HomeMy WebLinkAbout20150342 Ver 2_Compliance Evaluation Inspection_20180116Wetland Inspection Report
Project Num: 20150342 Version: 2
Project Name: Smith Crossing Mixed Use Development Project
County: Forsyth
Location: Smith Crossing Mixed Use Development Project
Latitude: +36° 04'
SW Plan Location
Site Owner Name Parr Construction Inc
Inspection Date: 1/16/2018
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Status: Issued
Project Type: Mixed Use Development
Region: Winston-Salem
Longitude: -80° 06' 17"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Sue L Homewood Phone: 336-776-9694
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
page: 1
Site Number: 20150342 Owner: Parr, Chris
Inspection Date: 1/16/2018 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC)
Yes
No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
0
❑
❑
❑
Are the culverts and/or filled areas installed properly?
❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
❑
❑
❑
Comment: Culvert installation complete. Downstream riprap/scour pool needs to be revised at lowest point, riprap
acting as check dam. Upstream restoration not complete. Permittee requested site visit to discuss
possible options for regrading and restoring stream channel to culvert inlet.
Will send revised drawings
when completed.
page: 2