HomeMy WebLinkAbout20140060 Ver 1_DCM Permit_20171221Permit Class U Permit Number
RENEWAL 122-10
STATE OF NORTH CAROLINA
Department of Environmental Quality
and R�
Coastal Resources Commission pN WR
Vernt p,C 21 R/D
for 201)
X Major Development in an Area of Enviropjn�tztgl,Cou%e T'
o�
pursuant to NCGS 113A-118
op
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Gwinn Hedrick, 401 Vandemere Street, Oriental, NC 28571
Authorizing development in Pamlico County at Smith Creek, 23 A -G Blackwell
Point Loop Road, 1922 Wilkins Road, Oriental , as requested in the permittee's application dated letter dated
Chis permit, issued on December 13, 2017 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
)e subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 122-10, which was issued to the permittee on 10/28/10,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
10-0558 and 14-0060.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2010-01805, which was issued on 10/28/10 and 2014-00173, which was issued on 3/24/14.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31. 2019
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
v (�
Br6fofi C. Davis, Director
ivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee