space provided
below and return the completed renewal form along with the required supplemental information to the address indicated.
Owner Information
a
* Address to which permit correspondence will be mai/ed
Owner/ Organization Name:
MICHAEL B FOSTER
Owner Contact:
Mailing Address:
POPO BOX 471
STATESVILLE NC 28687
Phone Number:
704=872-4123 Ext.
Fax Number:
704-872-4125
E-mail address:
Facility Information
Facility Name:
STATESVILLE BRICK CO-IREDELL-
Facility Physical Address:
391 BRICK YARD ROAD
STATESVILLE NC 28677
Facility Contact:
Mailing Address:
'I V y`�
ED
Phone Number:
JAN 24 20Ir}
Fax Number:
E-mail address:
r� R=� �'` &IAliffff
Permit Information'OR`f1fEf�"1=f�,ida�4
Permit Contact:
STEVE MOOSE
Mailing Address:
PO BOX 471
STATESVILLE NC 28687
Phone Number:
704-812-TI23 Ext.
Fax Number:
E-mail address:
Discharae Information
Receiving Stream:
Stream Class:
Basin:
Sub -Basin:
Number of Outfalls:
CATAWBA RIVER (Lake Norman below elevation)
WS-IV;CA
CATAWBA RIVER BASIN
03-08-32
Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a
separate sheet if necessary.
CERTIFICATION
I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief
such informatior/7is,true, complete and accurate.
Signatu
STEVE MOOSE
Print or type name of person signing above
Date �J - • -1 -
ENVIROMENTAL DIRECTOR
Title
SW Individual Permit Coverage Renewal
Please return this completed\application form Stormwater Permitting Program
and requested supplements information to: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
�J�—e_A
Certification
I certify under penalty of law that I have personally examined and am familiar with the information
submitted in this document, and that based on my inquiry of those individuals responsible for
obtaining this information, I believe that the submitted information is true, accurate, and complete.
Signature
STEVE MOOSE
Name (please type or print)
ENVIROMENTAL DIRECTOR
Title
JANUARY 11, 2018
Date
]'-
JAN 24 2011
DENIR=L-AND QUAUTY
MIGAMVvATEA PEF1P IffIN05
Bir ti
S"tat
R[� .�.
��f �iY�rMik
,4�c ���hiuc� oau�ced �2r�si�y �isaurea� ¢uzce 181... .
. �ur�'ac1`ct�r,� o� �isrfr.'c ?.flaad �uted �aicle
Statesville Brick Company: We have had no significant changes in industrial
activities at our permitted facility. We have had no changes that could include
the addition or deletion of work processes, changes in material handling
practices, changes in material storage practices, and changes in raw materials
used by the facility.
Steve Moose
h�
STATESVILLE BRICK COMPANY
DATE J /// `2 6ki
P. 0. Box 471 Statesville, NC 28687-0471
Phone: 704.872-4123 `l=ax: 704-872-4125 Toll Free: 800-522-4716
wwmstatesviUebrickcom
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL
NPDES STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order for the application
to be considered complete:
Initials
V/ 1.
�/z.
(Do not submit the site Stormwater Pollution Prevention Plan)
A current Site Map from the Stormwater Pollution Prevention Plan. The location of
industrial activities (including storage of materials, disposal areas, process areas and
loading and unloading areas), drainage structures, drainage areas for each outfall,
building locations and impervious surfaces should be clearly noted.
A summary of Analytical Monitoring results during the term of the existing permit
(if your permit required analytical sampling). Do not submit individual lab reports.
The summary can consist of a table including such items as outfall number,
parameters sampled, lab results, date sampled, and storm event data.
A summary of the Visual Monitoring results. Do not submit individual monitoring
reports. The summary can consist of a table including such items as outfall number,
parameters surveyed, observations, and date monitoring conducted.
A summary of the Best Management Practices utilized at the permitted facility.
Summary should consist of a short narrative description of each BMP's in place at
the facility. If the implementation of any BMP's is planned, please include
information on these BMP's.
5. A short narrative describing any significant changes in industrial activities at the
permitted facility. Significant changes could include the addition or deletion of
work processes, changes in material handling practices, changes in material storage
/ practices, and/or changes in the raw materials used by the facility.
V/
6. Certification of the development and implementation of a Stormwater Pollution
Prevention Plan for the permitted facility (Sign and return attached form).
If the final year analytical monitoring of the existing permit term has not been completed
prior to filing the renewal submittal, then the last years monitoring results should be submitted
within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal
waiting on lab results)
Sitl,,
aw
ni-,
ON 0== wormaM��z 2=0%0
y',
,46,46m&" ac wd Pmi?,ry kra&em &6w 19'91....
