Loading...
HomeMy WebLinkAbout20171645 Ver 1_Complete PCN Application_20171221a`'pF wArE�Q� C, vlllt:� Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes NX No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. N Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. N Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑ No 2. Project Information 2a. Name of project: Millbrook Exchange Park (MXP) Stream Restoration 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Raleigh 3b. Deed Book and Page No. 002017, 00479 3c. Responsible Party (for LLC if applicable): 3d. Street address: 1905 Spring Forest Rd 3e. City, state, zip: Raleigh, NC 27615 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: CoR Project Manager 4b. Name: Lory Willard 4c. Business name (if applicable): City of Raleigh 4d. Street address: 127 West Hargett Street 4e. City, state, zip: Raleigh, NC 27601 4f. Telephone no.: (o) 919-996-4012; (m) 919-307-6572 4g. Fax no.: 4h. Email address: Lory.Willard@raleighnc.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Jonathan Page 5b. Business name (if applicable): North Carolina State Universiy 5c. Street address: Campus Box 7625 5d. City, state, zip: Raleigh, NC 27695 5e. Telephone no.: (o) 919-515-8595; (m) 843-384-7799 5f. Fax no.: 5g. Email address: jlpage3@ncsu.edu Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1717722022 1 b. Site coordinates (in decimal degrees): Latitude: 35.870935 Longitude: -78.606675 1 c. Property size: 48.36 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Perry Creek 2b. Water Quality Classification of nearest receiving water: B; NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The proposed project reach of UT Perry Creek (871 LF) is located within Millbrook Exchange Park (owned by the City of Raleigh). The proposed project lies within the extents of an old impoundment created by an earthen dam. The dam was breached in the 1980s. UT Perry Creek drains a very urban catchment and has incised through the legacy sediment that settled behind old dam. The existing channel is actively incising and eroding banks. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,200 3d. The Explain the purpose of the proposed project: purpose of the proposed project is to restore the stream using grade controls to arrest the active incision and bank erosion with the project reach. 3e. Describe the overall project in detail, including the type of equipment to be used: Excavators will install grade controls constructed of large rock and boulders within the channel (similar to cross -vanes). See attached project narrative. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases in the past? ❑ Yes X❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Stabilization UT Perry Creek INT DWQ 10 871 S2 - Choose one S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 871 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 T Construction access path. UT Perry Creek No 21,400 0 B2 P Greenway. UT Perry Creek No 0 495 B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 21,400 495 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The restoration effort has been limited to the most degraded reach of UT Perry Creek. The proposed project is confined to the existing channel, which minimizes disturbance to the site and existing riparian vegetation. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction activities will be confined to the LOD shown on the project plans, which is only on the North side of the existing channel. Construction equipment will use this area to build the proposed structures and move all construction materials need to repair the stream. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Stream restoration activities will not change existing grading adjacent to the channel. All proposed work ❑ Yes ❑X No will take place within the existing channel onsite. After construction is finished all disturbed vegetation will be replanted with an aggressive re -vegetation plan. See attached project plans. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Stream restoration / enhancement. The LOD is only 0.6 acres and all major work will be contained within the existing channel. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: N/A 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? NA ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑X Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Stream rehabilitation and repair site is located within an existing park owned by the City of Raleigh. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NOAA Habitat Conservation Mapper 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAH Habitat Conservation Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Wake County Records and City of Raleigh Surveyor. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Maps Lory Willard 12-09-2017 Applicant/Agent's Printed Name Date V Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 NC STATE UNIVERSITY PCN Project Narrative: Millbrook Exchange Park Project Narrative - UT Perry Creek The site of the proposed project is approximately 1,000 LF reach of channel that is an unnamed tributary (UT) to Perry Creek that passes through City of Raleigh's Millbrook Exchange Park (1905 Spring Forest Rd, Raleigh, NC 27615; N 35o 52' 14.8" W 78o 36'24.0"). Most of the proposed project is located within the former extents of an impoundment created by an earthen dam near the park boundary. The dam was breached in the 1980s. This reach receives stormwater runoff from a 180 -acre, 85% -developed drainage area that includes most of the park (see table below). Development in the drainage area has caused increased storm flows (in both magnitude and duration) and shear stress applied to the channel bed and banks. As a result, the channel has dramatically incised through legacy sediment that accumulated in the former impoundment, exporting large quantities of sediment from the bed and banks. On average, the channel bed is incised 5 to 6 feet below its probable predevelopment level. Along approximately 150 LF of this reach, the channel has incised up to 12 feet. This channel conveys a substantial amount of sand and fine gravels from upland urban developed land and from upstream bed and bank erosion. Preliminary estimates of sediment -transport rates from upland, upstream, and within the project reach range from 700 to 1,300 tons per year. UT Perry Creek Site and Watershed Summary River Basin Neuse River Sub -watershed Perry Creek Impairments (Perry Creek) 303(d) and TMDL (2010*) Drainage Area 180 acres (0.28 miz) Total Developed Area 153 acres (85%) Impervious Area 40 acres (22%) *Benthic macroinvertebrate community bioclassification The City of Raleigh and NCSU BAE was awarded an Innovative Stormwater Grant through Clean Water Management Trust Fund (CWMTF) to install a series of grade control structures to repair and rehabilitate UT Perry Creek (see attached proposal and award letter). By installing a series of rock and boulder grade control structures (see attached project plans), the proposed project is expected to reduce the export of channel sediment and nutrients to downstream reaches and surface waters, build a new stream bed with watershed -supplied and upstream channel -supplied sediment, and connect the channel to its floodplain. These grade control structures will cause stream flow to deepen and slow upstream of each weir, and sediment entrained in the stormflow will settle and accumulate behind