HomeMy WebLinkAbout20180080 Ver 1_B-4662_Wetland & Surface Water Permit Drawings_20180118(Version 2.07; Released October 2016)17BP.5.R.99TIP No.:B-4662County(ies):Wake Page 1 of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2040Existing:Year:Aquatic T&E Species?NoComments:YesNoNoWetlands within Project Limits?Nutrient Sensitive Waters (NSW)NoneSupplemental Classification: ruralMoccasin Creek27-86-20.60.265 milesProject DescriptionProposed ProjectNeuseRiver Basin(s): City/Town:0.8Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nocmurray@ncdot.govAddress:1/9/2018WakeChris MurrayDurham, NC 27704WBS Element:Bridge ReplacementWBS Element:MI Engineering / Andrew Nottingham, PENCDOT Contact:919-220-4660Suite 100Raleigh, NC 27606Contractor / Designer:919-851-66061011 Schaub DriveNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:2612 North Duke StreetAddress:General Project InformationB-466217BP.5.R.99Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The existing bridge over Moccasin Creek is a 2 span bridge of 1 @ 20.7' and 1 @ 19.4' (total length of 40.1') with timber floor on continuous I-beams with timber caps and piles. The existing bridge will be replaced while the road is closed (no detour brdige). Drainage from the existing bridge discharges directly into moccasin Creek from the bridge deck. The replacement structure is a single span of 1 @ 70' Cored Slab Unit Bridge with 105 degree skew. Discharge from new bridge is collected in a 2GI drainage inlet at lower (Northwest) end of bridge and outlets into a rip rap pad into grass swale. Drainage on Northwest side of Moccasin Creek drains through approximately 200' of grassed line roadway ditch and then 50' of Grassed Swale before entering buffer zone (total DA is 1.22 AC). Only 50' of Grassed Swale was able to be obtained at this location due topography. Drainage on Southwest side of Moccasin Creek drains through approximately 150' of grass lined roadway ditch and outlets into rip rap dissipator pad and is dispersed into wetlands at non erosive velocities before entering buffer zone. Drainage on Northeast side of Moccasin Creek drains through a rip rapped lined ditch through the buffer and into the creek. Due to the steep topography (4% to 9% slope) on this side it was not possible to provide grass swale treatment (total DA of riprapped lined ditch is 0.3 AC). Drainage on Southeast side of Moccasin Creek drains through rip rapped lined ditch and then outlets into rip rap energy dissipator pad and is dispersed into wetlands at non erosive velocities before entering buffer zone. Erosion control on the project will be designed to sensistive watershed standards. NeuseBuffer Rules in Effect:N/ANone4002 lanes undivided secondary road with 10' lanes and 5' shoulders (2' of shoulder is paved).Waterbody Information2013NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac.2 lanes undivided secondary road with 9.0' to 10' lanes and grass shoulder.900anottingham@mi-engineers.comProject Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) (Version 2.07; Released October 2016) 17BP.5.R.99 TIP No.:B-4662 County(ies):Wake Page 2 of 2 Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width (ft) Front Slope (H:1) Back Slope (H:1) Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length (ft) Longitudinal Slope (%) Q2 (cfs) V2 (fps) Q10 (cfs) V10 (fps) Rock Checks Used BMP Associated w/ Buffer Rules? 15+50 TO 16+00 -L- LT 35.8993684 / -078.3324419 North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Additional Comments No(1)Moccasin Creek Swales Yes1.51.2 122 2.70.0 3.0 3.0 504 2.1 WBS Element: 1.40.78% WETLAND AND SURFACE WATER IMPACTS PERMIT SITE 2SITE 1 SHEET _3_ OF _11_ PERMIT DRAWING 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 00 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$VICINITY MAP RIGHT OF WAY DATE: PROJECT ENGINEER LETTING DATE: Prepared in the Office of: 0 ROADWAY DESIGN ENGINEER SIGNATURE: STATE PROJECT REFERENCE NO.ART ME NN ASO H DEPTOF TRA SPORTTIONTATEOFNRTCARO LI