HomeMy WebLinkAbout20211043_R-5709_CP1andCP2signatures_061517_missingUSACE_FAMPO_SHPO_20180122Section 404/NEPA Merger Project Team Meeting Agreement
Concurrence Point No. 1
Project Purpose and Need and Study Area Defined
STIP Project: R-5709
Project Name/Description: NC 211, from US 15-501 in Aberdeen to SR 1244 (West Palmer Street) /
SR 1311 (Mockingbird Hill Road) in Raeford, Moore and Hoke Counties. Widen to multilanes.
Project Purpose: The purpose of the proposed project is to reduce traffic congestion and travel delays,
improve safety and correct roadway deficiencies along NC 211 within the project limits.
Study Area: The study area generally includes a 500-foot wide corridor along NC 211 from US 15-501 to
just east of West Palmer Street/Mockingbird Hill Road. In order to explore intersection improvements
and realignments (y-lines), as well as railroad grade separations, the study area expands beyond a 500-
foot corridor in several locations, as shown on the attached map.
The Project Team has concurred on this date of June 15, 2017, on the above-mentioned project purpose
and need and the study area as defined for STIP Project R-5709.
USACE HPO
USEPA �[�,� . L�PI� r
USFWS LRRPO G� ��''���J V���
� �ii/� �-
NCWRC TARPO
NCD � ° FAMPO
Section 404/NEPA Merger Project Team Meeting Agreement
Concurrence Point No. 2
Detailed Study Alternatives Carried Forward
STIP Project: R-5709
Project Name/Description: NC 211, from US 15-501 in Aberdeen to SR 1244 (West Palmer Street) / SR 1311
(Mockingbird Hill Road) in Raeford, Moore and Hoke Counties. Widen to multilanes.
Alternatives: The alternatives to be studied in detail include the following options. Selected alternatives are circled,
alterna
tives to be dropped from consideration are stricken through:
Section No. Widening Side Description/Comments
1: N S
2A: N S NC 211 at-grade RR crossing
2B: S NC 211 bridges over RR
3A: N -�- Realign Indiana Ave east to Carolina Rd
3B: -�d- -S- Realign Indiana Ave west
4: N S
5: -�Pd- S
6A: --P� �— RR bridges over NC 211 / Reservation Rd
66: N S Realign Reservation Rd, provide two intersections with NC 211
6C: �PF- S Realign NC 211 and Reservation Rd, provide bridges over RR
6D: �td" S Realign NC 211, provide bridges over RR
7: N S
8: #- S
9: N S
10: N S
11: N S
12: --Pd- S
13: � S
14: -�PJ- S
15: N S
The Project Team has concurred on this date ofJune 15, 2017, on the above-mentioned preliminary alternatives to
be studied in detail for STIP Project R-5709.
USACE
HPO
. ��j�� Q�
USEPA w�JL`�T ;'
i
.
USFWS LRRPO
�-------�-. �
NC � TARPO
NCDW � FAMPO