Loading...
HomeMy WebLinkAbout20160691 Ver 2_401 Application_20171217LABS L in 9140 Arrowpoint Blvd., Suite 200arPA Phone 704.342.3007 Fax 704..1666 To: North Carolina Department of Water Quality 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 Attn: WE ARE SENDING YOU ❑ Shop Drawings ® Copy of Letter ® Attached ❑ Prints ❑ Change Order LETTER OF TRANSMITTAL Date: 12/20/17 Project #: 2160699 Re: Phase II South Fork Sewer 12/11/2017 As Requested PCN application for renewal 1 ❑ For Bids due ❑ Under Separate Cover ® Plans ❑ Samples ❑ Please Sign and Return ❑ Invoice ❑ Specifications COPIES DATE NO. DESCRIPTION 5 12/11/2017 As Requested PCN application for renewal 1 ❑ For Bids due Application fee $240 IN All D Q-ATER RES UR cm ITT THESE ARE TRANSMITTED ® For Approval ❑ For Your Use ❑ As Requested ❑ For Review and Comment ❑ For Bids due COMMENTS Submittal package 2 of 2. ❑ Reviewed ❑ Resubmit ❑ Furnish as corrected ❑ Submit ❑ Returned for corrections ❑ Return COPY TO (❑) w/enc. (❑) w/enc. SIGNED (❑) w/enc. Copies for approval Copies for distribution Corrected prints _? 40 �,rrowpoint Blvd., S_.ite 200, Charlotte, NC 28273 Phone 704.342.3007 Fax 704.342.1666 To: North Carolina Department of Water Quality 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 Attn: WE ARE SENDING YOU ❑ Shop Drawings ® Copy of Letter ® Attached LETTER OF TRANSMITTAL Date: 12/20/17 Project #: 2160699 Re: Phase II South Fork Sewer ❑ As Requested ❑ 2 12/11/2017 For Bids due ❑ Under Separate Cover ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Change Order ❑ Please Sign and Return ❑ Invoice COPIES DATE NO. DESCRIPTION For Your Use ❑ As Requested ❑ 2 12/11/2017 For Bids due Half size set of construction plans 5 12/11/2017 Full size set of construction plans THESE ARE TRANSMITTED ® For Approval ❑ For Your Use ❑ As Requested ❑ For Review and Comment ❑ For Bids due COMMENTS Submittal package 1 of 2. COPY TO ❑ Reviewed ❑ Resubmit ❑ Furnish as corrected ❑ Submit ❑ Returned for corrections ❑ Return 1-1 (❑) w/enc. (❑) w/enc. (❑) w/enc. Copies for approval Copies for distribution Corrected prints TWO VERS UTI I,III ES We are TR U to our customers! December 11, 2017 North Carolina Division of Water Resources 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 Reference: Phase II South Fork Sewer Town of McAdenville, Gaston County, North Carolina City of Gastonia Project Number: 701-265 Subject: US Army Corps of Engineers Pre -Construction Notification (PCN) Application (updated) DWQ — 401 Certification — DWR #16-0691 Please find attached the following information for the above referenced project: 1. Five (5) complete copies of the submittal sent to USACE for an updated 404 Certification. This submittal includes: a. Cover letter (1 page) b. Updated PCN Application Form (10 pages) c. Original PCN Application 2. Updated Full size project plans (2 sets) 3. Updated 11 x 17 project plans (3 sets) 4. Original 404 Permit Approval 5. Original 401 Permit Approval 6. Application Fee (Check for $240.00) Please see the attached revised submittal due to original permit expiration. The alignments of the proposed sewer lines are unchanged and proposed impacts to wetlands and streams remain unchanged. The changes in the plan reflect a series of value engineering negotiations between the contractor and City. Therefore, changes in the plans are primarily pipe material changes as well as removal of items no long in the project scope. Please advise us of any modifications or clarifications needed prior to re -approval by your office. Thank you for your time and please do not hesitate to call me with any questions or comments regarding the attached application or the project in general (Direct: 704-866-6726, Email: stepha n ies@two rive rsutiIities.com). We look forward to your comments and subsequent approval. PO Box 1748 Gastonia, NC 28053-1748 Sincerely, Stephanie Scheringer Division Manager Wastewater Treatment CC: Jason Wallace PE, Civil Engineer III Matt Bernhardt — Director of Public Works and Utilities Mike Bynum PE — Division Manager TRU Engineering Margo Tauzel — Project Administrator Kevin Garton, EI — La Bella Associates fTWo VERS U T I L I l" I F S We are TRU to our customers! December 11, 2017 D Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue — Room 208 Asheville, NC 28801-5006 D Reference: Phase II South Fork Sewer Town of McAdenville, Gaston County, North Carolina City of Gastonia Project Number: 701-265 Subject: US Army Corps of Engineers Pre -Construction Notification (PCN) Application (updated) USACE — 404 Certification —SAW -2016-01412 Please find attached the following information for the above referenced project: 1. Updated PCN Application Form (10 pages) 2. Updated 9.1 x 17 project plans (1 set) 3. Original Application 4. Original Approval Please see the attached revised submittal due to original permit expiration. The alignments of the proposed sewer lines are unchanged and proposed impacts to wetlands and streams remain unchanged. The changes in the plan reflect a series of value engineering negotiations between the contractor and City. Therefore, changes in the plans are primarily pipe material changes as well as removal of items no long in the project scope. Please advise us of any modifications or clarifications needed prior to re -approval by your office. Thank you for your time and please do not hesitate to call me with any questions or comments regarding the attached application or the project in general (Direct: 704-866-6726, Email: stephanies@tworiversutilities.com). We look forward to your comments and subsequent approval. Sincerely, Stephanie Scheringer Division Manager Wastewater Treatment CC: Jason Wallace PE, Civil Engineer III Matt Bernhardt— Director of Public Works and Utilities Mike Bynum PE—Division Manager TRU Engineering Margo Tauzel — Project Administrator Kevin Garton, EI — La Bella Associates PO Box 1748 Gastonia, NC 28053-1748 RENEWAL APPLICATION PRE -CONSTRUCTION NOTIFICATION (PCN) FORM SUBMITTAL DATE: DECEMBER 11, 2017 o�0F warF9QG J y O Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑x Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑x No 1 d. Type(s) of approval sought from the DWQ (check all that apply): Q 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑x No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑x No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑x No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑x No 2. Project Information 2a. Name of project: Phase 2 South Fork Sewer 2b. County: Gaston 2c. Nearest municipality / town: McAdenville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Gastonia 3b. Deed Book and Page No. Varies 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 1300 North Broad Street 3e. City, state, zip: Gastonia, NC 28054 3f. Telephone no.: 704-866-6726 3g. Fax no.: --�stephanies@tworiversutilities.com 704-867-0120 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): See attached PCN Document and Figure 1 1 b. Site coordinates (in decimal degrees): ILatitude: See attached document Longitude: See attached document 1 c. Property size: Varies acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: South Fork Catawba River 2b. Water Quality Classification of nearest receiving water: WS -V 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is linear across bare land and adjacent to manufacturing facilities. Construction will occur in existing rights -of -ways, through single-family residential neighborhoods, adjacent to stream banks, ponds and wetlands, and crossing streams, wetlands, and railroad and roadway rights -of -ways. Figure 2 shows land use along the project alignment. Figure 3 shows the soils along the project alignment. 3b. List the total estimated acreage of all existing wetlands on the property: See Figure 4 & attached document 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: See Figure 4 & 3d. Explain the purpose of the proposed project: attached document To eliminate the McAdenville and Pharr Yams wastewater treatment plants and convey wastewater to Gastonia's Two Rivers Utilities system. 3e. Describe the overall project in detail, including the type of equipment to be used: See attached document. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ro6ect includin all rior hases in the ast? ❑ Yes ❑x No ❑ Unknown Comments: Determinations made by LaBella Associates, PC 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Ira Poplar -Jeffers Agency/Consultant Company: LaBella Associates, PC Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? O Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. Corps Action ID: SAW -2016-01412, approved 8/31/2016, expired 03/18/2017. Water Quality permit W00038297 dated August 5, 2016 6. Future Project Plans 6a. Is this a phased project? ❑x Yes ❑ No 6b. If yes, explain. Future possible phases of the project may extend forcemains from the Lowell WWTP and/or the Eagle Road WWTP. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑x Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 T Excavation Unknown No DWQ 0.00300000 W2 - W3 - W4 - W5 - W6 - 2g. Total Wetland Impacts: .00300000 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T None. Directional Drill Trb South Fork Catawba PER Corps/DWQ 12.00000000 0.00000000 S2 T None. Directional Drill Trb South Fork Catawba PER Corps/DWQ 11.00000000 0.00000000 S3 T None. Directional Drill Trb Duhart's Creek PER Corps/DWQ 5.00000000 0.00000000 S4 T None. Bore & Jack Duhart's Creek PER Corp/DWQ 53.00000000 0.00000000 S5 - Choose one S6 - Choose one - 3h. Total stream and tributary impacts 0.00000000 3i. Comments: Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 None 02 03 04 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 None P2 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - None B2 B3 B4 B5 B6 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See attached PCN document. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. See attached PCN document. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑x No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes x No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑x No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? Less than 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑x No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project will only impact one watershed AND will result in less than 24% imperviousness. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's 'urisdiction is this ro'ect? City of Gastonia, Gaston County, NC ❑x Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑x No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑x Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑x No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements?x❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑x Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑x Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Q Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes Q No Comments: See attached PCN document. 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H.1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑x No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑x No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A IM 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. See attached PCN discussion document for a discussion of the facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑Q No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑x No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The website http://www.fws.gov/raleigh/species/cntylist/gaston.htmi was consulted. See attached PCN discussion document for a discussion of Endangered Species or Designated Critical Habitat in Gaston County. See also Figure 5. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑x No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Essential Fish Habitat Mapper (http://www.habitat.noaa.gov/protection/efh/habitatmappe r.html) was used to determine whether designated essential fish habitat occurred in the project area. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation 0 Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The North Carolina State Historic Preservation Office HPOWEB GIS Service (http://gis.ncdcr.gov/hpowebl was used to determine whether any historic or archeological resources would be impacted. See attached PCN discussion document. See also Figure 6. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: See attached PCN discussion document for a discussion of FEMA requirements and compliance of this project. 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM maps (https:Hmsc.fema.gov/portal/search#searchresultsanchor) for Gaston County w s d to make the floodplain determination. See attached PCN discussion document. See also Fi ur Matt Bernhardt Applicant/Agent's Printed Name Dat Icant/Agent's Signature (Ags signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 ORIGINAL APPLICATION PRE -CONSTRUCTION NOTIFICATION (PCN) FORM DATE: JULY 13, 2016 NVN4 A / �ic1�G w o < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Phase 2 South Fork Sewer 2b. County: Gaston 2c. Nearest municipality / town: McAdenville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Gastonia 3b. Deed Book and Page No. Varies 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 1300 North Broad Street 3e. City, state, zip: Gastonia, NC 28054 3f. Telephone no.: 704-866-6768 3g. Fax no.: 704-867-0120 3h. Email address: erich@tworiversutilities.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): See attached PCN Document and Figure 1 1b. Site coordinates (in decimal degrees): ILatitude: See attached document Longitude: See attached document 1c. Property size: Varies acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: South Fork Catawba River 2b. Water Quality Classification of nearest receiving water: WS -V 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is linear across bare land and adjacent to manufacturing facilities. Construction will occur in existing rights -of -ways, through single- family residential neighborhoods, adjacent to stream banks, ponds and wetlands, and crossing streams, wetlands, and railroad and roadway rights -of - ways. Figure 2 shows land use along the project alignment. Figure 3 shows the soils along the project alignment. 3b. List the total estimated acreage of all existing wetlands on the property: See Figure 4 & attached document 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: See Figure 4 & 3d. Explain the purpose of the proposed project: attached document To eliminate the McAdenville and Pharr Yarns wastewater treatment plants and convey wastewater to Gastonia's Two Rivers Utilities system. 3e. Describe the overall project in detail, including the type of equipment to be used: See attached document. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? ❑ Yes ❑X No ❑ Unknown Comments: Determinations made by LaBella Associates, PC 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑Preliminary Final ❑ 4c. If yes, who delineated the jurisdictional areas? Name (if known): Ira Poplar -Jeffers Agency/Consultant Company: LaBella Associates, PC Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? 0 Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? Yes ❑ No 6b. If yes, explain. Future possible phases of the project may extend forcemains from the Lowell WWTP and/or the Eagle Road WWTP. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Tem orar T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 T Excavation Unknown No DWQ 0.003 W2 W3 - W4 - W5 - W6 - 2g. Total Wetland Impacts: 0.003 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c, Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T None. Directional Drill Trb South Fork Catawba PER Corps/DWQ 12 0 S2 T None. Directional Drill Trb South Fork Catawba PER Corps/DWQ 11 0 S3 T None. Directional Drill Trb Duhart's Creek PER Corps/DWQ 5 0 S4 T None. Bore & Jack Duhart's Creek PER Corp/DWQ 53 0 S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 0 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 None 02 03 04 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 None P2 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f, Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - None B2 - B3 - B4 - B5 - B6 - 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See attached PCN document, 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. See attached PCN document. 2. Com ensato Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? [] Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified [] Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why, ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? Less than 1 % 2b. Does this pr9ject require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project will only impact one watershed AND will result in less than 24% imperviousness. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Gastonia, Gaston County, NC ❑X Phase II ❑ NSW 3b. Which of the following locally-implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state-implemented stormwater management programs apply ❑ORW (check all that apply): ❑X Session Law 2006-246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the rX1 Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑X Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑X No letter.) Comments: See attached PCN document. 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, C] Yes © No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? El Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ONO additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. See attached PCN discussion document for a discussion of the facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The website http://www.fws.gov/raleigh/species/rntylist/gaston.html was consulted. See attached PCN discussion document for a discussion of Endangered Species or Designated Critical Habitat in Gaston County. See also Figure 5. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Essential Fish Habitat Mapper (http:/Iwww.habitat.noaa.gov/protection/efh/habitatmapper.htmO was used to determine whether designated essential fish habitat occurred in the project area. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The North Carolina State Historic Preservation Office HPOWEB GIS Service (http://gls.ncdcr.gov/hpowebtj was used to determine whether any historic or archeological resources would be Impacted. See attached PCN discussion document. See also Figure 6. B. Flood zone Designation (Corps Requirement) _....... __.. 8a. Will this project occur in a FEMA-designated 100 year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: See attached PCN discussion document for a discussion of FEMA requirements and compliance of this project. 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM maps (https:llmsc.fema.gov/portal/search#searchresultsanchor) for Gaston County were used to make the floodplain determination. See attached PCN discussion document. See also Figure 7. Applicant/Agent's Printed Name Date Applica gent's Signature (Agent's signa re Is valid only if an authorization letter fro the applicant is provided.) Page 10 of 10 PCN Discussions Document B.1a. Property Identification No. (Tax PIN or Parcel IDI: Properties along the project are owned by the City of Gastonia outright as well as through sanitary sewer easements across additional properties. A project location map is included as part of this submittal. B.1b. Site coordinates (in decimal degrees): Start: Latitude: 35.247361, Longitude: 81.097222 End: Latitude: 35.256167, Longitude: 81.073528 Latitude: 35.260361, Longitude: 81.076389 See Figure 1 for a project location map. Stream Crossing Latitude Longitude 1 35.256111 81.073472 2 35.257722 81.079056 3 35.248028 81.094 4 35.24775 81.0965 Wetland Latitude Longitude Crossing 1 35.259806 81.07525 B.3b. List the total estimated acreage of all existing wetlands on the property: The project will disturb 0.003 acres of wetlands. Figure 4 shows the locations of the wetlands in/around the project area. B.3c. List the total estimated linear feet of all existine streams (intermittent and perennial) on the property: The project will cross a tributary of South Fork Catawba River twice on different properties. Each crossing will be done perpendicular to its flow with estimated lengths of 12 and 11 feet, respectively, at each crossing. These crossings will have no impact to the river as they will be installed by the directional drill method. The project will cross a tributary of Duhart's Creek, perpendicular to its flow by the project alignment, with an estimated length of 5 feet at the crossing. The crossing will have no impact to the creek as it will be installed by the directional drill method. The project will cross Duhart's Creek, perpendicular to its flow by the project alignment, with an estimated length of 53 feet at the crossing. The crossing will have no impact to the creek as it will be installed by the bore and jack method. Figure 4 shows the stream crossing locations along the project alignment. B.3e. Describe the overall proiect in detail, including the type of equipment to be used: The project involves the construction of a pump station, forcemain, and gravity sanitary sewer utilizing pneumatic wheeled and tracked excavation equipment along with equipment used to complete pipe installation by the bore and jack and directional drilling method. Erosion control measures will include sediment fence, gravel check dams, inlet and outlet protection, temporary construction entrances, temporary diversion ditches, silt fence stone outlets, type "B" temporary wet weather ditch crossings, and bore and jack erosion control measures. The devices will be designed to accommodate the 25 year storm. Design drawings will be prepared and submitted to the North Carolina Department of Environmental Quality and the North Carolina Department of Transportation for approvals prior to any construction beginning. D.1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing proiect. All stream crossings will be installed by either the bore and jack or directional drill method and will be accomplished as near to perpendicular as possible. New easements have been proposed and obtained and the project has been designed to minimize as much environmental impact as possible. Temporary clearing for construction will be minimal as construction equipment will utilize newly obtained easements. D.1b Specifically describes measures taken to avoid or minimize the proposed impacts through construction techniques. Pre -construction contours will be restored and disturbed areas promptly returned to pre - construction conditions through repaving, revegetating or replacing with new gravel. Sediment fencing will be installed on the down slope edge of the right-of-way prior to construction and maintained until vegetation is reestablished. Contractors will be instructed to schedule line installation across any wet weather ditches during dry weather. No uncured concrete or asphalt will be allowed to contact surface waters. E.2a. What is the overall percent imperviousness of this proiect? Imperviousness of the project once complete will be less than one percent as the finished line will be buried. No additional impervious areas will be created other than the 17 manholes that will be installed and total approximately 350 ft2. F.1c. If you answered "}des" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) An ER/EID has been prepared and submitted pursuant to NCDEQ Division of Water Infrastructure requirements. The document is currently under review and will be approved prior to initiating any ground disturbing activity. F.4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Long Creek WWTP (NPDES No. NC0020184) is a 16.0 MGD capacity wastewater treatment facility using advanced biological nutrient removal (BNR). The treated water is discharged to the South Fork Catawba River. The solids removed from the wastewater are pumped to the WWTP digesters to help stimulate biological treatment, converting the solids to biosolids. These biosolids are then used to fertilize state -permitted farmland sites (Permit Nos. WQ0001793 and N D0084883). Source: Two Rivers Utilities Annual Wastewater System Performance Report 2014-2015 F.Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The US Fish and Wildlife Service's website http://www.fws.gg-ov/raleigh/species/cntviist/­gaston.html was consulted to identify any endangered species or designated critical habitat in the Gaston County. No known occurrences of threatened or endangered species exist anywhere within the project area. There is no designated critical habitat in Gaston County. Schweinitz's Sunflower (endangered) is listed as a current record in Gaston County but does not have suitable habitat along project alignments. Dwarf -flowered heartleaf (threatened) is listed as a current record in Gaston County, but does not have suitable habitat along project alignments. Georgia aster (candidate) is listed as a current record in Gaston County but does not have suitable habitat along project alignments. Shoals spiderlily (federal species of concern) is listed as a current record in Gaston County but does not have suitable habitat along project alignments. Bog Turtle (threatened by similarity of appearance to northern bog turtles) is listed as probable in Gaston County but also does not have suitable habitat along project alignments. Northern Long -Eared Bat (threatened) is as a current record in Gaston County but does not have a suitable habitat along project alignments. Bald Eagle (protected under the bald and golden eagle protected act) is a current record in Gaston County but does not have suitable habitat along project alignments. Figure 5 lists the Endangered Species and Designated Critical Habitat in/around the project area. F.7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The North Carolina State Historic Preservation Office HPOWEB GIS Service (http://gis.ncdcr.gov hj poweb/) was used to determine locations where the new outfall would cross into historic sites. One site was found along the path of the new outfall which is identified as the McAdenville Historic District (GS0428). Within this district, lies the McAden Mill (GS0402). Extra precaution will be taken when construction occurs along the south edge of the property, specifically along the south side of one of the mill buildings. The trees along the edge of the property, along the existing pond are called out on the construction drawings as being "culturally sensitive and shall be protected from damage". The contractor is also to "provide a 1 -year warranty against survival of existing trees". Figure 6 shows the location of historical sites along the project alignment. F.8b. If yes, explain how proiect meets FEMA requirements: Plans and the appropriate flood studies for any proposed construction activity in the floodway or non -encroachment area will be submitted to the City of Gastonia's Floodplain Administrator for approval. This project will require either a No -Rise Certification or a FEMA -approved Conditional Letter of Map Revision (and Subsequent Letter of Map Revision) because of construction within the regulatory floodway (Section 7.6.1.A.8.b of the City of Gastonia's Unified Development Ordinance). Manholes within the floodplain will be sealed and vented to above the regulatory flood elevation. All new sanitary sewer lines will be buried. F.8c. What sourcefs) did you use to make the floodplain determination? The NC Floodplain Mapping Program website along with FEMA FIRM maps (https://msc.fema.gov/portal/search#searchresultsanchor), FIRM Panels 3575 and 3585, was used to determine what portions of the project are in the floodplain. The City of Thomasville's Flood Damage Prevention Ordinance was also consulted. Figure 7 shows the project alignment in relation to the floodplain areas. L I "'p0'RD a o 2000 TRIBUTARY TO SOUTH FORK CATAWBA RIVER `'`�`'$ �� SCALE: I"= 2000' 1 c Q IL M ?V Aviary �-T Gardens ` t 7 KINSO BLVD 29a 74 d r i u a = .y, ° Cram erton West ow FoRge 3 Cramerton 91 4 r f i a �-- �° PROJECT LOCATION � � O OO�1 Yk- ZaO 9a r a PROJECT LOCATION MAP co �' FIGURE 1 5° 15 44" N 5` 14'44" N 5 (Soils Map) e m 35° 15.44 M 490900 491200 491500 491WO 492100 4914x 3 e W Map Scale: 1:13,000 if printed on A kvf cape (11" x 8.5") sheet. N Meters 0 150 300 600 900 Few a soo l000 z000 3000 MOP PrOJeCljon: Web Mercator Cortier coordinates: WCS84 Edge tics: UTM Zone 17N WCS84 t!SDA Natural Resources Web Soil Survey 492AX) 493000 493300 493600 3 a Soils Map Figure 3 - Page 1 MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons a� Soil Map Unit Lines ® Soil Map Unit Points Special Point Features V Blowout ® Borrow Pit Enlargement of maps beyond the scale of mapping can cause Clay Spot Wet Spot Closed Depression Gravel Pit „ Gravelly Spot 4 Landfill A. Lava Flow 46 Marsh or swamp OR Mine or Quarry Water Features Miscellaneous Water O Perennial Water IV Rock Outcrop ..t.. Saline Spot s Sandy Spot +-" Severely Eroded Spot Coordinate System: Web Mercator (EPSG:3857) Sinkhole Interstate Highways Slide or Slip Sodic Spot Soil Map --Gaston County, North Carolina (Soils Map) MAP INFORMATION A Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Warning: Soil Map may not be valid at this scale. Very Stony Spot Enlargement of maps beyond the scale of mapping can cause Wet Spot misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting Other soils that could have been shown at a more detailed scale. .� Special Line Features Please rely on the bar scale on each map sheet for map Water Features measurements. Streams and Canals Source of Map: Natural Resources Conservation Service Transportation Web Soil Survey URL: http://websoilsurvey.nres.usda.gov +-" Rails Coordinate System: Web Mercator (EPSG:3857) Interstate Highways Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts US Routes distance and area. A projection that preserves area, such as the Major Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Local Roads This product is generated from the USDA-NRCS certified data as of Background the version date(s) listed below. Aerial Photography Soil Survey Area: Gaston County, North Carolina Survey Area Data: Version 15, Sep 10, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Feb 13, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usDA Natural Resources Web Soil Survey Fig' Ure 3 - Page, 2 Conservation Service National Cooperative Soil Survey Soil Map -Gaston County, North Carolina Map Unit Legend Gaston County, North Carolina (NC071)' Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI ApB CeB2 CeD2 CfB CID ChA CoA Ld D2 PaD2 PaE TaB TaD TaE Ur W WeD WkF WnD Totals for Area of Interest Appling sandy loam, 1 to 6 percent slopes Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded Cecil sandy clay loam, 8 to 15 percent slopes, moderately eroded Cecil -Urban land complex, 2 to 8 percent slopes Cecil -Urban land complex, 8 to 15 percent slopes Chewacla loam, 0 to 2 percent slopes, frequently flooded Congaree loam, 0 to 2 percent slopes, occasionally flooded Lloyd sandy clay loam, 8 to 15 percent slopes, moderately eroded Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded Pacolet sandy loam, 15 to 25 percent slopes Tatum gravelly loam, 2 to 8 percent slopes Tatum gravelly loam, 8 to 15 percent slopes Tatum gravelly loam, 15 to 25 percent slopes Urban land Water Wedowee sandy loam, 6 to 15 percent slopes Wilkes loam, 15 to 30 percent slopes Winnsboro loam, 8 to 15 percent slopes 17.0 130.9 48.3 243.4 76.9 33.3 0.7 5.1 120.9 67.3 13.2 13.8 37.6 26.4 15.3 14.8 1.6 2.5 869.0 5.6% 28.0% 8.9% 3.8% 0.1% 0.6% 13.9% 7.7% 1.5% 1.6% 4.3% 3.0% 1.8% 1.7% 0.2% 0.3% 100.0% Soils Map U Flure 3 _ P.,_._ g ge 3 Natural Resources Web Soil Survey a Conservation Service National Cooperative Soil Survey _ Stream and Wetland Crossings Figure 4 - Page 1 i �. Wetland -PEM i k wd-13 wd-11 wd-14 Wd-1O w r -4 wd-15 wd-14a wd- 9 wd-18 .a wd-16 wd-20 wd-8 t wd-19 -� wd-101 wd-102 �G t wd-106 wd-6 —I - a wd-5 yeQ wd -3 / *o wd 1 \ Legend Wetland and Stream Boundaries (as delineated by LaBella) „. Jurisdictional Wetland and Stream Areas (as delineated by LaBella) V,7 • Stream Wetland O Wetland or Stream Boundary Flag Locations -�'. _.. - •"`+_ s� —� Drainage Direction Arrows (Approximate) +a•= `'t - � • . PFO-PEM Divide (Approximate) l- Culverts or Bridges (Approximate) Wetland Delineation Study Area (Approximate) 0 40 80 160 — • Proposed Sewer Route (Approximate) Feet's 1 inch = 80 feet Document Path: V�PEASE-AD1\Shares\projects-201x113.0\City of Gastonia\South Fork Sawer,tNe'.tandslDrawirystGastorua Wetlands Map (2016-03-29) mxd Figure 4 - Page 2 -4 wwwwwmmmmmww� .t National Wetlands Inventory I Wetlands Map July 11, 2016 This map is for general reference only The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the Estuarine and Marine Deepwater Freshwater Forested/Shrub Wetland Ej Other base data shown on this map All wetlands related data should be used in accordance with the layer metadata found on the Estuarine Marine Wetlands Mapper web site IFigure 4 Page 31 and Wetland Freshwater Pond Riverine - Freshwater Emergent Wetland r Lake ,r viaN Ct P' n NC -7 Main St. F rs, PIC Poplar St etland-A - PEM/PFO i l sb1r - �,v •^+ wa-9 wa-10 .__. sb 10 wa-6 q abu f wa 8 ;---► �'� m s �= . �. sa 6 sa-8 4 wa-571 ��� / sb wa-sa 1 f sb 7 sb-8;.. %r sa-l02 b-5 t, sti 1.04 , "•"t► �.o sa 9 � sb-145" "-'�►.�- i � ,� �r, _ ,� sb-106 =sa,40 Stream -13 - Perennial RPW 4 sa_11 sa 15 ' sa-T4 sa 11a wb-1 wb-2 N� a wb-3 N:, wb-4 x Y�� r s=. _ • - -S � tream-A Perennial RPW- s Y, Legend �. � �' Wetland -13 - PFO Wetland and Stream Boundaries (as delineated by LaBella) Fes' Jurisdictional Wetland and Stream Areas (as delineated by LaBella)� r - Stream' Wetland O Wetland or Stream Boundary Flag Locations - o C. t �m —� Drainage Direction Arrows (Approximate) PFO -PEM Divide (Approximate) a y — Culverts or Bridges (Approximate) n ry�0 3� OWetland Delineation Study Area (Approximate) 0 90 180 360 �� - — - Proposed Sewer Route (Approximate) Feet w' t 1 Inch = 180 feet . m` Figure 4 - Page 4 Document Path ",,PEASE-AD1\Shares\Proiects-201 xt13.O\City of Gastonia\SoutF Fork Sewer SJetlands\Drawl ,Gas.onia 4Vetlandc nna^ l901Fs ;-?4'; mart ___ Legend — Wetiand and Stream Boundaries (as delineated by La Bella) Jurisdictional Wetland and Stream Areas (as delineated by La Bella) Stream Wetland O Wetland or Stream Boundary Flag Locations ---01- Drainage Direction Arrows (Approximate) • PFO -PEM Divide (Approximate) - Culverts or Bridges (Approximate) Wetland Delineation Study Area (Approximate) — Proposed Sewer Route (Approximate) wc-4 Wetland -C - PEqsd-8 data point upl-4 WC-8� WC -3 we -2 WC -1 Stream -D - Ephemeral RPW -2 4 Stream -D - Perennial RPW6 14l se -1 Stream -E - Qq � Perennial RPW se -101 � se -3 ,.s .r�._r,t a!h rF'FS�- S a. -��r •� ,, x ��Ci[v of GasEonia�Sor..h Fnrk SPwar�WetlanesVnraw�rn ,f Y sd-13 sd-114 sd-14 f sd 116 sd-15 sd-16 sd-117 sd-118 sd-17 sd-18 I Sd-9 d -11C sd-10 Y sd-111 F 11 sd-11 Dn sd-112 sd-12 Figure 4 - Page 5 Legend Wetland and Stream Boundaries (as delineated by LaBeAa) Jurisdictional Wetland and Stream Areas (as delineated by LaBella) Stream Wetland O Welland or Stream Boundary Flag Locations —� Drainage Direction Arrows (Approximate) PFO -PEM Divide (Approximate) - Culverts or Bridges (Approximate) Welland Delineation Study Area (Approximate) -- • Proposed Sewer Route (Approximate) Ivs m� #� x Figure - Page 6 �« m_. V, : v x 0 25 50 100 Feet we 1 inch = 50 feet c Document Path: \\PEASE -AD 1\Shares\proiects-201 x113.0':City of Gastono7 South Fork S A:: 1 1 r . . I/ 1 I/Nl0 Caston uounry tnuangerea Species, i nreatenea Specles,reaerai Species of concern, and uandldate Species U.S. Fish & Wildlife Service Endangered Species, Threatened Species,Federal Species of Concern, and Candidate Species, Gaston County, North Carolina Updated: 7-24-2015 Common Name Scientific name Federal Record Status Status Vertebrate: Bald eagle Haliaeetus leucocephalus BGPA Current Bog turtle Glyptemys muhlenbergii T (S/A) Current Northern long, -eared bat Myotic septentrionalis T Probable/Potential Invertebrate: Vascular Plant: Dwarf -flowered heartleaf Hexastylis naniflora T Current Georgia aster Symphyotrichum georgianum C Current Schweinitz's sun ower Helianthus schweinitzii E Current Shoals spiderlily Hymenocallis coronaria FSC Probable/potential Nonvascular Plant: Lichen: Definitions of Federal Status Codes: E = endangered. A taxon "in danger of extinction throughout all or a significant portion of its range." T = threatened. A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range." C = candidate. A taxon under consideration for official listing for which there is sufficient information to support listing. (Formerly "C1" candidate species.) BGPA =Bald and Golden Eagle Protection Act. See below. FSC=Federal Species of Concern. FSC is an informal term. It is not defined in the federal Endangered Species Act. In North Carolina, the Asheville and Raleigh Field Offices of the US Fish and Wildlife Service (Service) define Federal Species of Concern as those species that appear to be in decline or otherwise in need of conservation and are under consideration for listing or for which there is insufficient information to support listing at this time.Subsumed under the term "FSC" are all species petitioned by outside parties and other selected focal species identified in Service strategic plans, State Wildlife Action Plans, or Natural Heritage Program Lists. T(S/A) = threatened due to similarity of appearance. A taxon that is threatened due to similarity of appearance https://www.fws.gov/raleigtVspecies/cntylist/gaston.html IFigure57 j/2 rnvzuib uaston county tnoangereo Species, I hreatened Species,Federal Species of Concern, and Candidate Species with another listed species and is listed for its protection. Taxa listed as T(S/A) are not biologically endangered or threatened and are not subject to Section 7 consultation. See below. EXP = experimental population. A taxon listed as experimental (either essential or nonessential). Experimental, nonessential populations of endangered species (e.g., red wolf) are treated as threatened species on public land, for consultation purposes, and as species proposed for listing on private land. P = proposed. Taxa proposed for official listing as endangered or threatened will be noted as "PE" or "PT", respectively. Bald and Golden Eagle Protection Act (BGPA�: In the July 9, 2007 Federal Register( 72:37346-37372), the bald eagle was declared recovered, and removed (de- listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8,2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668-668d) becomes the primary law protecting bald eagles. The Eagle Act prohibits take of bald and golden eagles and provides a statutory definition of "take" that includes "disturb". The USFWS has developed National Bald Eagle Management Guidelines to provide guidance to land managers, landowners, and others as to how to avoid disturbing bald eagles. For mor information, visit ht_ tajfwww.fws.Lov/tniaratorybirds/baidet�tale.htm Threatened due to similarity of appearance(T(S/A)L In the November 4, 1997 Federal Register (55822-55825), the northern population of the bog turtle (from New York south to Maryland) was listed as T (threatened), and the southern population (from Virginia south to Georgia) was listed as T(S/A) (threatened due to similarity of appearance). The T(S/A) designation bans the collection and interstate and international commercial trade of bog turtles from the southern population. The T(S/A) designation has no effect on land management activities by private landowners in North Carolina, part of the southern population of the species. In addition to its official status as T(S/A), the U.S. Fish and Wildlife Service considers the southern population of the bog turtle as a Federal species of concern due to habitat loss. Definitions of Record Status: Current - the species has been observed in the county within the last 50 years. Historic - the species was last observed in the county more than 50 years ago. Obscure - the date and/or location of observation is uncertain. Incidental/migrant - the species was observed outside of its normal range or habitat. Probable/potential - the species is considered likely to occur in this county based on the proximity of known records (in adjacent counties), the presence of potentially suitable habitat, or both. https:/A,vww.fws.gov/raleigNspecies/cntylisttgaston.htm 1 2/2 g ajn6id s91iS IeouOISIH NOIS VO ua;aawala Isam isPAie{{ 3 alis yBnojyj uopnol ioa[ojd :, W4 ;:S mak ,. WIN U40VOIN Zovcs*, ; �d.f Soot s'1�I,�N30b'�tN 8Z�oSQ r ECSV a r"" nT F e § GRID NORTH 'Y " `' ' MAP SCALE 1" = 500' (1 6,000) w r K- yy s S > PANEL 3575) ¢_ FIRM > t FLOOD INSURANCE RATE MAP 'f NORTH CAROLINA PANEL 3575 r ' arter aEE Jti1 —Y Ji?7.RN .X .uA`._C .IYli, ;;01 x a, COMMUS 9;1'i'1'-! S_tt 3 SGL rRANEG'Ok- TMW0 35" ,.....,,,._ } GASTON CQ4 .:, ?�L�94 3$15r 0 C tOr " • l� _. sad tx'risElt.0 ,'Y21 _. ,v 7Yv C� D' / \� M'ar• wags? - mp MimM .+w,., ewrn rwua oa wr - �, j �+` ""ewe ` �� ^ `•-` �� I m n"act enn C --A7 W -b. Vrmr abate �:. �- E DATE MAP NUMBER SEPTEMBER 3710357500J State of Nonh Carolina Federal Emctgcnc% Management Agency � t a90 ) 5 tt?icdb CAU „04 , �r x MOM i3eginning of Project ,ra`4. z � � w f` _. - ti. � e_ �.n»-o�o »..en +r �•. maa ..e.00,.++ ++r wwo,�n. ,Figur 7 - Page 17 Figure 7 - Page 2� ATTACHMENT A PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Mr. Matt Bernhardt, Director of Public Workds and utilities, City of Gastonia, Gaston County, NC PO Box 1748, Gastonia, NC 28053 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: See attached table for project locations and PCN Discussion Document for background information (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: Gaston County City: Gastonia Center coordinates of site (lat/long in degree decimal format): Lat. See attached documents °N; Long, see attached documents °W, Universal Transverse Mercator: Name of nearest waterbody: Duhart's Creek and South Fork Catawba River Identify (estimate) amount of waters in the review area: Non -wetland waters: S1 linear feet: 6 width (ft) and/or acres. COwardin Class: See Table Stream Flow: Perennial Wetlands: 0.003 acres. Cowardin Class: PEM Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: None Non -Tidal: None E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL APPLY): ❑ Office (Desk) Determination. Date: ❑ Field Determination. Date(s): THAT SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: ❑✓ Data sheets prepared/submitted by or on behalf of the appnt/consultant. Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report, ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data ❑ USGS 8 and 12 digit HUC maps 0 U.S. Geological Survey map(s). Cite scale & quad name, 75 Minute, BelmonVMt holly, Figure, ❑✓ USDA Natural Resources Conservation Service Soil Survey. Citation: USDA Web Soil Survey - Soil Map Gaston County, North Carolina - Figure 3 aNational wetlands Inventory map(s). Cite name: US Fish and Wildlife Service - Figure 4 ❑ State/Local wetland inventory map(s): ❑✓ FEMA/FIRM maps: Gaston County, N.C. FIRM 3575 & FIRM 3585- Figure 7 IN 100 -year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial (Name & Date): or [❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: Other information (please specify): 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be" waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Coros and should not be relied uD later jurisdictional determinations. Signature and date of Regulatory Project Manager (REQUIRED) M Sianatutel"and date of perms requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) Sewerline Stream Crossings Estimated amount Crossing Cowardin Class of aquatic Latitude Longitude of aquatic resource Number Class rescurce in review area 1 35.25611 81.073472 R -3 -UB -1 12 feet Non -section 10 R -3 -UB -1 11 feet -non-tidal Non -section 10 2 35.257722 81.079056 -non-tidal Non -section 10 3 35.248028 81.094 R -3 -UB -1 5 feet — -non-tidal_,_ Non -section 10 4 35.24775 810965 R -3 -UB -1 53 feet -non-tidal iNu ll Wv Ntream wentiucatton corm version ,4. i ii _ Date Project/Site: AfeAlK Latitude: Evaluator: „- 6oanyr; i�Cr Longitude: Total Points:Stream Determinatlon (circle one) Other Stream is at least intermittent Ephemeral Intermittent Perennial e.g. Quad Name: > if _ 19 or perennial if> 30" _�F A. Geomorphology (Subtotal = _.._ -) 1a Continuity of channel bed and bank 2. Sinuosity of channel along thalweg 3. In -channel structure; ex. riffle -pool, step -pool, ripple -pool sequence 4. Particle size of stream substrate 5. Active/relict floodplain 6. Depositional bars or benches 7. Recent alluvial deposits 8. Headcuts 9. Grade control 10. Natural valley 11. Second or greater order channel artificial ditches are not rated; see discussions in manual B. Hydrology (Subtotal 12. Presence of Baseflow 13, Iron oxidizing bacteria 14. Leaf litter 15. Sediment on plants or debris 16. Organic debris lines or piles 17_ Soil -based evidence of high water table? C. Biology (Subtotal = 57_) Absent Weak ModerateStrong _ 18. Fibrous roots in streambed 3 2 _ . _. _. _ _1 _ _ _ 1 --3 20. Macrobenthos (note diversity and abundance) - 0 1 2 3 0 1 2 3 0 1 2 /lot% _ 0 1 _._ 3 0 1 3 no 26. Wetland plants in streambed 0 0.5 1 1.5 _ w_._. _. _ 0 __... _ 0.5 _ 1. No l Yes = 3 C. Biology (Subtotal = 57_) _ _ 18. Fibrous roots in streambed 3 0 1 19. Rooted upland plants in streambed 3 2 1 20. Macrobenthos (note diversity and abundance) 0 1 2 21. Aquatic Mollusks 0 1 2 22. Fish 0 0.5 1 23. Crayfish 0 0.5 1 24. Amphibians 25. Algae 26. Wetland plants in streambed FACW = 0.75 OBL = 1.5 Other `perennial streams may also be identified using other methods. See p 35 of manual Notes: Sketch: , I be / (fl/s) 3 0 1.5 _ 1.5 IVC; UWU Stream Identification Norm Version 4.11 Date: 3 f2 Project/Site: 54 Q w%- b Latitude: Evaluator: �fi� - �d I n ' �ev. -!s✓� Longitude: trt r' PrJ. Total Points: ermination (circle one) Other Stream is at least intermittent 'Z phemera ntermittent Perennial e.g. quad Name: if >_ 19 or perennial if > 30" A. Geomorphology (Subtotal = _) Absent We Mode11 rate St11 ron 1a Continuity of channel bed and bank 0 2 2 3 2. Sinuosity of channel along thalweg 0 1 2 3- 3. In -channel structure: ex. riffle -pool, step -pool, 0 1 2 3 ripple -pool sequence 0 0.5 1 1.5 4.Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain 0 1 1 3 6. Depositional bars or benches Q 1 2 3 7. Recent alluvial deposits 0 2 3 8. Headcuts 1 2 3 9. Grade control 0 o- .9 1.5 10. Natural valley 0 0.5 1.5 11. Second or greater order channel o = 0 Yes = 3 ' artificial ditches are not rated; see discussions in manual B. Subtotal = Z 'Hydrology 12. Presence of Baseflow0 1 2 3 13 Iron oxidizing bacteria 0 1 3 14. Leaf litter 1.5 1 0.5 15. Sediment on plants or debris 0 0. 1 16. Organic debris lines or piles 0.5 1 17. Soil -based evidence of high water table? No = 0 Yes = 3 C. Biology (Subtotal 18. Fibrous roots in streambed 3 1 0 19. Rooted upland plants in streambed 2 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21, Aquatic Mollusks 0 1 2 3 22. Fish 0 0.5 1 1.5 23, Crayfish 0 0.5 1 -1.5 24. Amphibians 0 0.5 1 1.5 25. Algae Q 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other = 0 "perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: 4 5D - V, 0q NC DWQ Stream Identification Form Version 4.11e ProjectlSite: Date: V ZVI _ �Wj Evaluator: z5(', �..County: Total Points: Stream Dete circle one) Stream is at least mtemultent Ephemeral ntermitten Perennial i/ z 19 or i)erannial if a 30' - - - Latitude: Longitude: Other e.g. Quad Name: '5� - L A. Geomorphology (Subtotal = f�•� -� �.�. _. Sketch: Absent Weak _. Moderate _ m _ Strong 3 1 a' Continuity of channel bed and -bank - -- _- u 2 3 2. Sinuosity of channel aloe thalweg0 - . _. . ._- .. - 3. In -channel structure; ex. riffle -pool, step -pool, 0 3 ripple.pool sequence 1 4. Particle size of stream substrate 0 _. _ 1 _ __ 2 _ 3 5. Active/relict floodplain 0 6. Depositional bars or benches 2 3 7. Recent alluvial deposits 0 0 1 2 3 8. Headcuts 0 1 1.5 9. Grade control -._ 0.5 1 .5 10. Natural valley _ _.._ _ 11. Second or greater order channel No = 0 es = 3 _ °artificial ditches are not rated, see discu ions in manual B._ijdr91o9y (Subtotal 12. Presence of Baseflow 13, Iron oxidizing bacteria 1 - �- 2 - _. 0'S;lPm 0 - _ 14. Leaf litter _ _ - -- 15. Sediment on plants or debris - 0.5 1.5 16. Organic debris lines or piles _ 0.5 Yes - 3 5 17. Soil -based evidence of high water table? C. Bi 109y (Subtotal 18. Fibrous roots in streambed 3 2 0 19. Rooted upland plants in streambed 2 1 0 20. Macrobenthos (note diversity and abundance) 23 21. Aquatic Mollusks _ _W (� - 1 - 0.5 2 1 3 1.5 22. Fish 0.5 1 - 1.5 23. Crayfish 0 _. 0'S 1 1.5 24. Amphibians 25. Algae 26. Wetland plants in streambed FACW = 0.75; OBL = 1. Other 0 'perennial streams may also be identified using other methods. See p. 35 of manual. ,__ _.. _ ._ ------- Sketch: GENERAL PERMIT VERIFICATION SAW -2016-01412 DATE: 8/31/2016 EXPIRATION DATE OF VERIFICATION: 03/18/2017 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2016-01412 County; Gaston U.S.G.S. Quad: NC -MOUNT HOLLY GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Gastonia Address: 1300 North Broad Street Gastonia, North Carolina, 28054 Telephone Number: 704-866-6768 E-mail: erichAtworiversutilities.com Size (acres) >1 Nearest Town McAdenville Nearest Waterway South Fork Catawba River River Basin antee USGS HUC 3050102 Coordinates Latitude: 35.25981 Longitude: -81.67525 Location description: The permit area is located 200 feet northwest of the intersection of Hickory Grove Road and Lakeview Drive. Description of projects area and activity: This verification authorizes the placement of fill material in 0.003 acre of wetlands to facilitate the construction of a gravity sanitary sewer system. The remainder of waters of the United States within the permittees project corridor would be crossed using Jack and bore or horizontal directional drilling and would not result in a discharge in those waters. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit Number: Nationwide Permit 12. Utility Line Activities SEE ATTACHED NWP GENERAL AND REGIONAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated July 13, 2016, and the enclosed plan Sheets 16 dated July 13, 2016 and Figure 4 — Page 2 dated March 29, 2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department ofthe Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David Shaeffer at 704-510-1437 or David.L.Shoefferausa_ce.armv.mil. .0., .", $N&W1KDAWMW17f 1Mfl nAN6f8tDAYDlF7f�lf7(Wf057S Corps Regulatory Official: D.1K7�1.�.,1.1�,�, �� Date: 8/31/2016 Expiration Date of Verification: 03/18/2017 Determination of Jurisdiction: A. ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: SAW - Basis For Determination: Based on information submitted by the applicant and available to the U.S. Army Corps of Engineers, the proiect area appears to exhibit criteria for waters of the U.S. as Piedmont and Mountains v2.0. See the preliminary iurisdictional determination form dated 8/31/2016 included in the file. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The del ineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room IOMI 5 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. 'i Dig ltlyn.d by SHAEffE0.DANOAEI 77b07f0573 • U-SHAE wUS.GwemmenG 0750S7.ou.pKyou.V30. Corps Regulatory Official: cn.SHA1'0831FEKDAVIDA:59-04 b0770f73 Dafa 7016D731 71:7730-0E'00' David L. Shaeffer Date of JD: 8/31/2016 Expiration Date of JD: not applicable The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at htip:/://corpsma�u.usace.army.mil/em apex/Vp=136:4:0 Action ID Number: SAW -2016-01412 County: Gaston Permittee: City of Gastonia Project Name: City of Gastonia, Phase II South Fork Sewer Date Verification Issued: 8/31/2016 Project Manager: David Shaeffer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David Shaeffer Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Cf Gastonia File Number: SAW-2016-01412 Date: 8/31/2016 Attached is: See Section below INITIAL PROFFERED PERMIT Standard. Permit or Letter ofpermission) A ❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or lifitp://�vww tisace.,irniv.iniI/Missions!Civi NVorks/ReaulatoryProi�,ramandPemi ts.as or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you. may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in .its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: Ifyou object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn: Mr. Jason Steele, Administrative Appeal Review Officer David Shaeffer, Asheville Regulatory Field Office, US CESAD-PDO Army Corps of Engineers, 151 Patton Avenue, Room 208, U.S. Army Corps of Engineers, South Atlantic Division Asheville, North Carolina 28801-5006 60 Forsyth Street, Room IOMl5 Atlanta, Georgia 30303-8801 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site invest' ations. Date: Telephone number: Signature of appellant oragent. For appeals on Initial Proffered Permits send this fora: to: District Engineer, Wilmington Regulatory Division, Attn: David Shaeffer, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Ann: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): August 31, 2016 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: City of Gastonia, 1300 North Broad Stret, GAstonia, North Carolina 28054 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, City of Gastonia, Phase II South Fork Sewer, SAW -2016-01412 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: This determination only applies to the impact WI permit area associated with the PCN signed and dated July 13, 2016 and included in the administrative record for this file. State: NC County/parish/borough: Gaston City: McAdenville Center coordinates of site (lat/long in degree decimal format): Lat. 35.2598061 N, Long. -81.07525° W. Universal Transverse Mercator: Name of nearest water body: South Forte Catawba River Identify (estimate) amount of waters in the review area: Non -wetland waters: None in permit area. linear feet: width (ft) and/or acres. Cowardin Class: Stream Flow: Wetlands: 0.003 acres. Cowardin Class: Forested partially forested but mostly emergent. Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: None. Non -Tidal: None E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLIES): ® Office (Desk) Determination. Date: 8/31/20I6 ❑ Field Determination. Date(s): 1, The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be"waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Sheets 16 dated July 13, 2016 and Figure 4 — Page 2 dated March 29, 2016. ® Data sheets prepared/submitted by or on behalf of the applicant/consultant. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ❑ U.S. Geological Survey map(s). Cite scale & quad name: ❑ USDA Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100 -year Flood Iain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: Aerial (Name & Date): Most recent Bing satellite imagery. or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE The information recorded on this form has not necessarily been verified by the Corns and should not be relied upon for later iurisdictional determinations. Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is Impracticable) Digitally signed by SHAEFFEa.DAVIDISGH.1260750573 DN: cd1S, o.U.S. Government ou=DoD, ou=PKI, ou: USA, .i• cn-SHAEFFERDAVID.IEIGH.12607S057 3 Date: 2016.08-311 152.S2 -04'00' Signature and date of Regulatory Project Manager (REQUIRED) 8/31/2016 Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is Impracticable) K s `. a'`� , .� "a ..._.. ,y kid -1 v �^ wd-11 3 W,J wd-16 wd 20 wd19`: ,x wd-101 ( w(J- ';'a wd 5 06 k ^_• Legend Weiland and Stream Boundaries (as delineated by LaBella) Jurisdictional Wettand and Stream Areas (as delineated by LaBella" " Lam,iy Stream Weiland - O Welland or Stream Boundary Flag Locations Ax- -1 Drainage Direction Arrows (Approximate) • PFO -PEM Divide (Approximate) taf _ Culverts or Bridges (Approximate) �---------- � N 3 Welland Delineation Study Area (Approximate) 0 40 80 160 • Proposed Sewer Route(Approximate) — Feet N r ' { pproximate) 1 inch = 80 fleet ti Document Path:11PEASE-ADt4Shareslprojeas-20lx113.0\City of GastoniMSouth Fork SewenWetlandslDrawmgs\Gastonia Wetlands Map (2016-03.29).mxd Figure 4 —Page 2 ORIGINAL APPROVAL OF 401 WQ CERTIFICATION JULY 29, 2016 Water Resources ENVIRONMENTAL QUALITY July 29, 2016 Mr. Matt Bernhardt Dir. Public Works P.O. Box 1748 Gastonia, NC 28053 PAT MCCRORY (;urrr7wr DONALD R. VAN DER VAART Rrcrcrarr S. JAY ZIMMERMAN DWR# 16-0691 Gaston County Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions Phase 2 South Fork Sewer Project Dear Mr. Bernhardt: You have our approval, in accordance with the General Certification and those conditions listed below, for the purpose proposed in your application dated July 13, 2016, and received by the Division of Water Resources (the Division) on July 14, 2016. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3884 which can be viewed on our web site at https://deg. nc.gov/about/divisions/water-resources/water-resources-permits/wastewater- branch/401-wetlands-buffer-permits/401-general-certifications. The General Certification allows you to use Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers (COE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. It is advised that all conditions of the Certification are reviewed prior to initiation of the project. In addition to the requirements of the Certification, you must also comply with the following conditions: This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new Certification. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. 15A NCAC 02H .0506 and 15A NCAC 02H .0507 2. Approved Impacts: Type of Impact Amount Approved Amount Approved Temporary Impact Permanent Impact Wetland 0 acre 0.003 acre State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Officel 610 East Center Avenue, Suite 301 Mooresville, NorthCarolina 28115 704 663 1699 This Certification can be contested as provided in Articles 3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/or by calling the OAH Clerk's Office at (919) 431-3000. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday, 8:00 am to 5:00 pm, excluding state holidays). The petitions may be faxed to the OAH at (919) 431-3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.) Office of Administrative Hearings 1711 New Hope Church Rd. Raleigh, NC 27609-6285 One (1) copy of the petition must also be served on DEQ as follows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Karen Higgins in the Central Office in Raleigh 919-807-6360. Si erely,1-V- Fd-f-- W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office, DEQ Attachments cc: Eric Howard, Two Rivers Utilities (erich two rivers utiIities.com) David Brown, Army Corps of Engineers, Asheville (email) Karen Higgins, Wetlands Unit MRO, Land Quality STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE GENERAL PERMIT FOR IMPACTS TO ISOLATED AND OTHER NON -404 JURISDICTIONAL WETLANDS AND WATERS PERMIT NUMBER: IWGP100000 FOR PROJECTS IMPACTING LESS THAN OR EQUAL TO ONE (1) ACRE OF ISOLATEDAND OTHER NON -404 WETLANDS, LESS THAN OR EQUAL TOTHREE HUNDRED FEET (300) OF ISOLATEDSTREAMS AND/OR LESS THAN ONE-THIRD ACRE (1/3) OFISOLATED SURFACE WATERS In accordance with the provision of Article 21 of Chapter 143, General Statutes of North Carolina as amended and other lawful standards and regulations, including 15A NCAC 02H .1300 and 15A NCAC 02B .0200, promulgated and adopted by the North Carolina Environmental Management Commission. Permission is hereby granted to all owners or operators of activities which impact isolated and other non -404 wetlands, isolated streams or other isolated waters in accordance with the conditions set forth in this General Permit. This General Permit shall become effective on March 19, 2012. This General Permit shall expire at midnight on March 18, 2017 or unless otherwise rescinded or until deemed appropriate by the Director of the NC Division of Water Quality (DWQ). Charles Wakild, P.E., Director Division of Water Quality By the Authority of the NC Environmental Management Commission PROJECT VICINITY MAP (NO SCALE) City of Gastonia PROJEC ARE 0 We are TRV to our customers! PHASE II SOUTH FORK CATAWBA REGIONAL WASTEWATER IMPROVEMENTS City of 74) SRL No.: E -SRL -T- 13 -0090 INDEX OF SHEETS SHEET 1 COVER SHEET SHEET 2 OVERALL LAYOUT & CONSTRUCTION NOTES SHEETS 3-13 LINE FM -1 PLAN & PROFILE SHEETS SHEETS 14 & 15 LINE GS -1 PLAN & PROFILE SHEETS SHEETS 16 & 17 LINE FM -2 PLAN & PROFILE SHEETS SHEETS 18 — 24 DETAILS SHEETS 25 — 28 PUMP STATION SITE PLAN & DETAILS SHEET 29-35 ELECTRICAL GASTONI N Great Place. Great People. Great Promise. Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM N.. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 CA gut 0880" Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: NO SCALE Date: 12/11/2017 701-265 SHEET 1 OF 35 PROP. MCADENVILLE PUM STATION SEE SHEETS 242 1 CONSTRUCTION NOTES 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY LOCAL, COUNTY, STATE AND UTIUTY CONSTRUCTION PERMITS UNLESS OTHERWISE INCLUDED WITH THESE CONTRACT DOCUMENTS. 2. LOCATION OF EXISTING UTILITIES IS APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATION AND DEPTH PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CALL NC ONE CALL CENTER AT 1-800-632-4949 PRIOR TO EXCAVATION, BORING OR POTHOLING. 3. NO ADDITIONAL PAYMENT SHALL BE MADE FOR URUTY RELOCATION COORDINATION OF DELAYS CAUSED BY UTILITY CONFLICTS. ALL COSTS RELATED TO UTILITY COORDINATION AND RELOCATIONS, INCLUDING ADDITIONAL POTHOLING, ARE TO BE CONSIDERED INCIDENTAL AND INCLUDED IN THE UNIT PRICES OF THE BID. 4. FOR ANY WATERLINE INSTALLED ABOUT SANITARY SEWER, A MINIMUM OF 18 -INCH VERTICAL CLEARANCE MUST BE MAINTAINED BETWEEN THE TOP OF THE SANITARY SEWER AND THE BOTTOM OF THE WATERMAIN PIPING. AT THE CROSSING BOTH THE WATERMAN AND SANITARY SEWER SHALL BE DUCTILE IRON PIPE (DIP), MINIMUM PRESSURE CLASS 350. 5. CONTRACTOR SHALL RESTORE ALL STRUCTURES, LOTS, SWALES, DITCHES, CURBS, FENCES, WALLS, MAILBOXES, SIGNS, POLES, GUY WIRES, SIGNS, LANDSCAPING, PIPING AND UTILITIES DISTURBED DURING CONSTRUCTION TO PRE -CONSTRUCTION CONDITIONS. 6. CONTRACTOR SHALL COORDINATE ALL UTILITY REMOVALS AND RELOCATIONS WITH PROPER OWNERS, AUTHORITIES AND UTILITY COMPANIES TO PREVENT CONFLICTS. 7. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL HOMES AND BUSINESSES AT ALL TIMES. PROVIDE WRITTEN NOTICE TO ALL PROPERTY OWNERS AT LEAST TWO DAYS IN ADVANCE OF WORK IN OR CROSSING OF DRIVEWAYS. 8. ALL LANDSCAPING, INCLUDING SIGNS, MUST BE PROTECTED DURING CONSTRUCTION. IF LANDSCAPING IS IN THE PATH OF CONSTRUCTION, IT SHALL BE RELOCATED OR REMOVED ONLY AFTER RECEIVING PERMISSION FROM THE PROPERTY OWNER. 9. INSTALL EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION OPERATIONS. 10. PROPOSED SPOT ELEVATIONS ARE SHOWN AT FINISHED GRADE. 11. CONTRACTOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE. 12. COMPACT ALL RLL AREAS TO THE DENSITY DETAILED IN THE PROJECT SPECIFICATIONS OR PER THE GEOTECHINCAL RECOMMENDATIONS. 13. CARE MUST BE TAKEN WHEN WORKING NEAR POWER POLES. EXTRA SHORING, BRACING OR RELOCATION MAY BE NECESSARY. 14. ALL WORK PERFORMED WITHIN NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RIGHTS-OF-WAY SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE NCDOT CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL OR UNIFORM TRAFFIC CONTROL DEVICES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE WORK AND ADHERING TO THE RIGHT-OF-WAY ENCROACHMENT CONTRACT SPECIAL PROVISIONS. OVERALL LAYOUT & CONSTRUCTION NOTES EASING — GIS PROPERTY LINE�r EXISTNG CONCRETE FUTURE — — — RIGHT—OF—WAY +Hi� RAILROAD TRACKS TE.6 ry TELEPHONE OR CAN PEDESTIAL OU — - — UNDERGROUND TELEPHONE OR TV LINE GS -1 FO UNDERGROUND FIBER OPTIC CABLE FO UNDERGROUND FIBER OPTIC SIGN PROPOSED —«<—«E— OVERHEAD ELECTRIC GAS .. 1 MAIN Y1.GHYfR Rp NICKO� —FM— FORCEMAIN — u-— GAS LINE a, CONSTRUCTION NOTES 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY LOCAL, COUNTY, STATE AND UTIUTY CONSTRUCTION PERMITS UNLESS OTHERWISE INCLUDED WITH THESE CONTRACT DOCUMENTS. 2. LOCATION OF EXISTING UTILITIES IS APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATION AND DEPTH PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CALL NC ONE CALL CENTER AT 1-800-632-4949 PRIOR TO EXCAVATION, BORING OR POTHOLING. 3. NO ADDITIONAL PAYMENT SHALL BE MADE FOR URUTY RELOCATION COORDINATION OF DELAYS CAUSED BY UTILITY CONFLICTS. ALL COSTS RELATED TO UTILITY COORDINATION AND RELOCATIONS, INCLUDING ADDITIONAL POTHOLING, ARE TO BE CONSIDERED INCIDENTAL AND INCLUDED IN THE UNIT PRICES OF THE BID. 4. FOR ANY WATERLINE INSTALLED ABOUT SANITARY SEWER, A MINIMUM OF 18 -INCH VERTICAL CLEARANCE MUST BE MAINTAINED BETWEEN THE TOP OF THE SANITARY SEWER AND THE BOTTOM OF THE WATERMAIN PIPING. AT THE CROSSING BOTH THE WATERMAN AND SANITARY SEWER SHALL BE DUCTILE IRON PIPE (DIP), MINIMUM PRESSURE CLASS 350. 5. CONTRACTOR SHALL RESTORE ALL STRUCTURES, LOTS, SWALES, DITCHES, CURBS, FENCES, WALLS, MAILBOXES, SIGNS, POLES, GUY WIRES, SIGNS, LANDSCAPING, PIPING AND UTILITIES DISTURBED DURING CONSTRUCTION TO PRE -CONSTRUCTION CONDITIONS. 6. CONTRACTOR SHALL COORDINATE ALL UTILITY REMOVALS AND RELOCATIONS WITH PROPER OWNERS, AUTHORITIES AND UTILITY COMPANIES TO PREVENT CONFLICTS. 7. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL HOMES AND BUSINESSES AT ALL TIMES. PROVIDE WRITTEN NOTICE TO ALL PROPERTY OWNERS AT LEAST TWO DAYS IN ADVANCE OF WORK IN OR CROSSING OF DRIVEWAYS. 8. ALL LANDSCAPING, INCLUDING SIGNS, MUST BE PROTECTED DURING CONSTRUCTION. IF LANDSCAPING IS IN THE PATH OF CONSTRUCTION, IT SHALL BE RELOCATED OR REMOVED ONLY AFTER RECEIVING PERMISSION FROM THE PROPERTY OWNER. 9. INSTALL EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION OPERATIONS. 10. PROPOSED SPOT ELEVATIONS ARE SHOWN AT FINISHED GRADE. 11. CONTRACTOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE. 12. COMPACT ALL RLL AREAS TO THE DENSITY DETAILED IN THE PROJECT SPECIFICATIONS OR PER THE GEOTECHINCAL RECOMMENDATIONS. 13. CARE MUST BE TAKEN WHEN WORKING NEAR POWER POLES. EXTRA SHORING, BRACING OR RELOCATION MAY BE NECESSARY. 14. ALL WORK PERFORMED WITHIN NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RIGHTS-OF-WAY SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE NCDOT CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL OR UNIFORM TRAFFIC CONTROL DEVICES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE WORK AND ADHERING TO THE RIGHT-OF-WAY ENCROACHMENT CONTRACT SPECIAL PROVISIONS. OVERALL LAYOUT & CONSTRUCTION NOTES EASING — GIS PROPERTY LINE�r EXISTNG CONCRETE FUTURE — — — RIGHT—OF—WAY +Hi� RAILROAD TRACKS TE.6 ry TELEPHONE OR CAN PEDESTIAL — — — — PROPERTY LINE — - — UNDERGROUND TELEPHONE OR TV FO UNDERGROUND FIBER OPTIC CABLE FO UNDERGROUND FIBER OPTIC SIGN PROPOSED —«<—«E— OVERHEAD ELECTRIC GAS UNDERGROUND GAS SIGN —FM— FORCEMAIN — u-— GAS LINE a, POWER POLE W / GUY WIRE --mmmmm-- CUT & PATCH (FORCEMAIN) —y—�— 2" WATERLINE BORE & JACK 12" WATERLINE LIGHT POLE plan view 16" WATERLINE — SIGN =— = profile view ------- ------- STORM DRAIN 9 SEWER MANHOLE DIRECTIONAL DRILL WOODS LINE STORM DRAIN MANHOLE FM plan view DITCH OR TOE OF SLOPE ® WELL profile view —'—'— — FENCE FG 0 FIBER OPTIC PEDESTAL ® AIR RELEASE / VACUUM VALVE VARIOUS TREES & SHRUBS OT COMMUNICATION MANHOLE GRAVITY SEWER �— CUT & PATCH (GRAVITY SEWER) ® HOUSE / STRUCTURE 0 RIGHT—OF—WAY MARKER m Ji STORM CATCH BASIN SEWER MANHOLE 100 YR. FLOOD PLAIN pd WATER VALVE _ _ _ _ C — _ — — EASEMENT g4� FLOOD ELEVATION FIRE HYDRANT --------- SEWER EASEMENT m WATER METER ss GRAVITY SEWER cv — — — RIGHT—OF—WAY pQ GAS VALVE ® ELECTRICAL BOX ® RIP RAP APRON 2000 0 4000 HORIZONTAL SCALE IN FEET CREEK Revisions 0 ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/2412017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/112017 awn By: GAQ ecked By: MWB ty Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 2 OF 35 LIMITS OF CONSTRUCTION SHALL BE o RIGHT-OF-WAY OR LIMITS OF EASEMENT PROP. MCADENVILLE REGIONAL PUMP STATION - SEE SHEET 24 THRU 27 \ �� \ i • • WESLEYAN DEVELOPMENT LLC 99 \\ \ \ PIN #3585-13-3992 \— \ \\I • .,yp D84526 PG 1424 �g �� '� \ /4 100 YR. FLOOD PLAIN EXISITNG POND FUTURE SUBDIVISION 1Q/� / \ W G ao \ \\ PIN#58RR 5-Rasa10 1-'1 C%1 � z U BRACE EXISTING 8' SANITARY SEWER \ I--1 BEGIN FM-1 DURING INSTALLATION OF FORCE MAIN 1\ DB 0358 PG 050 Q w 7 \ \ O .a TEMPORARY SURGE z TEMPORARY DOUBLE \ /� STA. -INC I� STONE ENTRANCE/EXIT O O STONE OUTLET �, '�„ ° m 1 - 18-INCH 45° BEND 1 \••♦ \STA. 0+38 \ \\ 5'�j / '- NOTE: EXISTING TREES ARE CULTURALLY SENSITIVE T. y a w W 1 - 16-INCH 45° BEND �E+�5 / .. a '\ AND SHALL BE PROTECTED FROM DAMAGE. t� V w EXIST. LIMITS \ I \ / i /OVE AND REPLACE 11 LF \\\ CONTRACTOR SHALL PROVIDE 1 YEAR WARRANTY AGAINST SURVIVAL OF EXISTING TREES. i OF DEBRIS \ \ \ ij .p \. z \ \\X"� �: •'• �STINGGRAVE� DRIVE 15' (TWJ �� ig�.. O C/] O 16-INCH C-905 DR-28 Asa _ _ 0� ... / .. `� '/ \ - •` i \ \ i� / / ^ \ \�. 1 - 16-INCH 22.SABEND PVC FORCE MAIN \\\ q ////� �• \• \\\\ / ij ilii/ 1i� i \ / h (` 1 - 181NCH - 11.25° BEND i I•? � /,/ DEFLECT FORCE MAIN AS TEMPORARY STONE OUTLET (TYP.) \ "'4.- �^ - } p )) i 164NCH C-905 DR-26 NECESSARY AROUND TREE A. I(� > � \�-\� PVC FORCE MAIN ♦• / \ v \/ \1� t� / A \ 1, \j t F' - �.°„ \ EXIST. IRRIGATION PUMP 35' PERMANENT GENERAL DRAINAGE, LINE GS-1 SEE 10SC26 TEMP. � � t I) a ,�� UTILITY & ACCESS EASEMENT CONSTRUCTION SHEET 14 ,- \. EASEMENT /� i i - t0' RESTORE LANDSCAPING - �1 TEMPORARY SEDIMENT TO EXIST. CONDITIONS FENCE (TYP.) \• 16-INCH DR 11 HDPE i °\. . DIRECTIONAL DRILL , \ ^ •\. /• BEGIN STA. 1+72+-•—__Fu-_.__ — — J ' �' f', 4 F PHARR vARNSLLC •�/' END STA. 3+72 -- I'll I �. \ �, J -._..- --F—FM FM 7+0 — _ PHARR YARN PIN #358E-14-1910 { —� II - I NF1 DB 0358 PG 050 REMOVE AND REPLACE�----�-- EXISTING CONCRETE / RIPRAP FROM DRAINAGE STRUCTURE L--'-- »/ r STA. 7+19 � U CUT & PATCH 193LF / 1p' 1. 18 INCH 45° BEND L5; I / EXIST. ASPHALT ROAD / DRIVE // N / / CUT 8 PATCH 293LF 0 20 0 40 l_ 3 \ I I I w L / I EXIST. ASPHALT PARKING LOT / DRIVE O \ 5 � �Yc / PHARR YARNS LLC TEMPORARY SURGE PIN #3585-05-e47s TEMPORARY DOUBLE % - I W DB 4554 PG 1334 HORIZONTAL I �i�i/ ;`_ �":' I J STONE ENTRANCEIEXIT STONE OUTLET SCALE IN FEET 1 ( 100 YR. FLOOD PLAIN TEMPORARY SEDIMENT; 1--40' (FULL SIZE)' 1--BO' (HALF SIZE) FENCE (TYP.) TEMPORARY SEDIMENT FENCE (TYP.) LINE FM-1 3 w - — R� w I Revisions: ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 590 m __ --._ m z __.__. 590 NEGOTIATED CHANGES IADDENDUMNo.3 u �a NEGOTIATED MATERIAL. CHANGES f0 ib u5 G� 12/11/2017 — PROX, 1000R. FLOOD—PLAI� - PQM �dPg`�N� EXIST. 8" SEWER 581.251 -ASPHALT DRIVE E —_ EX G--�aS11: 8'RCP 18" MIN. y LAKEVIEW OR i f----- j _---_- �----\ (I INV =�79.57t SEE SHEET 26 FOR 580 _ -- (-`'"y`-- 18" MIN. - -- 5803' MIN. CONNECTION TOPUMP STATION528LF 16-INCH -�---i__ FORCE 9--�Q--28C DR-26 PVC Mq IN --- ' 1-HOPEIPVC TRANSITIO STAN+72 I -- - IST. e;°SEWER N SLEEVE FIST. ABANDONED) BEGIN HDPE T. ----- NV=571,60± ,tYjCAI? ' (TO BE SE� ED A:3+72 — 570 _ e 69.4__ 481 _ 'HDPE/PVC TRANSITION SLEEVE 570 a. ' -D HDPE _ .— _ _ — _ _ — — — — — — — _ — _ = OSYOY� GOLF S" DRI HDPE SURFACE ELEV. 570.15 565 DIRE TION DRILL MIN SURFACE ELEV T CROSSING 565 0 Drawn By: GAQ 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+DO2 Checked By: MWB VERTICAL City Engineer: GBS SCALE IN FEET Scale: AS SHOWN 1----60' (HALF40' (2t SIZE) Date: 12/11/2017 1 SIZE) 701-265 SHEET 3 OF 35 610 STA. 09+14 1 -AIR RELEASE / VACUUM VALVE (INSTALL AT HIGH POINT OF UNE) 35' PERMANENT GENERAL DRAINAGE, X�UTILITY &ACCESS EASEMENT G POND ,fl/ 10'x30' LAUNCHING PIT \ 70,00 CUT & PATCH 70LF EXIST. PARKING DRIVE,, NEW 18 -INCH C 905 DR -26 PVC FORCE MAIN - �\ STA 10+33 1 - DIPIPVC TRANSITION COUPLING -BEGIN DIP z / INV -585.71'± / 'f100 YR. FLOOD PLAIN (TYP.) / BORE & JACK 70LF 304NCH STEEL CASING (MIN. THICKNESS 0.312') W / BOLF 16 -INCH CLASS 52 DI PIPE FORCE MAIN BEGIN CASING: STA. 10+37 END CASING: 11+11 10�RECEIVING PIT STA. 11+26 1 - 16 -INCH 11.25° BEND TEMPORARYSURGE / STONE ENTRANCE/EXIT / i o5 Bull's T / STA, 13+66 tea. �\ �✓ 1 - 16 -INCH 45° BEND BEND \� pOp�gR ST �\ BELMONT LANL \ PIN #3575-85-8226 DB 4297 PG 0108 LIMITS OF CONSTRUCTION SHALL BE RIGHT-OF-WAY OR LIMITS OF EASEMENT TEMPORARYSURGE I � SyFF`�ti BELMONT LAND & INVESTMENT CO / / ' STONE ENTRANCE/EXIT T PIN #3575-85-8226 / i -ti• s ST DB 4297 PG 0108 FUTURE SUBDIVISION / / / 28 OXO WETLANDAREA STA. 13+75 WESLEYAr7- 2 1 - 18 -INCH 45° BEND- PINa�\\\�\\�� TEMPORARY SEDIMENT TEMPORARY STONE ,' . FENCE (TYP.) OUTLET (TYP.) /� c` J•7 i % . \ \ \ WOODED AREA -INCH -905 1 \ \\ PIN #3\5LWESLEYANDEVEOPMENT LL� NEW16 75-94-4976 DR -26 PVC FORCE MAIN STA. 18+95 ,� \ D8 4148 PG 1459 \ ` 1 �' �- \ \\ � / / 1 - AIR RELEASE / VACUUM VALVE (INSTALL AT HIGH POINT OF LINE \ %� -\ \ •�.qp EXIST. 8- SEWER EXIS�.�'SEN£R- 1 - 16 -INCH RW GATE VALVE (MJ) �` \ 7 - - \s�1 / s e (TYP-) -` -- \ 1 - 18"CTEE (MJ) -E�5ix\ 1 - 12" EMERGENCY CONNECTION00 FUTURE SUBDIVISION -so,YC d � NEW 16 INCH DR11 HDPE 9h� DIRECTIONAL DRILL '9•p BEGIN STA. 17+25 _ \ - END STA 21+65 EXIST 8 SEWER LINE FM -1 _ 30' PERMANENT GENERAL DRAINAGE, UTILITY & ACCESS EASEMENT 20 0 40 �\ STA 17+25 HORIZONTAL v - 1 - HDPE/PVC TRANSITION SLEEVE SCALE IN FEET -'tet \ \ BEGIN HDPE 1--40' (FULL SIZE) +a`" ss� ...• 1"-80' (HALF SIZE) STA 17+20 1 - 164NCH 11.25° BEND 1 - 18 -INCH 45° BEND 610 w ��- _ V) E O 40' PERMANENT GENERAL DRAINAGE, UTILITY & ACCESS EASEMENT U Q 0 �J cc 0 3 L / O Obi "� = O 3 STA 11+13 - 1 • DIP/PVC TRANSITION -" = •1- _������ COUPLING - END DIP ro TEMPORARY SEDIMENT LOGS (TYP.) r# TEMPORARYSURGE / STONE ENTRANCE/EXIT / i o5 Bull's T / STA, 13+66 tea. �\ �✓ 1 - 16 -INCH 45° BEND BEND \� pOp�gR ST �\ BELMONT LANL \ PIN #3575-85-8226 DB 4297 PG 0108 LIMITS OF CONSTRUCTION SHALL BE RIGHT-OF-WAY OR LIMITS OF EASEMENT TEMPORARYSURGE I � SyFF`�ti BELMONT LAND & INVESTMENT CO / / ' STONE ENTRANCE/EXIT T PIN #3575-85-8226 / i -ti• s ST DB 4297 PG 0108 FUTURE SUBDIVISION / / / 28 OXO WETLANDAREA STA. 13+75 WESLEYAr7- 2 1 - 18 -INCH 45° BEND- PINa�\\\�\\�� TEMPORARY SEDIMENT TEMPORARY STONE ,' . FENCE (TYP.) OUTLET (TYP.) /� c` J•7 i % . \ \ \ WOODED AREA -INCH -905 1 \ \\ PIN #3\5LWESLEYANDEVEOPMENT LL� NEW16 75-94-4976 DR -26 PVC FORCE MAIN STA. 18+95 ,� \ D8 4148 PG 1459 \ ` 1 �' �- \ \\ � / / 1 - AIR RELEASE / VACUUM VALVE (INSTALL AT HIGH POINT OF LINE \ %� -\ \ •�.qp EXIST. 8- SEWER EXIS�.�'SEN£R- 1 - 16 -INCH RW GATE VALVE (MJ) �` \ 7 - - \s�1 / s e (TYP-) -` -- \ 1 - 18"CTEE (MJ) -E�5ix\ 1 - 12" EMERGENCY CONNECTION00 FUTURE SUBDIVISION -so,YC d � NEW 16 INCH DR11 HDPE 9h� DIRECTIONAL DRILL '9•p BEGIN STA. 17+25 _ \ - END STA 21+65 EXIST 8 SEWER LINE FM -1 _ 30' PERMANENT GENERAL DRAINAGE, UTILITY & ACCESS EASEMENT 20 0 40 �\ STA 17+25 HORIZONTAL v - 1 - HDPE/PVC TRANSITION SLEEVE SCALE IN FEET -'tet \ \ BEGIN HDPE 1--40' (FULL SIZE) +a`" ss� ...• 1"-80' (HALF SIZE) STA 17+20 1 - 164NCH 11.25° BEND 1 - 18 -INCH 45° BEND 610 w W V) E O U Q 0 �J cc 0 3 L 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+uu 20+00 570 Z1+U0 !1 - Ir -7s.'17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 4 OF 35 2 QI Revisions: -- - y ADDENDUMNo. 1 " ^ 8/1912016 — ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 600 — --. - _. —#—{- �j Ri .u�m -- ADDENDUMNo.3 EXIST. 30' 'RCP . 1 '+'$ NEGOTIATED MATERIAL INV=597.065 3 __ ^ CHANGES i _.1. (TYP. 8" MIN. TY �" z - 12/1112017 590z ^ Do ' a Bm r n I ^ o 1 ^ i- T -1-4- EXIST TV OR TELEPHONE 8. I I _— -{JN�L -INV 3 o << m'• - - - i D -- EXIST. 8"' SEWER f -----j-- 593.51 RECTI RILL --�--- - 590 - EXIST18'RCP 1 EXIST. 'i -554.443 612LF ' PVC 18 MIN. (TYP.) j 3 cns I 18" MIN. (TYP.) .- - EXIST. 24' RCP INV 583.06t •I 1 RE EIVIN PIT t1l OF 16 -INCH FORCE MAIN C- D 28 ----- - — — -- - -- - -I- - -- $TA:17+25 - y i-HDPE/PVC BITION SLE BEGIN HOPET,o'Ife�-u--� -- EVE -' - -. - - MIN. TYP. -- - - - gnumw� gCAl� '¢F$59j Olr� 2044 9r 9. 580 i - 1 _....., -G ---I - - --� --- �- -- -- —1 - rt - -T— - I i - �- -r - —t- - 5W 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+uu 20+00 570 Z1+U0 !1 - Ir -7s.'17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 4 OF 35 I NEW 18 -INCH C-905 DR -26 STA, 25+90 1. PVC FORCE MAIN , --i` ' I STA. 23+57 — WATER MAIN STANDARD TEMPORARY SURGE 1 - 16 -INCH 11.25° BEND 1 - DIP/PVC TRANSITION STONE ENTRANCE/EXIT - COUPLING - BEGIN DIP 1 CD CD 4.FUTUREIBDIVISION N N \ SLEYAN DEVELOPMENT LLC �� EXIST. �6" WATER PIN J35754-94-4976 TEMPORARY STONE OUTLET (TYP.) \ 5'x10' \ u. N W (rYP� \ DB 4148 PG 7x59 Y" \ �� )UB /""�' TEMPORARY DOUBLE / STONE OUTLET RECEIVING PIT NEW 16 -INCH DR11HDPE DIRECTIONAL DRILL BEGIN STA. 17+25 END STA. 21+65 65LF OF 16'. DR 11 DIRECTIONAL 1— f' r,EXIST W •... / &R 1 50' RW (TYP) U U) - - ) EXIST. a- (\: sh FORCE MAIN TO BE CONSTRUCTED LIMITS OF CONSTRUCTION SHALL BE I AND TESTED TO WATERMAIN STANDARDS FROM RIGHT-OF-WAY OR LIMITS OF EASEMENT STA. 25+90 TO 34+40 IN THIS SECTION STA. 21+85 — �� � _ , ,o ^ — �ic` —� � ��`7 I— 1 - HDPE/PVC TRANSITION '� �• s �— -: / SLEEVE - END HDPE �� ' — _ ._•--- \' STA. 25+90 • EXIST. B' SEWER T. 8' WATER 1 • 18 -INCH 90° BEND (TYP.) ' 10'x15' I FUTURE ISUBDIVISION STA. 26+35 LAUNCHING PIT WESLEYAN DE OUBLE LOPMENT LLC 1 - 18 -INCH 90° BEND MOODY CLYDE JR EXIST.CURB dt GUTTER (TYP.) PIN p357 —94-4976 TEMPORARY DPIN JJ3575-4 DB 414 PG 7459 STONE OUTLET TEMPORARY DB 7370 PGC 0588 0588 SEDIMENT FENCE I (TYP) � LINE EM -1 MOODY, SCOTT M PIN #3575-84-9508 DB 1370 PG 0590 16 -INCH C-905 DR -26 PVC FORCE MAIN EXIST. .7: DEFLECT FORCEMAIN AROUND AS NEEDED MOODY, LARRY -- PIN #3575-84-8417 DB 2142 PG 0795 CONTRACTOR TO REMOVE 8 J RELOCATE FENCE TO RIGHT -OF -WAV Z�� ® o s0' RW + M N - �o U f0 Z W J UJ 30 -,Go 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 650 630 620 2L100 440 HORIZONTAL YIG�O SCALE IN FEET 1-:40' (FULL SIZE) 1--80' (HALF SIZE) 4 0 610 2 VERTICAL SCALE IN FEET 1-=4' (FULL SIZE) 1'®8' (HALF SIZE) 600 30+00 Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIA!. CHANGES 12/11/2017 NUL 08a0W Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 5 OF 35 STA, 25+90 1. BEGIN CLASS 52 16 -INCH DI PIPE CONSTRUCTED TO WATER MAIN STANDARD 1 - DIP/PVC TRANSITION COUPLING - BEGIN DIP 1 BORE & JACK 40LF 30 -INCH STEEL CASING (MIN. THICKNESS 0.312') W / 45LF 16 -INCH CLASS 52 DI PIPE FORCE MAIN TEMPORARY BEGIN CASING: STA. 25+95 SEDIMENT END CASING: 26+25 FENCE (TYP.) \ 1 v WRICH, T ST (SR 2210) - 29+00 STA. 21+85 — �� � _ , ,o ^ — �ic` —� � ��`7 I— 1 - HDPE/PVC TRANSITION '� �• s �— -: / SLEEVE - END HDPE �� ' — _ ._•--- \' STA. 25+90 • EXIST. B' SEWER T. 8' WATER 1 • 18 -INCH 90° BEND (TYP.) ' 10'x15' I FUTURE ISUBDIVISION STA. 26+35 LAUNCHING PIT WESLEYAN DE OUBLE LOPMENT LLC 1 - 18 -INCH 90° BEND MOODY CLYDE JR EXIST.CURB dt GUTTER (TYP.) PIN p357 —94-4976 TEMPORARY DPIN JJ3575-4 DB 414 PG 7459 STONE OUTLET TEMPORARY DB 7370 PGC 0588 0588 SEDIMENT FENCE I (TYP) � LINE EM -1 MOODY, SCOTT M PIN #3575-84-9508 DB 1370 PG 0590 16 -INCH C-905 DR -26 PVC FORCE MAIN EXIST. .7: DEFLECT FORCEMAIN AROUND AS NEEDED MOODY, LARRY -- PIN #3575-84-8417 DB 2142 PG 0795 CONTRACTOR TO REMOVE 8 J RELOCATE FENCE TO RIGHT -OF -WAV Z�� ® o s0' RW + M N - �o U f0 Z W J UJ 30 -,Go 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 650 630 620 2L100 440 HORIZONTAL YIG�O SCALE IN FEET 1-:40' (FULL SIZE) 1--80' (HALF SIZE) 4 0 610 2 VERTICAL SCALE IN FEET 1-=4' (FULL SIZE) 1'®8' (HALF SIZE) 600 30+00 Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIA!. CHANGES 12/11/2017 NUL 08a0W Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 5 OF 35 PSNC ENERGY GAS NOTE: 1. AS WELL AS CALLING 811 FOR UTILITY LOCATES. HWY 74 & 29 (WILKINSON BLVD.) HAVE HIGH PRESSURE GAS LINES. A PSNC ENERGY REPRESENTATIVE HAS TO BE PRESENT DURING CONSTRUCTION, CONTACT PSNC ENERGY 48 HOURS PRIOR TO BORING OR DIGGING IN THIS AREA. (704-810-3209) FORCE MAIN TO BE CONSTRUCTED AND TESTED TO WATERMAIN STANDARDS FROM STA. 25+90 TO 34+40 IN THIS SECTION TEMPORARY DOUBLE — STONE OUTLET STA. 37+201 11 1 -16-INCH 45° BEND av\\ NEW 18 -INCH C-905 DR -26 \ 0 PVC FORCE MAIN so s \ TEMPORARY INLET \ PROTECTION (TYP.) \ \. CUT &PATCH 20TH EXIST. CONCRETE DRIVE ABANDONED Y = r i i/sem O y i i GOODSON DORIS T PIN #3575-84-7316 DB 1832 PG 0298 CONTRACTOR TO REMOVE FENCE & GATE ALONG THE FRONT OF PROPERTY (ROLL UP FENCE POSTS AND GATE TO REMAIN ON SITE). CONTRACTOR TO INSTALL CORNER POSTS APPROX. 1' BEHIND THE GENERAL UTILITY EASEMENT. 680 670 660 650 645 30+00 EXISTING WELL '. REMOVE & REPLACE 11 LF . ya EXIST. GRAVEL DRIVE CONTRACTOR TO REMOVE & RELOCATE /,gyp EXISTING FENCE TO RIGHT -OF -WAV NEW 104NCH C-905 DR -26 PVC FORCE MAIN REMOVETREE CUT & PATCH TH MORqN# NIE F EXIST. CONCRETE DRIVE 1Y✓// 575-84-622 111 PG 0261 CONTRACTOR TO REMOVE FENCE & GATE ALONG THE FRONT OF PROPERTY (ROLL UP FENCE POSTS AND GATE TO REMAIN ON SITE). CONTRACTOR TO INSTALL CORNER POSTS APPROX. 1' BEHIND THE GENERAL UTILITY EASEMENT. i STA. 34+40 1-DIPIPVC TRANSITION COUPLING - END DIP En SHULER JAMES E & HOPE PIN #3575-83-3966 DB 1250 PG 0538 PB 041 PG 036 CUT & PATCH 11 LF EXIST. CONCRETE DRIVE CITY TO CONSTRUCT AN ADDITIONAL GRAVEL DRIVEWAY (30' L X 10' W) FOR PROPERTY OWNER AFTER FORCE MAIN INSTALLATION. LIMITS OF CONSTRUCTION SHALL BE RIGHT—OF—WAY OR LIMITS OF EASEMENT STA. 38+66 1 - 16 -INCH 45' BEND 0 1- �,P 5 \ BELMONT LAND INVESTMENT CO \ PIN #3575-74-9007 DB 3075 PG 0499 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 21L0��4D HORIZONTAL Y�d�Grt—� SCALE IN FEET 1'=40'(FULL SIZE) 1'_80' (HALF SIZE) 680 670 660 650 645 40+00 4 0 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1-=8' (HALF SIZE) Revisions ADDENDUM No. 1 8119/2016 ADDENDUM No, 2 NEGOTIATEDCHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12111/2017 tk BAR ;FESSIG OVL 08mm n -11-1017 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 6 OF 35 O gyp. / TEMPORARY CHECK NEW 16 -INCH C-905 DR -26 PVC FORCE MAIN DAM (TYP.) 35' PERMANENT GENERAL DRAINAGE, 2 UTILITY & ACCESS EASEMENT TEMPORARY SEDIMENT ry Gj�PQ< r FENCE (TYP.) A �,P 5 \ BELMONT LAND INVESTMENT CO \ PIN #3575-74-9007 DB 3075 PG 0499 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 21L0��4D HORIZONTAL Y�d�Grt—� SCALE IN FEET 1'=40'(FULL SIZE) 1'_80' (HALF SIZE) 680 670 660 650 645 40+00 4 0 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1-=8' (HALF SIZE) Revisions ADDENDUM No. 1 8119/2016 ADDENDUM No, 2 NEGOTIATEDCHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12111/2017 tk BAR ;FESSIG OVL 08mm n -11-1017 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 6 OF 35 / �,P 5 \ BELMONT LAND INVESTMENT CO \ PIN #3575-74-9007 DB 3075 PG 0499 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 21L0��4D HORIZONTAL Y�d�Grt—� SCALE IN FEET 1'=40'(FULL SIZE) 1'_80' (HALF SIZE) 680 670 660 650 645 40+00 4 0 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1-=8' (HALF SIZE) Revisions ADDENDUM No. 1 8119/2016 ADDENDUM No, 2 NEGOTIATEDCHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12111/2017 tk BAR ;FESSIG OVL 08mm n -11-1017 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 6 OF 35 FORCE MAIN TO BE CONSTRUCTED AND TESTED TO WATERMAIN STANDARDS FROM LIMITS OF CONSTRUCTION SHALL BE STA. 48+57 TO 73+51 IN THIS SECTION RIGHT-OF-WAY OR LIMITS OF EASEMENT BORE & JACK 60LF 30 -INCH STEEL CASING I La (FEET) (FEET) (NVCHES) DIA. (MCHES) DIA. (INCHES (MIN. THICKNESS 0.312") W/85LF 16 -INCH L-1 18 3.75 21 9 14 00 CLASS 52 DI PIPE FORCE MAIN 10'x 15' LAUNCHING PIT BEGIN CASING: STA. 41+20 / NOTE: DRIVEWAY CULVERT REMOVAL AND REPLACEMENT SHALL BE REPAIRED TO OWNERS SATISFACTION. n, a END CASING: 41+80 / fit O , \ / STA. 41+96 (v/.0 \� �� ,� 1 - 164NCH 45° BEND PERMANENT RIP RAP OUTLET PROTECTION SEE DETAIL SHEET 28 'ULVERT NO. APRON LENGTH APRON WIDTH APRON THICKNESS STONE "d50" I MAX. STONE PSNC ENERGY GAS NOTE: 1. AS WELL AS CALLING 811 FOR UTILITY LOCATES. HWY 74 & 29 (WILKINSON BLVD.) IS HIGH PRESSURE GAS LINES. A PSNC ENERGY REPRESENTATIVE HAS TO BE PRESENT DURING CONSTRUCTION, CONTACT PSNC ENERGY 48 HOURS PRIOR TO BORING OR DIGGING IN THIS AREA. (704-810-3209) STA. 42+00 1 - DIP/PVC TRANSITION /1 "AT .Q7 / / j�,�g' / '` COUPLING -END DIP /jA r n `.,,� _, SHEECNONE STq, SO+pO p n •. 8 OF' NEW 16 -INCH C-905 DR -28 / _. a ` / - �'� w� 28 PVC FORCE MAIN o �, `„�!/I WIC%CIIV$O - a TEMPORARY STONE ~ 'n.\ TM_ �_ry l( N gCVD c / 7'` *_ �� �` ! OUTLET (TYP.)Y. `�" 74 15' (TYP cPC 2 TEMPORARY SURGE 9� 0 SC[ \ \ - STONE ENTRANCE/EXIT - " / _ °3F _ v o —� STA. 41+84 RIP RAP OUTLET - 710 o== .� v'\ / 1 - 18 -INCH 45° BEND - �'���+.., �'� — --�ro PROTECTION (TYP.) �`� _ NEW 18 -INCH DR11 HDPE / o -U DIRECTIONAL DRILL ¢ om / O / 10' x 15' RECEIVING PIT v ` �' �� - m `a.0 / BEGIN STA: 48+82 20 0 40 m`" / UOQ / -��. ~!`QI ;4,4'^--.. r.,"`'" - STA. 48+S0 `m\1 ENDSTA:49+82 STA. 41+15 1 - 18 -INCH 45' �p 8 HORIZONTAL 1 - DIP/PVC TRANSITION SCALE IN FEET COUPLING - BEGIN DIP TEMPORARY SEDIMENT OV ^J / NEW 16 -INCH C-905 DR -28 1"-40' (FULL SIZE) FENCE (TYP.) PVC FORCE MAIN � � 1--80' (HALF SIZE) BELMONT LAND INVESTMENT CO \... PIN #3575-74-9007 STA. 48+82 / DB 3075 PG 0499 - _ _AI '`�h "O �_�" PIN ,y3575-74-5418 �r'^'� _ 1 - 16 -INCH 45° BEND / DB 4458 PG 0732 STA. 47+18 1 -AIR RELEASE/ VACUUM VALVE sem` (INSTALL AT HIGH POINT OF LINE) 1 - 16 -INCH PLUG VALVE 710 700 690 680 670 668 40+00 _ J . 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 710 700 690 680 670 668 50+00 4 0 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1--8' (HALF SIZE) Revisions: ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 CA v 1111111111111111116 0l�Oi� /)-11-_w17 -awn By: GAQ lecked By: MWB ty Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 7 OF 35 BORE & JACK 48LF 30" STEEL CASING (MIN. THICKNESS .0312") W1 52LF 18 -INCH CLASS 52 DI PIPE FORCE MAIN (RESTRAINED FLEX RING) BEGIN CASING: STA, 52+57 END CASING: 53+05 1U' x 15' RECEIVING PIT 1 RIP RAP OUTLET PROTECTION (TYP.) - CULVERT NO. L-3 REMOVE AND REPLACE CULVERT IN KIND NOTE: DRIVEWAY CULVERT REMOVAL AND REPLACEMENT SHALL BE REPAIRED TO OWNERS SATISFACTION. \ INSTALL AT PRECONSTRUCTION INVERTS y \ UNLESS OTHERWISE DIRECTED. I \ < \ 15' WIDE PERMANENT GENERAL DRAINAGE, \ ➢ UTILITY & ACCESS EASEMENT VARIES I PERMANENT RIP RAP OUTLET PROTECTION SEE DETAIL SHEET 28 PIN #3574 PC 15352 IN 4574 7 1515.-- PB 004 PG 084 Cl1LVERT APRON LENGTH "La" (FEET) APRON WIDTH APRON THICKNESS (FEET) ONCHES) STONE "d50" DIA. (INCHES) MAX. STONE DIA. (INCHES) L-2 15 3 14 6 9 L-3 12 3.75 21 9 14 L4 12 3 19 9 13 L-5 9 3 11 5 8 8A-1 14 3 11 5 8 8A-2 6 3 7 3 5 BORE & JACK 48LF 30" STEEL CASING (MIN. THICKNESS .0312") W1 52LF 18 -INCH CLASS 52 DI PIPE FORCE MAIN (RESTRAINED FLEX RING) BEGIN CASING: STA, 52+57 END CASING: 53+05 1U' x 15' RECEIVING PIT 1 RIP RAP OUTLET PROTECTION (TYP.) - CULVERT NO. L-3 REMOVE AND REPLACE CULVERT IN KIND NOTE: DRIVEWAY CULVERT REMOVAL AND REPLACEMENT SHALL BE REPAIRED TO OWNERS SATISFACTION. \ INSTALL AT PRECONSTRUCTION INVERTS y \ UNLESS OTHERWISE DIRECTED. I \ < \ 15' WIDE PERMANENT GENERAL DRAINAGE, \ ➢ UTILITY & ACCESS EASEMENT VARIES I 740- 730 40- 730 - 720 - 710- 700 10- 700 50+00 \ EXIST. ASPHALT DRIVE! mwo \ STA. 50+52 1 - 16 -INCH 11.25° BEND STA. 50+32 CUT & PATCH 25LF 1 - 16 -INCH 11.25° BEND EXIST. ASPHALT DRIVE -CUT & PATCH 22LF \ EXIST. CONCRETE DRIVE V WT & PATCH 18LF \ I EXIST. CONCRETE DRIVE — CULVERT NO. L-2 REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. CULVERT NO. L-5 — REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. 1 x \ — CULVERT NO. L-4 — REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. ® CU7 &4LF tF EXIST. CONCRETE SIDEWALK `. OWELL AVE. _ 57+00 �{ \\ I _FM �-- \inoov PIN #3574 PC 15352 IN 4574 7 1515.-- PB 004 PG 084 Z \ 10 x 15' LAUNCHING PIT Q REMOVE & REPLACE O CULVERT NO. L-1 1 - REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS\ INLET PROTECTION (TYP.) a =.✓ UNLESS OTHERWISE DIRECTED. \ CUT & PATCH 12LF 740- 730 40- 730 - 720 - 710- 700 10- 700 50+00 \ EXIST. ASPHALT DRIVE! mwo \ STA. 50+52 1 - 16 -INCH 11.25° BEND STA. 50+32 CUT & PATCH 25LF 1 - 16 -INCH 11.25° BEND EXIST. ASPHALT DRIVE -CUT & PATCH 22LF \ EXIST. CONCRETE DRIVE V WT & PATCH 18LF \ I EXIST. CONCRETE DRIVE — CULVERT NO. L-2 REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. CULVERT NO. L-5 — REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. 1 x \ — CULVERT NO. L-4 — REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. ® CU7 &4LF tF EXIST. CONCRETE SIDEWALK `. OWELL AVE. _ 57+00 �{ \\ I _FM �-- t 249 a N i L - _ j / ) REMOVE & REPLACE RESTORE LANDSCAPING 1 EXIST. RIP RAP z CUT & PATCH 35LF TO EXIST. CONDITIONS 3 U, EXIST. ASPHALT ROAD / WT & PATCH 2 n3LF C 1 S-- � EXIST. CONCRETE DRIVE 730 REMOVE & REPLACE 55LF \ ` - � EXIST. GRAVEL DRIVE ` _)On CU RT NO. 8A-1 P„ 6At00 AND REPLACE CULVERT IN KIND -REMOVE &\REPLACE 25LF \ Ln \ INSTALL ALL REMOVE AT PRECONSTRUCTION INVERTS 1 FILES DIMITRI " MptCH1'1N�g OF 28 EXIST. GRAVEL DRIVE \ PIN #3575-6 948 SNEET UNLESS OTHERWISE DIRECTED BORE & JACK 35LF 30" STEEL CASING (MIN. THICKNESS .0312") W/ 40LF 16 -INCH CLASS 52 DI PIPE FORCE MAIN (RESTRAINED FLEX RING) BEGIN CASING: STA. 59+75 END CASING: 60+10 y- STA. 60+11 1 - 18•INCH 90" BEND 10'x 15' RECEIVING PIT TEMPORARY MPORARY SEDIMENT ` FENCE (TYP.) a+ RESTORE LANDSCAPING I TO EXIST. CONDITIONS CUT & PATCH 19LF R W. ASPHALT 1 \inoov PIN #3574 PC 15352 IN 4574 7 1515.-- PB 004 PG 084 Z \ 10' x 15' LAUNCHING PIT I S I \ REMOVE & REPLACE BOUMANS SANDRA M EXIST. RETAINING WALL / 1 - WOODEN BRIDGE u \ 1,A ✓ t 249 a N i L - _ j / ) REMOVE & REPLACE RESTORE LANDSCAPING 1 EXIST. RIP RAP z CUT & PATCH 35LF TO EXIST. CONDITIONS 3 U, EXIST. ASPHALT ROAD / WT & PATCH 2 n3LF C 1 S-- � EXIST. CONCRETE DRIVE 730 REMOVE & REPLACE 55LF \ ` - � EXIST. GRAVEL DRIVE ` _)On CU RT NO. 8A-1 P„ 6At00 AND REPLACE CULVERT IN KIND -REMOVE &\REPLACE 25LF \ Ln \ INSTALL ALL REMOVE AT PRECONSTRUCTION INVERTS 1 FILES DIMITRI " MptCH1'1N�g OF 28 EXIST. GRAVEL DRIVE \ PIN #3575-6 948 SNEET UNLESS OTHERWISE DIRECTED BORE & JACK 35LF 30" STEEL CASING (MIN. THICKNESS .0312") W/ 40LF 16 -INCH CLASS 52 DI PIPE FORCE MAIN (RESTRAINED FLEX RING) BEGIN CASING: STA. 59+75 END CASING: 60+10 y- STA. 60+11 1 - 18•INCH 90" BEND 10'x 15' RECEIVING PIT TEMPORARY MPORARY SEDIMENT ` FENCE (TYP.) a+ RESTORE LANDSCAPING I TO EXIST. CONDITIONS CUT & PATCH 19LF R W. ASPHALT 1 \inoov PIN #3574 PC 15352 IN 4574 7 1515.-- PB 004 PG 084 cnu PD INLET PROTECTION (TYP.) .OB 212 G011-9 PB 4 PG 115 N BOUMANS SANDRA M �- PB 003 PG 031 PIN #3575-73-0484 DS 2780 PG 0362 1 - - SAN JUAN 3:16 CHURCH u \ 1,A ✓ \ PIN 03575-63-9185 DB 3728 PG 0196 \ PB 008 PG 084 \ - I y�l NTOYA DE 0 NO LUZ MAR LG ` PIN #3574 PC 15352 IN 4574 7 1515.-- PB 004 PG 084 \ —` Ut PIN #35'75-73-1 24 S.,NEY TROY L i08 4567 PG 1912--- & CINDY C �- PB 003 PG 031 PIN #3575-73-0484 DS 2780 PG 0362 1 - - PB 003 PG 0311 \ - I U FORCE MAIN TO BE CONSTRUCTED LIMITS OF CONSTRUCTION SHALL BE I I AND TESTED TO WATERMAIN STANDARDS FROM RIGHT—OF—WAY OR LIMITS OF EASEMENT ST. 1 RCP II E)t7 III IN a 7 8.283— LINE FM -1 STA. 48+57 TO 73+51 IN THIS SECTION 20 0 40 HORIZONTAL SCALE IN FEET 1-=40' (FULL SIZE) 1-=80' (HALF SIZE) 51+00 52+00 53+00 54+00 1 55+00 56+60 57+00 58+00 59+OD 60+00 —740 -730 -720 4 -710 0 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1-=B' (HALF SIZE) 700 61+00 0 U 5 O O F AF N Q Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/2412017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 CA SIM O11mY" n -)—l"17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 8 OF 35 - I U I I- I I F ST. 1 RCP II E)t7 III IN a 7 8.283— I I EXIST i 1sT. 2 GASI- _. I � 5 M 4.6' MIN. i ! -- - _I I I +�— i MIN. 5.5 1 I 'I I I 2.6 MIN. -� �_-___--�L-_—. __ .i... I� U..- L-.. _ OF _.— 75LF F 1&I CH J 18- NCH 5 or R-26 FORCE MAIN DR 26 PV F OF 16 -INCH C-905 DR -28 FORCE MAIN i9 z L.