NACONTRACT:TIP PROJECT: PROJECT DESIGNER CLAUDETTE M.K. ROQUE, PE 50 25 50 See Sheet 1B For Conventional Symbols See Sheet 1A For Index of Sheets 100 502550 10 20 100 510 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RAMEY KEMP Transportation Engineers Phone: 919-872-5115 - www.rameykemp.com 5808 Faringdon Place, Suite 100 - Raleigh, North Carolina 27609 ASSOCIATES, INC. & NC License No. C-0910 TO HOPKINS TO BUNN10+00 15+00 20+00 KAYLA M. POULOS, EI B-4662 B-4662WAKE COUNTYFRANKLIN COUNTYWAKE COUNTYF RANKLIN COUNTYOCTOBER 2017 NCDOT CONTACT: GRADING, PAVING, DRAINAGE, & STRUCTURES W A K E C OUN TY C OUN T Y F R A N K L IN PE, UTIL.38457.1.2 BRZ-2308 (5) FOWLER ROAD SR 2308 -L-HENRY BAKER ROAD SR 1726-L-MOCCASIN CREEK= = ADT ADT 2040 2013 LENGTH ROADWAY PROJECT B-4662 = 0.249 MILES LENGTH STRUCTURE PROJECT B-4662 = 0.014 MILES CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III BRIDGE NO. 196 OVER MOCCASIN CREEK SR 2308 (FOWLER RD) & SR 1726 (HENRY BAKER RD) AT PH: 919-733-4699 DIVISION 5 - BRIDGE PROGRAM MANAGER LISA GILCHRIST, EI TOTAL LENGTH PROJECT B-4662 = 0.263 MILES WAKE & FRANKLIN COUNTIES 4 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION PROJECT SITE FUNC CLASS = LOCAL SUB-REGIONAL TIER V = 35 MPH DUAL 3%* TTST =2% DHV = 12%* 400 900 D = 60% T = 5%* DETOUR ROUTE JUNE 2018 DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED OF 35 MPH** ** 1001 2309 2335 2408 2309 2334 2308 2309 2308 5407 5420 5419 2309Duk es Lake Dukes Lake Johns Church St.Rd. Rd. Rd.CassaroLn.CarolLake DrFairwaySportland Dr.FowlerRd.Dr.Country Club Rd.1727 1726 Fu r ne y Pe a r c e Rd.Rd.Henry Baker -L- POT STA. 10+00.00 BEGIN TIP PROJECT B-4662 -L- POT STA. 23+90.00 END TIP PROJECT B-4662 17BP.5.R.99 R / W, CONST. 2018 STANDARD SPECIFICATIONS DATE: 9/14/2017 SUBMITTAL: R/ W PLANS TYP. 20' TYP. 20' TYP. 20' TYP.10'10'27'-10"20'20'10'10' 20' 2 0'10'10'-L- POT STA. 16+20.33 BEGIN BRIDGE -L- POC STA. 16+92.58 END BRIDGE NAD 1983 NA 2 0 1 1 E E IN WETLAND DENOTES EXCAVATION WETLAND DENOTES FILL INFF TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SITE 1 SITE 2 GRAPHIC SCALE 0'50'100'150'50' CLEARING DENOTES MECHANIZED* * * * ** * ** * * BANK STABILIZATION FOLLOWING DETAIL K AND H. EXISTING TIMBER ABUTMENTS AND INSTALLATION OF CONSIDERED INCIDENTAL TO THE REMOVAL OF THE THE PLACEMENT OF THE IMPERVIOUS DIKES IS REMOVED USING APPROVED NCDOT BMP METHODS. EXISTING TIMBER ABUTMENTS MUST BE COMPLETELY NOTE FOR SITE 2: SHEET _4_ OF _11_ PERMIT DRAWING F F F F F F V10= 0.69 FPS V10= 0.70 FPS V10= 1.87 FPS V10= 0.62 FPS S S S S S **** *** *** ********* ******COLLAR 2 4 " COLLAR 2 4 " STANDARD BASE DITCH SEE DETAIL A TB 2GI 7 SY GEOTEXTILE EST. 2 TONS CL B RIP RAP 15"STA. 16+13 -L-LT APPROACH SLAB STA. 15+70 TO PROP. SBG 0401 0402 SPECIAL CUT DITCH SEE DETAIL B REPLACE REMOVE/ SPECIAL LAT. BASE DITCH SEE DETAIL E TO LAT. BASE DITCH TIE ROADWAY DITCH GRASSED SWALE SPECIAL LATERAL SEE DETAIL I SPEC. LAT. GRASSED SWALE TIE ROADWAY DITCH TO TO SPEC. CUT DITCH TIE EX. DITCH SPECIAL CUT DITCH SEE DETAIL B 21 SY GEOTEXTILE EST. 10 TONS CL B RIP RAP 10 SY GEOTEXTILE EST. 3 TONS CL B RIP RAP FALSE SUMP SEE DETAIL F FS ENERGY DISSIPATOR PAD SEE DETAIL G REMOVE 15"0403 04040405 0406 0407 0408 0409 0410 7 SY GEOTEXTILE EST. 2 TONS CL B RIP RAP SPECIAL CUT DITCH SEE DETAIL B DITCH DITCH TO EX. TIE SPEC. CUT ( Not to Scale) RIP RAP AT EMBANKMENT FROM STA. 17+19 TO STA. 17+51 -L- LT DETAIL H Grade Ditch 1.5' GEOTEXTILE Geotextile= 31sy Type of Liner= 22 TONS,CL II Rip-Rap 10'min. 1.0'min. 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d EST. 12 TONS 25 SY. GEOTEXTILE S=5.0%, L=25', DDE=5 C.Y. STA. 11+05 -L- LT DETAIL A B= 2.0 Ft. Max. d= 1.0 Ft. Min. D= 1.0 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner=CL. B Rip-Rap Geotextile 20:1 10:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP DETAIL F Traffic Flow Outside Ditch 1.0'MINSTA. 