Loading...
HomeMy WebLinkAboutNC0025496_Compliance Inspection_20171215a'^ Water Resources Environmental Qualiq ROY COOPER Governor MICHAEL S. REGAN .Secretary LINDA CULPEPPER Interim Director December 15, 2017 RECEIVED/DENR/DWR JAN 0 5 2017 Mr. Robert Pearson, Water Services Director Water Resources City of Lincolnton Permitting Section P. O. Drawer 617 Lincolnton, North Carolina 28093-0617 Subject: Pretreatment Compliance Inspection City of Lincolnton NPDES Permit No. NCO025496 Lincoln County Dear Mr. Pearson: Enclosed is a copy of the Pretreatment Compliance Inspection Report for the inspection of the City of Lincolnton's Industrial Pretreatment Program on December 12, 2017, by Mr. Wes Bell of this Office. Should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192, or via email at wes.bell&cdenr.gov. Enclosure: Inspection Report cc: Vivien Zhong, PERCS Unit MSC -1617 Central -Basement M SincerelyJ�"I/ cf W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ State of North Carolina I Environmental Quality) Water Resources! Watet Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 310 I Mooresville, North Carolina 28115 704-663-1699 K`ra NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Yate+ Resources LN VMO..MNTAL OV IL1Y Y BACKGROUND INFORMATION 1Comulete Prior To PCI; Review Proeram Info Database Sheet(s)1 1. Control Authority (POTW) Name: City of Lincolnton 2. Control Authority Representative(s): Debra Tunstall 3 Title(s): Pretreatment Program Coordinator 4 Last Inspection Date: 9/21/16 Inspection Type: ❑ PCI ® Audit 5 Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters. Are Milestone Dates Being Met? ❑ YES ❑ NO ® NA PCS CODING Main Program Permit Number MM/DD/YY NCO025496 12/12/17 7. Current Number Of Significant Industrial Users (SIUs)? 6 8. Number of SIUs With No IUP, or With an Expired IUP 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 1 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 13. Number of SlUs in SNC with Pretreatment Schedule? 0 14 Number of SIUs on Schedules? 1 15. Current Number Of Categorical Industrial Users (CIUs)? 3 16. Number of CIUs in SNC? 1 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed9 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed9 19. Which Industries have been in SNC for Limits or Reporting during SNC foi either of the Last 2 Senn -Annual Periods? Not Been Published for Violatio Public Notice?(May refer to PAR if Excessive SIUs in SNC) SNC foi Not Pu 20 Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones9 ❑ YES ® NO ❑ YES ® NO Limits: KACO USA — Zinc TRC is (July — December 2016) Reporting: None flished: None VT LeeBoy, Yes ❑ YES ® NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report9 ® YES ❑ NO 26. If NO to 23 - 26, list violations: 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO NC DWR Pretreatment Compliance Inspection (PCI) Form updated December 2016 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files. complete with sutmortine documents and cony of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Received Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis A 5/8/17 ® Yes ❑ No 8/3/17 ® Yes ❑ No 6/1/22 Industrial Waste Survey S 1/26/15 ® Yes ❑ No 4/6/15 ® Yes ❑ No 10/1/19 Sewer Use Ordinance (SUO) 10/2/13 ® Yes ❑ No 10/7/13 ® Yes ❑ No ® Yes ❑ No Enforcement Response Plan RP 7/31/08 ® Yes ❑ No 10/29/08 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 12/29/16 ® Yes ❑ No 3/30/17 ® Yes ❑ No a. ®Yes ❑No 1[a. INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR I FILE REVIEW AND 1 IU INSPECTIO 29. User Name 1. Cataler North America 2. South Fork Industries 3. G&W Laboratories 30. IUP Number 10021 0004 0012 31. Does File Contain Current Permit? I ® Yes ❑ NoI ® Yes ❑ No ® Yes ❑ No 32. Permit Expiration Date 6/30/18 6/30/19 6/30/19 33. Categorical Standard Applied I.E. 40 CFR, Etc. Or N/A 4151 410 439 34 Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ❑ Yes ®No ® Yes ❑ No to Permit Issue Date 35 Does File Contain an Inspection Completed Within Last Calendar Year? I ®Yes ❑ NoI ® Yes ❑ No 11 ® Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan a. ®Yes ❑No 1[a. ❑Yes ®No a. ®Yes []Nob. If No, is One Needed? (See Inspection Form from POTW) b ❑Yes ❑No b. ❑Yes ®No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A Organic Management Plan (TOMP)9 38 a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ®Yes []No a. ®Yes ❑No 11 b All Issues Resolved? b ❑Yes❑No®N/A b ❑Yes❑No®N/A b ❑Yes❑No®N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ® Yes El No ® Yes [I No ®Yes El No its Sam lin as Re uired b lUP, includin flow 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Y I ® Yes ❑ No -11 ® Yes ❑ No 41a During the Most Recent Semi -Annual Period, Did the SILT Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SILT submit all reports OYes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A on time 42a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑NoON/A file includeprocess/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A pr duction rates and/or flows as Required b IUPC 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑No®NA ❑Yes❑No®N/A ®Yes❑No❑N/A All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑No®N/A ❑Yes❑NoON/A ❑Yes❑NoON/A All Reporting Non -Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a ❑Yes❑No®N/A a ®Yes❑No❑N/A Monitoring Violations9 b. Did Industry Resample and submit results to POTW Within 30 Days9 b ❑Yes❑No®N/A b ❑Yes❑No®N/A b ®Yes❑No❑N/A c. Did POTW resample within 30 days of knowledge of SIU limit c ❑Yes❑No®N/A c ❑Yes❑No®N/A c ❑Yes❑No®N/A violations from the POTW sample event? 45. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No 1 ❑ Yes ® No❑ Yes ® No 46. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑No®N/A ❑Yes❑No®N/A ®Yes❑No❑N/A as Specified in the POTW's ERP OVs, Penalties, timing, etc )9 47 Does the File Contain Penalty Assessment Notices? ❑Yes❑NoEN/A I ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A 48. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoON/A ❑Yes❑NoON/A 49. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A b. Is SIU in Compliance with Order? b ❑Yes❑No®N/A b ❑Yes❑No®N/A b ❑Yes❑No®N/A 50 Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No Requested Information For You? NC DWR Pretreatment Compliance Inspection (PCI) Form updated December 2016 Page 2 FILE REVIEW COMMENTS: 14. VT LeeBoy has been on a Consent Order since 6/7/16 to address zinc limit violations. The Consent Order is scheduled to expire on 1/1/18. 28. The SUO was adopted on 7/10/14. 34. South Fork Industries' failure to submit a renewal application within 180 days of permit expiration has been previously addressed by the POTW (NOV issuance). 35. POTW Inspections: Cataler North America -12/7/17, South Fork Industries -11/29/17, G&W Laboratories -12/1/17. 39. POTW only analyzes conventional parameters at the on-site lab during LTMP sampling events. Blue Ridge Labs (metals, cyanide, oil & grease), Prism Laboratories (conventional parameters, total phosphorus, total nitrogen), and Two Rivers Utilities Laboratory (low level mercury) are contracted to perform analyses during LTMP and/or SIU sampling events. 41a. Cataler North America, South Fork Industries, and G&W Laboratories all contract NC certified commercial labs (Blue Ridge Labs and/or Prism Laboratories) for analyses. 46. The POTW issued a NOV to G&W Laboratories for a daily maximum oil & grease limit violation (SIU sampling event) in April 2017. SUMMARY AND COMMENTS: The required IUP detection levels for copper (2 ug/L), ethyl acetate (5 ug/L), acetone (15 ug/L), and isopropyl acetate (5 ug/L) were not being met by G&W Laboratories' contracted labs (Prism and sub -contracted Analytical Environmental Services, Inc). The POTW must ensure that all required IUP detection levels are being met. The POTW pretreatment staff use a field notebook to document field measurements during SIU sampling events. The pretreatment staff must ensure that all data is complete (sampling times, units of measurement, etc.) and legible. The records reviewed during the inspection were organized and well maintained. Overall, the City's Industrial Pretreatment Program appeared to be properly implemented. NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory ® Marginal ❑ Unsatisfactory ❑ /I PCI COMPLETED BY: ��r tet" DATE: December 14, 2017 Wes Bell, Mooresville Regional Office NC DWR Pretreatment Compliance Inspection (PCI) Form t;pdated December 2016 Page 3