Loading...
HomeMy WebLinkAbout20171341 Ver 1_Certification of Completion_20171207i i ROY COOPER C5""ta, DCC 2 D 2017 ( MICHAEL S REGAN ' c Water Rcaoumes j LINDA CULPEPPER �.%ateuo is Hn� =mul punliq I hverim Dfreclnr WR Project No.: ( County: Applicant17(1-1 Project Name: %� f'(a,Jk/1(I 1�S I`s`L'"V' ��-/PfLN(iY�✓w. ��lx�l�IL(ti%'\.. Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to retum this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Ap l�ican/t's Cerbffca6o I, 1 WYf .R - n SJ a - , hereby state that, to the best of my abilities, due cue and JOnce was used in the observation of the construction such that the construction was observed to be built in substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signaturej,0OUI Agent's Certification 1, I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Pf thu/}�roject was designed by a Certified Professional 1P�, �ra5 ,as a duly registered Professional i�KuQt% Engineer, Eandscape Architect, Surveyor, etc.) in the State of North Carolina, having lacen authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to bKbuilt within substantial compliance and intent of the 401 Water Quality Certification and Bu$ lulu, c approlved plans and specifications, and other supporting materials. re: Signatu,/(/ Registration No. Li of i f Date ZZ_4T4'�?" -✓`Nothing Compares.' -a.,:... State of novh Carolina I Cnvlmmrcmal Quality I wear Resonrnex 2090 Us. Unitwoy 70. Swannmma, Noah Ca ulit a 28978 828-2964500