Loading...
HomeMy WebLinkAbout20072022 Ver 6_Approval Letter_20180122Water Resources ENVIRONMENTAL QUALITY January 22, 2018 RREF II -FH NC Sierra LLC Attn: Aimee Carlson ROY COOPER Gave.. MICHAEL S. REGAN seoeta,) LINDA CULPEPPER /n+erim Dwecror DWR # 2007-2022 v6 Durham County 790 NW 10711 Ave, 411 floor Miami, FL 33172 Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B.0233) WITH ADDITIONAL CONDITIONS Fendol Farms (formerly known as Laurel Grove -Phase 1 and Sierra -Phase 1) Dear Ms. Carlson: You have our approval for the impacts listed below for the purpose described in your application dated December 6, 2017, received by the Division of Water Resources (Division) December 6, 2017. These impacts are covered by the attached Water Quality General Certification Number 3890 and the Neuse River Basin Riparian Buffer Rules and the conditions listed below. This Certification replaces Certification 2007-2022 v.4 issued on June 25, 2015. This certification is being issued to approve modifications to the buffer impacts at Impact Areas #36, #4, #5, #7, #8 and #10 previously approved in the Certification issued on June 25, 2015. This certification is associated with the use of Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification (s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Neuse Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] and 15A NCAC 02B.0233(8)] State of North Carolina I Envronmenul Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 RREF II -FH Sierra LLC DWR# 07-2022 v6 Page 2 of 7 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream 0 (linear feet) 31 (linear feet) Sewer (#1) Stream 0 (linear feet) 46 (linear feet) Sewer (#3A) Stream 0 (linearfeet) 59 (linear feet) Sewer (#36) Stream 0 (linear feet) 32 (linearfeet) Sewer (#4) Stream 137 (linear feet) 10 (linear feet) Road Crossing (#5) Stream 0 (linear feet) 41 (linearfeet) Sewer (#6) Stream 262 (linearfeet) 0 (linearfeet) Road Crossing (#7) Stream 21 (linear feet) 0 (linear feet) Fill/Diversion (#7) Stream 115 (linearfeet) 0 (linearfeet) Road Crossing (#8) Stream 30 (linear feet) 0 (linear feet) Road Crossing (#9) Buffers—Zone 1 9,131 (square feet) 0 (square feet) Sewer — Parallel (#1) Buffers—Zone 2 11,294 (square feet) 0 (square feet) Sewer— Parallel (#1) Buffers —Zone 1 1,888 (square feet) 0 (square feet) Sewer — Perpendicular (#1) Buffers—Zone 2 1,383 (square feet) 0 (square feet) Sewer — Perpendicular (#1) Buffers —Zone 1 471 (square feet) 0 (square feet) Trail (#1) Buffers — Zone 2 0 (square feet) 0 (square feet) Trail (#1) Buffers—Zone 1 1,007 (square feet) 0 (square feet) Bypass Channel (#2) Buffers — Zone 2 897 (square feet) 0 (square feet) Bypass Channel (#2) Buffers—Zone 1 0 (square feet) 0 (square feet) RREF II -FH Sierra LLC DWR# 07-2022 v6 Page 3 of 7 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Trail (#2) Buffers — Zone 2 1,860 (square feet) 0 (square feet) Trail (#2) Buffers —Zone 1 0 (square feet) 0 (square feet) Sewer — Parallel (#3A) Buffers—Zone 2 1,137 (square feet) 0 (square feet) Sewer — Parallel (#3A) Buffers—Zone 1 1,810 (square feet) 0 (square feet) Sewer — Perpendicular (#3A) Buffers —Zone 2 899 (square feet) 0 (square feet) Sewer — Perpendicular (#3A) Buffers—Zone 1 557 (square feet) 0 (square feet) Bridge & Trail (#3A) Buffers —Zone 2 462 (square feet) 0 (square feet) Bridge & Trail (#3A) Buffers—Zone 1 6,364 (square feet) 0 (square feet) Sewer — Parallel (#36) Buffers —Zone 2 9,027 (square feet) 0 (square feet) Sewer — Parallel (#3B) Buffers—Zone 1 3,993 (square feet) 0 (square feet) Sewer — Perpendicular (#36) Buffers — Zone 2 533 (square feet) 0 (square feet) Sewer — Perpendicular (#3B) Buffers —Zone 1 0 (square feet) 0 (square feet) Trail (#3B) Buffers—Zone 2 408 (square feet) 0 (square feet) Trail (#3B) Buffers—Zone 1 6,525 (square feet) 0 (square feet) Sewer — Parallel (#4) Buffers — Zone 2 10,387 (square feet) 0 (square feet) Sewer — Parallel (#4) Buffers —Zone 1 1,916 (square feet) 0 (square feet) Sewer — Perpendicular (#4) Buffers —Zone 2 851 (square feet) 0 (square feet) RREF II -FH Sierra LLC DWR# 07-2022 v6 Page 4 of 7 F— Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Sewer – Perpendicular (#4) Buffers–Zone 1 360 (square feet) 0 (square feet) Bridge and Trail (#4) Buffers – Zone 2 16 (square feet) 0 (square feet) Bridge and Trail (#4) Buffers –Zone 1 11,302 (squarefeet) 0 (square feet) Road Crossing (#5) Buffers – Zone 2 7,652 (square feet) 0 (square feet) Road Crossing (#5) Buffers –Zone 1 92 (square feet) 0 (square feet) Sewer – Parallel (#6) Buffers – Zone 2 793 (square feet) 0 (square feet) Sewer — Parallel (#6) Buffers—Zone 1 2,246 (square feet) 0 (square feet) Sewer — Perpendicular (#6) Buffers — Zone 2 1,416 (square feet) 0 (square feet) Sewer — Perpendicular (#6) Buffers—Zone 1 364 (square feet) 0 (square feet) Trail (#6) Buffers — Zone 2 11 (square feet) 0 (square feet) Trail (#6) Buffers—Zone 1 267 (square feet) 0 (square feet) Bypass Channel (#6) Buffers — Zone 2 0 (square feet) 0 (square feet) Bypass Channel (#6) Buffers — Zone 1 9,566 (square feet) 0 (square feet) Road Crossing (#7) Buffers—Zone 2 7,444 (square feet) 0 (square feet) Road Crossing (#7) Buffers—Zone 1 8,154 (square feet) 0 (square feet) Road Crossing (#8) Buffers — Zone 2 5,451 (square feet) 0 (square feet) Road Crossing (#8) Buffers—Zone 1 1,718 (square feet) 0 (square feet) Road Widening (#9) Buffers —Zone 2 2,681 (square feet) 0 (square feet) RREF II -FH Sierra LLC DWR# 07-2022 v6 Page 5 of 7 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. Mitigation must be provided for the proposed impacts as specified in the table below. The Division understands that 292 feet of stream credits have been previously paid (receipt dated December 1, 2014). The Division understands that 272 feet of stream credits have been previously paid (receipt dated August 4, 2015). The Division understands that 133,023 square feet of buffer credits have been previously paid (receipt from RES dated August 4, 2015). In addition, the Division has received an acceptance letter from EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank, specifically the Cedar Grove, Hatley or Ezell bank sites to meet the mitigation requirement for riparian buffers. Until EBX receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to EBX to meet the following compensatory mitigation requirement [15A NCAC 02H.0506 (b)(6)]: Amount Approved Amount Approved Type of Impact (units) (units) Stream Permanent Temporary Road Widening (#9) (paid December 2, 2014 Buffers —Zone 1 460 (square feet) 0 (square feet) Sewer — 133,023 (square feet) Neuse 03020201 Perpendicular (#10) (paid August 4, 2015) Buffers—Zone 2 2,148 (square feet) 0 (square feet) Sewer— Perpendicular (#10) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. Mitigation must be provided for the proposed impacts as specified in the table below. The Division understands that 292 feet of stream credits have been previously paid (receipt dated December 1, 2014). The Division understands that 272 feet of stream credits have been previously paid (receipt dated August 4, 2015). The Division understands that 133,023 square feet of buffer credits have been previously paid (receipt from RES dated August 4, 2015). In addition, the Division has received an acceptance letter from EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank, specifically the Cedar Grove, Hatley or Ezell bank sites to meet the mitigation requirement for riparian buffers. Until EBX receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to EBX to meet the following compensatory mitigation requirement [15A NCAC 02H.0506 (b)(6)]: Compensatory River and Sub - Mitigation Required basin Number Stream 565 (feet) Neuse 03020201 (paid December 2, 2014 and August 4, 2015) Riparian 133,023 (square feet) Neuse 03020201 Buffer (paid August 4, 2015) Riparian 19,248 (square feet) Neuse 3020201 Buffer RREF II -FH Sierra LLC DWR# 07-2022 v6 Page 6 of 7 4. You are required to provide one copy (hard copy or digital) of the approved SMP, including plan details on full-sized plan sheets, with proof of the City of Durham's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Unit (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from the City of Durham. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [15A NCAC 02H .0506(b)(5)] 5. All stormwater must be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re -concentrate before discharging into a stream. [15A NCAC 02H .0506(b)(5)] 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501 and .0502] The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H.0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification and Buffer Authorization can be contested as provided in General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 RREF II -FH Sierra LLC DWR# 07-2022 v6 Page 7 of 7 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse River Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Supervis 401 & Buffer Permitting Branch cc: Deborah Shirley; Soil & Environmental Consultants, PA (via email) USACE Raleigh Regulatory Field Office (via email) DWR 401 & Buffer Permitting Branch file DWR RRO Filename: 072022v6FendolFarms(Durham)_401_GC_NBR