HomeMy WebLinkAbout20072022 Ver 6_Credit Transfer_20180123Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
January 23, 2018
Aimee Carlson
RREF-II FH NC Sierra LLC
790 NW 107" Avenue, 4t" Floor
Miami, FL 33172
Ezell Bank Parcel ID: DWR Project # 2011-07200
Riparian Buffer Credits Purchased: 19,248.00, (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Fendol Farms — Phase 1 (DWR Project #2007-2022 v6)
You have elected to fulfill your permitted buffer mitigation requirements for the Fendol Farms — Phase 1 project
by paying into the Upper Neuse Riparian Buffer and Nutrient Bank,(Ezell Site).
The Bank has received full payment for buffer mitigation for the above referenced project for a total of 19,248.00
buffer credits. Riparian buffer impacts occurred in the Neuse River Basin, Falls Lake watershed. The amount of
buffer mitigation required is specified and verified by DWR in project #2007-2022 v6 and is 19,248.00 ft2.
You must also comply with any other state, federal or local government permits or authorization associated with
this activity including SL 2009-337, An Act to Promote Compensatory. Mitigation Banks. This payment into the
Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at
919-209-1052 or cconder@res.us.
Sincerely,
Com'" _ A
Cara S. Conder
Project Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
S&EC —,Debbie Shirley
Resource Environmental Solutions, LLC . 302 Jefferson Street, Smite 110 . Raleigh, NC 27605,
EBX,Lr
fIUC 03020201: lows, Fall.'WS Buifej,6edjiLadjer-,
A•
a t a last u jid a te d�1123%2018:
'DWR Bank Parc6l'Pr32 oject,#20square 11'-072043',',
Rwied'mltigatton Cniiiits:"504;35$ squareje'f
7Avasa b1e,t0 Frecift Debited
Transaction baserftm0br, 8V ski
Number N ,Pro,ject, Name,
"146t of 14� quare Fait,' _Acres
A ani feet
A
e�Feet t�
s
',Local
a, GoVt
R64ulnnu
1
513/2013
Tasks 1; 2, and.7: Credits Released.
147,751.65
3.39
147,751.65
3.39
-
__2 6118113
-- - --Task 3: Credits'Released-
---32,833.70
0.75
180.585.35
4:15
3
7/26/13
H.J. Morris Construction, Inc. - 8103 Dreamy Way
03020201
2,938.50
0.07
177.646.85
4.08
DWQ
4
8/2/13
City of Raleigh Marsh Creek Interceptor
03020201
-50,777.00
1.17
126,869.85
2.91
DWQ
5
9/11/13
Town of Knightdale Smithfield Road Sidewalk Improvements
03020201
4,392.00
0.10
122,477.85
2.81
DWR
6
10/3113
KGtis Holdings, LLC Kofis Garner Development
03020201
7,406.00
0.17
115,07.1.85
2.64
DWR
7.
10128/13
- John and Lindsay Bayer Bayer Fire Truck Turnaround
03020201
1,250.001
0.03
113,821.85
2.61
DWR--
8
10/28/13
John and Lindsay Bayer 526 Oakland Dr., Raleigh NC
03020201
6,940.501
0.16
106,881.35
2.45
DWR
9
10128113
Transfer of Nitrogen Credits from Ezell Bank per 10.28-13 DWR Letter
136,778.40
3.14
-
243,659.75
5.59
DWR
10
10/28113
Nutrient Conversion Credit Release
4,03315
0.09
247.692.90
5.69
DWR
11
1111/13
Task 4: Credits Released
5-8,43580
1.34
306,128.70
7.03
12
12110113-
City of Raleigh Richland Creek Sewer Rehabilitation
03020201
152,040.00
3.49
154,088.70
3.54
DWR
13
2125114
E&A Development, Inc. Corbin Greek Woods
03020201
3,081.00
0.07
151,007.70
3.47
Orange County
14
8114/14
NCDENR DENR EEP Contract #6125
03020201
77,137.00
1.77
73.870.70
1.70
DWR
15
11124/14
Task 5: Credits Released
58,435.80
1.34
132.306.50
3.04
16
1211/14
NCDENR-EEP . DENREEPConTact#6125
58,43,5.00
1.34
73,871.50
1.70.
DWR
17
.1126/15
Hazen and Sawyer Crabtree Basin Improvements Phase 11
03020201
67,710.00
1.55
6,161.50
0.14
DWR
18
4/14/15
Wyndcroft HOA Wyndcroft
03020201
318.00 1
0.01
5,843.50
0.13
DWR
19
5/20115
PW North Shore LLC North Shore Condominiums Phase 1
03020201
4,119.00
0.09
1.724.50
0.04
DWR
20
11/12/15
Pinpoint Properties Valley Springs Sewer Outfall
03020201
1,252.80
0.03
471.70
0.01
DWR
21
-7/512016
Shotwell Landfill, Inc.. Shotwell Landfill Expansion
03020201-
299.20
0,01
172.50
0.00
DWR
- -22 -
a7/6/2016
Singh Development; LLC Waltonwood at Lake Boone Trail-
03020201
.172.50
0.00
-
-
DWR
23--
9129/2016
Task 8: Credits Released
46,748.64
-1.07
46,748.64
1.07
--24
-
-8/30/2017 RF -Pa a Road Road Developer Creekside at Bethpage Phases 3&4
03020201-
33,606.27- 0.77
13,142.37
0.30
DWR
251
12/512017
Task 9: C reclits Released -
-
29,217.90
0.67
42,360.27
-
261
1/23/2018
RREF-11 FH NC Sierra LLC Fendol Farms - Phase 1
03020201
19 �248.00
0.44
23 ,112.27
01
65711DWR