Loading...
HomeMy WebLinkAboutNCG030103_Tier-Relief_RRO-ResponseEnergy, Mineral and Land Resources ENVIRONMENTAL QUALITY December 19, 2017 Moen Incorporated Attn: Ms. Zina Briner Environmental Coordinator 2609 Cox Mill Road Sanford, NC 27330 SUBJECT: NPDES Stormwater Permit: Request for Regulatory Relief Moen Inc. -Sanford Plant General Permit No: NCG030000; COC No: NCG030103 Lee County Dear Ms. Briner: ROY COOPER Gove..or MICHAEL S. REGAN Secretary TOBY VINSON Interim Director In response to your request for Regulatory Relief, NCDENR-Land Quality Section staff conducted a site inspection on December 13, 2017. The primary goal of the inspection was to evaluate the drainage to outfalls SDO1-SD04 and to ensure that there are no illicit discharges at your facility. At the time of this inspection the facility was found to be in compliance with permit NCG030103 with the exception of one possible illicit discharge originating from the Chip Containment system loading area. The containment and separation system located at the covered loading area is a potential source for contamination to the stormwater system. Monthly monitoring has been triggered by consistent exceedances of the zinc and copper benchmarks since 2014 at your facility. Please keep in mind that benchmark exceedances are NOT limit violations or violations of permit conditions; however, you are obligated to follow the tiered response actions outlined in your permit. Moen Incorporated has been following the tiered response actions and therefore is in compliance with the permit. Based on your materials inventory and certification that industrial activities at Moen Incorporated does pose potential for release of copper and zinc into stormwater we are requesting that further investigation of the containment and separation system at the Chip Containment system loading area be undertaken. This will ensure that all precautions are being taken to prevent the contamination of stormwater from copper and zinc at this location. This office requests that the containment and separation system design be reviewed and that field measurements be taken to ensure that the system is functioning as designed and that additional measures cannot be taken to Nothing Compares_ Slateol'North(ar'olina Eirviroamentai Quality I Energy. Miner al and Land Resources 512N.Salissbury Street I Inumail Servlce Center I Raleigh.North Carolina27h99-4612 improve the efficiency of the system before granting regulatory relief in the form of a collapsed Tier 2 — Tier 3 response for SDO1. We do concur with the request for regulatory relief for SDO2-SDO4. Upon receipt of this letter, Moen Inc. may resume the permit specified semiannual analytical monitoring for the remainder of your current permit for SDO2-SDO4 only. This decision only applies to the copper and zinc benchmarks. A benchmark exceedance of any other parameter listed in your permit will trigger tiered response actions as described in the general permit. Once a thorough investigation of the containment and separating system has been completed and all reasonable options to reduce the copper and zinc contamination in stormwater from this area have been explored, regulatory relief for this outfall can be revisited. You must notify this office in writing, within five business days, if you become aware of any significant source of copper or zinc at your facility that has the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at Moen Inc. If industrial practices change and copper or zinc become a significant stormwater exposure risk, then this office reserves the right to withdraw this decision and reinstate the permit specified tiered response or other actions that may be warranted by the new set of circumstances. Please retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or comments concerning this letter, please contact Thad valentine or me at (919) 791-4200. Enclosure cc: Bethany Georgoulias, RCO Sincerely, William H. Denton, IV Regional Engineer RECEIVED lks 02 2% Nothing Compares. State or North Carolina IEnviironmen[al Quality IEnergy. 6liner<+I Hod Lund Resources 512N.SaiLsbury Strect h,12NUll S"Ou Center I Raleigh. North Carolina 27o9r+-1612 919 707 9200