13+00 -L- LT C Proposed Ditch (STRUCTURE PAY ITEM) ELEVATION (TYP.) TO SHOULDER POINT CLASS II RIP RAP (TYP.) EST. 85 C.Y. EXCAVATION TO EL. 278.0' STRUCTURE UNCLASSIFIED RIP RAP ROCK PLATING 17+50 -L- LT CL. II STA. 16+97 TO STA. 1.5:1 SLOPE FROM TBDETAIL G GEOTEXTILE GROUND PLAN VIEW PROFILE VIEW ENERGY DISSIPATOR PAD PAD DISSIPATOR ( Not to Scale) 1.0' L Geotextile= 23sy Type of Liner=15 TONS CL I Rip-Rap L= 20' FROM STA. 17+65 TO STA. 17+85 -L- RT 10ft 2:1 2:1 CUT IN 1FT FLOW 10' ( Not to Scale) ROADWAY DITCH D d 2:1FROM STA. 18+50 TO STA. 22+50 -L- RT FROM STA. 20+00 TO STA. 22+00 -L- LT DETAIL D Max. d= 1.0 Ft. Min. D= 1.0 Ft. Type of Liner= CL. B Rip-Rap Slope Fill Flatter4:1 or Ground Natural Geotextile ( Not to Scale) SPECIAL LATERAL 'V' DITCH D d 3: 1 FROM STA. 10+50 TO STA. 11+00 -L- RT FROM STA. 17+51 TO STA. 20+00 -L- LT DETAIL C Max. d= 1.0 Ft. Min. D= 0.7 Ft. Type of Liner= CLASS B Rip-Rap Slope Fill Flatter3:1 or Ground Natural Geotextile Flatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH FROM STA. 12+35 TO STA. 13+00 -L- LT FROM STA. 22+50 TO STA. 23+50 -L- RT FROM STA. 14+50 TO STA. 14+80 -L- RT DETAIL B Min. D= 1.0 Ft. Ground Natural Slope Ditch Front3: 1 D B ( Not to Scale) SPECIAL LATERAL GRASSED SWALE Flatter4:1 or FROM STA. 15+50 TO STA. 16+00 -L- LT DETAIL I Min. D= 1.0 Ft. Ground Natural Slope Fill 18" RCP-IV 291 SY GEOTEXTILE 98 TONS CL. B RIP-RAP W/CL. B RIP RAP ROADWAY DITCH SEE DETAIL D 307 SY GEOTEXTILE 97 TONS CL. B RIP-RAP 'V' DITCH SPECIAL LATERAL SEE DETAIL C d 2: 1 B D ( Not to Scale) Flatter4:1 or SPECIAL LATERAL BASE DITCH 109 SY GEOTEXTILE 39 TONS CL. B RIP-RAP FROM STA. 17+85 TO STA. 18+50 -L- RT Slope Fill DETAIL E B= 2.0 Ft. Max. d= 1.0 Ft. Min. D= 1.0 Ft. Type of Liner= CLASS B Rip-Rap Ground Natural Geotextile 582 SY GEOTEXTILE 195 TONS CL. B RIP-RAP W/CL. B RIP RAP ROADWAY DITCH SEE DETAIL D 71 SY GEOTEXTILE 23 TONS CL. B RIP-RAP SPECIAL LATERAL 'V' DITCH SEE DETAIL C ( Not to Scale) DETAIL K 2' GEOTEXTILE 1.0'min. RAP BANK STABILIZATION SEE DETAIL H CL. II RIP 4CY PIPE CLEANOUT 3'min. Geotextile= 25sy Type of Liner=31 TONS, CL II Rip-Rap 35 SY GEOTEXTILE EST. 31 TONS TO TOP OF BANK BANK STABILIZATION CL. II RIP RAP SEE DETAIL K BANK STABILIZATION 5 SY GEOTEXTILE EST. 10 TONS TO TOP OF BANK BANK STABILIZATION CL. II RIP RAP SEE DETAIL K EST 80SY GEOTEXTILE EST 36 TON STA 11+20 - 13+15 -L -RT TOE PROTECTION SEE DETAIL J EST 33SY GEOTEXTILE EST 15 TON STA 15+15 - 16+05 -L- RT TOE PROTECTION SEE DETAIL J EST 31SY GEOTEXTILE EST 14 TON STA 17+00 - 17+70 -L- RT TOE PROTECTION SEE DETAIL J ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM STA. 17+00 TO STA. 17+70 -L- RT FROM STA. 15+00 TO STA. 16+05 -L- RT FROM STA. 11+20 TO STA. 13+15 -L- RT DETAIL J Type of Liner= CL B Rip-Rap d= 1.0Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE FROM STA. 16+37 TO STA. 16+45 -L- T T 1' ROCK WALL W 15" RCP 24" RCP 9' BST CONC WALK PVT LT 2S FD BARN 12' SOILINV=283.81' INV=284.74' INV=282.04' INV=284.36' EIP RCP 15" GATE CABLE 18' BST 20' BST SR 2308 FOWLER RD SR 1726 HENRY BAKER RD EXISTING R/W EXISTING R/W60.00' WOODS WOODS WOODS WOODS WOODS WOODS MOCCASIN CREEKWD & STL BRG 196 -BL- 102-BL- 101-BL- 1002 3 F RANKLIN COUNTYWAKE COUNTYFRANKLIN COUNTY WAKE COUNTY 0.06'R/W TO EI PEXISTING R/W EXISTING R/W 60.00'b b b DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2004 PG 225 (FRANKLIN CO.) DB 10956 PG 1632 (WAKE CO.) PB 2003 PG 1594 (WAKE CO.) 3 BETSY BAKER SMITH REVOCABLE TRUST DB 1420 PG 346 (FRANKLIN CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 10956 PG 1629 (WAKE CO.) PB 2003 PG 1595 (WAKE CO.) INTERNAL PARCEL, NOW PART OF OVERALL TAX PARCEL DB 949 PG 908 (FRANKLIN CO.) DB 1287 PG 138 (FRANKLIN CO.) PB 2003 PG 1594 (WAKE CO.) DB 10956 PG 1632 (WAKE CO.) PB 2004 PG 225 (FRANKLIN CO.) DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2003 PG 1595 (WAKE CO.) DB 10956 PG 1629 (WAKE CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 1420 PG 346 (FRANKLIN CO.) BETSY BAKER SMITH REVOCABLE TRUST 2 RDDUKES LAKETO SAUDER WAY TO CONSTRUCTION INC. DRIVER REALTY AND DB 16716 PG 137 (WAKE CO.) BM 2016 PG 2047 (WAKE CO.) 4 EIP N 36°37'29" E 