Loading...
HomeMy WebLinkAbout20180095 Ver 1_15BPR2_GEO_Slope_Repair_3_20180122, � ,^ I�) % .� �� �--� ,� � ESTIMATED Q UANTITIES FOR SLOPE REPAIR DETAIL B UNDERCUT EXCAVATION .................................250 CYD RIP RAP, CLASS I ...............................................750 TONS GOETEXTILE FOR ROCK PLATING............250 SYD* *GEOTEXTILE QUANTITY DOESN'T INCLUDE OVERLAP SLOPE REPAI R STA 58 � 50 TO N.T.S. 3-FT OVERLAP MIN (TYPJ D ETAI L B 61 + 00 RT 5-ft OVERLAP MI N (TYP) GEOTEXTILE OVERLAP DETAIL �P�,e,N vi Ew� �0000 'r•.•� =LE TO FACE OF EXISTING SLOPE EXISTING GROUND SURFACE �IP RAP CONST RUCT lON SEQUENCE FOR T YPICAL SECT lON B: l. UNDERCUT FAILED RlP RAP DOWN TO EXISITNG EMBANKMENT. 2. EMBED GEOT EXT lLE FOR ROCK PLAT lNG AT T HE T OP OF SLOPE AS SHOW N ON T HE T YPICAL SECT ION. 3. COV ER ALL EXPOSED SOIL SURFACES W lT H GEOT EXT ILE, T YPE 2. 4e OV ERLAP ALL �EOT EXT lLE lN ACCORDANCE W lT H GEOTEXTILE OVERLAP DETAIL. 5. FILL W ASHOUT W lT H RlP RAP, CLASS l RIPRAP T 0 2: l l H:V J SLOPE. DO NOT DROP RlP RAP FROM HEI�HT S GREAT ER THAN 2 FEET ONTO GEOTEXTILE. 6. SEE SLOPE REPAIR SPECIAL PROV lSION AND ST ANDARD SPECIFICAT IONS FOR RlP RAP, CLASS l AND �EOT EXT lLE FOR ROCK PLAT ING. 7. T URBIDITY CURT AlN MUST BE USED T 0 ENCAPSULAT E THE AREAS WHERE WORK AROUND WATER lS BEING PERFORMED.