Loading...
HomeMy WebLinkAbout20180022 Ver 1_401 Application_20180118PAIL, OF WATEq �i y O 'c �L0�1 I AN 027018 , Office use only:" 8 l �F Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 24 1a. Type(s) of approval sought from the Corps: Section 404 Permit El Section 10 Permit 10 1b. Specify Nationwide Permit (NWP) number: 26.1 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? x Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): 19401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes 9No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑Yes �No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ®No 2. Project Information 2a. Name of project: 2 2b. County: / 2c. Nearest municipality / town: , -2e. on y, .. .ors a e proje 3. Owner Information 3a. Name(s) on Recorded Deed: �' t 2 /1e_ 3b. Deed Book and Page No. 6 0 b9 F144 11 84 G, Z gs 3c. Responsible Party (for LLC if applicable): 3d. Street address: Yl 3e. City, state, zip: /q j/pWce_ I Ive , 2700 3f. Telephone no.: -3 3 S 4 2 ZG 3g. Fax no.: 3h. Email address: Z A lkt le- 2 (% Cd 2 Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version FA 4. Applicant Information (If different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Informs ' n (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street add re : 5d. City, stat , zip: 5e. Tele'p one no.: 5f. F x no.: 5g. Email address: Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: Longitude: - ?0#4W19 (DD.DDDDDD) - (-DD.DDDDDD) 1c. Property size: acres l/ 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to + rC proposed project: 2b. Water Quality Classification of nearest receiving water: k3 S )\J1 2c. River basin: map is available at http://h2o.enr.state.nc.us/admin/maps/ ,Z � 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: II , ,P • l' 6r1 40� 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: cJ /c;P//'ne- M I <o l- 4 /1 GC Pe el,4/I 4 / 3d. Explain the purpose of the proposed project: T 3e. Describe the overall project in detail, including the type of equipment to be used: f sl��- t A e- yR4, c�{ lava �c 4 cc.�L ><e�»s, del -a 7 Z 1` a C: 1e it "C t/4; n a ee torn hit de e ry,,r 01-e�, 1 fu � / f Z 'niLrACl— (� s�'/ /,v �,/ W / I /L Flou'J J(4ot. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / XYes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: El Preliminary E] Final 4b. If the Corps made the jurisdictional determination, what type of determination was made? 4c. if yes, who delineated the jurisdic ional areas? Agency/Consultant Company: Name (if known): Other: -DLO 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for El Yes jNo E] Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes No 6b. If yes, explain. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Streams - tributaries ❑ Buffers ❑ Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T \ ❑ Ye ❑ Corps W1❑ P ❑ T o ❑ DWQ W2 ❑ P ❑ TYes El Corps ❑ DWQ o ❑ Yes El Corps W3 ❑ P ❑ T El No DWQ W4 ❑ P ❑ T ❑ Yes El No Fleorps El DV W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6❑ P ❑ El Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) ❑ ❑ Corps S1 ❑ P ❑ T INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S3 ❑ P [-]T PER ❑IMIT, El Corps E] DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ INT C311c,orps ❑ OWQ E] PER ❑Cor S6 ❑P❑T ❑ INT ❑ DWQ 3h. Total stream a d tributary Impacts 3i. Comments: Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the A tic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c' 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type f impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T , 4f. Total open water Impacts 4g. Comments: S. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b, 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Tota I 5g. Comments: ��-i , ' ' S Y1 + ( LA I 0C p,clxY) 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): W3 ac2zS 5j. Size of pond watershed (acres):l�e . 