221.74' EIP S 41°21'09" E194.88'R/W TO EIP 0.93'S 53°21'52" E178.36' EIP WOODS 1SFD CONC.RCP 15" GRASS WELLS 53°21'52" EPI Sta 11+77.42 D L = 224.41' T = 112.79' R = 900.00' PI Sta 17+74.14 D L = 223.18' T = 115.00' R = 375.00' PI Sta 21+77.21 D L = 281.25' T = 147.61' R = 375.00' -L- e = 0.04e = 0.04 15+00 20+00 -L- POT St a. 10+00.00-L- PC St a. 10+64.63-L- PT Sta. 12+89.04-L- PC Sta. 16+59.14- L- P T Sta. 18 +82.3 1 - L- P C Sta. 20+29.60 -L- PT Sta. 23+10.85-L- POT Sta. 23+98.85DS = 45 mph DS = 35 mph DS = 35 mph e = 0.03 Runoff = 60 Runoff = 80 Runoff = 80 DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED HENRY RD BAKER -L- FOWLER RD -L-+10.00TYP.+95.002 ' FDPS 2 ' FDPS 2' FDPS 2' FDPS 20' TYP. + 5 5.6 4 +24.1820' TYP. 20' TYP. 8:1 8:1 8:1 8:1 8:18:1 8:1 8:1 +69.04DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED 10'10'27'-10"20'20'10'10' 20' 2 0'10'10'TIE TO EXIST. -L- POT STA. 10+00.00 BEGIN TIP PROJECT B-4662 SHEET 2A-1 DETAIL ON MILLING SEE INCIDENTAL SHEET 2A-1 DETAIL ON MILLING SEE INCIDENTAL TIE TO EXIST. -L- POT STA. 23+90.00 END TIP PROJECT B-4662 -L- POC STA. 16+92.58 END BRIDGE -L- POT STA. 16+20.33 BEGIN BRIDGE -L- POT STA. 16+09.50 BEGIN APPROACH SLAB -L- POC STA. 17+03.30 END APPROACH SLAB MILL REMNANTS DO NOT DISTURB BAKER MILL SITE GREU TYPE TL-3 (TYP.) 79 ' + /- TRANSITION 65' +/- TRANSITION TYPE-III TYPE-III TYPE-III SHOP CURVED TYPE-III DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED 1 2 2 1 CHORD CHORD 44 OF THE BRIDGE TO THE PAVEMENT SKETCH SHOWING THE RELATIONSHIP BRIDGE APPROACH SLAB EXISTING. WITH 5' MIN. RADII; OTHERWISE MATCH NOTE: USE 12' MIN. WIDTH DRIVEWAYS FOR -L- PROFILE SEE SHEET 5 DESIGN EXCEPTION FOR DESIGN SPEED OF 35 MPHREVISIONS $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RAMEY KEMP Transportation Engineers www.rameykemp.com Phone: 919-872-5115 Raleigh, North Carolina 27609 5808 Faringdon Place, Suite 100 ASSOCIATES, INC. & NC License No. C-0910 F. A. PROJ. NO.DESCRIPTIONSTATE PROJ. NO. SHEET NO.PROJECT REFERENCE NO. B-4662 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 38457.1.2 17BP.5.R.99 BRZ-2308 (5)PE, UTIL. R / W, CONST.N/A GREU TYPE TL-3 -L- STA. 16+92.58 END BRIDGE -L- STA. 16+20.33 BEGIN BRIDGE T T RUINS 1' ROCK WALL W 15" RCP 24" RCP 9' BST CONC WALK PVT LT 2S FD WD CONC BARN 12' SOILSTONE WALLS REMAINS OF INV=283.81' INV=284.74' INV=282.04' INV=284.36' EIP RCP 15" GATE CABLE 18' BST 20' BST AREA ROCKY SR 2308 FOWLER RD SR 1726 HENRY BAKER RD EXISTING R/W EXISTING R/W60.00' WOODS WOODS WOODS WOODS WOODS WOODS MOCCASIN CREEK-BL- 102-BL- 101-BL- 1002 3 F RANKLIN COUNTYWAKE COUNTYFRANKLIN COUNTY WAKE COUNTY 0.06'R/W TO EI PROCK EXISTING R/W EXISTING R/W 60.00'b b b DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2004 PG 225 (FRANKLIN CO.) DB 10956 PG 1632 (WAKE CO.) PB 2003 PG 1594 (WAKE CO.) 3 BETSY BAKER SMITH REVOCABLE TRUST DB 1420 PG 346 (FRANKLIN CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 10956 PG 1629 (WAKE CO.) PB 2003 PG 1595 (WAKE CO.) INTERNAL PARCEL, NOW PART OF OVERALL TAX PARCEL DB 949 PG 908 (FRANKLIN CO.) DB 1287 PG 138 (FRANKLIN CO.) PB 2003 PG 1594 (WAKE CO.) DB 10956 PG 1632 (WAKE CO.) PB 2004 PG 225 (FRANKLIN CO.) DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2003 PG 1595 (WAKE CO.) DB 10956 PG 1629 (WAKE CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 1420 PG 346 (FRANKLIN CO.) BETSY BAKER SMITH REVOCABLE TRUST 2 RDDUKES LAKETO SAUDER WAY TO CONSTRUCTION INC. DRIVER REALTY AND DB 16716 PG 137 (WAKE CO.) BM 2016 PG 2047 (WAKE CO.) 4 EIP N 36°37'29" E 221.74' EIP S 41°21'09" E194.88'R/W TO EIP 0.93'S 53°21'52" E178.36' EIP WOODS PORCH 1SFD CONC.RCP 15" GRASS WELLS 53°21'52" E15" C C F C F F C C C F F C F C C F F C F NAD 1983 NA 2011 NAD 1983 NA 2011 E E IN WETLAND DENOTES EXCAVATION WETLAND DENOTES FILL INFF TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SITE 1 SITE 2 GRAPHIC SCALE 0'50'100'150'50' CLEARING DENOTES MECHANIZED* * * * ** * ** * * BANK STABILIZATION FOLLOWING DETAIL K AND H. EXISTING TIMBER ABUTMENTS