Loading...
HomeMy WebLinkAbout20180007 Ver 1_PCN Form Submission_20180102Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 12/22/2017 3:28:16 PM (Start Event) Accept by Carpenter,Kristi 1/2/2018 4:00:51 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: December 27, 2017 5:00 PM 12/22/2017 3:28 PM E-PCN Submittal ��� �lulslaa af Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 15, 2017 Ver 2.2 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx A. Processing Information County(or Counties) where the project is located:* Rowan Is this project a public transportation project? *(') C�' Yes C' No Is this a NCDOT Project?* r Yes C' No (NCDOT only) T.I.P. or state project number: I-3804 WBS # 38708.1.1 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* r Nationwide Permit (NWP) r% Regional General Permit (RGP) Regional General Permit (RGP) Number: 198200031 - NCDOT Bridges, Widening Projects 2015 RGP Number Other: List all RGP nurrbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply ri 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: �' Yes C•' No C' Yes �' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C� Yes l" No Acceptance Letter Attachment Gick the upload button or drag and drop files here to attach docurrent I-85 - SR 1221 Interchange - Division 9- STR - YD 105.pdf 63.68KB FlLE TYFE MJST BE FflF 1f. Is the project located in anyof NC's twentycoastal counties?* C' Yes �' No 1h. Is the project located in a designated trout watershed?* C' Yes C' No Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Amy Euliss - NCDOT Division 9 Environmental Officer 1b. Primary Contact Email:* aeuliss@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (336)747-7800 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: Not applicable 2c. Responsible party: (for Corporations) Not applicable 2d.Address Street Address 375 Silas Creek Parkway Address Line 2 Qty Winston-Salem Fbstal / Zip Code 27127 2e. Telephone Number: (xxx)xxx-xxxx (336)747-7800 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* aeuliss@ncdot.gov State / R-ovince / I�gion NC Country US C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* New Interchange at Interstate 85 (I-85) and SR 1221 (Old Beatty Ford Road Relocation) 1b. Subdivision name: (if appropriate) Not applicable 1c. Nearest municipality/town:* Kannapolis / China Grove 1d. Driving directions* I If it is a new project and can not easily be found in a C�S rrapping system Rease provide directions. The new interchange is located on e�sting I-85 between e�ts 63 and 68 at the location of Old Beatty Ford Relocation (W-5516). 35°32'07.0"N 80°34'26.1 "W 35.535274.-80.573926 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) Not applicable 2b. Propertysize: (in acres) 20 acres 2c. Project Address Street Address Not appicable - New interchange at the Old Beatty Ford Road Relocation. Address Line 2 Not applicable C1ty State / Rovince / f�gion China Grove NC Fbstal / Zip Code 28023 2d. Site coordinates in decimal degrees Country US Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.532093 -80.573776 ex:34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Cold Water Creek 3b. Water Resources Classification of nearest receiving water:* WS-IV for Cold Water Creek Surface Water Lookup 3c. What river basin(s) is your project located in?* Yadkin-PeeDee RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use within the project vicinity consists mainly of forested, agricultural, and low density residential areas. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent I-3804 CE topo.pdf 1.79MB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent I-3804 CE soils.pdf 302.05KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: Less than 10 acres 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) Approximately 10,500 linear feet 4f. Explain the purpose of the proposed project:* The primary purpose of the proposed project is to improve system connectivity to employment centers and access to planned developments in southern Rowan County. The project is needed to support economic prosperity across southern Rowan County, improve access to I-85 for regional, statewide and national markets, and to support long-range planning and land use initiatives. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* The North Carolina Department of Transportation (NCDOT) proposes to provide a new interchange at I-85 and SR 1221 (Old Beatty Ford Road relocation) in Rowan County (see Figure 1). The project is included in the NCDOT 2016-2025 State Transportation Improvement Program (STIP) as Project No. I-3804. The proposed project v�rould convert the I-85 crossing of the Old Beatty Ford Road relocation project, currently under construction as STIP W- 5516, from a grade separation to an interchange. Standard road building equipment will be used. In addition, a roundabout will be added at the intersection of Old Beatty Ford Road relocation and China Grove Road v�st of the new interchange. 