Loading...
HomeMy WebLinkAbout20211043_R-5709_CP1andCP2signatures_061517_missingUSACE_FAMPO_SHPO_20180122Section 404/NEPA Merger Project Team Meeting Agreement Concurrence Point No. 1 Project Purpose and Need and Study Area Defined STIP Project: R-5709 Project Name/Description: NC 211, from US 15-501 in Aberdeen to SR 1244 (West Palmer Street) / SR 1311 (Mockingbird Hill Road) in Raeford, Moore and Hoke Counties. Widen to multilanes. Project Purpose: The purpose of the proposed project is to reduce traffic congestion and travel delays, improve safety and correct roadway deficiencies along NC 211 within the project limits. Study Area: The study area generally includes a 500-foot wide corridor along NC 211 from US 15-501 to just east of West Palmer Street/Mockingbird Hill Road. In order to explore intersection improvements and realignments (y-lines), as well as railroad grade separations, the study area expands beyond a 500- foot corridor in several locations, as shown on the attached map. The Project Team has concurred on this date of June 15, 2017, on the above-mentioned project purpose and need and the study area as defined for STIP Project R-5709. USACE HPO USEPA �[�,� . L�PI� r USFWS LRRPO G� ��''���J V��� � �ii/� �- NCWRC TARPO NCD � ° FAMPO Section 404/NEPA Merger Project Team Meeting Agreement Concurrence Point No. 2 Detailed Study Alternatives Carried Forward STIP Project: R-5709 Project Name/Description: NC 211, from US 15-501 in Aberdeen to SR 1244 (West Palmer Street) / SR 1311 (Mockingbird Hill Road) in Raeford, Moore and Hoke Counties. Widen to multilanes. Alternatives: The alternatives to be studied in detail include the following options. Selected alternatives are circled, alterna tives to be dropped from consideration are stricken through: Section No. Widening Side Description/Comments 1: N S 2A: N S NC 211 at-grade RR crossing 2B: S NC 211 bridges over RR 3A: N -�- Realign Indiana Ave east to Carolina Rd 3B: -�d- -S- Realign Indiana Ave west 4: N S 5: -�Pd- S 6A: --P� �— RR bridges over NC 211 / Reservation Rd 66: N S Realign Reservation Rd, provide two intersections with NC 211 6C: �PF- S Realign NC 211 and Reservation Rd, provide bridges over RR 6D: �td" S Realign NC 211, provide bridges over RR 7: N S 8: #- S 9: N S 10: N S 11: N S 12: --Pd- S 13: � S 14: -�PJ- S 15: N S The Project Team has concurred on this date ofJune 15, 2017, on the above-mentioned preliminary alternatives to be studied in detail for STIP Project R-5709. USACE HPO . ��j�� Q� USEPA w�JL`�T ;' i . USFWS LRRPO �-------�-. � NC � TARPO NCDW � FAMPO