Loading...
HomeMy WebLinkAbout20171517 Ver 1_Spirit Rail loading access 11-29-2017_20180122-- _, • -a��'.I �H��\ .•'`\` �_ �, 4LZ. si� f' f � �I � �, \ �`�� ��' INREPLYREFERTO �' Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office Post Office Box 1000 Washington, North Carolina 27889-1000 Action ID No. SAW-1992-02851 Mr. Jay Johnson Post Office BoX 1587 Greenville, North Carolina 27835 December 19, 2017 SUBJECT: North Carolina Global TransPark Area B Permit Process Dear Mr. Johnson: This letter acknowledges receipt of a Pre-Construction Notification (PCN) application requesting approval for construction activities utilizing the Area B permit process for the North Carolina Global TransPark (NCGTP). This request includes the installation of 2 pairs of 100' x 42" culverts approximately 300' apart within an existing tributary to facilitate loading and unloading of railway cars within the GTP/Spirit rail complex, approximately 400 feet west of the intersection of John Mewborn Road and Aerosystems Blvd. The proposed work will result in impacts to 0.02 acres of jurisdictional waters and will not require compensatory mitigation. The Area B process reflects the steps of avoidance and minimization and other procedures required by the U. S. Army Corps of Engineers for the NCGTP to obtain authorization for activities proposed within Area B, an area that the Authority had not developed specific plans for at the time of permit issuance. The initial Department of the Army (DA) Section 404 permit for construction was issued on October 21, 1998 (Action I. D. 199202851) and expires October 21, 2018. Sincerely, STEFFENS.THOMAS.A S�TE�FFENS.THOMAS.ANCRUM.1284706273 DN: c=U5, o=U.S. Govemment, ou=DoD, ou=PKI, NCRUM.1284706273 Date 201712.1911E4149 OS'00'ANCRUM.1284706273 Thomas Steffens Regulatory Project Manager