Loading...
HomeMy WebLinkAboutNC0075612_Staff Report_20180102State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ® NPDES Unit ❑ Non-Dischar eg Unit Application No.: NCO075612 Attn: (name of Reviewer in Raleigh) Facility name: Wildcat Cliffs From: (name of Reviewer in Regional Office) Asheville Regional Office Note: This form has been adapted from the non -discharge facility acility staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: 12/20/2017 b. Site visit conducted by: Tim Heim and Mikal Willmer c. Inspection report attached? ® Yes or ❑ No d. Person contacted: John Impacliatelli and their contact information: (828) 526 - 2165 ext. e. Driving directions: 2. Discharge Point(s): Latitude: Latitude: Longitude: Longitude: 3. Receiving stream or affected surface waters: UT to Cullasaja River (Ravenel Lake) Classification: WS -III; Tr River Basin and Subbasin No. Little Tennessee; Sub -Basin: 04-04-01 Describe receiving stream features and pertinent downstream uses: Cullasaja River is classified WS -III, Tr, which feeds into a CA at Mirror Lake. Cullasaja downstream is on the 2016 Draft 303d list as impaired for Benthos. II. PROPOSED FACILITIES: NEW APPLICATIONS (NA) 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No ❑ N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ N/A If no, please explain: FORM: WQROSSR 04-14 Page 1 of 4 5. Is the proposed residuals management plan adequate? ❑ Yes ❑ No ❑ N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? ❑ Yes ❑ No ❑ N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No ❑ N/A If yes, attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: 11. Pretreatment Program (POTWs only): III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: Brandon Buchanan Certificate #: 1000794 Backup ORC: Mark Teague Certificate #:10920 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, please explain: Description of existing facilities: 35,000 GPD WWTP (Package Plant w/ diffused aeration) Proposed flow:.05MGD Current permitted flow:.05MGD Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ❑ Yes or ❑ No ® N/A If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ❑ Yes or ❑ No ❑ N/A If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ❑ Yes or ® No If no, please explain: The new 35,000 GPD treatment train has an aerated EQ Basin. 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A If no, please explain: FORM: WQROSSR 04-14 Page 2 of 4 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A If no, please complete the followine (expand table if necessarv): Monitoring Well Latitude Longitude O , „ O , if O , „ O , if O , „ O , if O , if O , „ O , „ O , „ 12. Has a review of all self-monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: BOD limit violations in May, June, July, August, September and October 2017. Discussed with property manager and Environmental Inc. The WWTP was operating at a 1/3 the treatment capacity as the larger treatment train was being replaced. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ❑ No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ® Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Limit exceedances due to construction and plant upgrades over 2017. Second treatment train is now installed. Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ® N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A If yes, please explain: 16. Possible toxic impacts to surface waters: 17. Pretreatment Program (POTWs only): FORM: WQROSSR 04-14 Page 3 of 4 IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ❑ No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: 5 0 Condition Reason Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑Deny (Please state reasons: .) Signature of report preparers I `m a�,% Signature of regional supervisX�__� Date: 1/2/2018 V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS See attached inspection report. FORM: WQROSSR 04-14 Page 4 of 4