Loading...
HomeMy WebLinkAbout20072022 Ver 6_Credit Transfer_20180123Mitigation Credit Transfer Certificate Prepared by Environmental Banc & Exchange, LLC January 23, 2018 Aimee Carlson RREF-II FH NC Sierra LLC 790 NW 107" Avenue, 4t" Floor Miami, FL 33172 Ezell Bank Parcel ID: DWR Project # 2011-07200 Riparian Buffer Credits Purchased: 19,248.00, (ft2) 8 digit-HUC — 03020201 Neuse River Basin Project Name: Fendol Farms — Phase 1 (DWR Project #2007-2022 v6) You have elected to fulfill your permitted buffer mitigation requirements for the Fendol Farms — Phase 1 project by paying into the Upper Neuse Riparian Buffer and Nutrient Bank,(Ezell Site). The Bank has received full payment for buffer mitigation for the above referenced project for a total of 19,248.00 buffer credits. Riparian buffer impacts occurred in the Neuse River Basin, Falls Lake watershed. The amount of buffer mitigation required is specified and verified by DWR in project #2007-2022 v6 and is 19,248.00 ft2. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory. Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at 919-209-1052 or cconder@res.us. Sincerely, Com'" _ A Cara S. Conder Project Manager Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator S&EC —,Debbie Shirley Resource Environmental Solutions, LLC . 302 Jefferson Street, Smite 110 . Raleigh, NC 27605, EBX,Lr fIUC 03020201: lows, Fall.'WS Buifej,6edjiLadjer-, A• a t a last u jid a te d�1123%2018: 'DWR Bank Parc6l'Pr32 oject,#20square 11'-072043',', Rwied'mltigatton Cniiiits:"504;35$ squareje'f 7Avasa b1e,t0 Frecift Debited Transaction baserftm0br, 8V ski Number N ,Pro,ject, Name, "146t of 14� quare Fait,' _Acres A ani feet A e�Feet t� s ',Local a, GoVt R64ulnnu 1 513/2013 Tasks 1; 2, and.7: Credits Released. 147,751.65 3.39 147,751.65 3.39 - __2 6118113 -- - --Task 3: Credits'Released- ---32,833.70 0.75 180.585.35 4:15 3 7/26/13 H.J. Morris Construction, Inc. - 8103 Dreamy Way 03020201 2,938.50 0.07 177.646.85 4.08 DWQ 4 8/2/13 City of Raleigh Marsh Creek Interceptor 03020201 -50,777.00 1.17 126,869.85 2.91 DWQ 5 9/11/13 Town of Knightdale Smithfield Road Sidewalk Improvements 03020201 4,392.00 0.10 122,477.85 2.81 DWR 6 10/3113 KGtis Holdings, LLC Kofis Garner Development 03020201 7,406.00 0.17 115,07.1.85 2.64 DWR 7. 10128/13 - John and Lindsay Bayer Bayer Fire Truck Turnaround 03020201 1,250.001 0.03 113,821.85 2.61 DWR-- 8 10/28/13 John and Lindsay Bayer 526 Oakland Dr., Raleigh NC 03020201 6,940.501 0.16 106,881.35 2.45 DWR 9 10128113 Transfer of Nitrogen Credits from Ezell Bank per 10.28-13 DWR Letter 136,778.40 3.14 - 243,659.75 5.59 DWR 10 10/28113 Nutrient Conversion Credit Release 4,03315 0.09 247.692.90 5.69 DWR 11 1111/13 Task 4: Credits Released 5-8,43580 1.34 306,128.70 7.03 12 12110113- City of Raleigh Richland Creek Sewer Rehabilitation 03020201 152,040.00 3.49 154,088.70 3.54 DWR 13 2125114 E&A Development, Inc. Corbin Greek Woods 03020201 3,081.00 0.07 151,007.70 3.47 Orange County 14 8114/14 NCDENR DENR EEP Contract #6125 03020201 77,137.00 1.77 73.870.70 1.70 DWR 15 11124/14 Task 5: Credits Released 58,435.80 1.34 132.306.50 3.04 16 1211/14 NCDENR-EEP . DENREEPConTact#6125 58,43,5.00 1.34 73,871.50 1.70. DWR 17 .1126/15 Hazen and Sawyer Crabtree Basin Improvements Phase 11 03020201 67,710.00 1.55 6,161.50 0.14 DWR 18 4/14/15 Wyndcroft HOA Wyndcroft 03020201 318.00 1 0.01 5,843.50 0.13 DWR 19 5/20115 PW North Shore LLC North Shore Condominiums Phase 1 03020201 4,119.00 0.09 1.724.50 0.04 DWR 20 11/12/15 Pinpoint Properties Valley Springs Sewer Outfall 03020201 1,252.80 0.03 471.70 0.01 DWR 21 -7/512016 Shotwell Landfill, Inc.. Shotwell Landfill Expansion 03020201- 299.20 0,01 172.50 0.00 DWR - -22 - a7/6/2016 Singh Development; LLC Waltonwood at Lake Boone Trail- 03020201 .172.50 0.00 - - DWR 23-- 9129/2016 Task 8: Credits Released 46,748.64 -1.07 46,748.64 1.07 --24 - -8/30/2017 RF -Pa a Road Road Developer Creekside at Bethpage Phases 3&4 03020201- 33,606.27- 0.77 13,142.37 0.30 DWR 251 12/512017 Task 9: C reclits Released - - 29,217.90 0.67 42,360.27 - 261 1/23/2018 RREF-11 FH NC Sierra LLC Fendol Farms - Phase 1 03020201 19 �248.00 0.44 23 ,112.27 01 65711DWR