AND INSTALLATION OF CONSIDERED INCIDENTAL TO THE REMOVAL OF THE THE PLACEMENT OF THE IMPERVIOUS DIKES IS REMOVED USING APPROVED NCDOT BMP METHODS. EXISTING TIMBER ABUTMENTS MUST BE COMPLETELY NOTE FOR SITE 2: SHEET _5_ OF _11_ PERMIT DRAWING F F F F F F V10= 0.69 FPS V10= 0.70 FPS V10= 1.87 FPS V10= 0.62 FPS S S S S S **** *** *** ********* ******COLLAR 2 4 " COLLAR 2 4 " STANDARD BASE DITCH SEE DETAIL A TB 2GI 7 SY GEOTEXTILE EST. 2 TONS CL B RIP RAP 15"STA. 16+13 -L-LT APPROACH SLAB STA. 15+70 TO PROP. SBG 0401 0402 SPECIAL CUT DITCH SEE DETAIL B REPLACE REMOVE/ SPECIAL LAT. BASE DITCH SEE DETAIL E TO LAT. BASE DITCH TIE ROADWAY DITCH GRASSED SWALE SPECIAL LATERAL SEE DETAIL I SPEC. LAT. GRASSED SWALE TIE ROADWAY DITCH TO TO SPEC. CUT DITCH TIE EX. DITCH SPECIAL CUT DITCH SEE DETAIL B 21 SY GEOTEXTILE EST. 10 TONS CL B RIP RAP 10 SY GEOTEXTILE EST. 3 TONS CL B RIP RAP FALSE SUMP SEE DETAIL F FS ENERGY DISSIPATOR PAD SEE DETAIL G REMOVE 15"0403 04040405 0406 0407 0408 0409 0410 7 SY GEOTEXTILE EST. 2 TONS CL B RIP RAP SPECIAL CUT DITCH SEE DETAIL B DITCH DITCH TO EX. TIE SPEC. CUT ( Not to Scale) RIP RAP AT EMBANKMENT FROM STA. 17+19 TO STA. 17+51 -L- LT DETAIL H Grade Ditch 1.5' GEOTEXTILE Geotextile= 31sy Type of Liner= 22 TONS,CL II Rip-Rap 10'min. 1.0'min. 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d EST. 12 TONS 25 SY. GEOTEXTILE S=5.0%, L=25', DDE=5 C.Y. STA. 11+05 -L- LT DETAIL A B= 2.0 Ft. Max. d= 1.0 Ft. Min. D= 1.0 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner=CL. B Rip-Rap Geotextile 20:1 10:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP DETAIL F Traffic Flow Outside Ditch 1.0'MINSTA. 13+00 -L- LT C Proposed Ditch (STRUCTURE PAY ITEM) ELEVATION (TYP.) TO SHOULDER POINT CLASS II RIP RAP (TYP.) EST. 85 C.Y. EXCAVATION TO EL. 278.0' STRUCTURE UNCLASSIFIED RIP RAP ROCK PLATING 17+50 -L- LT CL. II STA. 16+97 TO STA. 1.5:1 SLOPE FROM TBDETAIL G GEOTEXTILE GROUND PLAN VIEW PROFILE VIEW ENERGY DISSIPATOR PAD PAD DISSIPATOR ( Not to Scale) 1.0' L Geotextile= 23sy Type of Liner=15 TONS CL I Rip-Rap L= 20' FROM STA. 17+65 TO STA. 17+85 -L- RT 10ft 2:1 2:1 CUT IN 1FT FLOW 10' ( Not to Scale) ROADWAY DITCH D d 2:1FROM STA. 18+50 TO STA. 22+50 -L- RT FROM STA. 20+00 TO STA. 22+00 -L- LT DETAIL D Max. d= 1.0 Ft. Min. D= 1.0 Ft. Type of Liner= CL. B Rip-Rap Slope Fill Flatter4:1 or Ground Natural Geotextile ( Not to Scale) SPECIAL LATERAL 'V' DITCH D d 3: 1 FROM STA. 10+50 TO STA. 11+00 -L- RT FROM STA. 17+51 TO STA. 20+00 -L- LT DETAIL C Max. d= 1.0 Ft. Min. D= 0.7 Ft. Type of Liner= CLASS B Rip-Rap Slope Fill Flatter3:1 or Ground Natural Geotextile Flatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH FROM STA. 12+35 TO STA. 13+00 -L- LT FROM STA. 22+50 TO STA. 23+50 -L- RT FROM STA. 14+50 TO STA. 14+80 -L- RT DETAIL B Min. D= 1.0 Ft. Ground Natural Slope Ditch Front3: 1 D B ( Not to Scale) SPECIAL LATERAL GRASSED SWALE Flatter4:1 or FROM STA. 15+50 TO STA. 16+00 -L- LT DETAIL I Min. D= 1.0 Ft. Ground Natural Slope Fill 18" RCP-IV 291 SY GEOTEXTILE 98 TONS CL. B RIP-RAP W/CL. B RIP RAP ROADWAY DITCH SEE DETAIL D 307 SY GEOTEXTILE 97 TONS CL. B RIP-RAP 'V' DITCH SPECIAL LATERAL SEE DETAIL C d 2: 1 B D ( Not to Scale) Flatter4:1 or SPECIAL LATERAL BASE DITCH 109 SY GEOTEXTILE 39 TONS CL. B RIP-RAP FROM STA. 17+85 TO STA. 18+50 -L- RT Slope Fill DETAIL E B= 2.0 Ft. Max. d= 1.0 Ft. Min. D= 1.0 Ft. Type of Liner= CLASS B Rip-Rap Ground Natural Geotextile 582 SY GEOTEXTILE 195 TONS CL. B RIP-RAP W/CL. B RIP RAP ROADWAY DITCH SEE DETAIL D 71 SY GEOTEXTILE 23 TONS CL. B RIP-RAP SPECIAL LATERAL 'V' DITCH SEE DETAIL C ( Not to Scale) DETAIL K 2' GEOTEXTILE 1.0'min. RAP BANK STABILIZATION SEE DETAIL H CL. II RIP 4CY PIPE CLEANOUT 3'min. Geotextile= 25sy Type of Liner=31 TONS, CL II Rip-Rap 35 SY GEOTEXTILE EST. 31 TONS TO TOP OF BANK BANK STABILIZATION CL. II RIP RAP SEE DETAIL K BANK STABILIZATION 5 SY GEOTEXTILE EST. 10 TONS TO TOP OF BANK BANK STABILIZATION CL. II RIP RAP SEE DETAIL K EST 80SY GEOTEXTILE EST 36 TON STA 11+20 - 13+15 -L -RT