Xzc*ct`csww 4 , afff& e %cod gvaed vv'?z¢
STATESVILLE BRICK COMPANY
SUMMARY REPORT FOR VISUAL MONITORING
Storm Water Permit #NCG070112
Visual Monitoring Results
GENERAL permit expires on May/31/2018
Outfall #1-6 Date 2/10/17 and 10/02/17
Outfall #1-6 Date 3/30/16 and 10/30/16
Outfall #1-6 Date 3/02/15 and 10/15/15
Outfall #1-6 Date 3/10/14 and 9/08/14
Outfall #1-6 Date 3/12/13 and 10/08/13
Outfall #1-6 Date 3/12/12 and 10/26/12
P. 0. Box 471 Statesville, NC 28687-0471
Phone: 704.872-4123 Fax: 704-872.4125 Toll Free: 800.522-4716
www.statesvi//ebrickcom
Facility Name: Statesville Brick Facili
Facility Address: Statesville_ North Carolina have a total
oil over water to or froom vessels and does
1. Does the facility transfer othe facility
oil storabe capacity greater than or equal to 42,000 gall
yes_ No, X allons
Does the facility have a total oil storage capacity greater than or equal to 1 million g
2. containment that is sufficiently large to contain the capacity of
and does the facility
above -ground oil storage
to secondary
tank Plus sufficient freeboard to allow for precipitation within
the largest above g
any aboveground oil storage tank area?
Yes No X
�. eater than or equal to 1 million gallons
3. Does the facility have a total oil storage capacity gr
the appropriate formula in Attachment C
and is, the facility locate -
d at a distance (as calculated using could cause injury
charge from the facility
III to this appendix or a comparable formula) such that a discharge
see Appendices 1, 11, and III to DOCINOAAs
to fish and wildlife and sensitive environmand
acilit and Vessel Response Plans: Fish and Wildlifeli able Area1Contin envy entsPlan.
Guidance for F y
(see Appendix E to this part, section 10, for availability) and the App
Yes _ No X
greater than or equal to 1 million gallons
4. Does the facility have a total oil storage capacity g ated using the appropriate formula ui Attachment C -
and is the facility located at a disc e formula) suance (as lch that a discharge from the facility would shut down
III to this appendix or a compar
a public drinking water intake?
Yes No X
5.
Does the facility have a total oil storage capacity greater than or equal to 1 million gallons
facility experienced a reportable oil spill in an amount greater than or equal to 10,00
and has the ty ex P
gallons within the last 5 years?
Yes _ No X
C
North Carolina Division of energy Mineral, and Land Resources - Storm grater Permitting
Facility Name: STATESVILLE BRICK COMPANY
Permit Number: NCG070112
Location Address: 391 BRICK YARD ROAD
STATESVILLE NC 28677
County: IREDELL
"I Certify i,;nrrlcr pcnaM-y of law th?t the SfnrmIniafar Pnll1ttlon Preventinn Plan ISPPPI deculm-- and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
And
"i certify that the SPP? has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of Anes and
imprisonment for knowing violations."
�;_ — � _- - _ _ —=-__ _- - - - _ ---= -__ -- --- __ = ��• -_ -- --__- -_- - - -=--�`�' =---Arm _• s-=-=---_:�•�- -
---
Sionature
STEVE MOOSE
Print or type name of person signing above
ENVIROMENTAL DIRECTOR
Title
SPPP Certification 10/13
f tj
4
z
o
0
PIS
Best Management Practices
Manufacturing Facility
Outfall
Activities
Pollutant
#1
Bat Storage &
Particulate
Vegetative Buffer for Particulate removal
Crushing
#Z
Sawdust Storage,
Organic
- Maintain Retaining wall in good condition
Handling, and
Particulates
- Remove accumulated sawdust in processing area
Processing Pit #4
- Protect outfall with check dams, silt fence ect...
#3
Diesel Tank
Petroleum
SPCC Plan
Color Additive
Particulate
- Use sufficient number of tubs to minimize cleaning
Mixing
- Clean tubs by dumping contents in grinding room,
Plt #4
allow to dry, and then shovel out remaining contents in
the grinding room.
Sand Storage
Particulate
- Clean up loose material
- If sand is stored outside, use vegetative cover, silt
fence, ect to prevent erosion
Brick Saw Pit #4
Particulate
- Clean up of loose material
Conveyor Belt Pit
Particulate
- Clean up of loose material
#4
94
Gasoline Tank
Petroleum
SPCC Plan
Sand Coating
Particulate
Clean up of loose material outside building
Preparation
Coating Raw
Particulate
- Clean up loose material outside building
Material Storage
Petroleum
- Conduct Activities under roof
Garage Activities
and
- Store used oil, hydraulic oil, grease, ect in appropriately
Solvents
labeled containers.
- Clean ups ills immediately.
Equipment
Organics
- Clean up excess grease
Greasing and
Petroleum
- Maintain system to filter petroleum and particulates
Washing
Particulate
from wash water
Conveyor Belts
Particulate
- Clean up of loose material
Plts. 43 & 44
Color Additive
Particulate
- Use sufficient number of tubs to minimize cleaning
Mixing
- Clean tubs by dumping contents in grinding room,
Plt 43
allow to dry, and then shovel out remaining contents in
the grinding room.
Sawdust Processing
Organic
- Cleanup spilled sawdust.
P1t. #3
Particulate
Raw Material
Particulate
- Clean up spilled material outside building
Storage
Plt. #3
Truck Parking
Petroleum
- Preventive Maintenance of trucks
Best Management Practices
Manufacturing Facility
Outfall
Activities
Pollutant
95
Diesel Tank
Petroleum
SPCC Plan
Brick Saws
Particulate
-Maintain vegetative buffer
Plt. #3
96
Sawdust Processing
Organic
- Clean up spilled sawdust.
Plt. #3
Particulate
Raw Material
Particulate
- Clean up spilled material outside building
Storage Plt #3