HomeMy WebLinkAboutNC0004979_IMP 1st Quarter 2018 Allen Revision_20180105Water Resources
Environmental Quality
January 5, 2018
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
Subject: Revised Interim Monitoring Plan for Allen Steam Station
1" Quarter 2018
Dear Mr. Draovitch:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised
Interim Monitoring Plan (IMP) for the Allen Steam Station. After submitting the revised IMPS
for the 14 coal ash facilities in December 2017, the DEQ and Duke Energy had identified some
errors that require submission of the revised IMP for the Allen Steam Station. This IMP, dated
January 3, 2018, shall supersede the IMP dated December 20, 2017.
If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444.
Sincerely,
S. Jay i erman, P.G.
Division of Water Resources
Attachments: Revised Interim Monitoring Plans for Allen Stearn Station
cc: MRO - WQROS Regional Office
WQROS Central File Copy
r `}'"Nothing Compares'-, .
State of North Carolina J Environmental Quality J Division of Water Resources
Water Quality Regional Operations Section
1636 Mail Service Center J Raleigh, North Carolina 27699-1636
919-707-9129
i.
Revised Allen Steam Station Interim Monitoring Plan — Groundwater Only
%A ells to be Sampled
Sample for
Radionuclides
M.
Regional Office Notes
AB-1 OD
AB-1 OS
AB-11 D
X
AB- 12D
AB-12S
AB-13D
X
AB-13S
X
AB-14BR
AB-14D
AB-1R
AB-2
AB-20D
AB-20S
AB-21 BRL
X
AB-21D
Sample to be analyzed for total boron and sulfate
only.
AB-21 S
X
AB-21 SL
X
AB-22BRL
AB-22BR
AB-22D
AB-22S
AB-23BRU
Sample to be analyzed for total boron and sulfate
only.
AB-23 S
AB-24BR
AB-24D
Sample to be analyzed for total boron and sulfate
only.
AB-24S
AB-24SL
AB-25BR
Sample to be analyzed for total boron and sulfate
only,
AB-25BRU
Sample to be analyzed for total boron and sulfate
only.
AB-25 S
X
AB-25SL
X
AB-26D
AB-26S
AB-27BR
AB-27D
Allen Steam Station Page 1 of 5 January 3, 2018
Wells to be Sampled
Sample for
i Radionuclides
i M
Regional Office Notes
AB-27S
AB-28D
AB-28S
AB-29D
AB-29S
AB-29SL
AB-2D
AB-30D
AB-30S
AB-31 S
AB-32D
AB-32S
AB-33D
X
AB-33S
X
AB-34D
AB-34S
AB-35BR
X
AB-35D
Sample to be analyzed for total boron and sulfate
only.
AB-35S
X
AB-36D
AB-36S
AB-37D
AB-37S
AB-38BR
AB-38D
AB-38S
AB-39D
AB-39S
AB-4BR
X
AB-4D
X
AB-4S
X
AB-5
AB-6A
X
AB-6R
X
AB-9D
X
AB-9S
X
BG-1DA
X
Note: BG-1 D has been abandoned and thus
removed from the IMP. BG-1DA was installed as
re lacement well.
BG-1 S
X
Allen Steam Station Page 2 of 5 January 3, 2018
Wells to be Sampled
Sample for
Radionuclides
X
Regional Office Notes
BG-2BRA-2
X
Note: BG-2BR has been abandoned and thus
removed from the IMP. BG-2BRA-2 was installed
as replacement well.
BG-2D
X
BG-2S
X
BG-3D
BG-3 S
BG-4BR
BG-4D
BG-4S
GWA-14DA
Note: GWA-14D has been abandoned and thus
removed from the IMP. GWA-14DA was installed
as replacement well.
GWA-14S
GWA-15D
GWA-15S
GWA-16D
GWA-16S
GWA-17D
X
GWA-17S
X
GWA-18D
GWA-18S
GWA-19D
Sample to be analyzed for total boron and sulfate
only.
GWA-19S
GWA-1BR
X
GWA-ID
X
GWA-IS
X
GWA-21BR
X
GWA-21DA
X
Note: GWA-21 D has been abandoned and thus
removed from the IMP. GWA-21DA was installed
as replacement well.
GWA-21 S
X
GWA-22D
GWA-22S
GWA-23D
Sample to be analyzed for total boron and sulfate
only.
GWA-23S
GWA-24BR
GWA-24D
GWA-24SA
Note: GWA-24S has been abandoned and thus
removed from the IMP. GWA-24SA was installed
as replacement well.
Allen Steam Station Page 3 of 5 January 3, 2018
Sample for
Ni ells to be Sampled 1 Radionuclides
X
Re;ionai Office Notes
GWA-26D
GWA-26S
GWA-2D
X
GWA-2S
X
GWA-3BRA
X
Note: GWA-3BR has been abandoned and thus
removed from the IMP. GWA-3BRA was installed
as replacement well.
GWA-3D
X
GWA-3S
X
GWA-4BRA
X
GWA-4BR
X
GWA-4D
X
GWA-4S
X
GWA-5BRA
X
Note: GWA-5BR has been abandoned and thus
removed from the IMP. GWA-5BRA was installed
as replacement well.
GWA-5D
X
GWA-5S
X
GWA-6BRA
X
Note: GWA-6BR has been abandoned and thus
removed from the IMP. GWA-6BRA was installed
as replacement well.
GWA-6DA
X
GWA-6S
X
GWA-7D
X
GWA-7S
X
GWA-8D
GWA-8S
GWA-9D
X
GWA-9S
X
GWA-9BR
X
Allen Steam Station Page 4 of 5 January 3, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Allen Steam Station Page 5 of 5 January 3, 2018