5k. Method of construction: r 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ata ba ❑ Randleman 6b. 6c. 6d. 6f. 6g. Buffer impact \ tBuffer number — Permanent Reason for Zone 1 impact Zone 2 impact (P) or Stream meation (square feet) (square feet) Temporary impact red? 131 ❑P❑T El Yes ❑ No B2 ❑P❑T El Yes No B3 ❑P❑T ❑QN No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. x" Icrj�'_� I I n Lppee- P�� an OC G�,c�n' l b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Pr ram 4a. Approval letter from in-lieu fee program is 91106hed. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, strea emperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requests -( WQ only): square feet 4e. Riparian wetland rniglftion requested: acres 4f. Non-riparian w fand mitigation requested: acres 4g. Coastal (tid I) wetland mitigation requested: acres 4h. Comments: Page 7 of 11 PCN Form —Version 1.3 December 10, 2008 Version 5. Complete if lasing a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the p posed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — r Ired by DWQ 6a. Will the project result in an impact within a protected ripan buffer that requires buffer mitigation? If you will have to fill out this e e form — l2lease contact the State for more information. El Yes ❑ No 6b. If yes, then identify the square feet of impac each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact Ad. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigption is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee re ponsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes] No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? C) % 2b. Does this project require a Stormwater Management Plan? ❑ Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DW0,8tormwater Program ❑ Q 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II El mgrams 3b. Which of the following locally-implemented stormwater mans ent pro El USMP El apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater with proof of approval been ❑ Yes ❑ No ManagementPll attached? 4. DWQ Stormwater Program Review ❑ Coastal counties [:1 HQW 4a. Which of the following state-' plemented stormwater management programs apply E]ORW (check all that apply): ElSession Law 2006-246 ❑ Other. 4b. Has the approv tormwater Management Plan with proof of approval been ❑ Yes E] No attached? 5. DWQ 401 VhIt Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form —Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the land? ❑YesNo use of public (federal/state) 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after -the -fact permit application? ❑ Yes VNO 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water ❑ YesNo quality? 3b. If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. P IJP Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? S. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? '�kpllcant/AgerlYs N Punted me a plicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 11 of 11 <j> Latitude 36.02793476 36° 1'40.56514" N ! Longitude -30,46188448 800 2742.78413" W � Altitude 203.00 meters 8 Accuracy 4.00 meters .11 Q)- Last Update Nov 17 2017 13:26:08 Google Primer x 0 Google Play NC Department of Envir•onin.ntal Quality Received prC 0 4 20i1 ' . Winston-Salem Regional Office Ringtone j1 }>-- - Ir-- 63 x MUNIT MCITY ADVANCE MSTATE NC MZI P 27006 t SITEADD 000266 RALTON EUGENE TR SADDNO SADDSTNAME SADDPREF SADDSTR SADDSTTYP SADDSTSUF �--� SUN IT SCITY SSTATE NC SZIP LEGDECFULL 14.110 ac Ralton Eugene Trail lot 2 Zoor-TI to �,.arovna vv i, csri, r:cKc _ _ s 11/13/2017 Screenshot_2017-11-01-07-35-46. png i ?map. maps.arcgis.com Parcel Centroids: WALKER STEPHEN WAYNE STNAME STFIPS CNTYNAME CNTYFIPS STCNTYFIPS GNISID PARNO NPARNO ALTPARNO PARUSECODE PARUSEDESC PARUSEDSC2 PARUSECD2 STRUCT STRUCTNO Q Zoom to https://drive.google.com/drive/u/O/my-drive NC 37 I Davie 059 37059 1,008,549 5863725463 37059_5863725463 C70000013405 r t.aroiina VVI, CSn, r-iCrCC I- .'. 3(9 Q i ?map.maps.arcgis.com Q X r� STRUCTNO 1 STRUCTYEAR 0 PARVALTYPE Assessed IMPROVVAL 3,430.00 LANDVAL 125,920.00 PARVAL 10,730.00 OWNTYPE OWNNAME WALKER STEPHEN WAYNE OWNFRST OWNLAST SUBSURFOWN SUBOWNTYPE MAILADD 287 SANDPIT ROAD MADDRNO MADDSTNAME MADDPREF h e n nnn-rn Zoom to �-aroiina uv i, csn, rlr-KC rI- hq V" W vio '30/2017 GoMaps 4.0 40m 200ft 36.029, -80.463 p://maps2.roktech.net/dav!eNC_gm4/# 266 a��oo� 0,