� _REC IVINC PIT - L- IJ - BORE - & ACK 35LF 30" STEEL CASiN(-(MIN. BORE & K 48 F 30' EEL IN (MIN. THICKNESS 0.312") W / 4OLF 16 -INCH C SS 57 ! THI KNE 0.312') W / 2LF 1 INCH LASS 2 DI PIPE FORCE MAIN (RESTRAIN F D FL ( RING) - 5' MIN. -- -- - f0 (TYP.) BE INCA,1INI57 ENq CAST GIST .60+10 EN CABIN G: STI, 53 F OF 6 -INCH C-905 LAUNC iING P IT DR PV FORCE MAIN 51+00 52+00 53+00 54+00 1 55+00 56+60 57+00 58+00 59+OD 60+00 —740 -730 -720 4 -710 0 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1-=B' (HALF SIZE) 700 61+00 0 U 5 O O F AF N Q Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/2412017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 CA SIM O11mY" n -)—l"17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 8 OF 35 NOTE: DRIVEWAY CULVERT REMOVAL AND REPLACEMENT SHALL BE REPAIRED TO OWNERS SATISFACTION. I CULVERT NO. 8A-3 REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. O REMOVE & REPLACE 1OLF O ' EXIST. GRAVEL DRIVE + r / cp N 73z 1- V) 00 _ - Z W 12 P 12' UV) .--ter '+:^ 2 ROP- -_ Q CULVERT NO. &A-2 REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS TEMPORARY CHECK UNLESS OTHERWISE DIRECTED. _ DAM (TYP.) FORCE MAIN TO BE CONSTRUCTED \ AND TESTED TO WATERMAIN STANDARDS FROM STA. 48+57 TO 73+51 IN THIS SECTION 750 740 730 720 710 -t- 61+00 \ � 0? CULVERT NO. 8A-4 W REMOVE AND REPLACE CULVERT IN KIND. CUT & PATCH 19LF INSTALL AT PRECONSTRUCTION INVERTS p" a EXIST. CONCRETE DRIVE UNLESS OTHERWISE DIRECTED. W o �\ CULVERT NO. 8A-6 W Z A \ INLET PROTECTION (TYP.) TEMPORARYFENCEIMENT � REMOVE AND REPLACE CULVERT IN KIND. / F~�I CIZ z U INSTALL AT PRECONSTRUCTION INVERTS O W z UNLESS OTHERWISE DIRECTED. TEMPORARY CHECK V z DAM (TYP.) REMOVE & REPLACE 18LF \ Q� O W O EXIST. GRAVEL DRIVE - - FMrLII w ~ F / & 27LF ASPHALT DRIVE REMOVE & REPLACE 11 LF - tr.. 0 EXIST. GRAVEL DRIVE I (�-I 0 STA. 84+10p,y W & 17LF ASPHALT w I j / 1 -AIR RELEASE / VACUUM VALVE r:y W REMOVE 8 REPLACE 15LF tL CUT & PATCH 3LF (INSTALL AT HIGH POINT OF LINE) EXIST. GRAVEL DRIVE EXIST. CONCRETE SIDEWALKO I REMOVE & REPLACE O CUT 8 PATCH ALF ISLFO 9 GRA RIVE Ips„ S EXIST. CONCRETE SIDEWALK GRAVEL DEXIST. W N Con 0 55+00 6 00 +',.: } 67+00... , =196+oo RCP / 12"4 1 H .a,'✓{ t.J` _ .�.,� W O 0 .RC - .._ RIP RAP OUTLET - ��� 1 - " = W PROTECTION (7YP. \ 07. --/ '—_� ( U = \j I = < N LIMITS - CONSTRUCTION SHALL BE Q RIGHT-OF-WAY OR LIMITS OF EASEMENT NEW 16 -INCH C-905 DR -26 PVC m REMOVE & REPLACE 15LF%j�� FORCE MAIN o EXIST. GRAVEL DRIVE r�i / vi l7y, ~ , I I N REMOVE &REPLACE ISLE � i � l EXIST. GRAVEL DRIVE 20 0 40 W _j CULVERT NO. BA -5 to Clrr &PATCH ALF CULVERT NO. SA -8 F - REMOVE & REPLACE 15LF I = SCALEINFEET REMOVE AND REPLACE CULVERT IN KIND. I EXIST. CONCRETE SIDEWALK REMOVE AND REPLACE CULVERT IN KIND. EXIST. GRAVEL DRIVE INSTALL AT PRECONSTRUCTION INVERTS INSTALL AT PRECONSTRUCTION INVERTS U ' UNLESS OTHERWISE DIRECTED. I I _CULVERT NO. BA -7 UNLESS OTHERWISE DIRECTED. 1--40' (FALL SIZE) 1'-80' (HALF SIZE) O REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS h- y LINE EM -1 I UNLESS OTHERWISE DIRECTED. U 0 0 62+00 63+00 � I i 70OLF OF 16 -INCH C-905 DR -26 PVC FORCE MAIN -I-- - I 64+00 65+00 66+00 67+00 750 TO 730 720 --I- 710 68+00 4 0 2 VERTICAL SCALE IN FEET 1--4' FULL SIZE) 1--8' HALF SIZE) Revisions: ADDENDUM No. 1 &/1912016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 a. 030m . - - I'll 7 'awn By: GAQ lecked By: MWB ty Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 9 OF 35 PERMANENT RIP RAP OUTLET PROTECTION SEE DETAIL SHEET 28 CULVERT NO. APRON LENGTH "La" FEE APRON WIDTH APRON THICKNESS STONE `60" DIA. FEE NCHES NCHES MAX. STONE DIA. INCHES 8A-3 6 3 7 3 5 8A-4 9.5 3 7 3 5 8A-5 12 3.75 21 9 14 8A-6 6 3 7 3 5 8A-7 12 3 14 6 9 BA -8 10 3 14 f—I 9 NOTE: DRIVEWAY CULVERT REMOVAL AND REPLACEMENT SHALL BE REPAIRED TO OWNERS SATISFACTION. I CULVERT NO. 8A-3 REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS UNLESS OTHERWISE DIRECTED. O REMOVE & REPLACE 1OLF O ' EXIST. GRAVEL DRIVE + r / cp N 73z 1- V) 00 _ - Z W 12 P 12' UV) .--ter '+:^ 2 ROP- -_ Q CULVERT NO. &A-2 REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS TEMPORARY CHECK UNLESS OTHERWISE DIRECTED. _ DAM (TYP.) FORCE MAIN TO BE CONSTRUCTED \ AND TESTED TO WATERMAIN STANDARDS FROM STA. 48+57 TO 73+51 IN THIS SECTION 750 740 730 720 710 -t- 61+00 \ � 0? CULVERT NO. 8A-4 W REMOVE AND REPLACE CULVERT IN KIND. CUT & PATCH 19LF INSTALL AT PRECONSTRUCTION INVERTS p" a EXIST. CONCRETE DRIVE UNLESS OTHERWISE DIRECTED. W o �\ CULVERT NO. 8A-6 W Z A \ INLET PROTECTION (TYP.) TEMPORARYFENCEIMENT � REMOVE AND REPLACE CULVERT IN KIND. / F~�I CIZ z U INSTALL AT PRECONSTRUCTION INVERTS O W z UNLESS OTHERWISE DIRECTED. TEMPORARY CHECK V z DAM (TYP.) REMOVE & REPLACE 18LF \ Q� O W O EXIST. GRAVEL DRIVE - - FMrLII w ~ F / & 27LF ASPHALT DRIVE REMOVE & REPLACE 11 LF - tr.. 0 EXIST. GRAVEL DRIVE I (�-I 0 STA. 84+10p,y W & 17LF ASPHALT w I j / 1 -AIR RELEASE / VACUUM VALVE r:y W REMOVE 8 REPLACE 15LF tL CUT & PATCH 3LF (INSTALL AT HIGH POINT OF LINE) EXIST. GRAVEL DRIVE EXIST. CONCRETE SIDEWALKO I REMOVE & REPLACE O CUT 8 PATCH ALF ISLFO 9 GRA RIVE Ips„ S EXIST. CONCRETE SIDEWALK GRAVEL DEXIST. W N Con 0 55+00 6 00 +',.: } 67+00... , =196+oo RCP / 12"4 1 H .a,'✓{ t.J` _ .�.,� W O 0 .RC - .._ RIP RAP OUTLET - ��� 1 - " = W PROTECTION (7YP. \ 07. --/ '—_� ( U = \j I = < N LIMITS - CONSTRUCTION SHALL BE Q RIGHT-OF-WAY OR LIMITS OF EASEMENT NEW 16 -INCH C-905 DR -26 PVC m REMOVE & REPLACE 15LF%j�� FORCE MAIN o EXIST. GRAVEL DRIVE r�i / vi l7y, ~ , I I N REMOVE &REPLACE ISLE � i � l EXIST. GRAVEL DRIVE 20 0 40 W _j CULVERT NO. BA -5 to Clrr &PATCH ALF CULVERT NO. SA -8 F - REMOVE & REPLACE 15LF I = SCALEINFEET REMOVE AND REPLACE CULVERT IN KIND. I EXIST. CONCRETE SIDEWALK REMOVE AND REPLACE CULVERT IN KIND. EXIST. GRAVEL DRIVE INSTALL AT PRECONSTRUCTION INVERTS INSTALL AT PRECONSTRUCTION INVERTS U ' UNLESS OTHERWISE DIRECTED. I I _CULVERT NO. BA -7 UNLESS OTHERWISE DIRECTED. 1--40' (FALL SIZE) 1'-80' (HALF SIZE) O REMOVE AND REPLACE CULVERT IN KIND. INSTALL AT PRECONSTRUCTION INVERTS h- y LINE EM -1 I UNLESS OTHERWISE DIRECTED. U 0 0 62+00 63+00 � I i 70OLF OF 16 -INCH C-905 DR -26 PVC FORCE MAIN -I-- - I 64+00 65+00 66+00 67+00 750 TO 730 720 --I- 710 68+00 4 0 2 VERTICAL SCALE IN FEET 1--4' FULL SIZE) 1--8' HALF SIZE) Revisions: ADDENDUM No. 1 &/1912016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 a. 030m . - - I'll 7 'awn By: GAQ lecked By: MWB ty Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 9 OF 35 PERMANENT RIP RAP OUTLET PROTECTION SEE DETAIL SHEET 28 CULVERT NO. APRON LENGTH APRON WIDTH APRON THICKNESS STONE "d50"DIA. MAX STONE DIA. "La" FE E INCHES INCHES INCHES BA -9 1 8 3.75 11 5 8 NOTE: DRIVEWAY CULVERT REMOVAL AND REPLACEMENT SHALL BE REPAIRED TO OWNERS SATISFACTION 1. JACK & BORE: THE FRONT OF THE CASING PIPE SHALL BE PROVIDED WITH MECHANICAL ARRANGEMENTS OR DEVICES THAT WILL POSITIVELY PREVENT THE AUGER FROM LEADING THE PIPE SO THAT NO UNSUPPORTED EXCAVATION IS AHEAD OF THE PIPE. 2. PROVIDE WEATHERPROOF SIGNS MARKED AT THE RIGHT -WAY LINES (ON BOTH SIDES OF TRACK FOR CROSSINGS) LOCATED OVER THE CENTERLINE OF THE PIPE. SIGNS SHALL SHOW THE FOLLOWING: NAME & ADDRESS OF OWNER CONTENTS OF PIPE PRESSURE IN PIPE PIPE DEPTH BELOW GRADE AT POINT OF A SIGN EMERGENCY TELEPHONE NUMBER IN EVENT OF PIPE RUPTURE. 3. CONTRACTOR SHALL FOLLOW ALL REQUIREMENTS OF NORFOLK SOUTHERN'S NSCE-8 SPECIFICATIONS. 4. PIPELINE AND CROSSING TO BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH LAST APPROVED AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION SPECIFICATIONS FOR PIPELINES CONVEYING FLAMMABLE AND NON-FLAMMABLE SUBSTANCES. 5. BLASTING NOT PERMITTED 5. CONTRACTOR SHALL SUPPLY ENGINEERED SHORING PLAN AS REQUIRED. 730 720 710 700 690 680 68+00 GREEN, ANGELA DAWN & JEFFERY SCOTT PIN #3575-63-1055 DB 3714 PG 0593 _PB 004 PG 115 CULVERT NO. SA -9 Y\ akQQ • REMOVE AND REPLACE CULVERT IN KIND. 51 P 6 8 INSTALL AT PRECONSTRUCTION INVERTS LAN QF 2 UNLESS OTHERWISE DIRECTED. C., TEMPORARY SEDIMENT y ` FENCE CTYP.) ;,nur r rrlu,l I. INLET PROTECTION (TYP.) �- 1 r RElCEIVING PIT Illllli� II J l�lll� III NEW 18 -INCH CLASS 52 DI I PIPE FORCE MAIN RIP RAP OUTLET PROTECTION (TYP )' .i t _ I P \ 1 IIIIIIII I � �j11111II� STA 66+75 ` .h 1111 I I I `}; �� i 1850't TO RR 1 1 1 -1 -INCH GATE VALVE N } \ I I I ' MILE POST IIII (EMERGENCY SHUT-OFF VALVE) I 393 1 - 16 -INCH 45° BEND 11 STA. 69+22 I I V 1 - 16 -INCH 22.5° BEND'' STA. 68+89 y 1 - 16 -INCH 22.5° BEND\ - 1 I �� RIGHT–OF–WAY NEW 16 -INCH CLASS 52 DI PIPE FORCE MAIN LIMITS OF CONSTRUCTION SHALL BE RIGHT-OF-WAY OR LIMITS OF EASEMENT LINE EM -1 I Z 60 R/' / RIGHT–OF–WAY / 3r w 1 p W 30,30' PERMANENT GENERAL DRAINAGE,d UTILTY & ACCESS EASEMENT (TY.) N IIiI IIIIIbIp QII / �Oz�X 1�07'Rx—+3�609� LAUNCHING AUNCHING PIT z v 7v_ �-_� Cr - ll'li Illllllll S� N� EI II IIIA I EXIST. PSNC \ I I I�IIIII�IIII I 1 DRIVEWAY BORE & JACK 35OLF 30' MIN. STEEL ` CASING (MIN. THICKNESS 0.469") W / 360 LF 16 -INCH CLASS 52 DI PIPE FORCE MAIN (RESTRAINED FLEX RING) BEGIN CASING: STA. 68+25 END CASING: STA. 72+77 FORCE MAIN TO BE CONSTRUCTED AND TESTED TO WATERMAIN STANDARDS FROM STA. 48+57 TO 73+51 IN THIS SECTION 69+OD 70+00 71+00 72+00 73+00 730 720 710 700 690 680 74+00 STA. 73+14 -16 -INCH PLUG VALVE (EMERGENCY SHUT-OFF VALVE) NEW 16 -INCH C-905 DR -26 PVC FORCE MAIN TEMPORARY STONE OUTLET (TYP.) 1 N � \ N --Z4 O W 2 1– PU LIC SERVICE CO F INC PIN #3575-52– 45 DB 4528 PG 16 STA. 73+51 PB 078 PG 034 1-DIP/PVC TRANSITION COUPLING END DIP STA. 73+23 ;LL II� z IL 1346' - , 97.58' 10.3' cli 9 —9668' 99.3 czi � i 'z o o =, Y O ti .. _ _ (L ST. FIBER OPTIC Z y- I � I I YI �Y G z t~i C -- ! (TYP.) I I I CHING PITS I I LAUNCHING 1 _ CEIVII G PIT OF 1122LF OF 16 -INCH ! LL E�BT. SH ET PI' E OR j'RENCOF i 1 TY0.O5.5 MA V ) CLASS PIPE I F BEROO �C�UN ING T FACE ��j 1.5 �I - FORCE MAIN I �RICEING ITFROM I owl 10L - -.. .. 69LF OF 16 -INCH Ii TH TI EMBAINIKMENT LINE CLASS 52 DI PIPE .BOTH DES) FORCE MAIN TA:73+51 I i-DIP/PVQ TRANSITION UFLING w - _- BODE & CK LF 30" MIN. S EEL INC. (MIN.. P SAW / F 1 " C 52 I PIPEC- _.. m - EIEG 62 PVC DR PVC NOTE: ALIJ DI PIP TO CEM NT LI ED -- — (RE$TRAI ED FLEX RI ) I 69+OD 70+00 71+00 72+00 73+00 730 720 710 700 690 680 74+00 STA. 73+14 -16 -INCH PLUG VALVE (EMERGENCY SHUT-OFF VALVE) NEW 16 -INCH C-905 DR -26 PVC FORCE MAIN TEMPORARY STONE OUTLET (TYP.) 1 4 0 2 VERTICAL SCALE IN FEET 1'=4' (FULL SZ 1•-8' (HALFI SZ 20 0 40 HORIZONTAL SCALE IN FEET 1--40' (FULL SIZE) 1--80' (HALF SIZE) w W- Revisions 3 ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES tonanm7 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 CA BLL OB111OB4 /)- 11-2"17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 10 OF 35 N � \ N --Z4 O W 2 1– PU LIC SERVICE CO F INC PIN #3575-52– 45 DB 4528 PG 16 STA. 73+51 PB 078 PG 034 1-DIP/PVC TRANSITION COUPLING END DIP STA. 73+23 1 -AIR RELEASE / VACUUM VALVE (INSTALL AT HIGH POINT OF LINE) 4 0 2 VERTICAL SCALE IN FEET 1'=4' (FULL SZ 1•-8' (HALFI SZ 20 0 40 HORIZONTAL SCALE IN FEET 1--40' (FULL SIZE) 1--80' (HALF SIZE) w W- Revisions 3 ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES tonanm7 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 CA BLL OB111OB4 /)- 11-2"17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 10 OF 35 STA. 74+50 TO STA. 84+00 FORCE MAIN MUST BE 10' OFF TOP OF BANK TEMPORARY SEDIMENT FENCE (TYP.) STA. B0+3a LIMITS OF CONSTRUCTION SHALL BE 1 -16-INCH 22.5° BEND — 1 RIGHT–OF–WAY OR LIMITS OF EASEMENT \ - STA. 80+90 / 1 - 16 -INCH 22.5° BEND 30' PERMANENT GENERAL DRAINAGE, N \ UTILITY S ACCESS EASEMENT (TYP.)LL Lu co crit Q \ ~�,� \ / FYI--1'r�� \ \- --/ �/ ON \��\\\\\\\'� `\ STA. 82+36 A. 83+37 680 670 660 655 -f-- 74+00 75+00 _ -\_ ��j- —\ `�— \ �\ T ----- OUTLET 1 -18 -INCH 22.5' BEND 1.1&INCH 11.25- BEND g1J---- NEW 16 -INCH C-905 DR -26 PVC FORCE MAIN 'STA. 76+05 ���� —----------_---'- STA. 79+28 TEMPORARY SEDIMENT FENCE (TYP.) ----.-f� 1 -16 -INCH 11.25* BEND-- 1 -18 -INCH 11.25* BEND 1 -16 -INCH 22.5* BEND PUBLIC SERVICE CO OF NC INC PIN #3575-52-5459 ` DB 4528 PG 1891 \ \ �\ ��> �Y\ \ \ � PB 078 PG 034 0ry 78+00 78+00 LINE FM -1 79+00 z w (— h16 Z m 1000LF OF 16 -INCH C DR -26 PVC FORCE A 80+00 81+00 82+00 83+00 F_ 20 0 40 HORIZONTAL � SCALE IN FEET 1--40' (FULL SIZE) 1--80' (HALF SIZE) 700 690 680 670 4 0 660 2 VERTICAL SCALE IN FEET 1--4' (FULL SIZE) 1--8' (HALF SIZE) -t 655 84+00 Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/2412017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 7 SIM 0l�Oi� 17 - 11-31:�17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 11 OF 35 30' PERMANENT GENERAL DRAINAGE, UTILITY & ACCESS EASEMENTSTA. 86+87 1 - 18 -INCH 45° BEND 1111 TEMPORARY DOUBLE / EXIST. 8° SEWER (TYP.) STONE OUTLET / / STA 86+92 STA. 85+92/ 1 - HDPE / PVC TRANSITION SLEEVE 1 - 16 -INCH 45° BEGIN HDPE STA. 85+57 - i--- , TA /'W 1 - 16 -INCH 22.5° BEND - -. 10'x10' / / 86+LAUNCHING PIT a I I w / r 5 NEW 16 -INCH C-905 DR -26 PVC \\ FORCE MAIN aNA 07 _ I U / NEW 16 -INCH DR11 HDPE / LIMITS OF CONSTRUCTION SHALL BE RIGHT-OF-WAY OR LIMITS OF EASEMENT 670 660 650 640 630 84+00 TRIANGLE REAL ESTATE BRENTWOOD PIN //3575-42-6069 DB 4127 PG 1649 TEMPORARY SURGE STONE ENTRANCE/EXIT STA 91+51 M////1 /r`\ v 1 - HDPE / PVC TRANSITION_ P GJ� 20 0 40 ly END HDPE / HORIZONTAL F- A/ / SCALE IN FEET g C J I 1 1•-40' (FULL SIZE) i'-80' (HALF SIZE) STA. 90+33 1 - 18 -INCH 45° BEN�i�� STA. 89+77 LINE FM -1 1-16-INCH45°BEND ' 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 670 660 650 4 640 0 2 VERTICAL SCALE IN FEET 1•-4' (FULL SIZE) 1'-8' (HALF SIZE) 630 94+00 Revisions: ADDENDUM No. 1 8/192016 ADDENDUM No. 2 NEGOTIATED CHANGES 10242017 ADDENDUM No. 3 NEGOTIATED MATERLM CHANGES 12/1]2017 sm Omem 0) 0 /�)-I1-21,17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 12 OF 35 a � o 3 Wm zo N 45 r��� V//1 z V W p( ?- d STA. 92+23 H 45° / 1 - 16-INCBEND O 100 YR. FLOOD PLAIN TEMPORARY STONE C7 � OUTLET (TYP.) _ / �IO FSI W U STA. 92+19 �NEW 16 -INCH C-905 DR -26 y 1 - 16 -INCH 45° BEND a PVC FORCE MAIN r-� V w F ` O 0 o < '� \ EXIST. 30' PERMANENT GENERAL DRAINAGE, UTILITY S ACCESS EASEMENT j �\ \ \ TEMPORARY SEDIMENT FENCE (TYP.) 5 [� I \\ o 20k10' RECEIVING PIT \ n 20x10GJ�V EIVING PIT / �// ; r n ., ` \`- ` h0 STA 91+51 M////1 /r`\ v 1 - HDPE / PVC TRANSITION_ P GJ� 20 0 40 ly END HDPE / HORIZONTAL F- A/ / SCALE IN FEET g C J I 1 1•-40' (FULL SIZE) i'-80' (HALF SIZE) STA. 90+33 1 - 18 -INCH 45° BEN�i�� STA. 89+77 LINE FM -1 1-16-INCH45°BEND ' 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 670 660 650 4 640 0 2 VERTICAL SCALE IN FEET 1•-4' (FULL SIZE) 1'-8' (HALF SIZE) 630 94+00 Revisions: ADDENDUM No. 1 8/192016 ADDENDUM No. 2 NEGOTIATED CHANGES 10242017 ADDENDUM No. 3 NEGOTIATED MATERLM CHANGES 12/1]2017 sm Omem 0) 0 /�)-I1-21,17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 12 OF 35 660 650 640 630 625 -t-- 94+00 LIMITS OF CONSTRUCTION SHALL BE RIGHT–OF–WAY OR LIMITS OF EASEMENT �y GASTONIA CITY OF PIN ,#3575-41-1603 DB 2799 PG 0174 1 PB 054 PG 069 TEMPORARY STONE OUTLET (TYP.) CH 45° BESTA. 101+02 / 1 - 16 -IN ND EX. SSMH -SS ` RIM: 645.94't -"_--Ss---._55--�.sS-_.___ss _SS SS -ys INV: 634.64' `� SS -S,-SS-SS 100 YR. FLOOD PLAIN (TYP.) ` a STA. 100+95 1 1 - 16 -INCH 45" BEND TEMPORARY SEDIMENT FENCE (TYR) \ TRIANGLE REAL ESTATE BRENTWOOD u� d PIN #3575-42-6069 OB 4127 PG 1649 STA.103+57 1 -AIR RELEASE I VACUUM VALVE (INSTALL AT HIGH POINT OF LINE) STA. 103+54 1 - 18 -INCH 45° BEND STA.103+33 1 - 16 -INCH 45° BEND TEMPORARY SURGE v STONE ENTRANCE/EXIT 2.00 NEW 16 -INCH C-905 DR -26 PVC FORCE MAIN STA.100+60 1 - HDPE/PVC TRANSITION COUPLING 30' PERMANENT GENERAL DRAINAGE, NEW 16 -INCH C-905 NEW 16 -INCH DR11 HDPE DIRECTIONAL DRILL i UTILITY & ACCESS EASEMENT DR -26 PVC FORCE MAIN AND 16" GATE I EXISTING 16 -INCH CATAW13A CREEK FORCE MAIN EXIST. 8° SEWER (TVP.) yam. , UHARTS CREEK VERTICAL Drawn By: GAQ 630 SCALE IN FEET Checked By:MWB 1--40' (FULL SIZE) 1--80' (HALF SIZE) + 00 Scale: AS SHOWN Date: 12/11/2017 • W ALS --A f l� -_ - - - _ � - .- � _ = -�` \ � ! N NO ---- -_ -_--��_-+.-F11-_pyy�F���i. rye __ _,-� �, / STA. 99+40 Z F- �- — - - _ -�,-- �, t -�� _-... ! _ —� -r _ y J _ :'-ti.- __ -� ZZ PVC TRANS TIO COUPLING J _ to 1 - 16 x16 TEE (MJ) l `�Z�= - - `�=-_� ,�_ J L� -_- —' - -_� _ A STA. 27 - .�-_- STA. 99+37 Q 1 - 18 x12 TEE W/ EMERGENCY CONNECT! ON BRENTWOOD Pte-„ � \` "-� ` � -"-- -- -- _ _ � 1 - 18 -INCH 45° BEND - BEND 1 - 16 -INCH 45° BEND � CHASE APARTMENTS BRCHAS STA. 102+24 _ 1 - 18 -INCH 45° BEND #11/6 A �DD / PA1686 7S ,88 hJ / /886 EXIST. SEWER LATERALS LINE FM -1 646.10± APPROX. EXIST. 8" .SEWER INV. = 645.80± DUHART'S oco,CA Rn,.,,.2 Ol CREEK„ — PUMP STATION = — , 'CONNECT NEW 18" FM WITH NEW 18"x16" TEE AND 16" GATE VALVE EXISTING 16 -INCH CATAW13A CREEK FORCE MAIN 2 -k.17 VERTICAL Drawn By: GAQ 630 SCALE IN FEET Checked By:MWB 1--40' (FULL SIZE) 1--80' (HALF SIZE) City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 625 GASTONIA CITY OF PIN #3575-31-8651 DB 2000 PG 0888 EX. SSMH uo i ` A RIM: 647.72'± EK CRE ,� INV: 633.31' DUHARTS p 2 -`zs'9 STA. 102+57 O 11 1 - 16 x16 TEE (MJ) 1 2 - 16 -INCH PLUG VALVES (MJ) 1 1 - 18 x12 TEE W/ EMERGENCY CONNECT! ON 1 - 16 -INCH PLUG (MJ) STA. 102+38 1 - 16 -INCH 45° BEND STA. 102+24 _ 1 - 18 -INCH 45° BEND m �s w I' D!� XIS Ap goy. FLOOD PLAIN u TI gl " 3' MIN. ]00 YR. FL Z a 5 8' SEWER INV = 636.3± APPROX j \ EXIST. 8' SEWER INV = 635.401 Y � U \\, 3' MIN, arc' ui . ` ' 120LF OF 385LFS�E16-INCH DR -26 (((IWWWWWWC FORCE YHDP@IPVC TRANSITION COUPLING HDPE DRILL APPROX. EXIST. 8' SEWER INV = 033.68'0 CROSSING 2�0 004II0 HORIZONTAL YG�O SCALE IN FEET 1--40' (FULL SIZE) 1'-80' (HALF SIZE) 660 650 640 00 v o � z � w W N W wA C7 ~' Q w z H W GHQ O x ° H au 0 Revisions: ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 3 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 4 oco,CA Rn,.,,.2 Ol 0 2 -k.17 VERTICAL Drawn By: GAQ 630 SCALE IN FEET Checked By:MWB 1--40' (FULL SIZE) 1--80' (HALF SIZE) City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 625 95+00 96+00 97+00 96+00 99+00 100+00 101+00 102+00 103+00 104+00 104+45 SHEET 13 OF 35 I I I I 1 I I FUTURE 1 1 I SUBDIVISION I ,,, ` EXIST. STORM �L� \ "�'' DRAIN EASE. I / TEMPORARY SURGE STONE ENTRANCE/EXIT M I a 10'x20' RECEIVING PIT IMcADENVILLE �� I I L LE EXIST. 8- TO REMAIN a I WESLEYAN OEVELO MEk LLC / PIN (/3585-13-39#2 � � � \ _ -_. F / � {J � v 5•,.{/ � rc- 1 I 3 ( I -� PUMP STATION SEE SHEET 25 - 26 DB 4526 PG/144 .• / EXIST SEWER METERING MH #1 / , �_ BE ABANDONED / I I '�*e,:",, WETWELL I a STA. 0+81 I / 1' 1 - �/^ �\ 1641'55' / EXIST. 8-INCH SEWER I--I ~ U YR. FLOOD PLAIN EXIST. PUMP STA ON - - 1 �' / �/ :. Ire /^ )\I I I �� 1 INV=564.90 PERMANENT GENERAL DRAINAGE, UTP 1\\� "�'� A,po 1�T / MH TO REMAIN C) z I �� r`1 `•. �+ 8, ACCESS EASEMENT VARIES =r ... ' .{` n - I /f1 /f �„�fl''" ,, REPLACE EXIST. MANHOLE STA. F�i/I Z U O P. LINE FM-1 f/.. \\ ' �' WATERR TIGHT LID T RIM = 582.64' O 1 i EXIST. WETWELL TdWN OF ! \ / // _ `sas - ter:\ - \. - '� �: SEE SHEET 3 - / // 1. ' i \ a "� �- -, _"� / \ \ NOTE: CONTRACTOR TO PROVIDE TEMPORARY BYPASS PIPE OUTSIDE OF MANHOLE w a C7 W a" 1 _ _ MCADENALLE 2. T INV-564.90 ... PIN X13585-14-0559 Ij'\ •98°23'1" `.r- 169°1'50" ' ,• \ // 'x' : • \� �, \ \� \ I \{, 1 \ PLUG SW 8 NE INVERTS U w 1 DB 0784 PG 0886 I �!L _ 2 - 18" PLUG VALVES ' ~ AND 80XES �1 58 - •� )\ \\� 108'32'43" I \ --C��.�� f / %)\\\ 1 30' GENERAL DRAINAGE, UTILITY BACCESSEASEMENTL, O O \ MH #1 STA. 0+37 NI (/f1�1 /�� / / BORE & JACK 195LF 30' MIN. STEEL \ MH #2 \ STA. 0+55 — REMOVE 8 REPLACE �I 1 1 I / \ 1 1 I 1 L '' ` CASING (MIN. THICKNESS 0.489") W /228 LF 18-INCH 52 PIPE FORCE \\ t \ \ �• 4. _ 17 LF EXIST. GRAVEL DR I REPLACE EXISTING ZJ �8`' , , - 5 , - SEWER WITH _ - - 58 - MH #4 _ 1 STA. 2+25 4� 7 I WATER TIGHT LID CLASS DI MAIN (RESTRAINED FLEX RING) BEGIN CASING: STA 2+32 END CASING STA 4+27 PHARR YARNS LLC \' lr \ V PIN X3585-05-6470 m \ ) \ OB 4554 PG 1334 y 0 _ 22 LF 8-INCH DR-26 (MH RIM = 583.00' Lf'-fp \ � I `�, «' FUNRECCHUDESAC •'� _ SAN. SEWER 0 0.40% \ #3 / / VENT ELEV - 586.47' INSIDE DROP MANHOLE � . N \: }},, \ L / / \ �- EXIST. 15' PERMANENT GENERAL GRAVITY SEWER � �� ••�� _••�-..�..�. •� •LIMITS STA. 1+10 QP 4' i 1 J \ \ DRAINAGE, UTIUTY do ACCESS EASEMENT ' • OF EXIST. DEBRIS 10'x20' LAUNCHING PIT 1 li l + 8 p TEMPORARY STONE 10'X25' TEMP. CONSTRUCTION EASEMENT OUTLET (TYP.) TEMPORARY SEDIMENT FENCE(TYP.)/ / \ 1 0 P' `L W `— N PHARR YARNS LLC PIN {j3585-14-1910 I ,t' \ \ \ �'� ` 2 DB 0358 PG 0507 �� LIMITSOF CONSTRUCTION SHALL BE i \\\ 0 RIGHT-OF-WAY OR LIMITS OF EASEMENT / ` ��\ 20 0 40 / \ \ \ HORIZONTAL SCALE IN FEET •=40' 0) 1 (FULL SIZE) 1•®80' (HALF SIZE) �. ..._... _... _.. _.. q LINE GS-1'i...- a W �� CL 000 0 i� b� m t'n0 m � 2 001 o (x.O N ui W GO mCl O � 0- J� =o Z � F- xn �+ G 'vi pIn l } v`Oi O Q Z II II O Q V) o�1�,,II II Z_ M i(j OD to x N N uj O N i W w o n N Q II It Revisions: � Q O Fm II II x H . IFx > r Q o w i w r . F- > M7 Q _ d - + 'D to II II Q N >1k - 11 II 11 N z x- J L r tom m eh N 3 Z ADDENDUM No. 1 8/19/2016 a: fA �> Z - ftnN 3w? in? > 2 Q i 4 N ~ > 3 W .4 W- m II F I ADDENDUM No.2 NEGOTIATED CHANGES LEV = 586.7 LEV = 586.47 Q5 -'n W \ IIF O' i Q to > > ELEV = 586 47 10/24n017x ADDENDUM No.3 ELEV = 58f. E V= 586.4 2 w 3 3 8? z APPROXIMATE 100 YR FLOOD PLAIN NEGOTIATED MATERIAL CHANGES 584 — 1 �' � 584 wunon �' - ---- - -- ��\_-- _T�-EXI57)NSe 580 ee 580 ro a NV=580.30 IcD �& D® �®N LO O� o� N o \ \\ I SURFAC I N ELEVI570.54 LO ° w 576 576 b a rn \ / AT CROWING I 1 8" fN =575.83 z w m 572 �(n n a U4 00w rn aD \ I I / NOTE: ALL DI I 1 PIPE I f _ _ n3 572 Z ma rn N IN = 571.37f - � ��� MECHANICAL OR PUSH INT I I TYPE 8" INV 571.81 4 ' FERC PERMI r ELEVATION 569.4 — 3' M N. ON — — — — — — — 0.82 0 568 Mm-1. AN. SEWER 568 SEE SHEET 28 CONNECTION 14TO rOR 3 3L SEE SHEEI CONNECIION 26 FOR INTO 0 •-C• 1 I. 564 PUMP STA INV. - ss ON .eo - - 1 5%�- -� ECEI\A G PIT PUMP INV STATION 564.90 - 2 564 n z'17 SS 51 DI PIPE 1811` 18" C-905 DR-26 PVC SAN. SEWER O 0.22%% UN SAN. HING PIT SEWER 0 0 ORE 8 J ASING ( ANDCASI CK 195LF 30" ST N. THICKNESS EL .312•) VERTICAL SCALE IN FEET CheckDrawn By: GAQ Checked By: MWB EGIN CA ING: STA. 2+32 G: 4+27 1•-4- (FULL SIZE) 1--S' (HALF SIZE) City Engineer: GBS Scale: AS SHOWN 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0+00 1+00 Date: 12/11/2017 701-265 SHEET 14 OF 35 .3 BENCHMARK 0° R/W MONUMENT ELEV = 591.05 NORTHING = 555740.76 w LIMITS OF CONSTRUCTION SHALL BE RIGHT—OF—WAY OR LIMITS OF EASEMENT EASTING=1380514.80 -" MH #9 STA. 13+57 TEMPORARY SURGE 'o WATER TIGHT LID 1 c W C7 N STONE ENTRANCE/EXIT o I PHARR YARNS LLC RIM = 587.21 1~-I O W Z PIN #3585-05-64C70 PC 16470 DB 4554 PG 1334 I _ _` F Q w 40'x40' METERING MANHOLE EASEMENTI U O 0 p MH #8 4 FIBERGLASS METERING MANHOLE #2 (SEE SITE PLAN DETAIL SHEET 24) O r•-i S Q ' ' _ -o STA. 13+70 w w C7 $l A. 15 OF 35 STA. 13+07 (GS-1) STA. 0+00 (GS-2) v WATER UD a O MplCNu $N / EX. SSMH 30' PERMANENT GENERAL WATER TIGHT LID Z RIM 587I42'T a IW ~ U - -1 L/ RIM: 581.97 DRAINAGE, UTILITY & ACCESS RIM = 584.81' EASEMENT (TYPJ VENT ELEV = 587.38' INV: 573.23 i MH #7 STA.9+79a RIM = 587.07' p 18.0'0.0' EX. SSMH 8+00 t \ �0+00 i _ --- - --- - 65'38'5" !/ RIM: !� 1 590.83 0 STA. 7+75 WATER TIGHT LID —•�_- - \ ,q� l� ��-� — - _ tt4 t 2 55 _. _ _', ` 578.83 :2 - ` _ RIM = 579.15 -`_ \ \ ' `�'�.. `.�,. ,- - - �_ .,.. -, LAKEVIEW DR. �- > 1 r I��h j - /// VENT ELEV = 588.88 h: CUT & PATCH 421-F �. '� r VJ 3 •', A v EX SSMH - -_ EXIST. ASPHALT ROA \ CXj LOCATION ', I -• Z \ - t F TEMPORARY DOUBLE ) 1,, ,, .',--`\`,- STONE OUTLET .,..