Loading...
HomeMy WebLinkAboutNC0004979_IMP 1st Quarter 2018 Allen Revision_20180105Water Resources Environmental Quality January 5, 2018 Paul Draovitch Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 Subject: Revised Interim Monitoring Plan for Allen Steam Station 1" Quarter 2018 Dear Mr. Draovitch: ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised Interim Monitoring Plan (IMP) for the Allen Steam Station. After submitting the revised IMPS for the 14 coal ash facilities in December 2017, the DEQ and Duke Energy had identified some errors that require submission of the revised IMP for the Allen Steam Station. This IMP, dated January 3, 2018, shall supersede the IMP dated December 20, 2017. If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444. Sincerely, S. Jay i erman, P.G. Division of Water Resources Attachments: Revised Interim Monitoring Plans for Allen Stearn Station cc: MRO - WQROS Regional Office WQROS Central File Copy r `}'"Nothing Compares'-, . State of North Carolina J Environmental Quality J Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center J Raleigh, North Carolina 27699-1636 919-707-9129 i. Revised Allen Steam Station Interim Monitoring Plan — Groundwater Only %A ells to be Sampled Sample for Radionuclides M. Regional Office Notes AB-1 OD AB-1 OS AB-11 D X AB- 12D AB-12S AB-13D X AB-13S X AB-14BR AB-14D AB-1R AB-2 AB-20D AB-20S AB-21 BRL X AB-21D Sample to be analyzed for total boron and sulfate only. AB-21 S X AB-21 SL X AB-22BRL AB-22BR AB-22D AB-22S AB-23BRU Sample to be analyzed for total boron and sulfate only. AB-23 S AB-24BR AB-24D Sample to be analyzed for total boron and sulfate only. AB-24S AB-24SL AB-25BR Sample to be analyzed for total boron and sulfate only, AB-25BRU Sample to be analyzed for total boron and sulfate only. AB-25 S X AB-25SL X AB-26D AB-26S AB-27BR AB-27D Allen Steam Station Page 1 of 5 January 3, 2018 Wells to be Sampled Sample for i Radionuclides i M Regional Office Notes AB-27S AB-28D AB-28S AB-29D AB-29S AB-29SL AB-2D AB-30D AB-30S AB-31 S AB-32D AB-32S AB-33D X AB-33S X AB-34D AB-34S AB-35BR X AB-35D Sample to be analyzed for total boron and sulfate only. AB-35S X AB-36D AB-36S AB-37D AB-37S AB-38BR AB-38D AB-38S AB-39D AB-39S AB-4BR X AB-4D X AB-4S X AB-5 AB-6A X AB-6R X AB-9D X AB-9S X BG-1DA X Note: BG-1 D has been abandoned and thus removed from the IMP. BG-1DA was installed as re lacement well. BG-1 S X Allen Steam Station Page 2 of 5 January 3, 2018 Wells to be Sampled Sample for Radionuclides X Regional Office Notes BG-2BRA-2 X Note: BG-2BR has been abandoned and thus removed from the IMP. BG-2BRA-2 was installed as replacement well. BG-2D X BG-2S X BG-3D BG-3 S BG-4BR BG-4D BG-4S GWA-14DA Note: GWA-14D has been abandoned and thus removed from the IMP. GWA-14DA was installed as replacement well. GWA-14S GWA-15D GWA-15S GWA-16D GWA-16S GWA-17D X GWA-17S X GWA-18D GWA-18S GWA-19D Sample to be analyzed for total boron and sulfate only. GWA-19S GWA-1BR X GWA-ID X GWA-IS X GWA-21BR X GWA-21DA X Note: GWA-21 D has been abandoned and thus removed from the IMP. GWA-21DA was installed as replacement well. GWA-21 S X GWA-22D GWA-22S GWA-23D Sample to be analyzed for total boron and sulfate only. GWA-23S GWA-24BR GWA-24D GWA-24SA Note: GWA-24S has been abandoned and thus removed from the IMP. GWA-24SA was installed as replacement well. Allen Steam Station Page 3 of 5 January 3, 2018 Sample for Ni ells to be Sampled 1 Radionuclides X Re;ionai Office Notes GWA-26D GWA-26S GWA-2D X GWA-2S X GWA-3BRA X Note: GWA-3BR has been abandoned and thus removed from the IMP. GWA-3BRA was installed as replacement well. GWA-3D X GWA-3S X GWA-4BRA X GWA-4BR X GWA-4D X GWA-4S X GWA-5BRA X Note: GWA-5BR has been abandoned and thus removed from the IMP. GWA-5BRA was installed as replacement well. GWA-5D X GWA-5S X GWA-6BRA X Note: GWA-6BR has been abandoned and thus removed from the IMP. GWA-6BRA was installed as replacement well. GWA-6DA X GWA-6S X GWA-7D X GWA-7S X GWA-8D GWA-8S GWA-9D X GWA-9S X GWA-9BR X Allen Steam Station Page 4 of 5 January 3, 2018 Minimum Parameters to be Analyzed Aluminum Boron Copper Mercury Selenium Thallium Alkalinity Cadmium Hexavalent Molybdenum Sodium Total Organic Chromium Carbon Total Antimony Calcium Iron Nickel Strontium Combined Uranium Total Arsenic Chloride Lead Potassium Sulfate Suspended Solids Barium Chromium Magnesium Radium 226 Sulfide Vanadium Total Beryllium Cobalt Manganese Radium 228 Dissolved Zinc Solids Allen Steam Station Page 5 of 5 January 3, 2018