Loading...
HomeMy WebLinkAbout20171238 Ver 1_Certification of Completion_20180116Environmentaf (�L/Q�l%jF' "� NCDWR Project No.: �� � �.�� � County: �yLL�_ Applicant: _ %�iG _ p� � – Project Name: __ �� I � I � — `J�� �/�i,l"�L��►-z Date of Issuance of 401 Water Quality Certification: _��_.��� J� % ROY COOPER t;ore,•,ror MICHAEL S. REGAN .tirvc'r�u•, S. JAY ZIMMERMAN 1>rr t i ru� Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40l 7'ransportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be renurned to NCDWR by the applicant, the applicant's �uthorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applica►rt'.s Cerlificalion f,� ,+�r f, Gf/f`,r'�i��fic`a . hereby state that, to the best of my abilities, due care and diligence �---- was u. ca! m the observation of the construction such that the construction was observed to be built widiin substantial compliance and intent of lhc 40i Water (,�u��lit�� (" � tiiticatian and Buffer Rules, the approved plans and specifications, and c�the .�iy� rting r��, •euV: � � Signature: Date: � ��p _. _� Agenl's Cerlificalloir I, _ , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be buiit within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supparting materials. 5ignature: Engineer's Certifrculi�ii Pan:ial Final Date: f, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized tv observe (periodically, weekly, full time) the construction of the project for the Pennittee hereby state that, fo the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Bufler Rules, the approved plans and specitications, and other supporting materials. Signature Date Registration Na. Slatr ol Nurth l'arolina I f:nvironmental Quahly I G17 M al I Sen ice Ccnter � Ralcigh. North Carol ma '7699- I G I 7