•' .... ,/ \ 4,i' - _ '-- �.... -- v. — h.;'�., MH #2 STA. 0+66 (GS2)[- �s,o� EXIST. SEWER T6' , �'+' - REPLACE EXIST MANHOLE WATER TIGHT LID TEMPORARY SEDIMENT FENCE (TYP.)-' - - BE ABANDONED RIM = 583.10 EX RIM = 583.10' \ \\� ���\ I .. — EX. INV.= 578.00 NOTE: CONTRACTOR TO PROVIDE TEMPORARY BYPASS PIPE OUTSIDE OF MANHOLE I \ \\\�� \ �' \ n `y fs' SSMH EX. RIM: SBBAB TOP W PIPE- 581.87' VQ' / 20 0 40 O ~� ^' U J EX. SSMH MH #10 STA. 14+10 (GS-1) BOTTOM MH 578.96' )• LINE FM-2 HORIZONTAL O RIM: 578.59 INV: 574.35 STA. 0+00 (FM-2) WATER TIGHT LID I SEE SHEET 18 SCALE IN FEET O LINE GS-1 & LINE QS-2 TEMPORARY DOUBLE STONE OUTLET i•=40' (FULL SIZE) RIM = 586.11' •=80' (HALF SIZE) I z Oz 0 W .. p00 3 In N Imo. En I 0 ANO In fN9 nNM �_ i!7 (yv9 rn 0-7 NOJO I r02 SOOp 'ANN it I�� Lo[ II W m OS ISO— II ij x.- O 2 ��N O II OOO O =W 61 OoM m a0 r- MLo? -W Q II O Z Z r-) 'n II p Z II ? O Q^ '0 j II O Z O N Q Q J O W II ' Revisions: ADDENDUM No. 1 O ON c1 = O H H Q > > > = FQ- m > > _Q O F ¢ > _ F < i > M = FQ- 2 1n F W N N =. W ��� ~ Q v, 3� 8/19/2016 592 F ":) N� r 00 n g .t to N 3 Z Z Z y� Z Z v, 3� Z m •t In 3 K? 592 ADDENDUM No. 2 = r = is N NEGOTIATED CHANGES � + + F � ir1 r II + O II 1 anon ADDENDUMNo. 3 = o ~ a > > _ ~ s�v1 Q = 3� > APPRO:X. 00 YR. EXIS NEOOTIATEDMATERIAL CHANGES 588 ��� aazz FLK. PLAIN GRA 588 Ivl Inon ELEV = 587.36 LEV = 583.86' -EV = 586.86' AP ROXIMATE 100 YR. FLOOD AIN -- 584 584 TDP EX. SEWER " / / / — 580.61' = \ 580 I-'--, / 580 � � \\----- -- ------ I J PROP. 8• FM SEE SHEET 16 576 8" SEWER 576 (10 SE ABA INV = 5 .18t (TO BEA INV = 57.1.51± NDONED) SE ER ®0.97% 4 ,m"90ouugy ,\CARO p4`oFEss�ojif2 0 12 MIN DR-26 PVC SAN. 66LF 8" C 905 DR-26 2;a v;v 572 18" MIN. 326 F 1$' C-905 0 18" C-905 R-26 PVC SAN. SE R ®2.45% 572 R-26 PVC S N. SEWER ® 74y, PVC AN. SEWER ® 0.97% 0 +..` 204 8" C-g05 13LF 18" -905 DR-26 � 9� � PVC SAN. S 7WER O 0.97% 2 LIN G S -1 LF 18" C-90 DR-26 LINE G S 2 SCALER NO FEET Drawn By: GAQ PVC SAN. SEWER 0.9776 Checked By: MWB 1--4- (FULL SIZE) 1"-8' (HALF SIZE) City Engineer: GHS Scale: AS SHOWN 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 0+00 1+00 Date: 12/11/2017 701-265 SHEET 15 OF 35 I LIMITS OF CONSTRUCTION SHALL BE J RIGHT—OF—WAY OR LIMITS OF EASEMENT 0? DO BENCHMARKI RNV MONUMENT¢ ELEV = 591.05 ^ I "tom Yom'* °'� PHARR YARNS / STA. EXIST. 8 -INCH FORCE MAIN/ FROM PHASE PUMPS NORTHING = 555740.78 CONNECT TO EXIST. W 'N W TEMPORARY SURGE STONE ENTRANCE/EXIT EASTING = 1380514.80 } 3 100 YR. FLOOD PLAIN v .. BEND (BELOW GRADE) W/ 1 - 8 x 8 TEE (MJ) 1-8x8 REDUCER (MJ) ABANDON THIS SECTION OF EXISTING FORCE MAIN W 0-4 r�1 C7 N , Z U O W z LINEGS-1 SEE SHEET 15 I t j PLUG EXISTING QZ I V NORTH WYE INVERT INSTALL 1 - 8 -INCH 45° BEND ON EXISTING 6 -INCH FORCE MAIN 0 \ � �: �� / � y ' I STA. 5+93 STA. 7+41 EXIST. 6 -INCH FORCE MAIN LINE GS -2 I `"- '. L ,� /�5 ' / TEMPORARY DOUBLE / r/%� I �"'. 1 - 8 -INCH -' I 22.5° BEND WYE I / / 87 8 / a U W SEE SHEET 15 -\'-'. .-.. '" ss rs � STONE OUTLET / J/ �/ / ��/ - TEMPORAFENCEI(fYP) MENT \ I STA. 5+90 STA. 7+34 � 1 -AIR RELEASE/VACUUM VALVE o T U O \ \ \ \ 4 --,r' 1 - a ) 1-HDPE/PVC TRANSITION 111 l i/ \ SLEEVE) 3 BEGIN HDPE -. _ (INSTALL AT HIGH POINT OF LINE) I O 6 -INCH GATE VALVE (MJ) O EXIST. 8 -INCH SEWER (TYP.) \ \ a EXIST. ASPHALT 1 I I/ _ ON \ \•-.---�-� 8 -INCH C-900 DR25 I I\ \, (_ -�Mo— `�. `Y;k"1'cpP__ _,.. ...,�-. ~3'9 \Off I �\I X11 MH #10 -•- .- \ . PVC FORCE. MAIN y ,_-" .. „�� - �// / `. -- {*a0. '-- -L _ :r:. / -. '`+ STA. 6+88 / 1 - 8 -INCH 45° BEND STA. 14+10(GS•1)= STA. 0+00 (BEGIN FM -2) _ -� 1, t+F - FM FLI---- _ ,.,;__ ��� `-=. ---- _ -n,� � o WATER TIGHT LID t ` ` __"! .d _ FM"� Tu - RIM -588.11- `W w f ' I Ire• -� .. -- /- ... -�' ....-� --� -- " �-- �' • cuv -v STA 6+78 y I �-- ` 1 - a -INCH 45° SEND STA. 0+35 1-8•H11.25°BEND \ \� ---- I, 1 �\ //� I /� / B•INCH DR 11 HDPE DIRECTIONAL DRILL BEGIN STA. 0+50 EXIST. CONCRETE / ,'NOT TO BE REMOVED ' " 1 - 8 -INCH 11.25° BEND 1 \ \ ` \\\ k \ \ \\ \ \ / ii�� END STA. 5+90 .. CONCRETE s•E. REMOVE 8 REPLACE 88 LF EXIST. GRAVEL DRIVE n. _- r \ 8 -INCH C-900 DR -25 PVC FORCE MAIN `OX.. STA. 0+48 m STA. 0+50 �� 1-HDPE/PVC TRANSITION SLEEVE 0 - 1 I �'{ 10 30 -FOOT PERMANENT GENERAL DRAINAGE, UTILITY & ACCESS REMOVE 8 REPLACE / REMOVE 8 REPLACE SHRUBS 1 - 8 -INCH 45° BEND BEGIN HDPE 1 / - 1 �` 'J�yp�P ` FENCE \ EASEMENT VARIES (TYP.) AS NECESSARY FOR CONSTRUCTION AS NECESSARY A. 8+ � PHARR ARNS LLC STA.8+34 ► r 1 - F+� i 1'�- 1 g Q. Q� PIN N3 \ DB -05-6470 45 4 PG 1334 1- 8 -INCH 22.5° BEND J E -. Y EM -2 ~� 2E 0 0 40U w z ZI HORIZONTAL �J � O mo j o SCALE IN FEET O .` Zj Z 1"-40' (FULL SIZE) 1"=60' (HALF SIZE) 0- CACI �— a = O p z p vNx + Q Q N i0 - Z W m Z W p W J •v� W.m Z in m FSH ,O mN W N _ � iQ-Qj Nom- 2 pvK Neal= L 592 +�zi o I Wim. p 592 d ,y I'--- z , I W + + o o x J i0 . Revisions: N N3lrz N�� h Q I Q +~ m x 1 ADDENDUM No. I 8/1912016 r \ + N F- N "- Q� In ^ N - -, W 0 nL> Z O �- m ADDENDUM No. 2 588 \ Q -------- — - �ow� I 588 NEG/2017 ED CHANGES 1on4no17 EXIST. 12" DIP j L PPROXIMATE 00 YR. FLOOD PLAIN �� INV = 58 31t NAF EENDUMMN..3TIATED RtAL / Irl EXIS . 18" RCP 584.111 / / 1 APPROX. III IST EXIST. 6" FM 2/H1/2017 rn I 584 /INv � N 576.82f 584 Ilcz1 / 18" MIN. 580 Iia i \ 580 _ 3' M J. \ 161LF OF B -INCH 900 \ Ail^\ DR -25 PVC FORCE MAIN EXIST. 12" INV = 576. P 11 2t 41 / \ \\ STA. 5+90 576 50 F F - HDPE/WC TRANSIT10 SLEEVE 576 PVC FORCE S TA. 0+50 1 / 572 TRANSITIO VC DSLEEVE 1� / 5.0' MIN. 572 FERC PERMI ELEVATION 569.4 --- SURF kCE ELEV. 671.1A 5.0' MIN. ..a�'CAuny; �40FESS °HCl7 — MINS RFAC ELEVA CROSSING _ — — — — — — — — — — — — — —4 _ — - ` 568 s.o' MIN. 568 t `•. € 11 HDPE DIRECTIONAL DRILL BE N STA. 0+50 ` 0~ , + E D STA. 5+98 FLOW 5641 1 2 564 // 2 '7 VERTICAL Drawn By. GAQ SCALE IN FEET Checked By:MWB 1"-4' (FULL SIZE) City Engineer: GBS Scale: AS SHOWN 560 t'=6' (HALF srzE) 560 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 Date: 12/11/2017 701-265 SHEET 16 OF 35 s' i EXIST 6 -INCH D.I.PIPEI \ \ I I EXISTING ABANDONED 6 -INCH FORCE MAIN FROM FILTER B/W HOLDING TANK CUT AND PLUG EXISTING 6 -INCH DI PIPE DECOMISSION AND DEMOLISH IN PLACE EXISTING TANK PER SPECIFICATIONS (NOT CURRENTLY IN SCOPE OF PROJECT) EX. PLUG VALVES - - - - ss — - s---'ff---- - D FM— FM. _—_fM FTA FMS c WILLOW DR. .t . q='N REMOVE EXISTING PLUG J EXIST. 6 -INCH FORCE MAIN FROM HP FACILITY Agn 100 YR. FLOOD PLAIN —/ DECOMISSION AND DEMOLISH IN PLACE EXISTING TANK PER SPECIFICATIONS (NOT CURRENTLY IN SCOPE OF PROJECT) HOLDING TANK TEMPORARY DROP INLET PROTECTION UCI.VMlJ K DEMOLISH IN EXISTING TAI SPECIFIC/ (NOT CURREI SCOPE OF PRI rN I FT -1 ch 7 1 I •� m -,� •r- �. .. CONNECT NEW 8" FM TO `=-_-- _^ - -- - mss_— EXISTING 6" FM WITH 8"x8" TEE --- _ � - - � ws _._,_ � �` -� cws AND B" GATE VALVE AND BOX CONNECT EXIST. 6 -INCH FORCE MAINS WITH 150LF OF 6 -INCH CLASS 52 D.I. PIPEFORCE MAIN `\_ 1.•� _----- -- --- -`_— STONE OUTLET (TYP.) ' — — _ '—,�__ — S'-- --�... r• ._— — _ —_� ��_ , TEMPORARY SEDIMENT FENCE (TYP.) 10 0 20 1 - 6 -INCH 45° BEND (VERT) TA SCALE 2INNFEET �a U 1'-20' (FULL SIZE) I t 1'-40' (HALF SIZE) LINE FM -3 6-12V 592 0+00 1+00 Revisions ADDENDUM No. 1 6/19(2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 0 U O O 3 ADDENDUM No, 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 am oeoox ) )- II-un7 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 17 OF 35 616 x 584 m w Win 80 ot9w 612 a m ° ° 580 — ,L�_ EXISTING CR_A_D_E APPROX. I= TION 608 OF EXIST. 24 RCP APPROX. LO ION 576 INV=80 .00± EXIST. 8' FM 8" MIN. 604 (STING 6 -INCH I .--6W.2--/ T, e' 572 150E OF &INCH CLASS 52 DI PIPE FORCE MAIN 600 EX STING 6 -INCH IN . = 571.8 568 596 564 592 0+00 1+00 Revisions ADDENDUM No. 1 6/19(2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 0 U O O 3 ADDENDUM No, 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 am oeoox ) )- II-un7 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 17 OF 35 / TRENCH WALL UNDISTURBED EARTH AT 3/4 HEIGHT OF OUTLET_ INVERT OUT DUCTILE IRON PIPE DUCTILE IRON PIPE UNDISTURBED EARTH IN FIELD SOLID CONCRETE CONCRETE BLOCKING 3000 PSI JUMBO BRICK MAY BE USED - PIPE O CONCRETE BLOCKING 3000 PSI BOTTOM OF BOOT SHALL �''- BE SET 2' ABOVE SHELF CONCRETE BLOCKING •' •"•' " ' L J INSTALLED MIN. 6" IN — — — — — NATIVE MATERIAL ON ALL SIDES g• I I TRENCH WIDTH SECTION �1 ANTI -SEEPAGE COLLAR DETAIL ,e PLAN NOTES: 1. 6" MIN. CONCRETE SLAB TO BE POURED TO GROUND CUT 2. INVERTS TO IN & OUT PIPES TO BE BUILT AFTER MANHOLE HAS BEEN SET. 3. MANHOLE TO BE LEVELED & ASSEMBLED SO AS TO EVENLY DISTRIBUTE WALL BEARING LOAD. 4. SEE DETAIL 71 B-2 FOR REINFORCING DETAILS AND STEP DETAILS. 5.6" MIN. EXTENSION BEYOND EXTERIOR WALL OF MANHOLE. 6. PRECAST MANHOLE JOINTS TO BE SEALED WITH "O" RING JOINT -ASTM C-443 OR WITH APPROVED BUTYL RUBBER SEALANT. 7. CONCRETE SLAB SHALL EXTEND A MIN. OF 3" ABOVE BOTTOM OF FIRST MANHOLE SECTION. 8. ALL LIFT HOLES TO BE SEALED WITH TAPERED NEOPRENE PLUGS OR OTHER APPROVED EQUAL. LIFT HOLES TO BE SEALED FROM OUTSIDE. CAST OR CORE DRILL HOLE PER MFR. REQUIREMENTS PIPE DIAMETER AND MATERIAL VARIES FLOW RUBBER BOOT CONNECTOR CONCRETE WALL WALL PENETRATION DETAIL 18 ). FRAME & COVER 1. MANHOLE FRAME AND COVER AND VENT INSTALLATION TO BE SEALED WITH BUTYL RUBBER AND NON -SHRINK GROUT. 2. ALL VENT OUTLETS ARE TO BE POINTED DOWNSTREAM 3. STEEL VENT PIPE SHALL BE 5" I.D. 0 SCHEDULE 40 (14.62 LB./FT.) AS SPECIFIED IN ASTM A-139 OR LATEST REVISION. A 5" TYPE 316 OR 304 STAINLESS STEEL BUG SCREEN SHALL BE INSTALLED IN VENT PIPE. 4. INSIDE OF VENT PIPE SHALL HAVE A 3/32 INCH COAL TAR LINING ACCORDING TO AIAWA 203 OR LATEST REVISION 5. OUTSIDE OF VENT PIPE SHALL BE SAND BLASTED TO COMMERCIAL STANDARDS AND HAVE ONE COAT OF ZINC CHROMATE PRIMER APPLIED ACCORDING TO FEDERAL SPECIFICATIONS TT -86A OR LATEST REVISION, THEN THE VENT PIPE SHALL HAVE TWO EVENLY APPLIED COATS OF RUST INHIBITING ENAMEL PAINT, EITHER KOPPERS GLAMORTEX NO. 501 ENAMEL (OLIVE GREEN), SOUTHERN COATINGS RUSTALOY NO. 0537 ENAMEL (GARDEN GREEN), OR EQUAL. 6. 2 GALVANIZED STRAPS WITH STAINLESS STEEL BOLTS MAY BE USED IN LIEU OF CONCRETE FOOTING FOR VENT 7. ALL SEALED MANHOLES SHALL BE VENTED TO T ABOVE THE FLOOD ELEVATION 8. A THREADED COUPLING MAY BE USED IN THE TOP 18" TO AID IN ALIGNING THE VENT DOWNSTREAM 3 VENTED MANHOLE DETAIL CITY OF GASTONIA FILE NO. 71B -4A G USE BRICK OR BLOCK TO LEVEL MANHOLE AT 3 OR 4 POINTS AROUND BOTTOM OF MANHOLE 8" 24" B" 4 8 _ r I OPTIONAL CONE FOR SHALLOW MANHOLE (3 Lu W rx 2O Om U O a 4,_0„ azfx p< vgz } P, uj r + O Y N U Lu = y 0 a �S r 0­ .00ONTNETE ~ m� MANHOLE ASSEMBLIES SHALL MEET H-20 TRAFFIC LOADING 1" VARIES pfl O FLAT TOP MANHOLE DETAIL OPTIONAL MONOLITHIC BASE Lu ¢ x y FOR STANDARD DETAIL OF CFRAME & COVER SEE SHEET U aPia U2a� i >?ON / ¢<_�N I w5xa �zQO zwLLw o n y�z� WU 0 x Om wa z CL Lo 2 I ,n SELECT MATERIAL 95% PROCTOR HOLE TO BE CUT Irh IN MANHOLE AS CAST IN PLACE NEEDED,7 1 / RUBBER SLEEVE REQUIRED v � SELECT a MATERIAL z 95% PROCTO LEVELING tO `. BLOCKS 6" I MIN. SEE NOTE #1 3000 PSI CONCRETE ISI �41 B PRECAST MANHOLE DETAIL CITY OF GASTONIA FILE NO. 718-4 'UBBER BOOT i/CLAMP, TIP, NOTE: EXISTING SANRARY SEWER MAIN SHALL BE SAW -CUT TO SPRING LINE AFTER BASE CONCRETE IS PLACED AND SET. 2 DOGHOUSE MANHOLE (BUILT OVER EXISTING SANITARY SEWER MAIN) 1B I 4' z x w � O � z _ 4'-10" r _ — 1� I 5-10" I / L R I 5, I w Q co > r x? w O a w w O U rL ------ gmm STANDARD FOOTING AS SHOWN AT LEFT TO BE USED. NOTES: 1. PIPE SLIDE REVD WHERE VERTICAL SEPARATION BETWEEN PIPE INVERTS IS GREATER THAN 1.5+' AND LESS THAN OR EQUAL TO 2.5'. OUTSIDE DROP CONNECTION REQUIRED 2.VERIFY SLIDE INSTALLATION WITH PROJECT INSPECTOR PRIOR TO CONSTRUCTION. 3.MANHOLE AND CONNECTIONS SHALL BE IN ACCORDANCE WITH PRECAST MANHOLE DETAIL (SEE THIS SHEET) 4. BRICK USED FOR INVERT AND SHELF CONSTRUCTION SHALL BE NCDOT STANDARD CONCRETE JUMBO BRICK. MEETING ASTM C55 GRADE S—II EXCEPT ABSORPTION LESS THAN 10 LBS/CU.FT. FLOW CHANNEL SHAPE TO 3/4 HEIGHT OF OUTLET PIPE. �11 MORTAR SLIDE DETAIL a 0.99' /� ._ MAX. ! II SAN. SEWER MAIN Revisions ADDENDUM No. 1 8/1912016 ADDENDUM No. 2 NEGOTIATED CHANGES 10124/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/li/2017 I" Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 18 OF 35 BEGIN SHELF TRANSITION ALIGN STEPS OVER AT 3/4 HEIGHT OF OUTLET_ INVERT OUT PIPE 1:12 MIN. SLOPE CONCRETE SHELF PLACED IN FIELD SOLID CONCRETE SEAL AROUND JUMBO BRICK MAY BE USED - PIPE TO BUILD UP INVERT TO REDUCE MORTAR QUANTITIES. ON EXISTING MANHOLES BOTTOM OF BOOT SHALL BE SET 2' ABOVE SHELF FLOW CHANNEL SHAPE TO 3/4 HEIGHT OF OUTLET PIPE. �11 MORTAR SLIDE DETAIL a 0.99' /� ._ MAX. ! II SAN. SEWER MAIN Revisions ADDENDUM No. 1 8/1912016 ADDENDUM No. 2 NEGOTIATED CHANGES 10124/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/li/2017 I" Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 18 OF 35 WATER LINE WATER MAIN STANDARD JOINTS f— SEWER LINE NOTE: SEE STANDARD SPECIFICATIONS SECTION 333000 PLAN VIEW FOR WATER LINE OVER SEWER LINE W/LESS THAN 18" CLEARENCE WATER LINE m • SEWER LINE 10' 1 10' DIP or CIP a= LESS THAN 18" BOTH WATER AND SEWER LINE SHALL BE WATER MAIN STANDARDS (JOINT) FERROUS METAL PIPE (DIP), FOR 10' EACH SIDE OF CROSSING a= OVER 18" REGULAR MATERIAL STANDARDS SHALL APPLY WATER LINE CENTER ONE JOINT - OF PIPING AT CROSSING 10' 1 o' "O" RING JOINT ASTM C-443 OR APPROVED BUTYL RUBBER SEALANT — �__SEWER LINE o PLAN VIEW FOR WATER LINE UNDER SEWER LINE - 1I OSEWER LINE 10' 'o, DIP or CIP C77 _J WATER LINE CENTER ONE JOINT OF PIPE AT CROSSING WATER AND SEWER LINE SHALL BE WATER MAIN STANDARD (JOINTS) FERROUS METAL PIPE (DIP), FOR 10' EACH SIDE OF CROSSING. ONE JOINT OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. FERROUS MATERIAL & JOINT REQUIREMENTS FOR WATER LINE & SEWER LINE ,a .S: tslings to be free from sand holes & no I will be allowed. with the use of aluminum patterns. iron castling shall be supplied with no paint. ars used for storm drain manholes shall have .ewer" cast on them. d draft allowed on straight faces. vent holes required unless specified otherwise oved plans. dard letters unless otherwise specified. ,pproximate weight f FRAME - 190lbs. ,pproximate weight f COVER - 120 tbs. ,pproximate weight f TOTAL - 310 Llbs. he following Rings and Covers meets these specifications: last Jordan Iron Works (EJIW) V-1384 a) locking V-2384) :nnis Enter. MH -GRE -24 :nnis Enter. MH -GRE -24 IS Foundry & Mfd. Corp. USF 669 & KL Cover 3) USF669 & KL Cover, BWr ty logo preferred where available from the 'acture. All castings shell be identified as property of ty of Gastonia by stamping or casting methods. r watertight manholes see plans for required ins. add Watertight covers EJIW, USF w/ BWr and v_1384GS w/ Camlocks 3 CAST IRON FRAME & COVER FOR MANHOLE CITY OF GASTONIA FILE NO. 7113-1 TRANSITION TO PROFECTO 401 LINED D.I.P BEFORE FORCE MAIN ENTERS MANHOLE q0° RESTRAINED JOINT BEND .1 O M 1 O.D. AS REQUIRED NOTE: I. CONTRACTOR SHALL CORE -GUT EXISTIN& MANHOLE AND INSTALL PENETRATION BOOT PRIOR TO TIE-IN WITH PROPOSED FORCE MAIN. FORCE MAIN DISCHARGE TO MAHOLE Q 2 METERING STATION AND @ DUHART PS ,a 2-1/2 1" MIN. f Z O g4 f • to • • • • • 2.1/2" STEEL REINF. TO MEET ASTM C478 "1116 5/8 1 1-3/8 T 7 e 1-va v4 PS -1 (Step as manufactured by MA. industries or approved equal.) PS -1-45 12 114 1-1/4 —{, v4 PLASTIC MANHOLE STEP DETAIL �1 PLASTIC MANHOLE STEP DETAILS MANHOLE STEEL REINFORCING DETAIL CITY OF GASTONIA FILE NO. 71B-2 TYPICAL STEP INSTALLATION M.J. 5LEEVE 6" MIN. SCREENED &RAVEL BASE (NCDOT 1157 OR #6i) SPRINGLINE 112 D 1/4 D (4" M CLASS B COMPACTED GRANULAR BEDDING LOAD FACTOR 1.9 2' MIN. (95% STD. PROCTOR) (SEE STD. SPEC. SECTION 13.20 FOR SOIL CLASS REQUIREMENTS.) MAY USE NATIVE SOILS OF ASTM 2321 CLASS II, 111 (OR CLASS IA OR IB) ABOVE THE SPRINGLINE. CAREFULLY COMPACTED BACKFILL 95% STANDARD PROCTOR DENSITY (TAMPED IN 6" LAYERS) HAUNCHING #57 WASHED STONE GRANULAR MATERIAL 95% STANDARD PROCTOR DENSITY �1 STANDARD BEDDING DETAIL FOR PVC GRAVITY SANITARY SEWER PIPE CITY OF GASTONIA FILE NO. 71B -5A W F - Revisions: ADDENDUM No. 1 8/19/2016 ADDENDUMNo. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL. CHANGES 12/11/2017 9� 'y aemm Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 19 OF 35 m 4" ABC STONE BASE 6" CONCRETE MINIMUM MUST BE AT LEAST EQUAL TO 2" TYPE S9.5B (MUST BE EQUAL TO EXISTING DEPTH) EXISTING SECTION DEPTH. EXIST. PAVEMENT 6" STONE E EXIST. BINDER � °; EXIST. STONE 6 BINDEf TYPE 119.08Uj (T� 0 00 00 °00� o°oo p o V'o°go 0 0 [3� p'�• FJ(13T. PAVEMENT 0 0 $000 o po 0 0 0 o p o oO0 � 00 Oo00op p°p 00o pN �� 0000 poo opo OOp BOO Ooo oo 0p00 �+ W 900 EXIST. STONE o 0 g0 oo '6 o poo 00000000 12' W 12" � � zU 0000 0 0 opo o8008poa'a'° oq�0o 00 ° o� p H Qx tr] z 0 0 a o 0 0 o a o 0000 0 I o 00 0 oa CLAY BASE BACKFILL F+i d MATERIALtz +-= -- --- -- ''-4 FULL DEPTH STONE TO BE MAINTAINEDU 0 12" 12" UNTIL ASPHALT PATCHING OCCURS. 95% COMPACTION REQUIRED] U O MINIMUM 95% STD PROCTOR DENSITY O Hy rFi) CLAY BASE BACKFILL REQUIRED TO PATCH. — F a ONE YEAR WARRANTY APPLIES AFTER MECH. TAMP (EACH LAYER) MATERIAL COMP. 8" LAYER y� FULL DEPTH STONE TO BE MAINTAINED 95% COMPACTION REQUIRED DATE OF PATCHING. UTILITY UNTIL CONCRETE PATCHING OCCURS, COMPANY CONTRACTOR RESPONSIBLE FUTURE 8" WATERLINE (BY OTHERS) 0.1 U MINIMUM 95% STD PROCTOR DENSITY FOR WARRANTY REPAIR. READ. TO PATCH. — MECH. TAMP (EACH LAYER) 1--� I"'I w0 on ONE YEAR WARANTY APPLIES AFTER+ DATE OF PATCHING. UTILITY COMPANY FOR — — COMP. 8" LAYER NOTE: SHARED TRENCH DETAIL SHALL O bd CIS O — I IN BE USED DURING INSTALLATION OF FM -1 od CONTRACTOR RE _ � FROM STA. 49+25 TO STA. 60+00. WARRANTY REPAIRS. / I (SEE PLAN SHEETS 7 do 8) VARIABLE VARIABLE (g) CONCRETE DRIVEWAY RESTORATION 79 CITY OF GASTONIA FILE NO. MODIFIED 71D-26 4" ABC STONE BASE CL MUST BE AT LEAST EQUAL TO I T EXISTING SECTION DEPTH. UT 0 0 0 0 000 0000 EXIST. STONE—� 000 0000ao 00 p 0000 oSo0°4�=00$0° oo00o o+ 12" CLAY BASE BACKFILL MATERIAL 95% COMPACTION REQUIRED 12" 12" MECH. TAMP (EACH LAYER) COMP. 8" LAYER VARIABLE (�j:) GRAVEL DRIVEWAY RESTORATION CITY OF GASTONIA FILE NO. MODIFIED 71D-26 EXIST. PAVEMENT EXIST. STONE o8. o 0 00 0 000o a o0 oc 00000 oo OOo �oaBpo p� 0 0 0 0 000 000.0- 12" 0000-12" FULL DEPTH STONE TO BE MAINTAINED UNTIL ASPHALT PATCHING OCCURS, MINIMUM 95% STD PROCTOR DENSITY REQD. TO PATCH. — ONE YEAR WARANTY APPLIES AFTER DATE OF PATCHING. UTILITY COMPANY — — CONTRACTOR RESPONSIBLE FOR WARRANTY REPAIRS. I I VARIABLE 1-1/2"SF9.SA ASPHALT 4" ABC STONE BASE MUST BE AT LEAST EQUAL TO EXISTING SECTION DEPTH. 0 00 0p0 aoa p o 0000 ,Oo o°o poo 000 12 CLAY BASE BACKFILL MATERIAL 95% COMPACTION REQUIRED MECH. TAMP (EACH LAYER) _. COMP. 8" LAYER �1 ASPHALT DRIVEWAY RESTORATION m CITY OF GASTONIA FILE NO. MODIFIED 71D-26 D.I. PIPE 3-4X4 CEDAR OR PRESSURE TREATED PINE RUNNERS CONTINUOUS EXCEPT AT JOINTS PROPOSED 18" FORCEMAIN Utility cuts on any State Road should be backfilled with soil material, and ABC stone according to �'� SHARED TRENCH DETAIL City Standard Detail (71 D-26), and these materials should be compacted to within 95% of 8 standard proctor. Said cuts should be patched with asphalt surface material, also according to 20 PROPOSED 18" FORCEMAIN AND 8" WATERLINE (71 D-26) on the same day as the cut is made. (BY OTHERS) ON LOWELL AVE. Within the twelve months following the street cut, the City will periodically check these patches for integrity. If any further action is needed, the City will inform the appropriate Utility, who will then be responsible for making any and all necessary repairs. TYPICAL PAVEMENT REPAIR FOR UTILITIES CUT (NCDOT) CITY OF GASTONIA FILE NO. 71D-26 SECTION A -A CASING SIZE SHOWN ON DRAWING STAINLESS STEEL BANDS, 3 REQUIRED PER PIPE LENGTH PAVEMENT OR OTHER CROSSING SEE DRAWING EXISTING GROUND 3 CASING Al PIPE MATERIAL AS SHOWN ON DRAWINGS D.I. PIPE 4 X 4 CEDAR OR P.T. A' PINE LUMBER FULL 1r sa LENGTH OF PIPE TYP TOJOINTWP EXCEPT BELL ALTERNATE CASING END SEAL BRICK MORTAR 2" x 2" WEEP HOLE gAT INVERT END 3116" X 4'-0" BLACK NEOPRENE SHEET RUBBER. CREASE & OVERLAP TO CONFORM TO PIPE SHAPE. OVERLAP SHEET A MINIMUM OF 24". CASING AS SPECIFIED 18" A STAINLESS STEEL BANDS (2 EA ON EA END) CASING END SEAL (TYPICAL EACH END) (NOTE: SPIDERS MAY BE USED IN LIEU OF TREATED LUMBER RUNNERS WITH PRIOR APPROVAL) NOTE: SPIDERS W / 4" WIDE BAND (3/16" t) W / 4 SKIDS W/BEVELED ENDS ALL PARTS ASPAHLT COATED, PER MANU. REC. 2 DRY BORE AND JACK ENCASEMENT AND CARRIER DETAIL CITY OF GASTONIA FILE NO. 7113-25 4" 1/4" TO 1" SLOPE TOWARD CURB CROSS—SECTION NOTE: WHEN FRONT EDGE OF WALK IS POURED ADJACENT TO CURB OR BACK OF WALK IS POURED ADJACENT TO A BUILDING OR EXISTING CONCRETE, A 1/2" EXPANSION JOINT SHALL BE PLACED BETWEEN NEW WALK AND EXISTING STRUCTURES; WHERE A DRIVEWAY CROSSES A WALK, THE SIDEWALK SHALL HAVE A DEPTH OF 6" WITH 1/2" EXPANSION JOINT EACH SIDE OF WALK. 1/2" EXPANSION JOINTS TO BE EVERY 4' MAX. 4 TYPICAL PAVEMENT REPAIR FOR CONCRETE SIDEWALK �° CITY OF GASTONIA FILE NO. MODIFIED 71D-14 18" NOTE: EXTENSION STEM WILL BE REQ'D. TO BE WITHIN 2' OF THE SURFACE IF OPERATING NUT IS OVER 5' BELOW , GRAD. EXTENSION SHALL BE , PERMANENTLY ATTACHED TO VALVE NUT AND SHALL BE PROVIDED HATH HORIZONTAL SPACERS FOR VERTICAL e ALIGNMENT WITHIN THE VALVE BOX. CAST IRON COVER �M 2 PRECAST REINFORCED CONCRETE VALVE BOX COLLAR TO BE OMITTED IN PAVED SECTIONS n BRICK UNDER EACH CAS SUP VALVE BOX SIDE OF VALVE BOX STONE BEDDING UNDER GATE OR VALVE BOX PLUG VALVE POURED IN PLACE CONC.�- CONIC. SUPPORT W/TIE DN'S REQ'D. (/44 BARS) FOR 10" TYP, CONIC. SUPPORT; AND LARGER VALVES PRECAST BLOCKS MAY BE 4USED FOR LESS THAN 10" VALVES NOTE: SEE TYPICAL FITTING AND JOINT RESTRAINT DETAILS FOR VALVE RESTRAINTS, 1 TYPICAL VALVE AND VALVE BOX Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10124/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 aaA°"t�rCA Ra`� 04 o4Essiotilt� OII�OY� , V4_ yawn By: GAQ hocked By: MWB ity Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 20 OF 35 L / / L bp'PER BEND s• VERTICAL OFFSETS DEAD ENDS LOWER BEND I rTURILUN IHL DCIVVJ L y REDUCERS PLAN TABLE "A" (DIMENSIONS IN FEET) EARTH (J] rW NT W ¢ 1�3T BLOCKS SHALL BE CONSTRUCTED OF 3000 P.S.I. CONCRETE. a a 2. THE CONTRACTOR SHALL USE MECHANICAL O a RESTRAINTS UNLESS OTHERWISE INSTRUCTED. ;�1., 3. CONTRACTOR SHALL PROVIDE CALCULATIONS a W FOR INSTALLATION OF MECHANICAL RESTRAINTS. E -I \RTH 4. THRUST BLOCKING DIMENSIONS ARE BASED ON O A TEST PRESSURE OF 200 PSI. CONTRACTOR ELEVATION SHALL SUBMIT CALCULATIONS TO ENGINEER FOR REDUCED BLOCKING DIMENSIONS BASED ON ACTUAL OPERATING PRESSURES. PI SIZE NO�IA..N INC SBEND 8"118" 90' - - 5.0 45' 3.5 22 1/2 2. 11 1/4' - - 2.0 Size & Horizontal Bend (Degrees) Tee Reducer Dead End A/2 A/2 UNDISTURBED EARTH . ' • ' N Material¢ w 90 45 22.5 11.25 Branch X 6" 18" DIP Length Restrained (ft) 31 13 7 3 37 17 43 a a F- 14" DIP Length Restrained (ft) 25 11 5 3 30 17 34 a W " UNDISTURBED EARTH ELEVATION Size & Horizontal Bend (Degrees) Tee Reducer Dead End Material 90 45 22.5 11.25 Branch 18" PVC Length Restrained (ft) 41 17 8 4 70 30 78 8" PVC Length Restrained (ft) 20 9 4 1 2 30 16 37 DESIGN PARAMETERS DEPTH OF BURY 3 FT SAFETY FACTOR 2:1 TRENCH TYPE 3, SEE DETAIL TEST PRESSURE 125 PSI (MIN.) SPEC. 14.15 SOIL TYPE SILTY SANDS, SAND SILT MIXTURES BACKFILLED USING NATIVE SOILS. NOTE: 1. THE CONTRACTOR SHALLINSTALL RESTRAINED JOINT THRUST PROTECTION AT ALL BENDS, TEES, REDUCERS, VERTICAL OFFSETS. THE ABOVE LENGTHS ARE MINIMUM LENGTHS REQUIRED FOR THE DESIGN PARAMETERS SHOWN ABOVE. THESE RESTRAINING CONDITIONS ARE COMMON CONDITION. THRUST BLOCKING ALTERNATE QNLY WHERE APPROVED BY ENGINEER. 