the weirs. The stream bed will gradually aggrade with watershed- and channel -supplied material, eventually reconnecting the bed and banks to the floodplain. The grade controls structures will function similarly to boulder cross -vanes, but will be more weir -like, somewhat taller and more elliptical in shape than typical cross -vanes used in stream restoration projects. To install the structures, excavators will be used to place the Millbrook Exchange Park PCN Project Narrative UT Perry Creek December 9, 2017 1 NC STATE UNIVERSITY rock and boulders within the channel to the proposed elevations shown on the project plans. Track trucks and skidsteer loaders will also be used onsite to move construction materials support the effort of the excavators placing the boulders in the channel. All construction activities will be within the Limits of Disturbance (LOD) shown on the project plans. After construction of the structures, and aggressive revegetation plan will be implemented to re- establish the riparian vegetation disturbed during construction. The proposed project will be monitored and evaluated on several levels after implementation. First, a site inventory and assessment will be conducted. This will include a vegetation, topographic and geomorphic survey. Suspended sediment load will also be measured at the site by installing a monitoring station to collect suspended sediment and turbidity samples and measure flow at the upstream and downstream limits of the proposed project. The upstream station will characterize upland and upstream TSS concentrations and loads, while the downstream station will help characterize TSS concentrations and loads through the highly incised and unstable bed and banks for the project reach. The sediment load data will be used inform design decisions. Particle size analysis of the sediment samples will also be conducted to determine the fractions of sand, silt and clay entrained in the flow. After implementation of the project, the site will be surveyed once a month for two years with a total station to document and measure sediment aggradation rates to evaluate the effectiveness of the project to build up a new channel bed. Upstream and downstream TSS and turbidity monitoring will continue to further support the evaluation of the effectiveness of the project. Millbrook Exchange Park PCN Project Narrative UT Perry Creek December 9, 2017 2 BASIS FOR DESIGN REPORT: Millbrook Exchange Park Innovative Grade Controls Prepared by: 11TEMEME, ON Jonathan Page, PE Biia&Ag North Carolina State University E N G I N E A I N Biological and Agricultural Eng. (919) 515-8595 Jlpage3@ncsu.edu Barbara Doll, Phd, PE North Carolina State University Sealmut North Carolina Sea Grant North Carolina (919) 515-5287 bdoll@ncsu.edu Prepared for: Kevin Boyer 'cx x3 -' City of Raleigh - Water Quality Manager (919) 996-3940 Kevin.Boyer@raleighncgov@raleighnc.gov Lory Willard City of Raleigh - Project Manager (919) 996-4012 Lory.Willard@ralei NC STATE UNIVERSITY 1.0 Project Description The site of the proposed project is 871 LF reach of unnamed tributary (UT) to Perry Creek that passes through City of Raleigh's Millbrook Exchange Park (1905 Spring Forest Rd, Raleigh, NC 27615; N 35o 52' 14.8" W 78o 36'24.0"). Most of the proposed project is located within the former extents of an impoundment created by an earthen dam near the park boundary. The dam was breached in the 1980s. This reach receives stormwater runoff from a 122 -acre, 91% -developed drainage area (Table 1). Development in the drainage area has caused increased storm flows (in both magnitude and duration) and shear stress applied to the channel bed and banks. As a result, the channel has dramatically incised through legacy sediment that accumulated in the former impoundment, exporting large quantities of sediment from the bed and banks. On average, the channel bed is incised 5 to 6 feet below its probable predevelopment elevation. Along approximately 150 LF of this reach, the channel has incised up to 12 feet. This channel conveys a substantial amount of sand and fine gravels from upstream bed and bank erosion. Table 1: UT Perry Creek Site and Watershed Summary River Basin Neuse River Sub -watershed Perry Creek Impairments (Perry Creek) 303(d) and TMDL (20101) Drainage Areae 122 acres (0.19 miz) Total Developed Areaz 111 acres (91%) Impervious Areaz 13 acres (11%) 'Benthic macroin vertebrate community bioclassification 2USGS StreamStats - See attached documentation The City of Raleigh was awarded an Innovative Stormwater Grant through Clean Water Management Trust Fund (CWMTF) to repair the stream by installing a series of grade control structures to stabilize the system, hold grade and raise the bed of UT Perry Creek. By installing a series of rock and boulder grade control structures the proposed project is expected to reduce the export of channel sediment and nutrients to downstream reaches and surface waters, build a new stream bed with watershed -supplied and upstream channel -supplied sediment, and enhance biochemical processes in the riparian zone. The proposed grade control structures is expected to accelerate aggradation processes by causing stream flow to deepen and slow upstream of each structure, and sediment entrained in the stormflow will settle and accumulate behind the structure. 2.0 Project Goals and Objectives 1. Conduct an existing conditions assessment of site constraints, hydrology, hydraulics, sediment transport and geomorphology. Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 1 NC STATE UNIVERSITY 2. Develop a grade control structure design that will stabilize active streambed and bank erosion, control grade, dissipate energy, trap sand and fine gravels, and gradually rebuild the channel bed through aggradation upstream of the structure. Conduct a detailed hydraulic and sediment transport analysis of the proposed grade control structures and channel design. 4. Prepare a proposed engineering design and set of plansheets for environmental permitting, cost estimating and implementation. 3.0 Grade Control Structure Design The proposed structures for UT Perry Creek are designed to stabilize active streambed and bank erosion, control grade, dissipate energy, trap sand and fine gravels, and gradually rebuild the channel bed through aggradation upstream of the structure. To do this, a hybrid structure design was developed using components of structures used for erosion and sediment control and typical cross -vane structures used in stream restoration. The proposed structure is modeled after a NC DOT Temporary Rock Silt Check - Type A and an arched cross -vane (Figure 1). Because UT Perry Creek is highly incised, a rock foundation or base will be installed and boulders will be set on the base at the proposed channel elevations. The base will be constructed of 40% NC DOT Class A, 40% NC DOT Class B and 20% ASTM #57 using 2:1 side slopes from the existing channel bed up to the elevation that boulders will be installed. Footer and header boulders (4.0 ft x 3.0 ft x 2.0 ft +/- 0.5 ft) will be installed on top of the rock base in an arched shape and keyed into the existing stream bank. A layer of filter stone (50% ASTM #57, 50% ASTM #78) 0.5 ft thick will then be placed on the upstream side of the structure base. A summary of proposed structure elevations and dimensions is included in Table 1. A detailed drawing of the proposed structure is included in the project plans. Figure 1: NC DOT Rock Silt Check (left) and arched cross -vane (right) Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 2 NC STATE UNIVERSITY Table 2: Summary of proposed structure design parameters. STR STA (FT) INV. ELV. (FT) A ELV. (FT) WSTR (FT) XSTR (FT) HBASE (FT) LEASE (FT) 1 2+47 332.03 1.0 13.5 8.1 4.0 20.0 2 3+19 331.03 1.0 13.0 7.8 4.0 20.0 3 3+92 330.03 1.0 15.5 9.3 3.0 16.0 4 4+65 329.03 1.0 18.0 10.8 1.5 10.0 5 5+37 328.03 1.0 13.0 7.8 2.3 13.2 6 6+10 327.03 1.0 12.0 7.2 1.5 10.0 7 6+82 326.03 1.0 16.5 9.9 1.0 8.0 8 7+55 325.03 1.0 14.0 8.4 1.0 8.0 9 8+01 324.03 1.5 13.0 7.8 1.0 8.0 10 8+47 322.53 1.5 11.0 6.6 1.0 8.0 11 8+93 321.03 1.5 10.0 6.0 1.0 8.0 In the near term, the rock base is expected to dewater during inter -event periods to prevent development of standing water and mosquito habitat. As sediment accumulates upstream of the structures, subsurface flows through the base are expected to provide water quality benefits through filtration, hyporheic exchange and other biogeochemical processes. 