Loading...
HomeMy WebLinkAbout20150342 Ver 2_Compliance Evaluation Inspection_20180116Wetland Inspection Report Project Num: 20150342 Version: 2 Project Name: Smith Crossing Mixed Use Development Project County: Forsyth Location: Smith Crossing Mixed Use Development Project Latitude: +36° 04' SW Plan Location Site Owner Name Parr Construction Inc Inspection Date: 1/16/2018 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Status: Issued Project Type: Mixed Use Development Region: Winston-Salem Longitude: -80° 06' 17" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Sue L Homewood Phone: 336-776-9694 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: 0 Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20150342 Owner: Parr, Chris Inspection Date: 1/16/2018 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑ Comment: Culvert installation complete. Downstream riprap/scour pool needs to be revised at lowest point, riprap acting as check dam. Upstream restoration not complete. Permittee requested site visit to discuss possible options for regrading and restoring stream channel to culvert inlet. Will send revised drawings when completed. page: 2