4 MECHANICAL JOINT RESTRAINT DETAILS z, BRASS MARKER PLATE 2" BRASS MARKER PLATE W/ 4" SQ. PRECAST CONC. ANCHOR (SEE BELOW) POST (4,000 PSI) I Ml V I 3/4 " CHAMFER AT 2' -6 -EACH CORNER EXIST. GROUND I I t mm q%W 4 - #3 BAR " 2'-0" 2 BRASS MARKER PLATE W •. I I.• DIRECTIONAL ARROW POINTED ONE CUBIC FT. TO VALVE W/ DISTANCE TO CONCRETE (MIN.) NEAREST FOOT TYPICAL CONCRETE MARKER s, (VALVE, ARV, BLOWOFF, CLEANOUT, PUMPER CONNECTION, LINE/BEND) NOTE, 1. CONCRETE MARKER POLES SHALL BE INSTALLED FOR ALL VALVES, AIR RELEASE VALVES, AND BURIED BLOW -OFF ASSEMBLIES WHICH SHALL INDICATE THE DIRECTION TO THE VALVE. 2. MARKERS SHALL BE IN THE STYLE AND NUMBERS AS DETERMINED BY THE CITY OF GASTONIA. 3. MARKERS SHALL INDICATE MV FOR MAIN LINE VALVES, 'ARV -FOR AIR RELIEF VALVES, AND BO FOR BLOW -OFFS. 4. WHERE CONCRETE CURBING IS INSTALLED ALONG ROADWAYS, THE CONTRACTOR SHALL ENGRAVE THE ABOVE REFERENCED ABBREVIATIONS INTO THE CONCRETE CURBING TO ALLOW FOR FUTURE REFERENCE OF THE VALVES, AIR RELEASE VALVES, AND BURIED BLOW -OFF ASSEMBLIES. 5. SEWER VALVE MARKER SHALL BE PAINTED GREEN. 6. WATER VALVE MARKER SHALL BE PAINTED BLUE. PLAN THRUST BLOCK SIZE DETERMINED BY SMALLEST DIA. OF TEE DIM. (IN FEET) PIPE SIZE INCHES 6" 1 8° 1 12" 16" 20" 24" 30° 36" 48" A 1.9 2.4 3.6 4.5 5.6 6.7 9.0 10.7 14.2 1 a THRUST BLOCK DETAIL FOR TEES & BENDS z, 2"X18" CONCRETE BOX W/LID 12" PLUG - ASA 8 BOLT PATTERN (FLANGE, BOLTS, NUTS AND WASHERS TO BE STAINLESS STEEL) 12" D.I. PIPE — 12" D.I. PIPE II II 12" D.I. PIPE I' I I I I II 12" D.I. PIPE TO FORCE MAIN u u ry�y—� �H FROM VALVE VAULT 12" M.J. GATE VALVE W/ CAST IRON SLIP TYPE VALVE BOX EMERGENCY CONNECTION DETAIL 21 N.T.S. 12" TEE (FLG.) Revisions ADDENDUM No, 1 8/192016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/242017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 121112017 sm 0O /)-i'l-7 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 21 OF 35 1.) PRECAST MANHOLE, SEE STANDARD DETAIL 71B-4. 5.) e@IPS THREAD RED BRASS PIPE AND FITTINGS. 2.) a@AIR RELEASE VALVE W/ VACUUM CHECK UNIT. 6.) TRASH HOOD. 3.) a@GATE VALVE. 7.) PIPE CAP. 4.)(DCORPORATION STOP (i.e. MUELLER H-10045). 8.) GROUT, 1/8/1'-0" MIN" MIN. SLOPE TO DRAIN >--V FOR 12" FORCE LINE AND SMALLER. @=2" ALL FORCE LINES LARGER THAN 12" CONC.BOTTOM POUR IN PLACE (SEE STD. M.H. DETA 4' DIAMETER MANHOLE W/1"A.R.V. NOTE: APPROVED CBZSPlN AVOWL # ZfS-POR (L) & S$09 (L) CONC.BOTTOM POUR IN PLACE (SEE STD. M.H. DETAIL) 1"ASPHALTIC SEALER FOR CUSHION AIR RELEASE VALVE WITH VACUUM 2 CHECK UNIT IN PRECAST MANHOLE N.T.S. M 7 T b 7 � o PROPOSED FORD 1300-5 a/ (~ 6 q PIPE RESTRAINT OR PROPOSED FORD 1300-C Z c DOI PRE -APPROVED EQUAL PIPE RESTRAINT OR W a a PRE -APPROVED EQUAL Al) HDPE PIPE G B) HDPE/MJ TRANSITION FITTING w ® C HDPE FU5ED JOINT E W z m ® D SPL17 -J GLAND C7 E MJ RUBBER GASKET r~1 z V HH F 55T SLEEVE INSERT C w z AO © G TIE RODS W � E>- __ _ H BELL RESTRAINT RING c1, v O -- r- Q� HDPE PIPEI I INSTALL ONE FULL JOINT OF 0 w " D.I. PIPE DIP AT EACH END OF DIRECTIONAL I I I I DR II ( I BORES (NOMINAL DIAMETER) -- L -J -- I I - L- f — O U_ 0 O o HDPE/PVC TRANSITION ASSEMBLY x 0 SEE NOTE P.E. PIPE TO BE INSTALLED WITH A MIN. OF 10' HORIZONTAL RUN. INSPECTION HOLE ONLY ALLOWED THIS LOCATION. DISTANCE TO BE APPROVED BY THE ENGINEER ROAD PROFI EXIST] PRIOR TO START OF WORK BORE MACHINE AND RODS SELF -RESTRAINED PE/MJ ADAPTERS, NSF APPROVED FOR POTABLE WATER WIT SST SLEEVE INSERTS AS MANUF. BY CM OR APPROVED EQUAL. ADAPTER BY CENTRAL, DRISCO, PIPE OR APPROVE EQUAL. ADAPTERS TO BE SDR It (TYD. BOTH ENDS.) SEE "PE/MJ TRANSITIOlf DETAIL. CABLES, WATER/ SEWER LINES (TYP.) TYPICAL DIRECTIONAL BORE (AWWA C90(., SDR II MIN. OR APPROVED EQUAL.) 10' MAX SPACING FOR DEPTH - MEASUREMENT I NOTNOTE I TYPICAL DIRECTIONAL BORE FOR POLYETHYLENE (PE) PIPE 22 NOTES: I. A PROFILE AND PLAN SHALL BE PROVIDED FROM ENTRY TO EXIT FOR EACH DIRECTIONAL BORE SECTION BY THE DIRECTIONAL BORE CONTRACTOR. 2. ALL BORE SECTIONS SHALL BE HYDROSTATICALLY TESTED PER SPECIFICATION STANDARDS UPON COMPLETION OF INSTALLATION AND PRIOR TO PLACING THE FORCE MAIN ON-LINE. 3. LENGTH OF CROSSING, LOCATION OF INSPECTION/OBSERVATION EXCAVATION, NUMBER OF P.E. PIPE JOINTS, LOCATION OF BORE MACHINE, AUGER ENTRANCE LOCATION, AND TIE-IN POINTS ARE TO BE APPROVED BY THE ENGINEER PRIOR TO ANY START OF WORK. 4. THIS DETAIL 15 AL50 APPLICABLE TO STREAMS, WETLANDS, LARGE STORM DRAINS, AND SIMILAR APPLICATIONS FOR DIRECTIONAL BORE WITH POLY- ETHYLENE PIPE. S. THE BORE DEVELOPED FOR THE LEAD IN END OF THE PIPE SHALL BE KEPT AT A MINIMUM DIAMETER FOR THE PIPE INSTALLATION. THE LEAD IN END SHALL BE PULLED THROUGH WITHOUT THE M.J. FLANGE ATTACHED FOR LARGER THAN G" PIPE INSTALLATIONS. THE M.J. FLANGE FOR SAID LEAD IN END SHALL BE INSTALLED AFTER THE PIPE INSTALLATION WITH THE USE OF A SPLIT M.J. FLANGE PER THE DETAIL ON THI5 DRAWING. b. SITE DEPTH/DITCH REQUIREMENT - MINIMAL COVER REQUIRED FROM LOWEST POINT OF ROAD CROSS-SECTION. MINIMAL COVER FOR DIRECTIONAL DRILLED UTILITY PIPE 1 O Q MIN. COVER 2 INCHES UP TO 6 INCHES , g ��R F G�cpOOP,��OI CONC.BOTTOM POUR IN PLACE (SEE STD. M.H. DETAIL) 1"ASPHALTIC SEALER FOR CUSHION AIR RELEASE VALVE WITH VACUUM 2 CHECK UNIT IN PRECAST MANHOLE N.T.S. M 7 T b 7 � o PROPOSED FORD 1300-5 a/ (~ 6 q PIPE RESTRAINT OR PROPOSED FORD 1300-C Z c DOI PRE -APPROVED EQUAL PIPE RESTRAINT OR W a a PRE -APPROVED EQUAL Al) HDPE PIPE G B) HDPE/MJ TRANSITION FITTING w ® C HDPE FU5ED JOINT E W z m ® D SPL17 -J GLAND C7 E MJ RUBBER GASKET r~1 z V HH F 55T SLEEVE INSERT C w z AO © G TIE RODS W � E>- __ _ H BELL RESTRAINT RING c1, v O -- r- Q� HDPE PIPEI I INSTALL ONE FULL JOINT OF 0 w " D.I. PIPE DIP AT EACH END OF DIRECTIONAL I I I I DR II ( I BORES (NOMINAL DIAMETER) -- L -J -- I I - L- f — O U_ 0 O o HDPE/PVC TRANSITION ASSEMBLY x 0 SEE NOTE P.E. PIPE TO BE INSTALLED WITH A MIN. OF 10' HORIZONTAL RUN. INSPECTION HOLE ONLY ALLOWED THIS LOCATION. DISTANCE TO BE APPROVED BY THE ENGINEER ROAD PROFI EXIST] PRIOR TO START OF WORK BORE MACHINE AND RODS SELF -RESTRAINED PE/MJ ADAPTERS, NSF APPROVED FOR POTABLE WATER WIT SST SLEEVE INSERTS AS MANUF. BY CM OR APPROVED EQUAL. ADAPTER BY CENTRAL, DRISCO, PIPE OR APPROVE EQUAL. ADAPTERS TO BE SDR It (TYD. BOTH ENDS.) SEE "PE/MJ TRANSITIOlf DETAIL. CABLES, WATER/ SEWER LINES (TYP.) TYPICAL DIRECTIONAL BORE (AWWA C90(., SDR II MIN. OR APPROVED EQUAL.) 10' MAX SPACING FOR DEPTH - MEASUREMENT I NOTNOTE I TYPICAL DIRECTIONAL BORE FOR POLYETHYLENE (PE) PIPE 22 NOTES: I. A PROFILE AND PLAN SHALL BE PROVIDED FROM ENTRY TO EXIT FOR EACH DIRECTIONAL BORE SECTION BY THE DIRECTIONAL BORE CONTRACTOR. 2. ALL BORE SECTIONS SHALL BE HYDROSTATICALLY TESTED PER SPECIFICATION STANDARDS UPON COMPLETION OF INSTALLATION AND PRIOR TO PLACING THE FORCE MAIN ON-LINE. 3. LENGTH OF CROSSING, LOCATION OF INSPECTION/OBSERVATION EXCAVATION, NUMBER OF P.E. PIPE JOINTS, LOCATION OF BORE MACHINE, AUGER ENTRANCE LOCATION, AND TIE-IN POINTS ARE TO BE APPROVED BY THE ENGINEER PRIOR TO ANY START OF WORK. 4. THIS DETAIL 15 AL50 APPLICABLE TO STREAMS, WETLANDS, LARGE STORM DRAINS, AND SIMILAR APPLICATIONS FOR DIRECTIONAL BORE WITH POLY- ETHYLENE PIPE. S. THE BORE DEVELOPED FOR THE LEAD IN END OF THE PIPE SHALL BE KEPT AT A MINIMUM DIAMETER FOR THE PIPE INSTALLATION. THE LEAD IN END SHALL BE PULLED THROUGH WITHOUT THE M.J. FLANGE ATTACHED FOR LARGER THAN G" PIPE INSTALLATIONS. THE M.J. FLANGE FOR SAID LEAD IN END SHALL BE INSTALLED AFTER THE PIPE INSTALLATION WITH THE USE OF A SPLIT M.J. FLANGE PER THE DETAIL ON THI5 DRAWING. b. SITE DEPTH/DITCH REQUIREMENT - MINIMAL COVER REQUIRED FROM LOWEST POINT OF ROAD CROSS-SECTION. MINIMAL COVER FOR DIRECTIONAL DRILLED UTILITY PIPE CARRIER PIPE DIAMETER MIN. COVER 2 INCHES UP TO 6 INCHES 4 FEET GREATER THAN 6 INCHES UP TO 14 INCHES 10 FEET GREATER THAN 14 INCHES UP TO 24 INCHES 15 FEET GREATER THAN 24 INCHES UP TO 48 INCHES i 25 FEET EXISTING GRADE C 3' (TYPE � TIE-IN LOCATION (TYP.) TEMP TAPPED MJ CAP (TYP. ALL ENDS) SEE "PE/MJ TRANSITION" DETAIL d O O O PRE -ASSEMBLY A HDPE PIPE B HDPE/MJ TRANSITION FITTING C HDPE FUSED JOINT C D) SPLIT MJ GLAND E MJ RUBBER GASKET G) MJ TAPPED INSERT ASSEMBLED 1 PE/MJ TRANSITION ASSEMBLY zz O R O' Q) Revisions ADDENDUM No. 1 8/19/2016 ADDENDUM Na. 2 NEGOTIATED CHANGES 10/2412017 ADDENDUM No, 3 NEGOTIATED MATERIAL. CHANGES 12/11/2017 /) -)'-L'17 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 22 OF 35 O SURFACE � gap #I I{= *017 OC a- 'LAN 3•CLR N®17 OC TYP r-0•' 1z• s -a' NOTE: PROVIDE AT LEAST 7-0" FROST COVER FROM FINISHED GRADE TO BOTTOM OF FOOTING. 5 RETAINING WALL DETAIL 7" 1'-5" 6" 1" BITUMINOUS SURFACING j� 3' RADIUS I T l i 3" RADUIS o 1 . e A CONC. CURB & GUTTER CRUSHEDSTONE BASE COURSE CURB AND GUTTER DETAIL 2" MESH FABRIC CROSS BRACING 3 STRANDS, 4 (TYPICAL) AT ENDS AND CHAIN LINK FABRIC POINT BARB CORNERS, 3/8"D (TYPICAL) WIRE BARBED DOUBLE SWING MIN. (TYP.) 1 5/8"- TOP RAIL (TYPICAL) SUPPORTINGARMSGATE (TYPICAL) � 4"- GATE POST (TY! PSI (TYP-) 12' ,I `-ITYP: . -� I�•I 2"- LINE U . I POST (TYP.) I. U •I 10'-0" & CHAIN LINK FENCE WITH DOUBLE SWING GATE DETAIL za O ip ).7 GAGE 1J'.I I..I,,, a )TTOM NSION RE RE 4"- CORNER 10'-0" POST (TYP.) NOTE 2 Fes— 51-011 .I R° 4►- 6,-4„ II SHOP DRILL 5/8 DIA. HOLE 8 PLACES ON A 54" DIA. BC STRADDLE FIELD DRILL CONCRETE PAD FOR 1/2-13NC STAINLESS STEEL ANCHOR BOLTS 6" TYPICAL ABOVE GROUND LEVEL - FIBERGLASS REINFORCED PLASTIC METERING MANHOLE NOTE 1 CONCRETE PAD (BY CONTRACTOR) ----------- (#4 REBAR ® 6" CENTERS EACH WAY)-_� 1 I n T-0" -f NOTES: (PALMER-BOWLUS) 1. FRP PIPE STUBS WITH FLEXIBLE WATER -TIGHT NEOPRENE CONNECTING BOOTS SHALL BE PROVIDED BY MANUFACTURER. NEOPRENE BOOT IS ATTACHED WITH STAINLESS STEEL CLAMPING BANDS FOR INSTALLATION. 2. FIBERGLASS GRATING OR COVER ON FLUME TO BE PROVIDED BY MANUFACTUER. 3. FRP LADDER SHALL BE PROVIDED ON MANHOLES OVER 4 FT. DEEP. FIBERGLASS METERING MANHOLE 29 L[1B1 �4R wi �E u1® R71 SEE DETAIL 2 THIS SHEET ao aw NfAwlpO 12• 1/2" CHAMFER (TYP) Ap4Alm V W � ®N aRAQ R>A Mlq ItRI VL DRAWINGS T 44RML mac Muc a ra rs TYPs- EE PLAN E AAIaNp IIRIr p —mm �A�SEL.ECEn ■a\olu� jwmiK�'1Oia FOR - p4�17OCOSTS OF EW N4®17' OC BARS a HORZ IF 4 7CLR T DRAINAGE FILL WRAPPED Rasp1�aq A ! AIO r R V 10 1r _ RM YAY a o44Y1 /�4 vAm wale 1 s 71H) --� >e r o,a LNm1 4xla "�.�.I SMOOTH -RUBBED IN FILTER FABRIC LAPPED 12. (SEE SPEC) WITH FM 1'-0' IIrTPVC WEEPS STANDARD DETAIL �� • 0 F-VOC PLACE SCALE: NONE 1/4• MESH SCREEN ON 1-23-83 DRAWN BY: HAM b BACK SIDE OF WEEPS � 2-02-01 CHECKED BY: DCC,FAP ■m ow m r COMPACTED TYPE 1 FILL O SURFACE � gap #I I{= *017 OC a- 'LAN 3•CLR N®17 OC TYP r-0•' 1z• s -a' NOTE: PROVIDE AT LEAST 7-0" FROST COVER FROM FINISHED GRADE TO BOTTOM OF FOOTING. 5 RETAINING WALL DETAIL 7" 1'-5" 6" 1" BITUMINOUS SURFACING j� 3' RADIUS I T l i 3" RADUIS o 1 . e A CONC. CURB & GUTTER CRUSHEDSTONE BASE COURSE CURB AND GUTTER DETAIL 2" MESH FABRIC CROSS BRACING 3 STRANDS, 4 (TYPICAL) AT ENDS AND CHAIN LINK FABRIC POINT BARB CORNERS, 3/8"D (TYPICAL) WIRE BARBED DOUBLE SWING MIN. (TYP.) 1 5/8"- TOP RAIL (TYPICAL) SUPPORTINGARMSGATE (TYPICAL) � 4"- GATE POST (TY! PSI (TYP-) 12' ,I `-ITYP: . -� I�•I 2"- LINE U . I POST (TYP.) I. U •I 10'-0" & CHAIN LINK FENCE WITH DOUBLE SWING GATE DETAIL za O ip ).7 GAGE 1J'.I I..I,,, a )TTOM NSION RE RE 4"- CORNER 10'-0" POST (TYP.) NOTE 2 Fes— 51-011 .I R° 4►- 6,-4„ II SHOP DRILL 5/8 DIA. HOLE 8 PLACES ON A 54" DIA. BC STRADDLE FIELD DRILL CONCRETE PAD FOR 1/2-13NC STAINLESS STEEL ANCHOR BOLTS 6" TYPICAL ABOVE GROUND LEVEL - FIBERGLASS REINFORCED PLASTIC METERING MANHOLE NOTE 1 CONCRETE PAD (BY CONTRACTOR) ----------- (#4 REBAR ® 6" CENTERS EACH WAY)-_� 1 I n T-0" -f NOTES: (PALMER-BOWLUS) 1. FRP PIPE STUBS WITH FLEXIBLE WATER -TIGHT NEOPRENE CONNECTING BOOTS SHALL BE PROVIDED BY MANUFACTURER. NEOPRENE BOOT IS ATTACHED WITH STAINLESS STEEL CLAMPING BANDS FOR INSTALLATION. 2. FIBERGLASS GRATING OR COVER ON FLUME TO BE PROVIDED BY MANUFACTUER. 3. FRP LADDER SHALL BE PROVIDED ON MANHOLES OVER 4 FT. DEEP. FIBERGLASS METERING MANHOLE 29 �1 BLOW OFF DETAIL CITY OF GASTONIA FILE NO. 7113-913 I Revisions ADDENDUM No. 1 &19/2016 ADDENDUM No. 2 NEGOTIATEDCHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 ou"Syl C.A "?0 % 04; 04 Ess/otilf�'+� 'Zji42' •Y�s19 's • �� i a t )rawn By: GAQ :hecked By: MWB 'ity Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 23 OF 35 L[1B1 �4R wi �E u1® R71 ao aw NfAwlpO M AAK IAL IMK W 4[ Ap4Alm V W � ®N aRAQ R>A Mlq ItRI o mn8. 44RML mac Muc a ra rs 1111141 QaMK A1N4\Yr) AAIaNp IIRIr p —mm ■a\olu� jwmiK�'1Oia F-- - eeAss vs Q; 4 7 a 4 R�4 YKK CYlOilr 4lOCNq----- T IlY1�1 Rasp1�aq A ! AIO r R V 10 1r _ RM YAY a o44Y1 /�4 vAm wale 1 s 71H) --� >e r o,a LNm1 4xla "�.�.I ID1062 1DO01M iui Ml" TH Q REVISED F.B. PG, DATE: 8-17-83 STANDARD DETAIL 12-6-84 SCALE: NONE CITY ENGINEER 1-23-83 DRAWN BY: HAM ayro,aA 8.c 2-02-01 CHECKED BY: DCC,FAP ■m ow 2-11-05 CITY ENGINEER: DEC,JPB �1 BLOW OFF DETAIL CITY OF GASTONIA FILE NO. 7113-913 I Revisions ADDENDUM No. 1 &19/2016 ADDENDUM No. 2 NEGOTIATEDCHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 ou"Syl C.A "?0 % 04; 04 Ess/otilf�'+� 'Zji42' •Y�s19 's • �� i a t )rawn By: GAQ :hecked By: MWB 'ity Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 23 OF 35 RETAINING WALL I SEE DETAIL 5 ON SHEET 23 I I 1 BENCHMARK I I I EMERGENCY SEE R MANHOLE FUTURE SUBDIVISION CONNECTION NORTH'NG = 554785.70 SEE DITAIL SHEET 21 EASTING = 1380980.19 I I RIM ELEV = 592.8 ' I I I (ADJUO' RIM ELEV. TO I I 8 -FOOT HIGH DECORATIVE MATCIIII ACCESS ROAD) ' I PROP METAL SECURITY FENCE I I z m ACCESS R PUMP OD VALVE VAULT y SEE DETAILS SHEET 25 & 28 I I Q Ay// WETWELL '�•..:., = !�_. SEE DETAILS SHEET 25 & 28 0 ""•� . -,- �_ _ V DIA. MAG METER �•' MANHOLE I ELECTRICAL BUILDINGI - _ I H 1 I y/ Noun 100 SEE DETAIL SHEET 27 1 dm I t `I� `RFI OOp PLAIN' 1 1 • a •, °//r>! (/� Y GRAVELAREA 1 1 o ' �' +i- 14'CHA!NK ` / / / / /�/:/• .1 I ; \A DEEP MIN. (TYP.) - i'I 1 a ✓ . 1, •. .l ...� SWING ATE •a / // // / / / / % I \ `\ I EXIST. WWTP o "\ TOBE ABANDONED I /� ` — w'-'r'w. '"°--\ •o0i o • 4.' 5 ' % / %/,/ // / / / / .�/ �I I�� PER SPECIFICATIONS ` / ~ -- y — ° ' y r , —° > / / // /�/ / /// /.I"• ` ` ENEfXTO ,4 \ "t • •ter~.—^�;, • 4 —• �/ / �� .59�_ —� �� //�/////�//�n}/ �`/,'! ,i..t II e FUTURE SUBDIVISION ANA 0. I jC _ .&•FOOT HIGH CkiAIN — — — — — — "*� �. — — — TOWN OF MCA.DENVILLE // " LINK FENCE — — \ 585 — PIN m3555-14-0559 II{�� L/ }y W�— — — _ �( l• DB 0764 PG 0558 ' moi. '_ -` \ 1 ( ^ sn \ ."/ ' —` .pp .._. — / --% roe \ / m - _ .MI6 G SHEET —580— --u- SEE 1 \ \ EXIST. GRAVEL DRIVE \ \(l 6L f 1\ --- y�----- \-- —`B2� PUTUK CHI JBCHST.CUL-DE-SACGRAyITY SEWER_ EXIST. 1S PERMANEACCESS EASRT GEN DRAINAGE, EMEKff-VAR+ES__ _ _ \ \ \ / / METERING MANHOLE (SIZE PER SELECTED FLUME) ' % ` �,,,�,.�'•_nl,. \ ` I PROP ' p ��s'•sn PUMP STATION PARCEL 10 0 20 HORIZONTAL SCALE IN FEET Revisions: ADDENDUM Na. 1 8/19/2016 ADDENDUMNo. 2 NEGOTIATED CHANGES 10242017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 w ppmuugyw �L 5 Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 24 OF 35 NOTES: 1. ALL INTERNAL WETWELL PIPING AND VALVE VAULT PIPING SHALL BE INTERNALLY COATED CLASS 250 DIP. ALL PUMP GUIDE RAILS, GUIDE RAILS (MID-SECTION) AND TOP RAIL GUIDES ARE TO BE STAINLESS STEEL. ALL NUTS, BOLTS AND WASHERS TO BE 316 STAINLESS STEEL. 2. CONTRACTOR SHALL INSTALL PUMP DISCHARGE PIPING PUMP GUIDE RAILS PLUMB AND LEVEL FOR EASE OF PUMP REMOVAL. EACH PUMP SHALL BE REMOVED AND REINSTALLED IN THE PRESENCE OF THE ENGINEER, OWNER AND INSPECTOR TO DEMONSTRATE PERFORMANCE. 3. WETWELL TO BE SEALED AT ALL JOINTS INSIDE AND OUTSIDE. WETWELL SHALL BE TESTED FOR LEAKAGE AND SHALL NOT EXCEED 1" OF WETWELL DEPTH IN 24 HOURS. 4. AT CONTRACTOR'S EXPENSE, PUMP DRAWDOWN TEST SHALL BE CONDUCTED FOR EACH PUMP IN THE PRESENCE OF THE ENGINEER, OWNER AND THE INSPECTOR. AT CONTRACTOR'S EXPENSE, OPERATION OF ALL ELECTRICAL CONTROLS, INCLUDING STAND-BY GENERATOR, SHALL BE DEMONSTRATED IN THE PRESENCE OF THE ENGINEER, OWNER AND THE INSPECTOR. 5. INSTALL AN 18" SQUARE METAL SOLE PLATE FLAT TO THE FLOOR OF THE WETWELL UNDER THE BASE ELBOW TO DISTRIBUTE THE LOADS AND MOMENT ARM FROM THE FOUR (4) ANCHOR BOLTS. ANCHOR BOLTS SHALL BE EPDXY ANCHORED OR INTO THE WETWELL FLOOR. 6. GUIDE RAILS AND DISCHARGE PIPING SHALL BE ANCHORED WITH BRACING AS SPECIFIED BY THE MANUFACTURER, BUT NOT LESS THAN EVERY 10 FT. MINIMUM SPACING. GUIDE RAIL JOINTS SHALL BE WELDED TO PROVIDE A SMOOTH TRANSITION BETWEEN JOINTS. 7. WETWELL PIPING SHALL BE FLG. BY FLG. (NO UNIFLANGE OR MEGAFLANGE JOINTS DUE TO CORROSION POTENTIAL OF GASKETS, ETC.) FLANGES SHALL BE ANCHORED WITH STAINLESS BOLTS. 8. PUMPS SHALL HAVE A SS WIRE ROPE CHAIN AND SHACKLE (RATED FOR PUMP WEIGHT) TO FACILITATE REMOVAL OF PUMPS. PUMP MANUFACTURER TO ENSURE THE REMOVAL BRACKET ON THE PUMP IS PROPERLY REINFORCED. 9. LOW LEVEL AND HIGH LEVEL BACK-UP FLOATS SHALL BE SUPPORTED BY 1/4" SS WIRE ROPE WITH AN ANCHOR WEIGHT (10 LBS RECOMMENDED). THIS WILL PREVENT FLOATS FROM BEING TANGLED AND FACILITATE MAINTENANCE AND REMOVAL. 10. ALL BENDS SHALL BE MECHANICALLY RESTRAINED AND RODDED WITH GRIP RINGS OR FROM FLANGE TO FLANGE. BENDS BELOW GRADE SHALL BE MECHANICAL JOINTS AND SHALL HAVE CONCRETE THRUST BLOCKING. 11. ISOLATION VALVE SHALL BE PROVIDED BETWEEN THE COLLECTION MANHOLE AND THE WETWELL. PROVIDE MINIMUM OF 8" PVC ACCESS TUBE FROM VALVE OPERATOR TO GRADES WITH A PERMANENT STAINLESS STEEL VALVE WRENCH PROVIDED TO GRADE. 12. WETWELL SHALL BE COATED FOR PROTECTION FROM HYDROGEN SULFIDE CORROSION. PUMP STATION DESIGN CRITERIA (TRIPLEX) FLOWS ELEVATIONS PEAK FLOW (ULTIMATE DESIGN CONDITION) 1,500 GPM PUMP STATION DESIGN FLOW (INITIAL CONDITION) (ONE PUMP ON) 924 GPM PI IKAP TYPE PUMP CAPACITY TOTAL DYNAMIC HEAD FORCE MAIN DIAMETER FORCE MAIN LENGTH VELOCITY AT PUMP RATE FORCE MAIN HIGH POINT FORCE MAIN LOW POINT NON -CLOG SUBMERSIBLE 924 GPM 187 FEET 16 INCH 10,390 FEET 2.54 F/S 736' 559.25' I SUBMERSIBLE PUMP STATION (ILLUSTRTRATIVE VIEW) 25 N.T.& Revisions TOP OF SLAB 586.50' x ADDENDUM No 1 PRECAST REINFORCED 586.00' a ACCESS HATCH CONCRETE SLAB PER 6" PVC SCREENED Q un 00 (TYP. OF 4) MANUFACTURER VENT PIPE F -i o HIGH WATER ALARM GRAVEL REQUIRED AROUND WET WELL VALVE VAULT AND BUILDING. W z o LAG PUMP ON TOP OF WETWELL TO BE 6" ABOVE FINISHED GRADE. z w N W 000 Z N 8" 558.90' > PUMP OFF 12' DIA (ID) PRECAST CONCRETE r0 O W z 8" RESTRAINED SOLID = PRECAST 8'x8' (ID) CONCRETE STAINLES STEEL WETWELL (TYP. OF 2) REMOVAL RAILS H SLEEVE (MJ) VALVE VAULT BOX 3' MIN. 12" H U O (TYP. OF 2) +. 8" CHECK VALVE (TYP. 4) 8" GATE VALVE (TYP. 4) INLET HUB (SEAL W/ NON- SHRINK U 8"x12" D.I. 90' BEND 8" D.I. 90' BEND GROUT OR LINK SEAL) (TYP. 2) CLASS 250 P4 w U CLASS 250 COATED _ COATED O �j O _8" D.I. DISCH RGE 18" INLET PIPE (TYP. 2) o PIPE �I • INTERMEDI TE G H x `•, . RAIL SUP ORT TEAR DROP SHAPED CONCRETE BLOCK GROUT 3" DRAIN LINE AND PVC MERCURY FLOAT O - FILLED PIPE SUPPORT BALL CHECK VALVE �• SWITCHES V1 UNDER BENDS AND TEES INSTALLED AT DIRECTION OF I "' HIGH WATER ALARM ENG. (NON -GLUED) LAG PUMP PIPE SUPPORTS I LEAD PUMP ON AS REQUIRED " STAINLESS STEEL PUMP OFF LIFTING CHAIN �: i LOW WATER ALARM • _ GROUT FILLET F - CLEARANCE BETWEEN BOTTOM OF BOTTOM OF WETWELL PUMP AND WETWELL SHALL BE AS REQUIRED BY PUMP — O MANUFACTURER. H h 12" .. .. U �(I 0 12� SUBMERSIBLE 14'x24'X 12" DEEP O SOLIDS PUMP (TYP. OF 4) #57 STONE BEDDING oft 4"x8" D.I. ECCENTRIC t" INCREASER O CLASS 250 COATED NOTES: 1. ALL INTERNAL WETWELL PIPING AND VALVE VAULT PIPING SHALL BE INTERNALLY COATED CLASS 250 DIP. ALL PUMP GUIDE RAILS, GUIDE RAILS (MID-SECTION) AND TOP RAIL GUIDES ARE TO BE STAINLESS STEEL. ALL NUTS, BOLTS AND WASHERS TO BE 316 STAINLESS STEEL. 2. CONTRACTOR SHALL INSTALL PUMP DISCHARGE PIPING PUMP GUIDE RAILS PLUMB AND LEVEL FOR EASE OF PUMP REMOVAL. EACH PUMP SHALL BE REMOVED AND REINSTALLED IN THE PRESENCE OF THE ENGINEER, OWNER AND INSPECTOR TO DEMONSTRATE PERFORMANCE. 3. WETWELL TO BE SEALED AT ALL JOINTS INSIDE AND OUTSIDE. WETWELL SHALL BE TESTED FOR LEAKAGE AND SHALL NOT EXCEED 1" OF WETWELL DEPTH IN 24 HOURS. 4. AT CONTRACTOR'S EXPENSE, PUMP DRAWDOWN TEST SHALL BE CONDUCTED FOR EACH PUMP IN THE PRESENCE OF THE ENGINEER, OWNER AND THE INSPECTOR. AT CONTRACTOR'S EXPENSE, OPERATION OF ALL ELECTRICAL CONTROLS, INCLUDING STAND-BY GENERATOR, SHALL BE DEMONSTRATED IN THE PRESENCE OF THE ENGINEER, OWNER AND THE INSPECTOR. 5. INSTALL AN 18" SQUARE METAL SOLE PLATE FLAT TO THE FLOOR OF THE WETWELL UNDER THE BASE ELBOW TO DISTRIBUTE THE LOADS AND MOMENT ARM FROM THE FOUR (4) ANCHOR BOLTS. ANCHOR BOLTS SHALL BE EPDXY ANCHORED OR INTO THE WETWELL FLOOR. 6. GUIDE RAILS AND DISCHARGE PIPING SHALL BE ANCHORED WITH BRACING AS SPECIFIED BY THE MANUFACTURER, BUT NOT LESS THAN EVERY 10 FT. MINIMUM SPACING. GUIDE RAIL JOINTS SHALL BE WELDED TO PROVIDE A SMOOTH TRANSITION BETWEEN JOINTS. 7. WETWELL PIPING SHALL BE FLG. BY FLG. (NO UNIFLANGE OR MEGAFLANGE JOINTS DUE TO CORROSION POTENTIAL OF GASKETS, ETC.) FLANGES SHALL BE ANCHORED WITH STAINLESS BOLTS. 8. PUMPS SHALL HAVE A SS WIRE ROPE CHAIN AND SHACKLE (RATED FOR PUMP WEIGHT) TO FACILITATE REMOVAL OF PUMPS. PUMP MANUFACTURER TO ENSURE THE REMOVAL BRACKET ON THE PUMP IS PROPERLY REINFORCED. 9. LOW LEVEL AND HIGH LEVEL BACK-UP FLOATS SHALL BE SUPPORTED BY 1/4" SS WIRE ROPE WITH AN ANCHOR WEIGHT (10 LBS RECOMMENDED). THIS WILL PREVENT FLOATS FROM BEING TANGLED AND FACILITATE MAINTENANCE AND REMOVAL. 10. ALL BENDS SHALL BE MECHANICALLY RESTRAINED AND RODDED WITH GRIP RINGS OR FROM FLANGE TO FLANGE. BENDS BELOW GRADE SHALL BE MECHANICAL JOINTS AND SHALL HAVE CONCRETE THRUST BLOCKING. 11. ISOLATION VALVE SHALL BE PROVIDED BETWEEN THE COLLECTION MANHOLE AND THE WETWELL. PROVIDE MINIMUM OF 8" PVC ACCESS TUBE FROM VALVE OPERATOR TO GRADES WITH A PERMANENT STAINLESS STEEL VALVE WRENCH PROVIDED TO GRADE. 12. WETWELL SHALL BE COATED FOR PROTECTION FROM HYDROGEN SULFIDE CORROSION. PUMP STATION DESIGN CRITERIA (TRIPLEX) FLOWS ELEVATIONS PEAK FLOW (ULTIMATE DESIGN CONDITION) 1,500 GPM PUMP STATION DESIGN FLOW (INITIAL CONDITION) (ONE PUMP ON) 924 GPM PI IKAP TYPE PUMP CAPACITY TOTAL DYNAMIC HEAD FORCE MAIN DIAMETER FORCE MAIN LENGTH VELOCITY AT PUMP RATE FORCE MAIN HIGH POINT FORCE MAIN LOW POINT NON -CLOG SUBMERSIBLE 924 GPM 187 FEET 16 INCH 10,390 FEET 2.54 F/S 736' 559.25' I SUBMERSIBLE PUMP STATION (ILLUSTRTRATIVE VIEW) 25 N.T.