Loading...
HomeMy WebLinkAbout20061559 Ver 2_Approval Letter_20061227pF WATER O?'~ ~Gy >_ ' `- _: --i -- ,-~r,y John Cloud Firefly Cove, LLC Post Office Box 25427 Sarasota, FL 34277 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality ~ece""tuber 27, 2006 DWQ Project # 06-1559 Version 2. Rutherford County Subject Property: Firefly Cove Developement Lake Lure, NC Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Cloud: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.10 acres of lake bed and 140 linear feet of shoreline for the purpose of watercraft access and shoreline stabilization at the subject property, as described within your application received by the N.C. Division of Water Quality (DWQ) on December 15, 2006 and additional information received December 21, 2006. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3492 (GC3492). The Certification(s) allows you to use Permit(s) General Permit 79 and General Permit 30 when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 !FAX 919-733-68931 Internet: www.ncwaterpualitY org No ethCarolina ~atirra!!t~ An Equal OpportunitylA~rmative Action Employer- 50% Recycledl10% Post Consumer Paper Firefly Cove, LLC . Page 2 of 5 ' December 27, 2006 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Plan Location or Reference Approved (Units excevation 0.10 acres A Shoreline Stabilization 140 linear Feet) B 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Confro/ Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Firefly Cove, LLC Page 3 of 5 December 27, 2006 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/VVetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Riprap Installation All banks shall be laid back at a 2:1 (length :height) slope and riprap applied at the water /land interface (at full pool). Riprap shall be placed as a linear protective measure upon the regarded slopes. Stone used in stabilization shall be Class B riprap with occasional larger rock (-4 boulders per 100 linear feet) up to 6 feet in diameter to provide additional wildlife habitat. The rip-rap shall be installed over a toed in filter fabric to prevent soil erosion behind the stabilized area. 7. Heavy Equipment Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 8. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before being discharged. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Firefly Cove, LLC Page 4 of 5 December 27, 2006 9. Trout Buffer Tree Protection Buffers shall be established / re-established along both tributaries through the property to a depth of 25 feet from the top of bank on both sides of the stream banks in accordance with the Guidelines for Riparian Buffer Guidelines. Along the length of the lake shoreline, large woody trees shall be established at a spacing of 12 to 14 feet over the entire length of the property. All buffers shall be established / re-established prior to April 1, 2007. No trees shall be removed within 25 feet of the top of water unless they are directly within the construction access corridor. If trees are removed, forested vegetation shall be re-established within the construction access or other temporary impact area occurring in the protected buffer zone within the next growing season following construction of the project. Disturbed banks and a 25-foot vegetated zone, must be restored along the shoreline to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 10. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 12. Deed Restrictions Deed Restrictions or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. Firefly Cove, LLC Page 5 of 5 December 27, 2006 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon' expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Mr. Kevin Barnett in the DWQ Asheville Regional Office at either Kevin.Barnett(c~ncmail.net or at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3492 Certificate of Completion Guidelines For Riparian Buffer Restoration cc: Town of Lake Lure USACE Asheville Regulatory Field Office Cyndi Karoly, DWQ 401 Central Office DLR Asheville Regional Office File Copy Central Files Filename: 06-1559.Version2. FireflyCove.WQ3492.Approval