4h. Please upload project drawings for the proposed project. Gick the upload button or drag and drop files here to attach docurrent 13804_HYD_PRM_SET.pdf 6.17M6 Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C' Yes C' No f" Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C•' Preliminary C' Approved C' Unknown C' fWA Corps AID Number: 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Mark Mickley Mulkey (now Caylx) HDR reverified 2017 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. The jurisdictional determination was completed for the I-3802B project on 6/23/2014. The impacts for this project are located within the area covered by that jurisdictional determination. Sd1. Jurisdictional determination upload qick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C•' No c' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands �J Streams-tributaries r Buffers � Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites I impacted. 3a. Site #- Reason for 3b.lmpact 3c. Type of impact* 3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact impact* type* Type* Jurisdiction* width* length* 1 P Bank Stabilization Cold Water Creek Perennial Corps 25 10 N�p label (e.g. f3�ad Q'ossing 1) F2rrrenent (P'j or (SJ) F�rennial (FH�) or Average (feet) (linear feet) Terrporary (� interrrdtent (If� 1 T Bank Stabilization Cold Water Creek Perennial Corps 25 10 N�p label (e.g. Id�ad Qossing 1) F�rrranent (P� or (SJ) F�rennial (�2) or Average (feet) (linearfeet) Terrporary (� interrrittent (IfVn 2 P Bank Stabilization Cold Water Creek Perennial Corps 25 43 N�p label (e.g. Fd�ad Qassing 1) F2rrranent (Fj or (SJ) F�rennial (F�Z) or Average (feet) (linear feet) Terrporary (� interrrittent (IfV� 2 T Bank Stabilization Cold Water Creek Perennial Corps 25 40 N�p label (e.g. I�ad CYossing 1) F2rrrenent (�j or (SJ) F�rennial (�) or Average (feet) (linear feet) Terrporary (� interrrdtent (If� 3 P Fill Cold Water Creek Perennial Corps 25 303 N�p label (e.g. I�ad Qossing 1) F�rrranent (� or (SJ) F�rennial (�) or Average (feet) (linearfeet) Terrporary (� interrrittent (IfVn 3 T Fill Cold Water Creek Perennial Corps 25 20 N�p label (e.g. Road Qassing 1) F2rrranent (Fj or (SJ) F�rennial (F�2) or Average (feet) (linear feet) Terrporary (� interrrittent (IfV� 4 P Fill UTto Cold Water Perennial Corps 10 56 N�p label (e.g. Finad Q'ossing 1) F2rrrenent (Pj or CPee k(SJB) F2rennial (FH�) or Average (feet) (linear feet) Terrporary (� interrrittent (If� 4 T Fill UTto Cold Water Perennial Corps 10 10 N�p label (e.g. f�ad Qossing 1) F�rrranent (Fj or Creek (SJB) F�rennial (�) or Average (feet) (linearfeet) Terrporary (� interrrittent (IfVn 5 P Bank Stabilization Cold Water Creek Perennial Corps 25 20 N�p label (e.g. F�ad Qassing 1) F2rrranent (Fj or (SJ) F�rennial (F�2) or Average (feet) (linear feet) Terrporary (� interrrittent (IfV� 5 T Bank Stabilization Cold Water Creek Perennial Corps 25 10 fv�ip label (e.g. R�ad Qossing 1) F2rrranent (Pj or (SJ) F2rennial (Fffl) or Average (feet) (linearfeet) Terrporary (� interrrittent (If� "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 432 3i. Total temporary stream impacts: 90 3i. Total stream and tributary impacts: 522 3j. Comments: Permanent Fill Impacts - 359 linear feet Temporary Fill Impact - 30 linear feet Permanent Bank Stabilization Impacts - 73 linear feet Temporary Bank Stabilization Impacts - 60 linear feet E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Two Build Alternatives were evaluated. Alternative A(Preferred) is a partial cloverleaf configuration with ramps and loops in the northwest and southeast quadrants of the interchange. Alternative A has less stream impacts and acquires less land from fewer properties than Alternative B. Alternative B is a half cloverleaf configuration with ramps and loops in the southwest and southeast quadrants of the interchange. Alternative B has more stream impacts, a culvert, and acquires more right of way than Alternative A. Alternative B also would moderately affect active farming operations. Urban discharge equations were used to accommodate future growth in the area. Bank stabilization has been proposed in areas to minimize future scour and sedimentation. Wetland WAQ was avoided and a note place on the plans indicating no disturbance to this wetland . Permit Impact Sites 1, 2, and 5 include bank stabilization impacts along Cold Water Creek. A bridge will span Cold Water Creek at Sta. 15+24 near Permit Site 2. Permit Site 3 is installation of a triple 12x12-foot reinforced concrete box culvert (RCBC) on Cold Water Creek. The RCBC will have a 2-foot sill in the left barrel of the culvert and the center and right barrels will have 1-foot sills. Native bed material shall be placed between the sills in the lowflowculvert. Native materials consists of material that is excavated from the stream bed or floodplain at the project site during culvert construction. Rip rap may be used to supplement the native material. If rip rap is used, native material should be placed on top to facilitate animal passage. The top surface of the natural stream bed material shall be placed and leveled to a flat surface to allowfor animal passage. The high flowbarrels shall be back filled with native material and/or rip rap. Native material and rip rap are subject to approval by the engineer and may be subject to permit conditions. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* NCDOT Best Management Practices for Construction and Maintenance Activities and Best Management Practices for the Protection of Surface Waters will be employed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C� Yes C' No 2c. If yes, mitigation is required by (check all that apply): � DWR �J Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank N7 Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. �J Yes 4b. Stream mitigation requested: (linear feet) 359' at 2:1 ratio i 4c. If using stream mitigation, what is the stream temperature: warm 4d. Buffer mitigation requested (DWR only): (squarefeet) 0 4e. Riparian wetland mitigation requested: (acres) 0 4f. Non-riparian wetland mitigation requested: (acres) 0 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 4h. Comments See attached DMS Letter 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. C' Yes C•' No F. Stormwater Management and Diffuse Flow Plan (required by DWR) "` Recent changes to the stormwater rules have required updates to this section ."* I 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes �' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: I The project is not located within a buffered basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C� Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* �' Yes c' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C� Yes C' No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPAor SEPAfinal approval letter.)* �' Yes l" No NEPAor SEPAFinal Approval Letter C7ick the upload button or drag and drop files here to attach docurrent I-3804 CE signature and commitments.pdf 502.07KB FlLE TYFE MJST BE FflF 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. The following is the Cumulative Effects Statement from the Categorical Exclusion (April 2017): Qualitative analyses of the probable development patterns in the FLUSA, based on the information and data available at the time of this report, suggest that future development resulting from STIP I-3804 would have a minimal effect on the watershed. It is anticipated that the project would not notably contribute to cumulative impacts to environmental resources in the FLUSA. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes C' No r f�/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C� Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* G Yes C' No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville Sd. Is another Federal agency involved?* C' Yes �' No 5e. Is this a DOT project located within Division's 1-8?* C' Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* �' Yes �' No Sg. Does this project involve bridge maintenance or removal?* C' Yes C' No C' Unknown Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?"* C' Yes G No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* C' Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* The USFWS county list and NCNHP database were consulted for Rowan County. Schweinitz's sunflower, northern long-eared bat (NLEB), and the bald eagle are federally protected species noted for the county. A No Effect Biological Conclusion was rendered for the Schweinit�s sunflower. The last survey for Schweinitz's sunflower was on October 18, 2016. The Biological Conclusion for the NLEB is May Affect. NCDOT has determined that the proposed action does not require separate consultation on the grounds that the proposed action is consistent with the final Section 4(d) rule, codified at 50 C.F.R. § 17.40(0) and effective February 16, 2016. NCDOT may presume its determination is informed by best available information and consider Section 7 responsibilities fulfilled for NLEB. It has been determined that this project would not affect the bald eagle species due to the lack of habitat, the lack of known occurrences, and based on completed past surveys as detailed in the November 2016. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * NEPA Categorical Exclusion Documentation approved April 2017. 7c. Historic or Prehistoric Information Upload aick the upload button or drag and drop files here to attach docurrent I-3804 CE historic_cultural.pdf I-3804_Cover Letter_12_20_2017.doc.pdf Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C•' Yes C' No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination?* FEMA Maps 6.64M6 140.7K6 Miscellaneous Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent 790000 2017 13802B COLD WATER CREEK I-85SB EXIT RAMP Y115RPA.PDF 1.61 MB Fle rrust be FDF Signature rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Amy Euliss Signature �fr�[j.rl./r.ctr� Date : current_date Initial Review Is this project a public transportation project? *(?) C� Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* 20180007 Version#* 1 Reviewing Office* Winston-Salem Regional Office - (336) 776-9800 Select Project Reviewer* I Dave Wanucha:eads\djwanucha Is a payment required for this project?* C� No payment required f Fee received C' Fee needed - send electronic notification