TOE PROTECTION SEE DETAIL J EST 33SY GEOTEXTILE EST 15 TON STA 15+15 - 16+05 -L- RT TOE PROTECTION SEE DETAIL J EST 31SY GEOTEXTILE EST 14 TON STA 17+00 - 17+70 -L- RT TOE PROTECTION SEE DETAIL J ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM STA. 17+00 TO STA. 17+70 -L- RT FROM STA. 15+00 TO STA. 16+05 -L- RT FROM STA. 11+20 TO STA. 13+15 -L- RT DETAIL J Type of Liner= CL B Rip-Rap d= 1.0Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE FROM STA. 16+37 TO STA. 16+45 -L- T T 1' ROCK WALL W 15" RCP 24" RCP 9' BST CONC WALK PVT LT 2S FD BARN 12' SOILINV=283.81' INV=284.74' INV=282.04' INV=284.36' EIP RCP 15" GATE CABLE 18' BST 20' BST SR 2308 FOWLER RD SR 1726 HENRY BAKER RD EXISTING R/W EXISTING R/W60.00' WOODS WOODS WOODS WOODS WOODS WOODS MOCCASIN CREEKWD & STL BRG 196 -BL- 102-BL- 101-BL- 1002 3 F RANKLIN COUNTYWAKE COUNTYFRANKLIN COUNTY WAKE COUNTY 0.06'R/W TO EI PEXISTING R/W EXISTING R/W 60.00'b b b DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2004 PG 225 (FRANKLIN CO.) DB 10956 PG 1632 (WAKE CO.) PB 2003 PG 1594 (WAKE CO.) 3 BETSY BAKER SMITH REVOCABLE TRUST DB 1420 PG 346 (FRANKLIN CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 10956 PG 1629 (WAKE CO.) PB 2003 PG 1595 (WAKE CO.) INTERNAL PARCEL, NOW PART OF OVERALL TAX PARCEL DB 949 PG 908 (FRANKLIN CO.) DB 1287 PG 138 (FRANKLIN CO.) PB 2003 PG 1594 (WAKE CO.) DB 10956 PG 1632 (WAKE CO.) PB 2004 PG 225 (FRANKLIN CO.) DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2003 PG 1595 (WAKE CO.) DB 10956 PG 1629 (WAKE CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 1420 PG 346 (FRANKLIN CO.) BETSY BAKER SMITH REVOCABLE TRUST 2 RDDUKES LAKETO SAUDER WAY TO CONSTRUCTION INC. DRIVER REALTY AND DB 16716 PG 137 (WAKE CO.) BM 2016 PG 2047 (WAKE CO.) 4 EIP N 36°37'29" E 221.74' EIP S 41°21'09" E194.88'R/W TO EIP 0.93'S 53°21'52" E178.36' EIP WOODS 1SFD CONC.RCP 15" GRASS WELLS 53°21'52" EPI Sta 11+77.42 D L = 224.41' T = 112.79' R = 900.00' PI Sta 17+74.14 D L = 223.18' T = 115.00' R = 375.00' PI Sta 21+77.21 D L = 281.25' T = 147.61' R = 375.00' -L- e = 0.04e = 0.04 15+00 20+00 -L- POT St a. 10+00.00-L- PC St a. 10+64.63-L- PT Sta. 12+89.04-L- PC Sta. 16+59.14- L- P T Sta. 18 +82.3 1 - L- P C Sta. 20+29.60 -L- PT Sta. 23+10.85-L- POT Sta. 23+98.85DS = 45 mph DS = 35 mph DS = 35 mph e = 0.03 Runoff = 60 Runoff = 80 Runoff = 80 DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED HENRY RD BAKER -L- FOWLER RD -L-+10.00TYP.+95.002 ' FDPS 2 ' FDPS 2' FDPS 2' FDPS 20' TYP. + 5 5.6 4 +24.1820' TYP. 20' TYP. 8:1 8:1 8:1 8:1 8:18:1 8:1 8:1 +69.04DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED 10'10'27'-10"20'20'10'10' 20' 2 0'10'10'TIE TO EXIST. -L- POT STA. 10+00.00 BEGIN TIP PROJECT B-4662 SHEET 2A-1 DETAIL ON MILLING SEE INCIDENTAL SHEET 2A-1 DETAIL ON MILLING SEE INCIDENTAL TIE TO EXIST. -L- POT STA. 23+90.00 END TIP PROJECT B-4662 -L- POC STA. 16+92.58 END BRIDGE -L- POT STA. 16+20.33 BEGIN BRIDGE -L- POT STA. 16+09.50 BEGIN APPROACH SLAB -L- POC STA. 17+03.30 END APPROACH SLAB MILL REMNANTS DO NOT DISTURB BAKER MILL SITE GREU TYPE TL-3 (TYP.) 79 ' + /- TRANSITION 65' +/- TRANSITION TYPE-III TYPE-III TYPE-III SHOP CURVED TYPE-III DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED 1 2 2 1 CHORD CHORD 44 OF THE BRIDGE TO THE PAVEMENT SKETCH SHOWING THE RELATIONSHIP BRIDGE APPROACH SLAB EXISTING. WITH 5' MIN. RADII; OTHERWISE MATCH NOTE: USE 12' MIN. WIDTH DRIVEWAYS FOR -L- PROFILE SEE SHEET 5 DESIGN EXCEPTION FOR DESIGN SPEED OF 35 MPHREVISIONS $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RAMEY KEMP Transportation Engineers www.rameykemp.com Phone: 919-872-5115 Raleigh, North Carolina 27609 5808 Faringdon Place, Suite 100 ASSOCIATES, INC. & NC License No. C-0910 F. A. PROJ. NO.DESCRIPTIONSTATE PROJ. NO. SHEET NO.PROJECT REFERENCE NO. B-4662 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 38457.1.2 17BP.5.R.99 BRZ-2308 (5)PE, UTIL. R / W, CONST.N/A GREU TYPE TL-3 -L- STA. 16+92.58 END BRIDGE -L- STA. 16+20.33 BEGIN BRIDGE 273274274 275275275 