3.0 Hydrologic Analysis of UT Perry Creek Watershed The Hydraflow extension of AutoCAD Civil 3D 2017 was used to conduct hydrologic analysis for the UT Perry Creek watershed using TR55 methodology. UT Perry Creek is an urban system. The contributing drainage area to the project reach is 122 acres and mostly developed (91%). However, the dominate Hydrologic Soil Group (HSG) in the watershed is B and overall impervious cover is relatively low (11%) compared to the total developed area, resulting in a relatively low composite curve number of 69 (CN). The 24 hour rainfall totals for select recurrence intervals were used to model the watershed and estimate discharges and flow volumes. The resulting discharges and flow volumes are included in Table 3. The modeled discharges described in Table 3 were used in the hydraulic analysis of the grade control structures and proposed channel design. Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 3 NC STATE UNNERSITY Table 3: UT Perry Creek discharges and flow volumes Event Rainfall (in) Discharge (cfs) Flow Volume (ft3) Q100% 2.86 36 262,464 Q50% 3.45 62 406,954 Q20% 4.32 108 651,353 Q10% 5.01 147 865,131 Q4% 5.94 203 1,173,897 Q2% 6.69 251 1,436,174 Q1i° 7.44 300 2,707,694 4.0 Hydraulic Analysis of Grade Control Structures HEC -RAS 5.0 was used to evaluate several specific hydraulic design and stability components of the proposed project (Figure 2): 1. Evaluation of channel velocities and shear stresses at the structure cross-section to ensure stability of the proposed structures up to the modeled Qui°. 2. Evaluation of channel velocities, particle settling velocities and pool length ensure that pools upstream of the structures are hydraulically long and sediment transported by UT Perry Creek will be settle and aggrade on the upstream side of the structure. 3. Analysis of the water surface elevations of UT Perry Creek to ensure a hydrologic trespass is not committed on parcels upstream or downstream of the proposed project. Figure 2: Pre- (left) and post- implementation (right) Q1% (loo) HEC -RAS model Structure Stability To ensure stability and long term function of the project, the proposed grade control structures will be constructed of large boulders and are designed remain intact for events up to Q1%. Applied shear stress (To) and dimensionless shear stress (T*) at the boundary was calculated for all structures under Q1% flow conditions (Table 3). To ranged from 1.1 lb/ftz to 1.7 lb/ftz and T* ranged from 0.008 to 0.013. T* is a ratio of the applied for forces to the forces that resist motion and is used to determine if hydraulic conditions near the boundary will initiate particle motion, where T* = To /[(YS - YW)*D5o]. Critical conditions for motion may range from Tc* = 0.040 to 0.053. All modeled values for T* during Q1% flow Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 4 "--7z ::-I J K L_ -_J � Figure 2: Pre- (left) and post- implementation (right) Q1% (loo) HEC -RAS model Structure Stability To ensure stability and long term function of the project, the proposed grade control structures will be constructed of large boulders and are designed remain intact for events up to Q1%. Applied shear stress (To) and dimensionless shear stress (T*) at the boundary was calculated for all structures under Q1% flow conditions (Table 3). To ranged from 1.1 lb/ftz to 1.7 lb/ftz and T* ranged from 0.008 to 0.013. T* is a ratio of the applied for forces to the forces that resist motion and is used to determine if hydraulic conditions near the boundary will initiate particle motion, where T* = To /[(YS - YW)*D5o]. Critical conditions for motion may range from Tc* = 0.040 to 0.053. All modeled values for T* during Q1% flow Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 4 NC STATE UNIVERSITY conditions are well below 0.040 (i.e. -co- <<< Tc*) indicating all proposed grade control structures will remain stable for events up to Qui° (Table 4). Table 4: Summary of hydraulic parameters for structure stability check for Q1% OD Design Station HEC -RAS Station WSE (ft) DSTR (ft) VSTR (ft/s) Tu (lb/ftz) T. 2+47 6+95 334.90 2.9 8.9 1.6 0.012 3+19 6+24 334.56 3.5 7.5 1.1 0.008 3+92 5+55 332.68 2.7 8.3 1.4 0.011 4+65 4+81 331.56 2.5 7.4 1.1 0.008 5+37 4+06 331.17 3.1 7.8 1.1 0.008 6+10 3+36 330.02 3.0 9.3 1.7 0.013 6+82 2+65 328.86 2.8 8.3 1.4 0.010 7+55 1+90 327.69 2.6 8.2 1.4 0.010 8+01 1+45 326.83 2.7 8.1 1.4 0.010 8+47 0+96 325.46 2.9 8.1 1.4 0.010 8+93 0+53 324.07 3.1 8.6 1.5 0.011 Particle Settling Velocity Check Pool lengths, depths and velocities were evaluated for the Qioo%, Q5o% and Q20% to determine hydraulic residence time (HT) and make comparisons to the required settling time (ST-Dso) for the median particle of the bed material. (HT) is calculated as length (L) / velocity (U) and ST-Dso is calculated as depth (D) / settling velocity (ws) of the Dso. The Dso of the UT Perry Creek bed material was 0.7 mm and ws was estimated graphically to be 1.9 ft/s from Figure 1.3 in the report published by the US Inter -Agency Committee on Water Resources, Subcommittee on Sedimentation (1957). Table 5 summarizes the findings from the settling velocity analysis. For structures and pools ST-Dso <<< HT, indicating sediment entrained in stream flow during Qioo%, Q5o% and Q20% will readily settle and accumulate upstream of the proposed grade control structures. Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 5 NC STATE UNIVERSITY Table 5: Summary of settling velocity check for Qioo%, Q50%, Q20% Pool Parameters Q100% Q50% Q20% STA (ft) L (ft) D (ft) U (ft/s) HT (s) ST -DSO (s) D (ft) U (ft/s) HT (s) ST -DSO (s) D (ft) U (ft/s) HT (s) ST -DSO (s) 7+37 170 6.3 0.5 354 3 6.8 0.8 224 4 7.4 1.2 144 4 6+64 71 7.4 0.4 166 4 7.9 0.7 103 4 8.5 1.1 65 4 S+91 69 6.3 0.6 121 3 6.7 0.9 77 4 7.3 1.4 49 4 5+19 74 5.0 0.7 109 3 5.3 1.1 69 3 5.8 1.7 45 3 4+42 75 4.4 0.6 121 2 4.9 0.9 81 3 5.5 1.4 54 3 3+69 70 4.3 0.8 83 2 4.7 1.3 56 2 5.4 1.8 38 3 3+00 71 3.2 1.1 64 2 3.6 1.6 43 2 4.2 2.4 30 2 2+31 75 2.7 1.5 50 1 3.1 2.2 34 2 3.6 3.1 24 2 1+69 46 2.3 2.2 20 1 2.7 3.2 14 1 3.1 4.5 10 2 1+21 49 2.6 1.9 26 1 3.0 2.6 19 2 3.6 3.4 14 2 0+74 42 1 3.3 1.3 32 2 3.7 1.9 22 2 4.3 2.7 16 2 Hydrologic Trespass Hydraulic analysis was conducted to ensure that a "hydrologic trespass" does not result on parcels upstream or downstream from implementation of the proposed project. Existing and proposed Qi% WSE are plotted in Figure 4 below. The proposed project will increase the Q1% WSE for model stations 8 + 50 to 0 + 54, which are in the immediate vicinity of the propose project. The western and eastern parcel boundaries of Millbrook Exchange Park are located at model stations 9 + 46 and 0 + 08, respectively. There is no change in the water surface elevation from the existing to the proposed condition for model stations 9 +46 to 8 + 99 upstream of the project reach or for model stations 0 + 49 to 0 + 08 downstream of the project reach. This hydraulic analysis confirms that all changes to Q1% WSEs will be limited to the extents of the project reach and the Millbrook Exchange Park parcel. Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 rel NC STATE UNNERSITY 340 r 338 336 w v 334 0 332 a� CO 330 CO > 328 Q Z 326 324 322 Qi.io WSE Comparison 1000 900 800 700 600 500 400 300 200 100 HEC -RAS Longitudinal Station (ft) --*—Existing --*--Proposed Figure 4: Pre- and post -implementation Q1oio WSE 7.0 Sediment Supply and Available Storage Sediment supply to the project reach of UT Perry Creek was estimated to evaluate the sedimentation rates upstream of the proposed grade control structures. Bedload transport equations described by van Rijn (1987) were used to model bedload transport and supply to the project reach. A bedload yield curve was constructed for the cross-sections above the project reach using HEC -RAS outputs for hydraulic radius (RH) and bedload load transport rates using van Rijn's (1987) equations (Figure 5). Then using the fitted curve and modeled 24 hour design storms from the hydrologic analysis (Qioo%, Qso%and Q2o%), bedload discharge curves were constructed (Figure 5). The cumulative bedload transported during the modeled design storms was then summed incrementally as the area under the curves. The cumulative bedload discharge for the Qioo%, Q5o% and Q2o%events was 151 CY, 273 CY and 485 CY, respectively (Table 6). Table 7 describes a conceptualized five-year post - implementation period where the five Q100% events, two Qso% events and one Q2o% event Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 7 NC STATE UNIVERSITY Bedload Yield Curve 3.0 2.5 u y = 1.6212x1. sas R = 0.9975 C, 2.0 V 1.5 caV p 1.0 Ad 0.5 0.0 0.0 0.5 1.0 Hydraulic Radius - RH (ft) 1.5 3.0 0.5 co 0.0 10 Bedload Discharge Curves 12 14 16 18 Time (hrs) Q100% Q50% —0---Q20% Figure 5: Bedload yield curve (left) and Qloo%, Q5o% and Q2o% bedload discharge curves (right) Table 6: Cumulative bedload discharge for Q1oo%, QSo% and Q2o% events Event Bedload (CY) Bedload (tons) Q100% 151 211 QSO% 273 382 Q20% 485 679 20 Table 7: Cumulative bedload supply over conceptual five-year post -implementation period AutoCAD C31) 2017 was used estimate the available storage for sediment created by the proposed structures using surface comparison methods and the Volumes Analyzer tool. The incremental and total storage volume and mass is included in Table 8. The proposed project creates storage for up to 935 CY or 1,309 tons of sediment. Table 7 shows that from Year 3 to Year 5 of the conceptualized five-year post implementation period, the cumulative bedload transported to the project reach will be 726 CY to 1786 CY. However, the bedload transport analysis and conceptualized post -implementation monitoring period does not account for suspended sediment transported to the reach or smaller storm events Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 N Q100% Q50% Q20% Incr. Vol. (CY) Cum. Vol. (CY) Year 1 X 151 151 Year 2 X X 424 575 Year 3 X 151 726 Year 4 X X 424 1150 Year 5 X X 636 1786 AutoCAD C31) 2017 was used estimate the available storage for sediment created by the proposed structures using surface comparison methods and the Volumes Analyzer tool. The incremental and total storage volume and mass is included in Table 8. The proposed project creates storage for up to 935 CY or 1,309 tons of sediment. Table 7 shows that from Year 3 to Year 5 of the conceptualized five-year post implementation period, the cumulative bedload transported to the project reach will be 726 CY to 1786 CY. However, the bedload transport analysis and conceptualized post -implementation monitoring period does not account for suspended sediment transported to the reach or smaller storm events Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 N NC STATE UNIVERSITY that may occur more frequently than Qiooio. This suggests that the available sediment storage capacity could be filled within three to five years and may occur sooner. Table 8: Summary of storage volume created upstream of proposed structures Structure C3D Design Station (ft) Storage (CY) Storage (Tons) 1 2+47 222 311 2 3+19 141 197 3 3+92 117 164 4 4+65 101 141 5 5+37 109 153 6 6+10 91 127 7 6+82 61 85 8 7+55 45 63 9 8+01 15 21 10 8+47 14 20 11 8+93 19 27 Total Storage= 935 1,309 8.0 Implementation Plan An Erosion and Sediment Control (E&SC) plan has been prepared for permitting and approval through the City of Raleigh for Land Disturbing Activities and is detailed in the project plans. All construction activities will be within the Limits of Disturbance (LOD) shown on the project plans (total LOD is 0.63). Access to the site will be from Rainwater Drive through a standard construction entrance. A staging and stockpile area will be established south of Rainwater Drive and west of the existing unimproved path along the top of the old embankment. A 20 ft wide path will be cleared along the north side of the existing channel (east and west of the old embankment) for equipment access. Tree protection fencing will be installed around the LOD to ensure all equipment stays within the permitted LOD and impacts to the adjacent riparian vegetation are minimized. To install the structures, excavators will be used to place the rock and boulders within the channel to the proposed elevations shown on the project plans. Track trucks and skid steer loaders may also be used onsite to move construction materials from the staging and stockpile area to the proposed structure location to support the effort of the excavators placing the boulders in the channel. After construction of the structures, an aggressive revegetation plan will be implemented to re-establish the riparian vegetation disturbed during construction. 9.0 Project Risks and Uncertainties The primary risks and uncertainties for the proposed project are related to the innovative and untested nature of the grade control structures. Engineering and modeling work was Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 7 NC STATE UNIVERSITY conducted using best professional judgement and best engineering design practices. All supporting calculations and documentation show that the proposed grade control structures will remain stable under Q1% hydraulic conditions and settle out entrained particles for flows up to Qzo%. However, the proposed design has not been field tested, which increases risk and uncertainty in project implementation and success. Additionally, newly constructed stream structures are particularly vulnerable to damage from flooding and overbank flows in the 1 - 2 years following implementation. Flood flows can degrade immature streambank and floodplain vegetation leading to bank erosion, floodplain rills and channelization, and structure failure. This risk of damage during high flows decreases substantially after vegetation becomes established on the streambanks and floodplain. Adaptive management and monitoring strategies may be required to mitigate the risks of project damage and long