Loading...
HomeMy WebLinkAbout20171439 Ver 1_Buffer and/or Stream Determination_20170215Water Resources Environmental Quality February 15, 2017 Mr. Chris Sheats Three Oaks Engineering 324 Blackwell Street, Suite 1200 Durham, NC 27701 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: On -Site Determination for Applicability to the Mitigation Rules (15A NCAC 2H.0500) Subject Property: Pisgah Church Road, PIN 7866268536, Greensboro NC, Guilford County Dear Mr. Sheats: On February 14 2017, at your request, April Norton and Sue Homewood conducted an on-site determination to review features located on the subject project for stream determinations with regards to the above noted state regulations. David Bailey with the US Army Corps of Engineers was also present during the site visit. The Division acknowledges the areas and boundaries identified as jurisdictional wetlands by the USACE. The attached map accurately depicts all stream determinations conducted during the site visit. Please note that at the time of this letter, all perennial stream channels and jurisdictional wetlands found on the property are subject to the mitigation rules cited above. The owner (or future owners) should notify the Division (and other relevant agencies) of this decision in any future correspondences concerning this property. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the Division or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o 401 & Buffer Permitting Branch, 1650 Mail Service Center, Raleigh, NC 27699-1650. Individuals that dispute a determination by the Division or Delegated Local Authority that "exempts" surface water from the buffer rule may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60 -day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. The Division recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. {'tithing Compares7_. State of North Carolina I Environmental Quality 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336-776-9800 This letter only addresses the applicability to the mitigation rules and does not approve any activity within Waters of the United States or Waters of the State. If you have any additional questions or require additional information, please contact April Norton at 336- 776-9692 or via email at april.norton@ncdenr.gov. You may also contact me at 336-776-9693 or via email at sue.homewood@ncdenr.gov. Sincerely, S � �=-- * ("s �') Sue Homewood Winston-Salem Regional Office Enclosures: USGS Topo Map Three Oaks Engineering Map Cc: David Bailey, USACE Raleigh Regulatory Field Office (via email) Susie M. Eudy, Property Owner (via mail) DWR, Winston-Salem Regional Office 2 ft Contours Wetland WA = 0.006 acres Roads Wetland WB = 0.019 acres Perennial Streams Stream SA = 340.61 If Wetlands Study Area 4 ���61NEER��,G Prepared For: p5fl Mr. Bill Eudy Z -f H433i1 p Wl31 / y Pisgah Church Road Jurisdictional Waters Assessment USGS 7.5 Minute Topographic Quadrangle Map Guilford County, North Carolina 1r Date: January 2017 Scale: 0 50 100 Feet I Jt � i Job No.: 16-611 Drawn By: Checked By: NDH CMS Figure �, \1 EEfte Prepared For: 4 Mr. Bill Eudy Pisgah Church Road Jurisdictional Waters Assessment Jurisdictional Features Map Guilford County, North Carolina Date: February 2017 Scale: 0 40 80 Feet I I I Job No.: 16-611 Drawn By: Checked By: SA W B CMS C0N WA a +t r NC OneMap, NC Center for Q� +r "� ' ,1 �`""� Geographic Information and Analysis, NC 911 Board � � a � . r� � � fir• WB SA a, WA , r� A Roads Le Perennial Streams Wetlands ti , Study Area Wetland WA = 0.061 acres '. Irving Park L'n Wetland WB = 0.036 acres fere/ Stream SA = 340 If BneMdapy, NC Center for Geographic Informahion and Anal sis, NC 91 �, \1 EEfte Prepared For: 4 Mr. Bill Eudy Pisgah Church Road Jurisdictional Waters Assessment Jurisdictional Features Map Guilford County, North Carolina Date: February 2017 Scale: 0 40 80 Feet I I I Job No.: 16-611 Drawn By: Checked By: NDH CMS Figure ' • NN si -Map r �_ ` r 1 ■a 2 ■ r y L LL M WB • r -r SA WA 9° ge— Orr 7 �� 2 ft Contours Roads i Perennial Streams e Wetlands L� Study Area Wetland WA = 0.061 acres 4 t drying -Park Ln. Wetland WB = 0.036 acres r. Stream SA = 340 If EEfte Prepared For D LC cMr. Bill Eudy r.� Pisgah Church Road Jurisdictional Waters Assessment USGS 7.5 Minute Topographic Quadrangle Map Guilford County, North Carolina Date: February 2017 Scale: 0 50 100 Feet I I I Job No.: 16-611 Drawn NDH y Checke %S Figure 66; ,;. S Roads e �Le , Perennial Streams A Wetlands "/C9 Study Area Soils �A\ i CCC C CfB ��\EERIHS. Prepared For: 01 ,I '4 Mr. Bill Eudy CfB WB CCC €, WA SA �, Ar CCC AA IrvingPark Ln NCvOne'Map; NC Centerfior Geographic Informahion and Anal •-� - 911 l.- a. ", Pisgah Church Road Jurisdictional Waters Assessment NRCS Soils Map Guilford County, North Carolina Date: February 2017 Scale: 0 50 100 Feet I I I Job No.: 16-611 Drawn By: Checked By: NDH CMS Figure