275276276276276277 277277277277 278 278 278278279279279279279 280 280 280 280 280280 280 28028028 0280280 281 28 1 281 281 28128 1 28 1 28 1 28 1282 28228 2 282282283 283 283 283284 284 2 84 284 28428 4 285 285 285 285 285 285285 285285286 286 28628 6 2862862 87287 287 287287 287 288 288 288288288289 289 28928928928 9 290 290 290 290 290290290290291291291291 291 292292292 292 293293293 294294294 295 29529 5 295295295 295 296296296296 2972972972972982982982982992992 99299 3003003003 0 0 300300 300 301301 302302 3033033033043 0 4 305305305305305306306 306307307 308309310310311311312312T T RUINS 1' ROCK WALL W 15" RCP 24" RCP 9' BST CONC WALK PVT LT 2S FD WD CONC BARN 12' SOILSTONE WALLS REMAINS OF INV=283.81' INV=284.74' INV=282.04' INV=284.36' EIP RCP 15" GATE CABLE 18' BST 20' BST AREA ROCKY SR 2308 FOWLER RD SR 1726 HENRY BAKER RD EXISTING R/W EXISTING R/W60.00' WOODS WOODS WOODS WOODS WOODS WOODS MOCCASIN CREEK-BL- 102-BL- 101-BL- 1002 3 F RANKLIN COUNTYWAKE COUNTYFRANKLIN COUNTY WAKE COUNTY 0.06'R/W TO EI PROCK EXISTING R/W EXISTING R/W 60.00'b b b DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2004 PG 225 (FRANKLIN CO.) DB 10956 PG 1632 (WAKE CO.) PB 2003 PG 1594 (WAKE CO.) 3 BETSY BAKER SMITH REVOCABLE TRUST DB 1420 PG 346 (FRANKLIN CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 10956 PG 1629 (WAKE CO.) PB 2003 PG 1595 (WAKE CO.) INTERNAL PARCEL, NOW PART OF OVERALL TAX PARCEL DB 949 PG 908 (FRANKLIN CO.) DB 1287 PG 138 (FRANKLIN CO.) PB 2003 PG 1594 (WAKE CO.) DB 10956 PG 1632 (WAKE CO.) PB 2004 PG 225 (FRANKLIN CO.) DB 1420 PG 349 (FRANKLIN CO.) CHRISTI RENEE DRIVER SASSER REVOCABLE TRUST PB 2003 PG 1595 (WAKE CO.) DB 10956 PG 1629 (WAKE CO.) PB 2004 PG 226 (FRANKLIN CO.) DB 1420 PG 346 (FRANKLIN CO.) BETSY BAKER SMITH REVOCABLE TRUST 2 RDDUKES LAKETO SAUDER WAY TO CONSTRUCTION INC. DRIVER REALTY AND DB 16716 PG 137 (WAKE CO.) BM 2016 PG 2047 (WAKE CO.) 4 EIP N 36°37'29" E 221.74' EIP S 41°21'09" E194.88'R/W TO EIP 0.93'S 53°21'52" E178.36' EIP WOODS PORCH 1SFD CONC.RCP 15" GRASS WELLS 53°21'52" E15" C C F C F F C C C F F C F C C F F C F NAD 1983 NA 2011 NAD 1983 NA 2011 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-4662 4 SITE 1 ENLARGEMENT N.T.S. WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * SHEET _6_ OF _11_ PERMIT DRAWING F F V10= 0.69 FPS V10= 0.70 FPS **** *** COLLAR 2 4 " COLLAR 2 4 " FS15" 18" RCP-IV EST 80SY GEOTEXTILE EST 36 TON STA 11+20 - 13+15 -L -RT TOE PROTECTION SEE DETAIL J 15" RCP 24" RCP INV=283.81' INV=284.74' INV=282.04' INV=284.36' 18' BST SR 2308 FOWLER RD WOODS CHRISTI RENEE DRIVER SASSER REVOCABLE TRUSTR/W TO EIP 0.93'EIP WOODSCON C.RCP 15" 5 4" PVC 2' FDPS 2' FDPS 20' TYP.+69.04CHORD .03.03.03.02.02.012' FDPS 2' FDPS 20' TYP.+69.04.0315" RCP 24" RCP INV=283.81' INV=284.74' INV=282.04' INV=284.36' 18' BST SR 2308 FOWLER RD WOODS CHRISTI RENEE DRIVER SASSER REVOCABLE TRUSTR/W TO EIP 0.93'EIP WOODSCON C.RCP 15" 5 4" PVC F C F F B-4662 4 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE 2 ENLARGEMENT N.T.S. WETLAND DENOTES FILL INFF E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SHEET _7_ OF _11_ PERMIT DRAWING F F F F S S S S S *** ********* ****** TB 2GI 15"TBTOE PROTECTION DETAIL J STONE WALLS REMAINS OF RCP 15" AREA ROCKY WOODS WOODS MOCCASIN CREEK-BL- 101ROCK 15+00 HENRY RD BAKER-L-+95.008:1 8:1 8:1 -L- POC STA. 16+92.58 END BRIDGE -L- POT STA. 16+20.33 BEGIN BRIDGE -L- POT STA. 16+09.50 BEGIN APPROACH SLAB -L- POC STA. 17+03.30 END APPROACH SLAB MILL REMNANTS DO NOT DISTURB GREU TYPE TL-3 (TYP.) TYPE-III TYPE-III TYPE-III SHOP CURVED TYPE-III CHORD STONE WALLS REMAINS OF RCP 15" AREA ROCKY WOODS WOODS MOCCASIN CREEKROCK C F F C F C F 260 270 280 290 300 310 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 5 260 270 280 290 300 310 SHEET _8_ OF _11_ PERMIT DRAWING5/14/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION RAMEY KEMP Transportation Engineers www.rameykemp.com Phone: 919-872-5115 Raleigh, North Carolina 27609 5808 Faringdon Place, Suite 100 ASSOCIATES, INC. & NC License No. C-0910 F. A. PROJ. NO.DESCRIPTIONSTATE PROJ. NO. SHEET NO.PROJECT REFERENCE NO. B-4662 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 38457.1.2 17BP.5.R.99 BRZ-2308 (5) - PE, UTIL. R / W, CONST. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PI = 15+00.00 EL = 281.59' VC = 170' PI = 18+55.00 EL = 285.85' VC = 290' PI = 22+00.00 EL = 310.00' VC = 300'EL=282.61'-L- PT STA. 15+85.00EL=283.21'-L- PC STA. 14+15.00EL=284.11'-L- PC STA. 17+10.00EXISTING GROUND PROPOSED GRADE EL=305.29'-L- PT STA. 23+50.00K = 55 DS = 35 MPH K = 50 DS = 35 MPH K = 30 DS = 35 MPH -1.9020% +1.2000% +7.0000% -3 .1421% -1.9020%EL=296.00'-L- PT STA. 20+00.00EL=299.50'-L- PC STA. 20+50.00EL=283.03'BEGIN BRIDGE -L- STA. 16+20.33EL=283.90'END BRIDGE -L- STA. 16+92.58EL=304.03' (TIE TO EXIST.) END GRADE -L- STA. 23+90.00 EL=291.10' (TIE TO EXIST.) BEGIN GRADE -L- STA. 10+00.00 NORMAL TO CAP 1.5:1 SLOPE EL = 283.937' (108' RIGHT OF -BL- STA. 10+62.00) 127.6063' LEFT OF -L- STA. 16+49.17 BM #2: 16d NAIL IN A 15" POPLAR -0.7200% (DATE OF SURVEY 08/04/2017) NWSE=277.7' (STRUCTURE PAY ITEM) CLASS II RIP RAP (TYP.)1.5:1EST. 85 CY TO EL. 278.0' EXCAVATION UNCLASSIFIED STRUCTURE EST. 110 CY TO EL. 275.0' EXCAVATION UNCLASSIFIED STRUCTURE EST. 31 TONS BANK ARMOR CL. II RIP RAP1.5:11.5:1-5.0800 %+0.8462% -2.2333% -0.7800% +6.9846% +4.0000% +9.6200%EL=280.06STA. 17+85 -L- RTBEGIN SPECIAL LAT. BASE DITCHEL=303.30STA 23+50 -L- RTEND SPECIAL CUT DITCHEL=294.12STA. 20+00 -L- LTEND SPECIAL LAT. V DITCHEL=284.60STA. 18+50 -L- RTEND SPECIAL LAT. BASE DITCHEL=279.00STA. 16+00 -L- LTEND SPECIAL LAT. GRASSED SWALEEL=279.39STA. 15+50 -L- LTBEGIN SPECIAL LAT. GRASSED SWALEEL=279.50STA. 14+80 -L- RTEND SPECIAL CUT DITCHEL=280.17STA. 14+50 -L- RTBEGIN SPECIAL CUT DITCHEL=283.43STA. 13+00 -L- LTEND SPECIAL CUT DITCHEL=282.88STA. 12+35 -L- LTBEGIN SPECIAL CUT DITCHEL=304.02STA 22+50 -L- RTBEGIN SPECIAL CUT DITCHEL=286.04STA. 10+50 -L- RTBEGIN SPECIAL LAT. V DITCHEL=283.50STA. 11+00 -L- RTEND SPECIAL LAT. V DITCHEL=278.54STA. 17+51 -L- LTBEGIN SPECIAL LAT. V DITCHEL 284.50STA. 19+00 -L- LTFOR -L- PLAN VIEW SEE SHEET 4 -L- SR 2308 (FOWLER ROAD) / SR 1726 (HENRY BAKER ROAD) DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED OF 35 MPH. 287.84 EX_ROWEX_ROWEX_EOPEX_EOPWET4:12:14:1 0.0300.030 288.25286.52 287.06 EX_ROWEX_ROWEX_EOPEX_EOPWET4 :12:14:1 0.0300.030 287.30285.57 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 60 6565 65 7070 70 7575 75 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0 6/23/16280 280 285 285 290 290 295 295 300 300 275 275 11+50.00 280 280 285 285 290 290 295 295 300 300 305 305 275 275 12+00.00 X-2B-4662 -L- 2.5 5 F. A. PROJ. NO.DESCRIPTIONSTATE PROJ. NO. 38457.1.2 17BP.5.R.99 BRZ-2308 (5) - PE, UTIL. R / W, CONST. SITE 1 SITE 1 SHEET _9_ OF _11_ PERMIT DRAWING 281.51 EX_ROWEX_ROWEX_EOPEX_EOPWET4 :14:1 0.0070.020 282.303:1279.39 281.16 EX_ROWEX_ROWEX_EOPEX_EOPWET3:14:1 0.0320.033 282.793:1279.00 274.02 EX_ROWEX_ROW0.0400.040 283.3900 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 60 6565 65 7070 70 7575 75 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0 6/23/16280 280 285 285 290 290 275 27515+50.00 275 275 280 280 285 285 290 290 270 270 16+00.00 270 270 275 275 280 280 285 285 290 290 265 265 16+50.00 X-5B-4662 -L- 2.5 5 -L- STA 16+20.33 BEGIN BRIDGE NO. 196 F. A. PROJ. NO.DESCRIPTIONSTATE PROJ. NO. 38457.1.2 17BP.5.R.99 BRZ-2308 (5) - PE, UTIL. R / W, CONST. SITE 2 SITE 2 SHEET _10_ OF _11_ PERMIT DRAWING Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 11+07/13+13 -L- RT Roadway Fill 0.02 0.10 2 15+07/17+74 -L- RT 70' Cored Slab Bridge 0.01 < 0.01 0.13 2 16+40/16+52 -L-Bank Stabilization 0.01 90 16+75/17+33 -L- 2 16+44/16+40 -L-Temporay Dewatering 0.03 105 16+65/17+40 -L- TOTALS*:0.03 < 0.01 0.23 0.01 0.03 90 105 0 *Rounded totals are sum of actual impacts NOTES: Revised 2016 09 09 SHEET 11 OF 11 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS WAKE COUNTY B-4662 17BP.5.R.99 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 01/09/2018