term function. Millbrook Exchange Park Basis for Design Report UT Perry Creek December 20, 2017 10 Land and Water Stewardship NATURAL AND CULTURAL RESOURCES November 2, 2016 Mr. Kevin Boyer City of Raleigh PO BOX 590 Raleigh NC 27602-0590 Re: 2016-1006 Raleigh, City of - ISW/ Innovative Grade Controls Dear Mr. Boyer, Bryan M. Gossage Executive Director Clean Water Management Trust Fund Congratulations! I am writing on behalf of the Clean Water Management Trust Fund (CWMTF) Board of Trustees to advise you that your project referenced above has been approved and funded. Grant funds in the amount of up to $240,000 will be available for the project. In the near future, CWMTF staff will be in contact with you regarding the next steps in the grant contracting process. Our partnership to safeguard our state's water supplies, natural heritage, military mission and cultural & historic resources is critical to protect North Carolina's environment and economic vitality. Thank you for your hard work to help us accomplish our mission and reachthese shared goals. If you have any questions or need additional information, please do not hesitate to contact me or your local CWMTF field representative. Sincerely, Bryan M. Gossage Executive Director Clean Water Management Trust Fund Nothing Compares7---,, State of North Carolina I Department of Natural and Cultural Resources 121 W. Jones Street I Raleigh, NC 27603 1651 Mail Service Center I Raleigh, NC 27699 www.cwmtfnet 1 919.707.9120 T 1 919.707.9121 F 12/4/2017 North Carolina State University Mail - FW: Proposed Modifications to Stream Channel in Millbrook Exchange Park in Raleigh Jonathan Page <jlpage3@ncsu.edu> FW: Proposed Modifications to Stream Channel in Millbrook Exchange Park in Raleigh Boyer, Kevin <Kevin.Boyer@raleighnc.gov> Thu, Jan 21, 2016 at 11:42 AM To: "Jonathan Page (jlpage3@ncsu.edu)" <jlpage3@ncsu.edu>, "Barbara Doll (bdoll@ncsu.edu)" <bdoll@ncsu.edu> FYI Kevin Boyer, PE Water Quality Manager Stormwater Management Division, City of Raleigh PO Box 590, Raleigh, NC 27602 Office: (919)996-4009 Cell: (919)306-4812 kevin.boyer@raleighnc.gov www.raleighnc.gov From: Smith, Cherri L [mai Ito: cherri.smith@ncdenr.gov] Sent: Thursday, January 21, 2016 11:37 AM To: Boyer, Kevin Subject: RE: Proposed Modifications to Stream Channel in Millbrook Exchange Park in Raleigh Kevin, As I understand the project, the Corps of Engineers will be using Nationwide Permit Number 27 (NWP 27) to permit the stream impacts for this project. The Division of Water Resources will use the corresponding Water Quality Certification Number 3885 (WQC 3885) to permit these same impacts. Since these permits are typically reserved for those project proposing to improve water quality and habitat, they are routine in nature. Since this project qualifies for NWP 27/WQC 3885, the Neuse Riparian Buffer impacts associated with this project are exempt and require no written authorization from the Division of Water Resources. If you need anything from this agency in order to proceed with your permit application, please don't hesitate to let me know. I look forward to seeing the implementation of this innovative City of Raleigh project. Cherri Smith Senior Environmental Specialist DEQ — Division of Water Resources https://mail.google.com/mail/u/0/?ui=2&ik=bdef55a3a6&jsver=oadh6Bg9AQ8.en.&view=pt&msg=152651100aOef24e&q=jennifer%20burdette&qs=true... 1/2 12/4/2017 North Carolina State University Mail - FW: Proposed Modifications to Stream Channel in Millbrook Exchange Park in Raleigh From: Boyer, Kevin[mailto:Kevin.Boyer@raleighnc.gov] Sent: Thursday, January 21, 2016 8:02 AM To: Smith, Cherri L <cherri.smith@ncdenr.gov> [Quoted text hidden] [Quoted text hidden] "E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized City or Law Enforcement official." https://mai I.goog le.com/mai 1/u/0/?ui=2&ik=bdef55a3a6&jsver=oadh6Bg9AQ8. en.&view=pt&msg=152651100aOef24e&q=jenn ifer%20bu rdette&qs=true... 2/2 o ROYAL OAKS DR NORTHO RIDGE DR. o i _ C% Stream flow (to Perry Creek) O 0 y�3m� Millbrook Exchange Park Project Site yac 'qqq�.. (Stream Channel, 700' - 1,000') BELLEC h►gss �,�N FO 0 J O O N Proposed Innovative Stormwater Project cwo Project Site E 0 125 250 500 Feet s � I i i i I i i i I ""tiPsw Ma� O , r 07. do 4t Lt Ar LLam' � � r ~ ° �•` � + � � �� � !'� � 01` >� '� .� . � � � ' �'� .� i ` '- � � 'lam r /•��ylr f • h �. � � ] .. �� �., s �` � ~� r ri � • �=•ter 49 t i.. ��1. • ��7 r �iFars r-. Iv 0 375 750 1,500 Feet NORTH�o - D o ro o "9 " o[j�'C�o [2.1Gfl��% - r r , o e— r ? �, ' �` d�rgs . \540 .{ • 5 , mar ,, I Forks Rd p.;j lh CD i orest 9 000j" Wept a Dixie Forest Rd 'Bend 1 + — 1 �0 , own, U r- djC- ` F � _• air � r . Jr x*� SFT+: • �'{� % 6- a �i r� .•r 4 N l • } ti & dPl h , f 10 4 o' r F jol �'i'_ +' Z 4 q} + It. 41H �#TMaa h,: f,. va,� �''', .��•,�• .�� .' � }'� +r ��l a r �' r � .•r'F `+�� T _ � , 11. fL ��. f � � }•'FLK': i� J I y� k} I 41 4blL. IN Al 41 iii ti.r�: a � --' ,_- .�4 �ti • _ f ,. f 3 IL+ • -5 qp r1 U - a.• tit - � - .fjr"=..- '3i i��� �+� - r I .}'1 � ♦ ~il SAF Id t" y7l Ide IC • • 11 I Ito a 011 MILLBROOK EXCHANGE PARK INNOVATIVE GRADE CONTROLS UT PERRY CREEK - 1905 SPRING FOREST RD, RALEIGH, NC - WAKE COUNTY PROJECT DIRECTORY PROJECT OWNER CITY OF RALEIGH KEVIN BOYER, PE WATER QUALITY MANAGER 919.996.3940 kevin.boyer@raleighnc.gov LORY WILLARD PROJECT MANAGER 919.996.4012 lory.willard@raleighnc.gov RESEARCH PTNR. NORTH CAROLINA STATE UNIVERSITY BARBARA DOLL, PHD, PE EXTENSION ASSISTANT PROFESSOR 919.515.5287 bdoll@ncsu.edu JONATHAN PAGE, PE EXTENSION ENGINEER 919.515.8595 jlpage3@ncsu.edu SHEET INDEX TITLE SHEET 1.1 PROPOSED E&SC PLAN 2.1 PROPOSED PLAN & PROFILE 3.1 PROPOSED STRUCTURE DETAIL 4.1 PROPOSED RE—VEGETATION PLAN 5.1 60°/a DESIGN FOR REVIEW DECEMBER 20, 2017 wO� w�w CU �LL Lu w�� O z 1 0z z cD LU z X L c) � 1 I I..L Lu m Z. A_ w LU LUw rcf) Zw J a U o � N � O � N w a❑w D m 2 O W d Z U QLu ❑ H U O 5 Q H of z o a cOn Q m ❑ a a m 0 w Z Z Y O Q w cn a 0� w = m ❑ ❑ U Q - - - LIMITS OF DISTURBANCE (LOD) - 27,590 FT (0.63 AC) TEMPORARY TREE PROTECTION FENCE - 930 LF STOCKPILE AND STAGING AREA TEMPORARY ACCESS PATH STANDARD CONSTRUCTION ENTRANCE NOTES AND SEQUENCE FOR E&SC PLAN TOTAL RB ZONE 1 IMPACT = 21,400 FT (0.49 AC) STANDARD CONSTRUCTION ENTRANCE SEE DETAIL STOCKPILE AND STAGING AREA RB ZONE 2 -Re zoNE / pp,TVA 20 F CcFs ACCESS - - - - l 6+50 - +�5,03320 FT - 3 6+ U _ - 5+00 v' co ox � 4+50 JV -` op 4+00 � ' � koomm- A. THE CONTRACTOR SHALL KNOW AND UNDERSTAND THE PROJECT EXTENTS AND LOD BEFORE STARTING CONSTRUCTION. THE LOD AND E&SC FEATURES WILL BE MADE AVAILABLE TO CONTRACTOR ON THE PLANSHEETS AND AS LINE WORK IN *.DWG FORMAT. B. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR (919-278-6461) TO SCHEDULE AN ON-SITE PRE -CONSTRUCTION MEETING. C. INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. D. CALL THE RAPID RESPONSE NUMBER (919) 857-4412 TO SCHEDULE A STORMWATER SITE INSPECTION AFTER PERMITTED EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED. E. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND DISTURBING ACTIVITY. F. INSTALL ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES AND/OR INCREASE MAINTENANCE FREQUENCY WHERE APPROVED MEASURES FAIL TO PREVENT ACCELERATED EROSION, OFF-SITE SEDIMENTATION, OR REPETITIVE NON-COMPLIANCE ISSUES. G. MODIFICATIONS TO THE APPROVED AND PERMITTED PLANS SHALL BE APPROVED BY STORMWATER INSPECTIONS PRIOR TO REMOVAL OR INSTALLATION. CONTACT THE STORMWATER INSPECTIONS REGIONAL COORDINATOR TO REQUEST AN INSPECTION AND OBTAIN A STORMWATER INSPECTOR'S SIGN -OFF ON THE PLANS OR AN APPROVED FIELD REVISION. H. THE CONSTRUCTION ENTRANCE OFF RAINWATER DRIVE SHALL BE USED FOR ACCESS TO THE SITE. ALL VEHICLES, TRUCKS AND EQUIPMENT SHALL USE THE CONSTRUCTION ENTRANCE OFF OF RAINWATER DRIVE AND TRAVEL EAST ALONG THE ACCESS PATH SHOWN ON THE APPROVED E&SC PLAN. I. TEMPORARY TREE PROTECTION FENCE SHALL BE INSTALLED AT THE LIMITS OF THE TEMPORARY ACCESS PATH AND AROUND THE DESIGNATED STOCKPILE AND STAGING AREA ON THE WEST SIDE OF THE CHANNEL AS SHOWN ON THE E&SC PLAN AND IN ACCORDANCE WITH THE DETAIL ON THIS SHEET. J. ALL CONSTRUCTION MATERIALS AND EQUIPMENT SHALL BE STORED AND 3+50 _ 332 RB ZONA RB ZONE 2 336 / OR STAGED IN THE DESIGNATED STOCKPILE AND STAGING AREA SHOWN ON THE APPROVED E&SC PLAN. K. ALL IN -CHANNEL STRUCTURAL WORK SHALL TAKE PLACE FROM THE WEST SIDE OF THE CHANNEL OR THROUGH ACCESS FROM THE WEST SIDE OF THE CHANNEL. L. THE GRADE CONTROL STRUCTURE AT THE DOWNSTREAM END OF THE PROPOSED PROJECT (STA 8+93 FT) SHALL BE INSTALLED FIRST TO ACT AS AN EROSION AND SEDIMENT CONTROL MEASURE FOR CONSTRUCTION ACTIVITIES OF GRADE CONTROL STRUCTURES UPSTREAM. M. A TEMPORARY PUMP AROUND SYSTEM MUST BE INSTALLED IF WORK IS TO TAKE PLACE WITHIN THE CHANNEL AND ACTIVE BASE FLOW IS OBSERVED. TO DATE NO BASE FLOW HAS BEEN OBSERVED. HYDROLOGY AND HYDRAULICS IN THIS CHANNEL IS PRIMARILY STORMFLOW DRIVEN. NO WORK SHALL OCCUR IN THE CHANNEL DURING STORM FLOWS. THE PUMP SHALL BE ADEQUATELY SIZED TO HANDLE CURRENT FLOW CONDITIONS IN THE CHANNEL. N. EROSIONAL CONTROL MATTING (700 GRAM COIR FIBER OR EQUIVALENT) SHALL BE INSTALLED ON THE STREAM BANKS DISTURBED DURING CONSTRUCTION OF THE GRADE CONTROL STRUCTURES AS SHOWN IN THE DETAIL ON THIS SHEET. O. ALL DISTURBED AREAS SHALL BE STABILIZED WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING ACCORDING TO THE PLANTING PLAN ON SHEET 4.1 AND WITHIN THE TIME FRAME DESCRIBED IN NOTE P ON THIS SHEET. P. GROUND COVER SHALL BE PROVIDED AS FOLLOWS: P.1. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF FOURTEEN (14) DAYS. P.2. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE SITE UPON WHICH FURTHER LAND -DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN WITHIN FOURTEEN (14) CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. P.3. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN FOURTEEN (14) CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR PRIOR TO FINAL INSPECTION. ALL SITE ACCESS SHALL OCCUR OFF RAINWATER DRIVE �30FT MIN. RB ZONE RB ZONE RB ZONE 2 TOTAL RB ZONE 2 IMPACT = 495 FT 2 (0.01 AC) 330 32$ ` 330 6 FT \ CCESS A r_- 8+50 000g+00 J 1 - x50 apo INSTALL D/S STRUCTURE FIRST 9+46 328 .mef 330- 0- Li 0 30 60 Feet SCALE: 1" = 30' DISCHARGE HOS FLOW r EARTH OR GRAVEL BERM (DAM) WORKAREA LENGTH NOT TO EXCEED PUMPS SHOULD DISCHARGE THAT WHICH CAN BE ONTO A STABLE VELOCITY COMPLETED IN ONE DAY DISSIPATOR MADE OF RIPRAP OR SANDBAGS TEMPORARY PUMP AROUND SYSTEM DETAILED PLAN STREAM DIVERSION PUMP INTAKE I� HOSE FLOW r SUMP -HOLE OR POOL (12" TO 18" DEEP 2' DIA.) GEOMEMBRANE HALF BANK HEIGHT WORK AREA (H/2)+1 FOOT (2 FOOT MINIMUM) , YV ll,//,A / W AXMVII�l/A TEMPORARY PUMP AROUND SYSTEM NOT TOSCALE DETAILED SECTION A -A' TEMPORARY PUMP AROUND SYSTEM NOTES 1. THE TEMPORARY PUMP AROUND SYSTEM SHALL BE USED WHEN CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE EXISTING STREAM CHANNEL AND BASEFLOW CONDITIONS ARE PRESENT. 2. THE CONTRACTOR SHALL ONLY BEGIN WORK IN AN AREA WHICH CAN BE COMPLETED BY THE END OF THE DAY OR WITHIN THE AVAILABLE WORK TIME INCLUDING GRADING ADJACENT TO THE CHANNEL. 3. AT THE END OF EACH WORK DAY, THE WORK AREA MUST BE STABILIZED AND THE PUMP REMOVED FROM THE CHANNEL. 4. THE TEMPORARY PUMP AROUND SYSTEM SHOULD NOT BE USED TO CONDUCT WORK DURING STORM FLOWS. WORK SHOULD NOT BE CONDUCTED IN THE CHANNEL WHEN STREAM FLOW CONDITIONS ARE ABOVE BASEFLOW. 5. AN EARTHEN OR GRAVEL BERM (DAM) SHOULD BE SITUATED AT THE UPSTREAM END OF THE WORK AREA, AND STREAM FLOW SHOULD BE PUMPED AROUND THE WORK AREA. A GEOMEMBRANE MATERIAL SHOULD BE PLACED ON THE UPSTREAM FACE OF THE DIKE TO SEAL AND CONTAIN STREAM FLOW. 6. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS. 7. THE HEIGHT OF THE BERM OR DIKE SHOULD BE HALF CHANNEL BANK HEIGHT PLUS ONE FOOT (H/2 + 1) OR A 2 -FOOT HEIGHT MINIMUM. 8. THE PUMP SHALL BE OF SUFFICIENT SIZE TO CONVEY NORMAL STREAM BASEFLOW. 9. WORK SHOULD BE PERFORMED WHEN STREAM FLOWS ARE AT THEIR LOWEST, 10. IF HEAVY RAINS ARE ANTICIPATED, THE PUMP -AROUND SYSTEM AND BERM SHALL BE REMOVED AND CHANNEL FLOW SHALL BE UNRESTRICTED. AT THIS TIME, IN -STREAM WORK SHOULD NOT CONTINUE UNTIL STREAM FLOW CAN BE HANDLED BY THE PUMP. EROSION CONTROL MATTING DETAILED PLAN A' 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING COIR FIBER BLANKET, RAKE SOIL LEVEL AND ADD SEED, FERTILIZER, LIME AND MULCH. 3. 700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 3 FT BEYOND THE BANKFULL ELEVATION. 4. SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. EROSION CONTROL MATTING NOT TOSCALE 0z U z 4U Xo NOTES: I.. VIN. VERTICAL OVERLAP 2' 700 GRAM COIR MATTING 50' MIN.TREE ❑ ❑ ❑ ❑ ❑ I SUPPLEMENT WOODEN STAKES BANKFULL PROTECTION AREA BUT SUFFICIENT TO KEEP 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP ❑ O WITH 12' ECO -STAKES SEDIMENT ON SITE TO ENSURE CONSTRUCTION ENTRANCE IS USED. OVERLAP DQ NOT ENTER o Soo go 00 moo ­qo ego o S o$o�oo0 0 0 0 0 000�b 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT B MAX. PLASTIC OR WARNING SIGN DETAIL o �$ THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING 25' OR FULL WIDTH W VARIABLE AS DIRECTED BY THE ENGINEER /WIRE TIES 2" - 3" STONE TO BE USED oo OVER THE STONE, THEN THE TIRES OF THE OF PROPOSED STREET STEEL POST EXISTING ( SURGE STONE OR OR ENTRANCE, VEHICLE MUST BE WASHED BEFORE ENTERING THE WOVEN WIRE FABRIC ROADWAY RAILROAD BALAST I WHICHEVER IS PUBLIC ROAD. O TREE PROTECTION AREA o 0o GREATER. MIN 0.5' WARNING SIGN MIN.1D GA. DO NOT ENTER IN. 12-1/2 GA. 0 0 p00 0 00 0 o 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS O ❑ O O LINE WIRES INTERMEDIATE 0� po 0 oS o$ 000o ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY 4 1 FILL SLOPE WIRES ❑ WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY SILT FENCE FABRIC RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL INSTALLED TO SECOND GRADE FROM TOP RESPONSIBILITY FORM.WIRE 2' LONG 2" x 2" WOOD STAKES „ 6 MIN. HORIZONTAL PLAN w/3" GALVANIZED ROOFING NAIL -_ GRADE -11111-VIII VIII-VIII-VIII-11111=11111-11111=�����-11111=11111=11111=11111=11111 AT THE TOP TO SECURE MATTING O � - IIIIIIIIII=III IIIIIIIIII=VIII=�����-�����-�����-11111 VIII 111 EROSION CONTROL MATTING NOT TO SCALE § * NEW CONSTRUCTION II MIN SILT FENCE GEOTEXTILE FABRIC VIII 11111 1 - FRONT VIEW 0 VIII VIII EXISTING ROADWAY 35'MIN. 15'MIN. SIDE VIEW III III 12" MIN. m 6" MIN. oI So o�oo o gog8000 0080 p_�S o� I I- II o o MAINTENANCE: CLEAN OUT AT 50% CAPACITY VIII IIII- IIII - IIII-VIII- LIFE OF FENCING: 6-9 MONTHS III- FABRIC UNDER STONE a m NOTES: 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 0 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. CROSS SECTION 3. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 4. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. CITY OF RALEIGH CITY OF RALEIGH 5. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. PUBLIC WORKS DEPARTMENT O PUBLIC WORKS DEPARTMENT 6. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. B'Im wins NOTTOSCALE CONSTRUCTION ENTRANCE REVISIONS DATEWIn3 NOT TO SGYE 7. ADDITIONAL SIGNS MAY BE REQUIRED BY CIN OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. &. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. CONSTRUCTION STANDARD TEM PORARY 9. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. ENTRANCE (SEDIMENT/SILT) / TREE 10. SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES; PROTECTION FENCE PLANNING CONSIDERATIONS & DESIGN CRITERIA. (HOWEVER FLOW SHALL NOT RUN PARALELL WITH THE TOE OF THE FENCE). SW -20.09 Q SW -20.02 DISCHARGE HOS FLOW r EARTH OR GRAVEL BERM (DAM) WORKAREA LENGTH NOT TO EXCEED PUMPS SHOULD DISCHARGE THAT WHICH CAN BE ONTO A STABLE VELOCITY COMPLETED IN ONE DAY DISSIPATOR MADE OF RIPRAP OR SANDBAGS TEMPORARY PUMP AROUND SYSTEM DETAILED PLAN STREAM DIVERSION PUMP INTAKE I� HOSE FLOW r SUMP -HOLE OR POOL (12" TO 18" DEEP 2' DIA.) GEOMEMBRANE HALF BANK HEIGHT WORK AREA (H/2)+1 FOOT (2 FOOT MINIMUM) , YV ll,//,A / W AXMVII�l/A TEMPORARY PUMP AROUND SYSTEM NOT TOSCALE DETAILED SECTION A -A' TEMPORARY PUMP AROUND SYSTEM NOTES 1. THE TEMPORARY PUMP AROUND SYSTEM SHALL BE USED WHEN CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE EXISTING STREAM CHANNEL AND BASEFLOW CONDITIONS ARE PRESENT. 2. THE CONTRACTOR SHALL ONLY BEGIN WORK IN AN AREA WHICH CAN BE COMPLETED BY THE END OF THE DAY OR WITHIN THE AVAILABLE WORK TIME INCLUDING GRADING ADJACENT TO THE CHANNEL. 3. AT THE END OF EACH WORK DAY, THE WORK AREA MUST BE STABILIZED AND THE PUMP REMOVED FROM THE CHANNEL. 4. THE TEMPORARY PUMP AROUND SYSTEM SHOULD NOT BE USED TO CONDUCT WORK DURING STORM FLOWS. WORK SHOULD NOT BE CONDUCTED IN THE CHANNEL WHEN STREAM FLOW CONDITIONS ARE ABOVE BASEFLOW. 5. AN EARTHEN OR GRAVEL BERM (DAM) SHOULD BE SITUATED AT THE UPSTREAM END OF THE WORK AREA, AND STREAM FLOW SHOULD BE PUMPED AROUND THE WORK AREA. A GEOMEMBRANE MATERIAL SHOULD BE PLACED ON THE UPSTREAM FACE OF THE DIKE TO SEAL AND CONTAIN STREAM FLOW. 6. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS. 7. THE HEIGHT OF THE BERM OR DIKE SHOULD BE HALF CHANNEL BANK HEIGHT PLUS ONE FOOT (H/2 + 1) OR A 2 -FOOT HEIGHT MINIMUM. 8. THE PUMP SHALL BE OF SUFFICIENT SIZE TO CONVEY NORMAL STREAM BASEFLOW. 9. WORK SHOULD BE PERFORMED WHEN STREAM FLOWS ARE AT THEIR LOWEST, 10. IF HEAVY RAINS ARE ANTICIPATED, THE PUMP -AROUND SYSTEM AND BERM SHALL BE REMOVED AND CHANNEL FLOW SHALL BE UNRESTRICTED. AT THIS TIME, IN -STREAM WORK SHOULD NOT CONTINUE UNTIL STREAM FLOW CAN BE HANDLED BY THE PUMP. EROSION CONTROL MATTING DETAILED PLAN A' 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING COIR FIBER BLANKET, RAKE SOIL LEVEL AND ADD SEED, FERTILIZER, LIME AND MULCH. 3. 700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 3 FT BEYOND THE BANKFULL ELEVATION. 4. SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. EROSION CONTROL MATTING NOT TOSCALE 0z U z DETAILED PLAN Xo WJ I.. VIN. VERTICAL OVERLAP 2' 700 GRAM COIR MATTING ❑ ❑ ❑ ❑ ❑ ❑ ❑ I SUPPLEMENT WOODEN STAKES BANKFULL 6" MIN. HORIZONTAL _ O ❑ O WITH 12' ECO -STAKES 12� OVERLAP �, r - r 2.5' (TYP) C 0- o W LU 700 GRAM COIR FIBER MATTING III KEY INTO EARTH � _ O W a MIN 0.5' U O O ❑ O O � ❑ ❑ ❑ E3❑ ❑ 2' LONG 2" x 2" WOOD STAKES „ 6 MIN. HORIZONTAL w/3" GALVANIZED ROOFING NAIL OVERLAP 2' LONG 2" x 2" WOOD STAKES W/ 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING O � AT THE TOP TO SECURE MATTING H EROSION CONTROL MATTING NOT TO SCALE EROSION CONTROL MATTING NOT TO SCALE DETAILED STAKING PLAN DETAILED CROSS-SECTION A - A' w�wc� �LL Lu co O (D z 0z U z W w z Xo WJ LLj -i I..L w Ed DO DO z. N w w Ong Sm w -j r ~U z J o U^ 06 ILL] m 2 lu3 O a k .l �~ Z "N -q w m 2 O a >- N 2f O 12� N W 0- o W LU m � O W a Z U Q O � Q H Of z o 0 0 00 m a a m 0 W Z Z Y O Qu C7 w a Q Q U Q EXISTING TOP OF BANK EXISTING TOE OF SLOPE �c BASE STON 40% NC DOT CLASS 40% NC DOT CLASS 20% ASTM #57 1 3 WSTR FLOW WSTR 1 3 WSTR A 1 3 WSTR GRADE CONTROL STRUCTURE DETAILED PLAN BASE STONE 40% NC DOT CLASS B 40% NC DOT CLASS A 20% ASTM #57 FILTER STONE 50% ASTM #57 21 HBASE 50% ASTM #78 GRADE CONTROL STRUCTURE SECTION A - A' 0 LBASE EXISTING TOP OF BANK FLOW EXISTING STREAM BED IE 17 '8 lIGH DENSITY "ONTAINERIZED ILANTINGS STRUCTURE INVERT ELEVATION PER TABLE HEADER BOULDER KEY STRUCTURE INTO STREAM BANK MIN. 6.0 FT NOT TO SCALE OFFSET FOOTER BOULDER 0.5 - 1.0 FT FOOTER BOULDER UvoUv U oU oU o� oU o� o� o� o GRADE CONTROL STRUCTURE NOTES 1. THE PROPOSED STRUCTURE IS A DESIGNED TO CONTROL GRADE, PROVIDE ENERGY DISSIPATION AND STORAGE FOR UPLAND AND UPSTREAM SUPPLIED SEDIMENTS IN A HIGHLY INCISED URBAN SYSTEM. THE STRUCTURE IS COMPOSED OF A QUARRIED ROCK BASE WITH FOOTER AND HEADER BOULDERS. THE FOOTER AND HEADER BOULDERS ARE INSTALLED ON THE ROCK BASE IN AN ARCHED PATTERN AND KEYED INTO THE EXISTING STREAM BANK. THE ARCHED ARMS WILL EXTEND SLIGHTLY UPWARD TOWARDS THE EXISTING STREAM BANK TO DIRECT FLOW TOWARDS THE CENTER OF THE CHANNEL. DEEP ROOTING WOODY VEGETATION WILL THEN BE AGGRESSIVELY PLANTED IN THE VICINITY OF THE BOULDER STRUCTURE ON THE STREAM BANK AND IN THE FLOODPLAIN. 2. THE QUARRIED ROCK BASE OF THE STRUCTURE STALL BE GRADED UP FROM THE EXISTING STREAM BED WITH A 2:1 (H:V) SLOPE AND SHALL BE CONSTRUCTED OF 40% NC DOT CLASS B, 40% NC DOT CLASS A AND 20% ASTM #57. 3. THE LAYER OF FILTER STONE SHALL BE 0.5 FT THICK AND CONSIST OF 50% ASTM #57 AND 50% ASTM #78. 4. ALL BOULDERS USED FOR THE STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. BOULDERS SHALL BE 2.5 FTX 4 FT X 2 FT +/- 0.5 FT. ALL BOULDERS SHALL FIT TIGHTLY TOGETHER. ALL HEADER BOULDERS SHALL HAVE FOOTERS. 5. THE ARMS OF THE ARCHED BOULDER STRUCTURE SHALL EXTEND UP TOWARDS THE EXISTING STREAM BANK AT A SLOPE OF 4 - 6% AND KEYED INTO THE STREAM BANK A MINIMUM OF 6.0 FT OR TWO BOULDER LENGTHS. 6. THE GRADE CONTROL STRUCTURES SHALL BE INSTALLED TO THE GRADES AND DIMENSIONS SHOWN IN THE STRUCTURE TABLE BELOW. DIMENSIONS, SLOPES AND ELEVATIONS OF THE STRUCTURES DESCRIBED IN THE DETAIL AND IN THE STRUCTURE TABLE BELOW MAY BE ADJUSTED BY THE ENGINEER TO FIT CONDITIONS ONSITE. STR STA (FT) INV. ELV. (FT) O ELV. (FT) WSTR (FT) XSTR (FT) HBASE (FT) LBASE (FT) 1 2+47 332.02 1.0 13.5 8.1 4.0 20.0 2 3+19 331.02 1.0 13.0 7.8 4.0 20.0 3 3+92 330.02 1.0 15.5 9.3 3.0 16.0 4 4+65 329.02 1.0 18.0 10.8 1.5 10.0 5 5+37 328.02 1.0 13.0 7.8 2.3 13.2 6 6+10 327.02 1.0 12.0 7.2 1.5 10.0 7 6+82 326.02 1.0 16.5 9.9 1.0 8.0 8 7+55 325.02 1.0 14.0 8.4 1.0 8.0 9 8+01 324.02 1.5 13.0 7.8 1.0 8.0 10 8+47 322.52 1.5 11.0 6.6 1.0 8.0 11 1 8+93 321.02 1.5 10.0 6.0 1.0 8.0 WSTR 4 - V 0/0 EXISTING TOP OF BANK EXISTING STREAM BED KEY STRUCTURE INTO STREAM BANK MIN. 6.0 FT STRUCTURAL BASE STONE 40% NC DOT CLASS B 40% NC DOT CLASS A 20% ASTM #57 NOT roSCALE GRADE CONTROL STRUCTURE NOT loSCALE CROSS-SECTION ,u�bz w�w� � LUC�UQ �zzz 0 O Uw�co w n a -w XoJ� L u) � _ 1 I I..L J af w m Z. L� w w i Lu U Lu W 0 Q � 2 a N � N � o 00 w o 2 W a -Z U D Q Q o�Q Lu m z o 0 0 00 m 0 a a m 0 w Z Z Y O Q w cn a 0� w = a Q Q U Q w i Lu U Lu W 0 Q � 2 J 1 ego i "oo� OX � so � 338— N 38— N tT' O TiO j �'11O PROPOSED GRADE CONTROL STRUCTURE ----- EXISTING STREAM CENTERLINE ZONE 1 RIPARIAN BUFFER ZONE 2 RIPARIAN BUFFER 345 344 343 342 341 340 339 338 337 336 335 334 333 332 331 LL 330 z 329 O 328 327 \ 326 w 325 J 324 w 323 322 321 320 319 318 317 316 315 314 313 312 311 310 336 u IRST STRUCTURE IS INSTALLED i/S OF TRIBUTARY STA = 2+47 FT .LV = 332.03 FT N*111N am RB ZONE 2 332/ RB ZONE 1 /� 2+s6 33� —330_ V 4+50 OxoO �� 4+00 - 6+00 —5+00 3+ 334 .000*0 336 ZONE 2 PROPOSED STRUCTURE SEE DETAIL SHEET 3.1 '332 6+50 - 00- \ \\j RB 0-100 0000 111111111100.