Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R4440 (6)
R-4440 - Needmore Road CP 2A - Build Alternate Construction Cost Summary Project Section Build Alternate C Build Alternate C Modified Build Alternate D Build Alternate D Modified Build Alternate E A $3,300,000 $3,300,000 $3,300,000 $3,300,000 $3,300,000 B $1,900,000 $1,900,000 $1,900,000 $1,900,000 $1,900,000 C $1,950,000 $3,150,000 $1,950,000 $3,150,000 $3,650,000 D $650,000 $650,000 $650,000 $650,000 $650,000 Build Alternate Total Cost $7,800,000 $9,000,000 $7,800,000 $9,000,000 $9,500,000