Loading...
HomeMy WebLinkAbout20150636 Ver 1_MonitoringBondingAmounts_20180102Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 1/2/2018 8:36:46 PM (Message Start Event) Approve by Montalvo, Sheri A 1/3/2018 7:54:48 AM (Initial Review- Sheri Montalvo) • The task was assigned to Montalvo, Sheri A 1/2/2018 8:36 PM D# * 20150636 Version* 1 Select Reviewer:* Katie Merritt Mitigation Project Submittal -1/2/2018 Type of Mitigation Project:* F Stream r Wetlands fJ Buffer rJ Nutrient Offset (Select all that apply) Is this a Prospectus or Technical Proposal?* a Yes a No Project Contact Information Contact Name:* Mike Herrmann Email Address:* mherrmann@watershedinvestmentsnc.net Project Information Existing (DWR) ID#:* 20150636 (nurrbers only... no dash) Existing Version:* 1 (nunbers only) Project Name:* Neville Farms Phase1 and Phase 2 County:* Orange Document Information Mitigation Document Type:* Mitigation Information File Upload: Neville Mon itoring_Bond ingAmounts. pdf 791.77KB Rease upload only one RDF of the conplete file that needs to be subnitted... Signature Print Name:* Michael Herrmann Signature:* January 2, 2018 Katie Merritt Nutrient Offset & Buffer Banking Coordinator NCDENR-Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Neville Farms – Monitoring Cost Assessment and Bond Amount Recommendations (DWR# 2015- 0636) Dear Ms. Merritt: I am providing additional information requested by the Division related to the monitoring bond amount required for the subject project. On 12/21/2017, you requested Watershed Investments NC, LLC provide the following for DWR review: “an itemized list of all of the fees/costs that incurred for your Year 1 monitoring and maintenance”. This information, in turn, would be reviewed along with remaining projected costs in consideration of the Year 2 and future years annual monitoring bond amount as allowed per the MBI. Four attachments are provided in response to the Division request detailing monitoring and maintenance: 1. Attachment 1. Projected vs. Actual Year 1 costs 2. Attachment 2. Revised Neville Phases 1 & 2 Monitoring & Maintenance Costs Projections Years 2-5. 3. Attachment 3. Original As-built Monitoring and Maintenance Cost Projections 4. Attachment 4. DWR Monitoring cost template The following are some findings from cost analysis.  The majority of monitoring costs are born the first year of the project.  Remaining estimated monitoring and maintenance costs are estimated to be $27,500 Total  NC DWR guidance requires the monitoring bond be at $25,000 Based on these findings, I propose that the monitoring bond be reduced annually in years 2-5 by 25% of $19,000, or $4,750 per year. $19,000 is the difference between the original bond amount ($44,000) and minimum monitoring bond requirement ($25,000). Table 1 details a proposed schedule that, if approved by the Division, shows how the bond could be reduced with completion of monitoring tasks/milestones: Table 1. Proposed Monitoring Bond Amount Schedule. Monitoring Year % reduction Reduction Amount ($) Bond Amount ($) 1 n/a n/a $44,000 2 25% $4,750 $39,250 3 25% $4,750 $34,500 4 25% $4,750 $29,750 5 25% $4,750 $25,000 Minimum Required Monitoring Bond $25,000 1630 Weatherford Circle, Raleigh NC 27604 | Tel : 919-533-9195 | www.watershedinvestmentsnc.net Please let me know if the Table 1 bonding amount schedule is suitable to the Division. If you need to discuss the project, please contact me at mherrmann@watershedinvestmentsnc.net (email) or 919-559-6264(phone). Sincerely, Mike Herrmann Attachment 1. As-Built vs. Actual Year 1 Costs Monitoring Tasks Actual Quantity Measure Actual Cost (per Unit) Consultant Fees Actual Cost As-Built Cost Vegetation Plot Data Collection 7 Plots * Yr $250 $7,000 $8,750 $8,800 Data Analysis 1 Years $1,200 $1,200 $800 Report Documentation 1 Annual Reports $2,000 $2,100 $600 Total $12,050 $10,200 Maintenance & Adaptive Management Tasks (if needed) Herbicide / Vegetation Control 3 Treatments $1,100 $3,300 $5,250 Herbivory Control 0 Controls $1,000 $0 0 Replanting 0 Supplemental Planting $3,000 $0 0 Total $3,300 $5,250 Stewardship Inspections 4 Visits $300 $1,200 600 Monitoring and Maintenance Costs Total $16,550 $16,050 Attachment 2. Remaining Neville Phases 1 & 2 Monitoring & Maintenance Costs Projections Years 2- 5. Years 2-5 Monitoring Tasks Vegetation Plot Data Collection 7plts * 4 yrs Plots*Yrs $250 0 $7,000 Data Analysis 4 Years $800 $3,200 Report Documentation 4 Annual Reports $1,625 $6,500 Monitoring Total $16,700 Years 2 - 5 Maintenance & Adaptive Management Tasks (if needed) Herbicide / Vegetation Control 2 Treatment $1,100 $2,200 Herbivory Control 2 Controls $1,000 $2,000 Replanting 1 Supplemental Planting $3,000 $3,000 Years 2-5 Maintenance/Management Total $7,200 Stewardship Inspections 12 Visits $300 $3,600 Years 2-5 Monitoring and Maintenance Costs Total $27,500 Attachment 3. Original As-Built Projected Neville Phases 1 & 2 Monitoring & Maintenance Costs (All Years). Monitoring Tasks Quantity Measure Cost (per Unit) Consultant Fees As-Built Total Cost Vegetation Plot Data Collection 6pl / 5yrs Plots/Year $300 $7,000 $16,000 Data Analysis 5 Years $800 $4,000 Report Documentation 5 Annual Reports $600 $9,000 Total $29,000 Maintenance & Adaptive Management Tasks (if needed) Herbicide / Vegetation Control 4 Treatments $1,750 $7,000 Herbivory Control 2 Controls $1,000 $2,000 Replanting 1 Supplemental Planting $3,000 $3,000 Total $12,000 Stewardship Inspections 10 Visits $300 $3,000 Monitoring and Maintenance Costs Total $44,000 Attachment 4. . DWR Monitoring cost template