� O Off\` RB ZONE ==-7+00 � —r, 7nWE i RB ZONE 2 330 i 9+46 32� 9kpp � 8+50 328-00000 / 330— LAST STRUCTURE IS INSTALLED U/S OF TRIBUTARY STA = 8+93 FT ELV = 321.02 FT 0+00 1+00 2+00 3+00 4+00 5+00 STATION 345 344 343 342 341 340 339 338 337 336 335 334 333 332 331 330 329 328 327 326 325 324 323 322 321 320 319 318 317 316 315 314 313 312 311 6+50 7+50 8+50 310 6+00 7+00 8+00 9+00 9+46 r m D O z SCALE: 1" = 30' \I w�bz w�wc� �ILL Lu co O (D z z co LU z a_ XoJ� LLj w � o A � � k a N M W a❑w � Lu m � O w + t N N 0 U QLu ❑ 0) M EMNANT EARTHEN DAM U Q co N O :EQ ~ LTOB AND c/) II ° N oXISTING w 11co =7+50 FT RTOB GRADE m � co—STA II � a a m J 0 117 w Z QLu Y> 0 0 Y O QO w as M co 0� w U a J U) Lu U Q II 04 N + N o N U~ J W (j II Q N ch o NO co _ Oo N (o U w _j coII II N NO Z — W + co Z ~ Lo M w W w LLI ~ m ~ (n Z ~ W Q N M + N O W ~ > U J co L11 II > II N O+ MO O Q M co co Z > L11 U w co II II co co Z L11 Z co w II 00L . N W co N—CO--- W > - > II U w rn o ° Z — � Z) W (n II � w 11 cy) o(n Z = W Q C7 — + f` U) Z w Q co o ? V -T° ; ~ w U Z w co U w - RIDGE CROSSING ° STA =0+87 FT > TW ELV = 331.96 FT ° - w- ° U)z SS CROSSING 3� STA = 0 + 00 FT TW ELV = 334.54 FT TRIBUTARY CONFLUENCE—EXISTING TW GRADE STA =2+00 FT TW ELV = 327.89 FT TRIBUTARY CONFLUENCE STA =9+09 FT TW ELV = 319.69 FT PARK PARCEL BOUNDARY STA = 9 + 46 FT TW ELV = 318.94 FT 0+50 1+50 2+50 3+50 4+50 5+50 0+00 1+00 2+00 3+00 4+00 5+00 STATION 345 344 343 342 341 340 339 338 337 336 335 334 333 332 331 330 329 328 327 326 325 324 323 322 321 320 319 318 317 316 315 314 313 312 311 6+50 7+50 8+50 310 6+00 7+00 8+00 9+00 9+46 r m D O z SCALE: 1" = 30' \I w�bz w�wc� �ILL Lu co O (D z z co LU z a_ XoJ� LLj w af w m W i cz z Lu U Lu W 3 U o � o A � � k a N W W i cz z Lu U Lu W U o � N � a N W a❑w Lu m � O w a z U QLu ❑ U O :EQ H a z o w Q m a a m 0 w Z Z Y> Y O QO w as co 0� w = a ❑ ❑ U Q W i cz z Lu U Lu W • ••••ol AL• LN �-==..r--iii• •••• -- •••••• • � . . _W 416 mm O O O O RIPARIAN VEGETATION - 145700 FT (1,630 YD 2) STREAMBANK STABILIZATION - 85200 FT (910 YD 2) GREENWAY - 1,700 FT (190 YD 2) SOD - 400 FT2 (45 YD2) STREAMBANK AND BUFFER PLANTING SPECIFICATIONS RIPARIAN VEGETATION RE-ESTABLISHMENT - 141700 FT (1,630 YD 2) SCIENTIFIC NAME COMMON NAME SIZE (CAL) SPACING QTY Liriodendron tulipifera TULIP POPLAR >/= 3" 20 FT O.C. 15 Quercus alba WHITE OAK >/= 3" 20 FT O.C. 15 STREAMBANK STABILIZATION - 8,200 FT (910 YD 2) SCIENTIFIC NAME COMMON NAME TYPE SPACING QTY Callicarpa americana BEAUTY BERRY BARE RT. / CNTNR. 3 FT O.C. 150 Xanthorhiza simplicissima YELLOW ROOT BARE RT. / CNTNR. 3 FT O.C. 300 Lindera benzoin SPICE BUSH BARE RT. / CNTNR. 3 FT O.C. 150 Alnus serrulate TAG ALDER BARE RT. / CNTNR. 3 FT O.C. 300 PERMANENT SEEDING - 22,900 FT (2,540 YD 2) SCIENTIFIC NAME COMMON NAME TYPE APP. RATE QTY ------ RIPARIAN SEED MIX SEED 4 LBS / 1000 SF 90 LBS Elymus virginicus VIRGINIA WILD RYE SEED 20%. ------ Agrostis perennans AUTUMN BENT GRASS SEED 15% ------ Pancicum virgatum SWITCHGRASS SEED 15% ------ Redbeckia hirta BLACK-EYED SUSAN SEED 10% ------ Coreopsis lanceolate LANCELEAF COREOPSIS SEED 10% ------ Andropogon gerardii BIG BLUESTEM SEED 10% ------ Juncus effusus SOFT RUSH SEED 10% ------ Schizachyrium scoparium LITTLE BLUESTEM SEED 5% ------ Sorghastrum nutans INDIAN GRASS SEED 5% ------ TEMPORARY SEEDING, MULCHING AND SOIL PREP - 22,900 FT (2,540 YD 2) SCIENTIFIC NAME COMMON NAME TYPE APP. RATE QUANTITY Secale Cereale RYE GRAIN SEED 5 LBS / 1000 SF 120 LBS ------ GROUND AG. LIMESTONE PELLET 45 LBS / 1000 SF 1,030 LBS ------ 10-10-10 FERTILIZER PELLET 17 LBS / 1000 SF 400 LBS ------ WHEAT STRAW MULCH STRAW 90 LBS / 1000 SF 2,060 LBS 0000— � RB ZON E2 336 PLANT LOCATIONS A. TREES GREATER THAN 3" SHOWN IN THE PLANTING LIST AND ON THE PROPOSED PLANTING PLAN SHALL BE PLACED INSIDE THE ZONE 1 RIPARIAN BUFFER FOR RE-ESTABLISHMENT. B. STREAMBANK STABILIZATION VEGETATION SHALL BE PLANTED IN THE AREAS DISTURBED DURING INSTALLATION OF THE GRADE CONTROL STRUCTURES. C. SOIL PREPARATION ELEMENTS, TEMPORARY AND PERMANENT SEED SHALL BE SPREAD OVER ALL AREAS WITHIN THE LOD THAT ARE DISTURBED DURING CONSTRUCTION. D. NECESSARY ADJUSTMENTS SHALL BE MADE ONLY. AFTER APPROVED BY CITY OF RALEIGH STAFF OR THE NCSU PROJECT ENGINEER. PLANTING INSTRUCTIONS A. ACCEPTABLE PLANTING TIMES ARE OCTOBER THROUGH APRIL. B. SEE TREE PLANTING DETAIL (AT RIGHT) FOR CITY OF RALEIGH TREE PLANTING SPECIFICATIONS FOR TREES OF 3" CALIPER OR GREATER. C. CONTAINER STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. D. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS.INSURE THAT ROOTS, ONCE REMOVED FROM POT, ARE STRAIGHTENED AND FACE DOWNWARD. E. CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT F. PLACE PLANTS IN PIT INSURING ROOTS ARE FACING COMPLETELY DOWNWARD G. HEEL IN SOIL AROUND PLANT AND PROCEED TO NEXT PLANTING LOCATION H. NEWLY -PLANTED PLANTS NEED TO BE FASTENED TO THE SUBSTRATE FOR THE ESTABLISHMENT OF NEW ROOTS I. ROOTS SHALL BE SPREAD IN THEIR NORMAL POSITION. ALL BROKEN OR FRAYED ROOTS SHALL BE CUT OFF CLEANLY. RB ZONE,' RB ZONE 2 J. THE DIAMETER OF THE PLANTING HOLES (PITS) FOR EACH PLANT SHOULD BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. K. SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. L. PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. M. BARE ROOTS SHOULD BE INSTALLED THE SAME DAY THEY HARVESTED AT FROM THE NURSERY. THEY SHOULD BE ORIENTED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE GROUND. N. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT PLANT MATERIAL FROM BEING DAMAGED DURING INSTALLATION. 32$ 326 328-0000, / 330— 0- Li 0 30 60 Feet SCALE: 1" = 30' �U NOT PRUNE LEADER. PRUNE OR CUT ONLY DEAD OR UNHEALTHY BRANCHES DROVIDE STAKING IF SPECIFIED. IF STAKING IS DROVIDED, PROTECT TREE WITH BROAD STRAP OR -LEXIBLE TUBING. ALLOW FLEXIBILITY IN STRAPS FO DEVELOP TRUNK TAPER. PROVIDE TURN 3UCKLE AND WARNING FLAGS. REMOVE ALL STAKING AND ACCESSORIES WITHIN ONE YEAR -ROM PLANTING. THE ROOT FLARE SHALL BE PLANTED AT GRADE, NO HIGHER THAN 2" ABOVE GRADE, AND NEVER BELOW GRADE. REMOVE EXCESS SOIL TO EXPOSE THE ROOT FLARE AT GRADE. TREE SHALL BE SET PLUMB MULCH DEPTH 3". KEEP MULCH 3" FROM ROOT FLARE AND DO NOT CONTACT STEM HIGH QUALITY SOIL MIX AS SPECIFIED WATER SAUCER SHALL BE NO MORE THAN 3" ABOVE GRADE COMPLETELY REMOVE TOP HALF OF BURLAP, LACING AND WIRE BASKET AND DISCARD FROM HOLE ROOT BALL SHALL BE PLACED DIRECTLY ON COMPACTED SUBGRADE. HANDLE TREE BY THE ROOT BALL ONLY. NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR ADEQUATE DRAINAGE OF ALL PLANTING PITS. (POSITIVE DRAINAGE AWAY FROM PIT) 2. ADHERE TO STANDARDS IN THE CITY TREE MANUAL. 3. STREET TREES MUST BE 3" CALIPER AT INSTALLATION WITH A 5' MINIMUM FIRST BRANCH HEIGHT. 4. PLANTING SEASON OCTOBER - APRIL. 5. A TREE IMPACT PERMIT IS REQUIRED. 6. ELECTRICAL OUTLETS AND OTHER UTILITIES ARE PROHIBITED IN THE PLANTING AREA IMMEDIATELY SURROUNDING THE TREE. CONTACT INFORMATION: CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES DEPARTMENT URBAN FORESTER: TREES@RALEIGHNC.GOV WWW.RALEIGHNC.GOV CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES DEPT REVISIONS DATE: 9/1/13 NOT TO SCALE TREE PLANTING DETAIL PRCR-03 w w�wc� Uw�� �LL Lu � O (D z 0 U z z LU z XoJolf U Lu < J Lu ii So �z Z_ a I— z Q 0- L.- C, - U o � N � O N W d 0 W Lu m � O W d Z U Lu Q LLI 0 5 a w a z coo 0 Q m 0 a a m 0 w Z Z Y O QU w as 0� w = m U Q