& Revisions TOP OF SLAB 586.50' ADDENDUM No 1 GROUND ELEV. 586.00' INVERT IN 1 565.05' ADDENe DDENDUM No. 2 NEGOTIATED CHANCES INVERT IN 2 564.90' 10124/2017 HIGH WATER ALARM 560.90' ADDENDUM No. 3 NEGOTIATED MATERIAL LAG PUMP ON 559.90' CHANGES 12/11/2017 LEAD PUMP ON 558.90' PUMP OFF 556.90' LOW LEVEL ALARM 554.90' BOTTOM OF WETWELL 552.90' ,�y,CARo 04: •F ssio , treooYa Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 25 OF 35 CONCRETE BOX W/LID S 12" PLUG — ASA 8 BOLT PATTERN O (FLANGE, BOLTS, NUTS AND WASHERS TO BE STAINLESS STEEL) i 4 SLIP TYPE 12' D.I. PIPE TO FORCE MAIN 14" D.I. PIPE 14" D.I. PIPE 14' D.1. PIPE FROM VALVE VAULT 14' M.J. GATE VALVE 14'x12" TEE (FLG.) W/ CAST IRON VALVE BOX s EMERGENCY CONNECTION DETAIL 16" DI. PIPE 14"x16" REDUCER 14" DI. PIPE 14" GATE VALVE (MJ) W/ VALVE BOX W/ CONCRETE COLLAR 14" TEE (FLG.) FOR EMERGENCY CONNECTION II �'•"� CONCRETE METER BOX 14"x8" TEE CLASS 250 COATED PRECAST 8'x8' (ID) CONCRETE VALVE VAULT BOX 14"x8" TEE CLASS 250 COATED 14" GATE VALVE PRECAST 8'xB' (ID) CONCRETE I VALVE VAULT BOX 14"xB" TEE CLASS 250 COATED 14"x8" TEE CLASS 250 COATED WITH BLIND FLANGE 8" GATE VALVE (TYP. FUTURE LINE TO EAGLE ROAD (REPLACE 14"x8" 90' WITH 14"x8" TEE, ADD 14" EMERGENCY CONNECTION AND 14' ISOLATE VALVE OUTSIDE VALVE BOX) HALLIDAY W1R OR OWNER APPROVED EQUIVALENT ACCESS DOOR (TYP. OF 4) 12' DIA (ID) PRECAST CONCRETE WETWELL 18" PLUG VALVE (MJ) W/ VALVE BOX W/ CONCRETE COLLAR r 18" INLET PIPE 12' DIA (ID) PRECAST CONCRETE WETWELL 18" PLUG VALVE (MJ) W/ VALVE BOX W/ CONCRETE COLLAR — 18" INLET PIPE ICHOR TO PARTITION WALL PARTITION WALL 18" SLUICE GATE 18" CAST IRON WALL THIMBLE ,INV. 558.5') 552.5' SLUICE GATE PRECAST 8'x8' (ID) •� CONCRETE VALVE a e. •''' '~,; ;. i.. VAULT BOX r777 77 �. ACCESS HATCH (TYP. OF 2) PRECAST 8'x8' (ID) CONCRETE VALVE VAULT BOX ACCESSHATCH (TYP. OF 2) HASP FOR PA 1 SUBMERSIBLE PUMP STATION (UPPER PLAN MEW) x ALUUM HATCH NTH - HOLD -OPEN DEVICE AST .• •' IN WETWELL TOP SECTION •'f' CENTERED OVER PUMPS FOR SLIDE RAIL OPERATION ` (TYP. OF 2) 12' DIA (ID) PRECAST CONCRETE WETWELL L J • • :t: HASP FOR PADLOCK 12' DIA (ID) PRECAST CONCRETE WETWELL C_• Revisions: ADDENDUM No. 1 8/19/2016 ADDENDUM No. 2 NEGOTIATED CHANGES 10/24/2017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 sm 01mm /a-/1-1�-IT Drawn By: GAQ Checked By: MWB City Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 26 OF 35 �a 3.713 0 I N 3" SMOOTH VINYL EACH o SIDE OF BACK Lu FIBER J CEMENT0 �` J SIDING 3 3" SMOC 6'-0"x 6'-8" STD. M COMMERCIAL METAL DBL DOOR 12'—O -Y4" FRONT ELEVATION LEFT SIDE ELEVATION NOTES: CONTRACTOR SHALL SUBMIT SAMPLES FOR SHINGLES, VINYL, FIBER CEMENT SIDING WITH ELECTRICAL BUILDING SUBMITTALS. O I O I t Z I n i� 8" 10'-0" 8" WALL LENGTH 10'-0" OVERALL LENGTH FLOOR PLAN 12'-0" W. X 10'-0" L. X T-6" H. GABLED ROOF BUILDING 18,_3„ PERIMETER FORM GRADE— 77T STONE —� BACK ELEVATION L+2' Dt w+2' iw 3" ROOF PLAN LEVEL C= SCREED • G- 4 Q COMPACTED SUBGRADE SITE PREPARATION RIGHT SIDE ELEVATION u M a O v� z C7) N N O Qwz d U U 0 PTO o x Con O Od o Revisions ADDENDUM No. 1 6/19/2016 ADDENDUM No. 2 NEGOTIATEDCHANGES 10/242017 ADDENDUM No. 3 NEGOTIATED MATERIAL CHANGES 12/11/2017 / -1,-),u7 'awn By: GAQ lecked By: MWB ty Engineer: GBS Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 27 OF 35 GROUNDCOVER SCHEDULE �'••..-,��L -' � CO.R.-SPED.- FABRG T HOBBSTEEM1R LKS MO ONFNSAN63roNN IN MF RAN ONA RTENi roupAmx. 2. ASEPMECE.FASTONF SECTIONATLEASTEIN:HFSBELOWMMNLGRWMN IEVFL MMERE THE SAM ABUTS TM CHARNEL EM -C 3 EKTNp EIDE AT LFMT I SFT BEwNA THE MR SAIN. M RFP GFRROM WAFER-ONDERCUFONG THE DAM AS IT RE-ENTERS ME CMNML 1, 59 SPRING BETWEEN OAS6 TO AB6NIE THAT ME ELEVATOR AT ME TOP OF ME COWER DAM B THE SAME AS THE ME ELEVATION OF ME UPPER DM. 5. RETELL ME CWYNNEL GOWISMEAM PCOM iR LONFSTCRCKDAM, CONSIDERING IRWi WATER WOR -ROW OVER Aro AS.. THE CAN, 7. ENEDRF THAT CHANNEL APPURTENANCES. BLCH AS CULVERT ENTRANCES SLOW CRECNDAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM OBRACED 2TOBS. �RIACEE . INSPECTCHECKOANS AND CHANNELS FOR DAMAGE AFTER EACH PUNJR NSALLA PROTECTM RIPMP LINER IN TMi PORTON O ME CANNEL. 3 RMONE RDIVI NT ACCUIUUTEO BERING THE UNE AS MEDEO TO PPMNT DAMAGE TO CHANNEL VEGETATIONALLOW TR CHANNEL N DRAT MROUGH THE SMMECHEER DEMAND PREVENTUIEEFROMCARRSEDIMENT OVERR SAMD S T. IOi0R0 t0MS DAAS NEEDEDDED CARRYING M NMINTAw DESIGN WEIGHT ANO CRWGSECMN. TEMPORARY GRAVEL CHECK DAM NW 5 ROM SMR %AXYEYI fl.. Law - SECTION AA NOTES 1. SEGMENT BMLL BE REMOVED AND TMP REBTORO A ITS ORKiNLL OMEMIOR WHEN THE SEDIMENT HAS ACCUMULATED TO la ME DESIGN DERM O THE TMP. REMOVED SEDIMENTSRNLLBEDEPoS DNABWAMEARUAx tNSMHA MANNER THAT IT WYL NOTERW E. THFIR SHILL BE wSPECIEDARER FACTO RAw AR RRAIE MODEM NRDM RESMLSTANCPERATDxS SMELLBE CARRIED our Iry SI.CN A MANNER TMT SIGN AND WATER POLLUTION SHALL BE MNIMZED. I. ME BEOMENT TAP ERALLSE RRAONED MD MEA STABMBIS WHEN MF RENMNNG CNWNME ARA HAS BEEN PROPERY BTAMLIEEO. STONE INLET SEDIMENT TRAP LcoMPAc1Fn Ru WTPEMESN SUPPoRi FENCE RLTEPFABRE STEELPOSitYA. 6a 1 MATERAL SPECIFICATIONS. 1. IEEA SYNTHETICRLTEP EMMNL OFAL LEAST EBA BVWEGXTOf NLMLETPS OR POLYESTER S CEAFIHEDBYTHEBMNUFM RORSUPPISERMCAM NM MEREWIHEMEN II 2SYNTHRE RLTER FAMUC SroLAMY D CONTAIN UL-RAMEF FINN ETTORG AND STABILI EES. 3. ENSUREMATFUSTSM SEDMEMFENCESAIE1.33LWUNU RETSHELW AMWIMUMLCMTM OF iFFET. MA SaETr SRELPOSISHAVEPRWECTONSIDFACILRATEFASTEWNGMEFABRC. 1. WRRINWREMENTOFSTANDAAOSMENGMHLMRFABRIC, LGEWpEFENCEWNHAMININOMIC GSAGEAND A MMMON MESH SPACING OB-ABSI ES. CQ`STLETION SPECINCATCNs'. [LM TME$MMEM&RIERDFSTANOMDSMENGMOREXFMSMENGMSMMEnCRLTEA R EISLRETWTMEHEIGHTDFME5FDNNEMFENCEOOESNOTIXCEEDI3-INCHEGE-TIEGAGI DONFICE INGNEPFENCES NAT IMPoUND`ALOAES OF TAMP SIFRCENT M SAISEfMIUIiEa THI ITHER E). 3. COMMLCTTHFFILTERFABRG ROMACONTWLALBNOLLUTONTEaE OHNEMARINEM AVODJO , WHEN JOINTS ARE NECESSARY, SECURELY FASTEN ME RTEN GLOM ONLY ATA SIBRORT POST WITH OVERUP TO ME NIXF POST. 1. SUPPORT STANDARD SMENSLH FI MA FABNG BY WIRE MESH FASTENED SECLRLY TO THE UPSLOPE OF THE POSTS ISMO HEAVY WRY TESIRES. ESREICTHE WANE MEBHMARNST TO THE SDITOM OF 5. WHENAMREMESHSWKRTHf EISLSEO.SPMER MAMAp OFBRRAPAR. STEEL MOPRORT PDETS Sro= BE OPMN S ECURELY WM THE GNW NDMAMINILMO-INCHIES. WORMESHSOPPOETFETAEMATERKSWLLBEAGRCULMRALONLITYlA GEANAEALFD STEEL LMR MMA 1'x 5A MIX SPACING PATTERN. 0. EARA PENGFf1 ALTERRBRCMTN6RPoTSPMINGWBNATREWIREWTRMESHSU RT RACE TIF WIRE TE IBERFABPA O-TC,"ET:. 7. EMOAVATE A 11ENCMAPPRONMATELY 41NCHE0 WIpEAN) BYNCPES ORPAIDAG ilE PROPCbED S. BACKRLL TNF TRENCH WITH COAPACIEOSCILPUGEO WEA THE FLT LTSEOIMENTPEAG ATLUSTONLEAWFEKANDAFTEAFACHM. RFALL MAKEARUNW EO AfPMPOIMAEOMTRY,SNDU➢TEFABRICDG ASEDIMENTFEFSECOURSE,TEM,DECU SEp BECOME NNEFFLTNE•RERMERPROMPTLY. REPUCEBURLAPEYEAVBGSAYS. 2 RMWE SSTIME.OEWSITE M NECESSARY TO PRUWREAOEOWTE STGRAGEVOLLME FOR THE REST RUN" i0 ROUCE PRESSUPE GN THE FENCE. TANECAR TOAYDID NODEARRINE THE FENCEGURACCLUNOUF. RMOYEALL FENCING MATERIALS AND UNSTABILI4D SEDMENT DEPOSIES. BRING THE APER TO GRADE AND STMLGE IT AFTER THE CONTRBUIING DMIN4GE MEA HAS BEEN PROPERLY STABILILD. TEMPORARY SEDIMENT FENCE OMM Mti.1 MY:M' APRON LENGM-N,C)1E1 EXTRA STRENGTH FER US E-1. OR APPROVED -N-W (U3 2D5 NAT APRON 11XCKM05 BELTMLM AA .NGTRLCTCN SPECIFICATIONS: 1. ENBLRE MAT ME 615GPADE TOR THE FILMRAND RPW FOLOW6 ME TOURED LANES AIAGRADES BWRDUNONGUNDSNHDED MATEML LUWARMINi ESLBGRAD UMISn MOSDLW ALSO BE HLLED BY INCREASING THE R04AP THICKNESS. 2, ME MRNP AHO GRAVEL FILTER MIST CONFORM M ME SPECIRED GRADINS OMITS SHOWN ON ME PLAINS 3. FS RCLOMWHENISED,M TMFETOSIGNREOMREMENBMDKMOPEIRTPROTECTEDMM WTEAPoNG WPoNG NSTMUT'DN. REPAID MYDAMAGE BY REMOWNG THE RIPMP AN PLMNG ARDMER RFCE a RLMRCLOM OVER ME DAMAGED ARRA. ALL CONNECTING JOINTS SHOULD OVERLAP A NI -OF 1 R. IF ME GAMADE 5 EXTENSOR REPLACE THE ENTIRE CLOTHRLTER a. FEMPMAY BE PLACED BY EQUINAGNT, WF FARE CARE M AVOIC DAMAGING ME RLTER 5. ME MNIMUM THCKIYESS O ME RPGW SHOULD BE I S TIMES THE MAYIMOM STONE DMMETER. 6 NPRAP MAYBE HELD STONE OR ROUGH OWRPY STONE. RSIEOC BE HAgO, ANGULAR, HIGHLY WEATHER.R05TANT AND WELL GOADED. 7. CONSMOR THEAREA R ZERO GRADE WITHIA OVERFALL AIME END. MME RE MPOFME IIICAP ME DOWNSTPUM END LEVELwIM FHFRECEMHG APEAOg6WHTVBEtOWR B ENSUREMATMEAPPONSPRCPEAV AWNEDWMTHFHECEMWGSn MAAOPPEFRMRE 8RIDS HTMA000HOUTRSLEMGM IFACURVEMNEEDEDMFER CONdiCNG,PULERMTHE OPPE SECTIONOFTHEMRON 9.IMKMRLYAFFERC MUG110N.STAOLI&ALLD6Ti.RBEDARE W7HYEGETA , INSPECT MR RAP OUILRBTWCTFES AFTER HEAVY HANS TO SEE N AMY GIEIBIOM ARWM CA BELOW TIRE RIPMP WAS TAKEN PUCEN STONES NAVE BEEN DISLODGED. AAMRNALV MAR ALL NEEDED TROMPS TO PRM. HIRMER SAFMCE. RIP RAP OUTLET PROTECTION 1FM1. SFOIMENi RACE EC GLOM 157 �;IMLG COMTFOCTMON BPEC6MCATONb 2 PPOSIDE BFfESTDR DG AR AT LOW PD.BLT RO IN RA O1. DIN TMHCENRROIH - I M-. G, 1UCE L RADE o- � 2vawMxfO n76TOEAONISB DPBIEp SILT FENCE STONE OUTLET ONSTHROTYINSPIfICATANS' LxrMlc BSTCK I =NG -1.5-1 OF ALL MESS, BRASH, ETIMWS ANA OTHER OBECTIOWSLE 2. RSUREZTTM1EMIMMUMCUMTRICOEDC%O SECT NMEETSMLDESIGNPWUIRMENTO. 3 END ONE TMT ME TOP a ME OR 6 NOT LOWER AT ANY PONT MAN THE DESIGN EIEVATRA RLS iFE SPE GREG SETREMERT 22 1. PPOADE SO FICIE. ROOM AROUND DYEROON3 TO PERMIT MACHINE REGRAONG AMC LEANOUT. 5. VSTRATE THERIDGE IMMEOAmrPF1ER CONSMUCIION LMES61iMLL AMAIN IX RACE , LESS MEN 3O WORKING DAYS. MAINTENANCE. y� ASPECT THE FLOWAEAWEEKANDR ME MRVMwIDGE MMEDOTRY AEMCNB MEDMRSRNPODGE.CECTERS K OUTLETS AND MIKE REMOVE NEEDED. VANNEL MOOD WN ME •• o b "q PFERNC Y6TAeltlhq RM)VF BUSBOE AND MECIMNNELMBLFNOWMME NANRAL 0 GPpIM'OLMLAMC APPgOPMmYsiMILQF D. � �e • ,• •o �lQs W. TEMPORARY DIVERSION DITCH R P 'uNPe aABN�2 ati+r%areMeS.var.2s�v' f- 21GLOPE, GRA ALTER IEMPOSMY WASHED WORESCREEN 00 -EOCREEN TMw. / TRAM iB' 6FOME. 0'MN DIP]P MIST MM6RATE T eFCTON .I-.- DUNESTONE) M GONSTR16TwN SPECIFCALLOM: 1. CLFAA ME ENTRANCE AND EAT AREA OF ALL MEGFTATEN, P MITER Al ANSPROPERLYDRADE IT. 2 PUDE ME GRAVEL TO THE SPECIFIC GRADE AND DMENSIGN BMWM R. qRESIDE DPANUGEM CMM WATER M M ASEDIMENT TP 1. USENOMAVEXDFOTEM, FABRICSSECAISEMET 1. SL&ECT M SEEPAGE SR HIGH WATER FARE, CONEMLCTICNSNE. THBMAVREGURPEMOOOMPORESSING lMTH21NCH5TONE MTEAfACH RAINFALL, INSPECT AW SMUCTUR USED M TMP SMIWNTAM CLEAN T WTAS NECESMW IMM MMREMOVEALLMECTIOMBLEWUR&SPILLMWASNEDORTWKMONMPIMW RG1GMAYS. TEMPORARY CONSTRUCTION ENTRANCE CONSMWTONSPFCIRDATOFS'. i. -FRES' RONEACH SIDEa TE SMOGTMiEON ITB BARE IN THE MO- MAY M ALLOW POO. GPANAGE. ME FOONSATON Sro=BEEKLAVATED ATLUST2IACRS BROW MECRSFOF TE STORM OPAIN. PUCf MF BOTTOM PoOW OF BLaNs AMIMi ME EWEOi MESMRM DRAIN WR MATERIAL sDR-T AND TO AME WASHOUTS WHEN OVERFLUV OCCURS. R NEEDED, GKUTERAL SUPPORTT05UBSEOLYNTRDYSBYPUCINGTAI'VAOOSTWSMPoL H SLOCKOPPEERINGG 2. BLOCK LYNINGSTOAO IgLUGWTH1ORPUCEAFNBLEWIREM MITIH )EHmGm OPENING40VEA ALL S LSE CLEAN GMVEL X. TO MINOR IN CARRION, PLACE) 2 INCFES BELOW THE MP OF ME BLOCK ON 2:1 SLOPE OR RATTER AND MINOR R TO AN EMI GRADE GOT Y57 WASHED SIDR IS RCOMNERDEO. IAINSPECTMF SAANET AFTER FMH RVN ANG MAKE FEPARB M NEEGEO. 2. RMOVESEDME.ASNFCESSMY M PgOWDFADEWATF 51'OMGEVWLw1F WPSLBSSTUF. MISE. 3. WHEN TE CONMBURlA DMIMGE AREA WS BEEN ADEOUATLYSTABILIZED, REMOVE ALL NRTFARS MDAN u%TABLES03MDEIMERSALVAGEORDISPoSEOF7PROPERLY. BANG THE OSTNMD AREA TO PROPER GRACE, MEN SMOOTH AND COMPACT IT. APPROPRARLY STABILRE ALL BARE AREAS AYL%C TIE IILR. TEMPORARY BLOCK AND GRAVEL DROP INLET PROTECTION LEGEND TEM. GRAVR GOA -GA- OA -GA fMINTEMERIAI I -gRAYEL ORION GD TEAPORMIN SEGMENT FENCE -•-�-�- TEWOWNY IIMFT PSSFERMOX IEMFOMAY DROP - PROTECTION N TEMPORARY SILT RSFCE STONE OCT. MMP00.41Y DNEPSKw DfTCX M �� PFAMAIEM OfVFRBpNOROI TEIAPOWWROPEOWIS ��E+�-�10 �H.SaLA�-� N•NF TSD y eI �- MARDRANNT SSTIMCT TRAP fimma ICES: I. SMWNMLSIORESIMLLBE CUSS B STONE. 2. SEDIMENT CONTROL SITE SHALL BE N0.5OR NO. 57 STONE, 3, DI -ABBE ARE MINIMUM ACCEPTABLE UNIEES STE ROBE SPECIRECT BY THE ENGINEER. CONSTRUCTION SEQUENCE 1OBTAIN AIL RWRED IO:STRUCMW GRADING PERMNS iPRONOF FTABW7EC I H MUCTMON 1 -CES AS FEOOHED. I FROVIO AU EROSON CONTROL. -HER AS -OX MEAN SHINES. CC-ACTOH SALE BE PFRML-TTETG OPERAMNNMWOMCORRIDOR WT IMI N IMDM SURFACE OISIURRAHCE ALONG PERHAANENT RIGHTS -DF -WAY NR EROSION CONTROL INSTILAnON ANN MRCTLON E0IXPMENi AHD MATERIAL ACa65, 1. NO -1. GRALITY BECTCH RGGHBL OFFICE PFOB TO STMT OF CONSTRUCTION. 5, BEGIN CONSMUCTMON. B. CLEAN EROSION CONTROL MEAgMES AS NET➢EG FDEIAMNR RAIBRML MMI HIEN HAV EULL IDNE.GN -RES, EC.R. S. SSTALL TEMPORARY DROP A- CORS INLET PROPIT11-Ab SOON AS NEW DROP AM1➢N CUR INLETS ARE CONSTRUCTED. T. SEED L NICE,I ONUUEDI OMSEED AREAS ON CONSIST ROLES ACCORDING TO THE FOLLOWING, TABLE'. STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PER -1 mai SWMEE,-ES T SAYS ADE MA ELDECS RICH OULfIYWAICI mm 7SAY8 NONE Ma 6 ARE TO OR LESS ISLEM{M RDFS SIESPER THAN GA ISAYS AND AR NOT STEM MM T1, 11 SAYS ARE ALOMEI. SLOPES .1 OR MITER 11 SAYS T SAYS AOR ROPES ORfATERTWI 5, w -THE ALL OILER AREAS WTM SLOPES 11 DAYS NONE FCG.fPT M, RPME18W Alp FURTER TION A'1 ROM, LANES. S. 1.UMAA1 BOIL EROSION CONTROL MFARRI UNR PERAMBR GRONNO CGVH15 ESTMAISHEO. S. NOTIFY LAND GUALm SECTON REGIONAL GREE FOR INSPECTION ARO APPROVAL RICH TO REMOVAL OF EROSION CONTROL MEASURES 1O. PEMEVF SDH EROSION CONTROL MEASURES AND STM I ALL REMAINING CNSMRBST MREAS. NOON LAND oDUTY SECTION REGIONAL OFACE FOR FINAL INSRCTAN. ' If R I6 FOUND TNT MDITIOXPL MEA WILL BE REOURFD FOP STWKPILWG Of MPSCC SOHTESC70R STAGING, TEMP SEAAYACCESS, HML ROADS, EROSION COMM MEASURES OR OMER LANG OSipPBMAG ACIMIIBASSOMTEO WRNF16 PPOECI, A REMSFD EROSION CDNTEL PLAN PERECTNG TIE ADOMIOMLIAFAMISI SE WMLRTSTM TELMD OIAUIY -.ON REOONL GITCE. E MW SFn**�� 6EIXME. ��MTIRMGRWN)39 PRE MM STANDARD ROCK PIPE INLET PROTECTION ANDP.BGM AS WGIC TEDE AND LENGTH As wacATED DN DMvnNIS PROPoSFO BOR IT SIffO M flEOURD 08 CAREEAK R CR ■ IX EDC£ Of AVEMExiOR IL CREEK PROP. MUIVOFSBEMBIYPE M wDMA.1FD ON GMWINGS M BE INSTALLED BY BORE AND LACK I~�1 zx a O GD c� z H R-INPUCE.SC RO6CDMPLRfEMOALLKE NENT RNP060HARGE YAESEEMPOONMMFAMCREMGRADIENfWMNAMZANY ONOOL f �✓OI S N IS W h+- U O -C"', /I Twa MMMM BLONDE AREA. EO S.F. CS.-WMMGMC. ED c1, B : GA Drawny Q W p -I U W u 0� RNCWLTNLNKMM AFTENC.RRAGNT NT AND S City Engineer: GBS W x mLCNNE�I �� � L O O [[�TTT VVVV����^^IIIIN dd �PANiNIMM C� SEDIMENT LOG DETAIL PROE MOAGE STi 9M1 BE ASMOKOUlEO LMH TEND. 14 /{• GE-CHECKDM ASPIEBR. VELCHECN , IFE, TYPICAL BORE AND JACK EROSION CONTROL MEASURES -OF PEEK MM �1NM OX PIPELINE SOMPAS TDO. A GUN COMEMCCOGRAMEA NEWREELS NWGO.R..N ARURAAXGUMR- SOGRI NM CM, 10 LG.A5W SEOME.MV� 7 111 IMRVHCODT MR ER SEGMENT TRAP CREEK CROSSING DETAIL -DE TEMOHMYEIG. SPWEN PMEMA ANTS AS RDOS. RNR CANMD11Y M BE MERLE. m nIANDI ENMEREGING CREEK ARWIAPRLNFCWSSwG PoNT W E 0 � U 0 0 Revisions ADDENDUMNo. 1 8/192016 ADDENDUM No. 3 NEGOTIATEDCHANGES 10242017 ADDENDUM No, 3 NEGOTIATED MATERIAL CHANGES 12/1/20/7 ECUAEMT CONSTFTMroRARvANHGMMFM6.M5TOLLLTHERMHMBpUPRECAST CONCRETEBMRNS fROSIOxneLE NP OTHERxaxMATERIALLS ••E53j•,;�i �' OF LA✓V';� ONT NIMUM OF OERACTASSM LM PATEEO6MUMBARMILMLM M. MOCOR-.-M E R-INPUCE.SC RO6CDMPLRfEMOALLKE NENT RNP060HARGE YAESEEMPOONMMFAMCREMGRADIENfWMNAMZANY ONOOL f �✓OI S IRAM MECTON. THE DOWNSTNGM CGRPDAM MAY BE TFEAYNARYCOMMLCTpHARCIEDME.TNA➢ -C"', /I Twa MMMM BLONDE AREA. EO S.F. CS.-WMMGMC. ED c1, B : GA Drawny Q Mw MIM OFPIH - 1 R. Checked By: MWB RNCWLTNLNKMM AFTENC.RRAGNT NT AND S City Engineer: GBS 1TIEIAM�A EDLwMEAzbFILTERMnNGO30 ALL 1fNM ORAMEMR� T "GUEWmMCOWACTEDP'-I Scale: AS SHOWN Date: 12/11/2017 701-265 SHEET 28 OF 35 SITE PLAN 1 " = 10' TUR61LL F E• - Revisions: 3 rawn By: RWL iecked By: RWS ity Engineer. CCB Scale: AS SHOWN Date: 07/13/2016 MOO SHEET 29 OF 35 CB DISCONNECT SWITCH (DSU) 480Y/277VAC, 3PH, 3W, 450A, SE RATED, NEMA 1 ENCL. A AUTOMATIC TRANSFER SWITCH (ATS) 480Y/277VAC, 3PH, 4 POLE, 450A (MIN), NEMA 1 ENCLOSURE N N CB DISCONNECT SWITCH ,R (DSG) D U 480Y/277VAC, 3PH, 4W, 45DA Gi NEMA i ENCLOSURE n In a 'O C; TPRITY o �� Q o / MCB h w w 0 i� j ak CP JB W rr #2G ENGINE -GENERATOR a z a z m 0 a #a LNR O U N Q 75 MS 75 z zo 75L Tg HP D VOLT, 3 PHASE, 4 WIRE 60`O 42_ KAIC, NEMA 1 L7 Q1 daNk PUMP CONTROL PANEL, (PCP1) (NOTE 2) NEMA 1 75 HP `XP SEALOFF (TYP.) �w Qj 0 N N �Z M I� M PUMP CONTROL PANEL, (PCP2) (FUTURE) NEMA 1 75 HP FLOW INDICATING TRANSMITTERI I COMBINATION MOTOR (FIT1) STARTER (EFMS) T1: 15KVA (FUTURE) 480-120/208V NEMA 1 1201208 VOLT, 3PH, 4W, 60 Hz __IWL NEUTRAL BUS 100 AMP 100 MLO O LOCK ON _ AMP MAIN BREAKER 0 SHUNT TRIP X FLUSH SURFACE MINIMUM AIC RATING: 38 KA W = u W U \_ v a W O W Z �5 a: (J— OO pp 0 O N'PSD B C NO. AMPSDESIGNATION &ng w w 2 12LIGHTING O N (7 M M Q KW S0 QUIF! 750 N >ik W a: alk N ONW N O. of C 311�_ V) M Z 0 (Y [L O = Z Z M zJ 4 IL (Wj Y W a a W SW 0_ W U Z H O 0 In U0. 0. z JW yO- a. J d (L LL Lw 18 0 d OO 20 1 U' 0 W KW NS N NJ a = O W1= O N 7F �^ o Rn a aS ao I U UW Uy- N NW o3 N O z O o 0 < XZ O\ a0 } 0Op Om0 Q �on O W z O Z G0 D_ J S N DX O.NU D_NU z l C I t 7d O3 70_ O3 M DX LLN yU z l t Od O3 J i N JN l� > WJN JM N JQ f/1 26 0 VIS Zai K7 K 0:• O S N H Q a a.. Ov N m ea FOv S x O H N \1' MO rMn NNN U QQZ mW O f lL VI i1n (LN iN a. V) fN J J J JJ F -N l� 4 0 31 0 32 0 SAME 1 20 20 1 SPARE 0 ELECTRICAL SYSTEM ONE -LINE DIAGRAM 1 20 20 SPARE 0 35 0 36 0 SPARE 1 20 20 SPARE 0 37 0 38 0 SPARE 1 20 NOT m crAl F 20 SPARE 0 39 0 40 0 SPARE 20 FLOW INDICATING TRANSMITTERI I COMBINATION MOTOR (FIT1) STARTER (EFMS) FE ) I RHAR FC. I 6 (11P / I DM1 o: Z 0 S S Q d U 0_ O (L tt 0 U 3c Q ILL UU N W W 0 MANHOLE 1 ONE -LINE DIAGRAM EXHAUST FAN CP ONE -LINE DIAGRAM NOT TO SCALE NOT TO SCALE H -R Z a 6 0 0 a a a \1 0 l J oI al i o f-1 aI MMI MI M 2 Q fr A a �h 5 (L' ISI ►'� � C7 ODOR CONTROL O PANEL OCP "/ T1: 15KVA (FUTURE) 480-120/208V NEMA 1 1201208 VOLT, 3PH, 4W, 60 Hz __IWL NEUTRAL BUS 100 AMP 100 MLO O LOCK ON _ AMP MAIN BREAKER 0 SHUNT TRIP X FLUSH SURFACE MINIMUM AIC RATING: 38 KA W = u W U \_ v a W O W Z �5 a: (J— OO pp 0 O N'PSD B C NO. AMPSDESIGNATION &ng w w 2 12LIGHTING O N (7 M M N }w} o N 750 N >ik W a: alk N h N O. of i alk N I iR N N al► N •le tD I fV tp li N N 0 15 0 16 0 SPARE N d 1 d (L LL Lw FE ) I RHAR FC. I 6 (11P / I DM1 o: Z 0 S S Q d U 0_ O (L tt 0 U 3c Q ILL UU N W W 0 MANHOLE 1 ONE -LINE DIAGRAM EXHAUST FAN CP ONE -LINE DIAGRAM NOT TO SCALE NOT TO SCALE H -R Z a 6 0 0 a a a \1 0 l J oI al i o f-1 aI MMI MI M 2 Q fr A a �h 5 (L' ISI ►'� � C7 ODOR CONTROL O PANEL OCP "/ X 0 LP1 HP T1: 15KVA (FUTURE) 480-120/208V NEMA 1 1201208 VOLT, 3PH, 4W, 60 Hz __IWL NEUTRAL BUS 100 AMP 100 MLO O LOCK ON _ AMP MAIN BREAKER 0 SHUNT TRIP X FLUSH SURFACE MINIMUM AIC RATING: 38 KA W = u W U BRANCH CIRCUIT 3PH Z F JJ W O W Z �5 a: (J— OO pp 0 O N'PSD B C NO. AMPSDESIGNATION &ng w w 2 12LIGHTING 12.0 AC7 210 1 930 2 720 RECEPTACLES 1 2 314 12 20 1 EXHAUST FAN MOTOR STARTER 750 3 1250 a S 120 314 12 O h 1500 1500 500 5 2000 7 1500 9 500 6 500 8 0 19 0 ARMHOLE I F.I.TB CHART RECORDER 1 20 314 1210 SPARE 2 2012 COORDINATE EXACT LOCATION OF EQUIPMENT PRIOR TO INSTALLATION. X 0 LP1 HP INDICATES DEVICES LOCATED PANEL: LPI VOLTAGE LOCATION: PUMP STATION MAINS FED FROM: TXI MOUNTING: Q UNITUED 1201208 VOLT, 3PH, 4W, 60 Hz __IWL NEUTRAL BUS 100 AMP 100 MLO O LOCK ON _ AMP MAIN BREAKER 0 SHUNT TRIP X FLUSH SURFACE MINIMUM AIC RATING: 38 KA Q DEVICE BRANCH CIRCUIT O = D Z F JJ W W d W Z �5 a: (J— OO INDICATES DEVICES LOCATED PANEL: LPI VOLTAGE LOCATION: PUMP STATION MAINS FED FROM: TXI MOUNTING: Q UNITUED 1201208 VOLT, 3PH, 4W, 60 Hz __IWL NEUTRAL BUS 100 AMP 100 MLO O LOCK ON _ AMP MAIN BREAKER 0 SHUNT TRIP X FLUSH SURFACE MINIMUM AIC RATING: 38 KA Q DEVICE BRANCH CIRCUIT O _0 F I M OL BRANCH CIRCUIT DEVICE pp DESIGNATION AMPS NO. N'PSD B C NO. AMPSDESIGNATION &ng w w 2 12LIGHTING 12.0 AC7 210 1 930 2 720 RECEPTACLES 1 2 314 12 20 1 EXHAUST FAN MOTOR STARTER 750 3 1250 4 500 ALARM DIALER 120 314 12 1-4 10 30 2 20 1 GENERATOR JACKET HEATER GENERATOR BATTERYCHARGER 1500 1500 500 5 2000 7 1500 9 500 6 500 8 0 19 0 ARMHOLE I F.I.TB CHART RECORDER 1 20 314 1210 SPARE 2 2012 COORDINATE EXACT LOCATION OF EQUIPMENT PRIOR TO INSTALLATION. 1SPARE 1 SPARE 0 0 11 0 13 0 12 0 14 020 SPARE 2 3020 CONDUITS ENTERING THE HAZARDOUS AREAS SHALL BE RIGID STEEL AND PROVIDED WITH 1 SPARE 0 15 0 16 0 SPARE 1 2020 ALL CONDUIT TURN -UPS SHALL BE RIGID STEEL 1 SAME 0 17 0 18 0 SAME 1 20 20 1 SPARE 0 19 0 20 0 SPARE 1 20 8549. • 20 1 SAME 0 21 0 22 0 SAME 1 2020 7 1 SPARE 0 23 0 24 0 SPARE 1 20 20 1 SPARE 0 25 0 26 0 SPARE 1 20 20 1 SPARE 0 27 0 28 0 SPARE 1 20 20 1 SPARE 0 24 0 30 0 SPARE 1 20 20 1 SPARE 0 31 0 32 0 SAME 1 20 20 1 SPARE 0 33 0 34 0 SPARE 1 20 20 SPARE 0 35 0 36 0 SPARE 1 20 20 SPARE 0 37 0 38 0 SPARE 1 20 20 SPARE 0 39 0 40 0 SPARE 20 20 SAME 0 41 0 42 0 SAME 20 TOTALS PER PHASE TOTALS AMPS PER PHASE 2430 1750 2000 20 15 1 17 TOTAL CONNECTED LOAD (VA) AT 120 VOLTS 6,180 NOTES: 1. MMMR LIGHTS AND SKIN CIRCUITS CONTROLLED BY INTEGRAL 4 STAGE CONTROLLER CONTAINED WITHIN THE POWER DISTRIBUTIDN BOX. AND A PHOTOCELL LOCATED ON THE ROOF. SEE POWER INTEGRR3'S18TALLATION DRAWINGS NOR DETERMINATION OF WHICH CIRCUITS ARE CONTROLLED BY WNW STAGES. INDICATES DEVICES LOCATED X7;1. lop/l :,nL. WJ Q REMOTE FROM THE CONTROLLER U S O O _0 F I M OL O 3 {rte l IN61NEIRIN6 . L7 )-- I--7 LLQ�S: SHEET 30 OF 35 12.0 AC7 EXH. FAN 1. SEE SHEET E104 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES. 1 -PH. MOTOR 2. CONTROL PANEL PROVIDED WITH EQUIPMENT AND INSTALLED BY CONTRACTOR. N 3. CABLE PROVIDED WITH PUMPS, LEVEL PROBE, FLOATS. CONDUIT AND INSTALLATION BY CONTRACTOR 4. COORDINATE EXACT LOCATION OF EQUIPMENT PRIOR TO INSTALLATION. 120VAC 5. WETWELL AREA IS DEFINED HAZARDOUS, CLASS 1, DIVISION 1, GROUP D BY THE NEC. ALL N CONDUITS ENTERING THE HAZARDOUS AREAS SHALL BE RIGID STEEL AND PROVIDED WITH SUITABLE SEAL -OFFS. EXHAUST FAN MOTOR 6. ALL CONDUIT TURN -UPS SHALL BE RIGID STEEL OFF CONTACTOR 7. AS ALLOWED BY CODE AND UNLESS OTHERWISE NOTED, PVC SCHEDULE 40 OR 80 IS HAND 0 OL ACCEPTABLE FOR UNDERGROUND CONDUITS. UP SIZE SCHEDULE 80 AS REQUIRED. M 8. DIALER PROVIDED BY OWNER INSTALLED BY CONTRACTOR. 9. CIRCUIT BREAKERS FOR FUTURE EQUIPMENT PROVIDED UNDER THIS CONTRACT. 8549. • 0O0 DAMPER 7 MOTOR, EXHAUST FAN CONTROL NOT TO SCALE Revisions: AADDENDUM NO. 1 X7;1. lop/l :,nL. WJ Q U S O O _0 F I STUP61LL O 3 {rte l Revisions: AADDENDUM NO. 1 X7;1. lop/l :,nL. Drawn By: RWL STUP61LL Checked By: RWS CityEngineer: H WN u IN61NEIRIN6 Date: 07/13/2016 O SOUTH MAIN ST. LEXINGTON, NC 27292 MNE 238-1249 PH. f i�6; 236-6393 FAX SHEET 30 OF 35 LIGHTING FIXTURE SCHEDULE LOUVER LAMP TOTAL LOUVER WIDE HIGH REE AREA FRAME POWER FILTER END NUMBER ACTUATOR POWER PER TAG TAG MFR SYMBOL BALLAST FIXTURE MOUNTING DESCRIPTION MANUFACTURER'S PART NUMBER RACK ONE (1) SWITCH OF ACTUATORS VOLTS/PH INTERLOCK L-1 82 W LED 82 SURFACE 4' LED FIXTURE FIBERGLASS ENCLOSED WITH UTHONV+ FEM4LED-9L/57—IMACD � WATTS MOUNT ON GASKET AND ACRYLIC PRISMATIC DIFFUSER. COLUMBIA LXEM4-50HL—RA—EU I NO A 120/1 CEILING DAMP LABEL LISTED, 120VAC. METALUX 4Vf2—LD4-8—DR—UNV—L850—CD1—WL _ OR APPROVED EQUIVALENT. B TWO (2) 16W 32 FLUSH MOUNT IN DUAL HEAD FLOOD LIGHT FIXTURE, LITHONIA OFLR-6LC-120—MO—WH COOPER LIGHTING MS—T2792OL—W—ES WATTS WET LOCATION LISTED. 120VAC. LED SOFFIT OR APPROVED EQUIVALENT. C TWO (2) WALL EMERGENCY LIGHT, LITHONIA INDX618—W—LP05VS 6W 12 MOUNT 8' NEMA RATED, COOPER LIGHTING UELI—WH—SD LED WATTS AFF SEALED & GASKETED, DUAL LITE DYNE 120VAC, w/BATTERY PACK. OR APPROVED EQUIVALENT. LIGHTING PLAN 3/4" = 1' — 0" LOUVER/DAMPER SCHEDULE LOUVER DAMPER CFM LOUVER WIDE HIGH REE AREA FRAME BIRD FILTER END NUMBER ACTUATOR POWER TAG TAG MFR MODEL (IN) (IN) (SF) TYPE SCREEN RACK FINISH SWITCH OF ACTUATORS VOLTS/PH INTERLOCK L-1 DM -1 RUSKIN ELC6375DAX 18 18 1.08 STANDARD I YES I YES I MILL I NO 1 1 120/1 1 EF -1 NOTES: 1. ALL LOUVERS SHALL BE PROVIDED IN SINGLE SECTIONS. 2. ALL DAMPERS SHALL BE PROVIDED IN SINGLE SECTIONS. FAN SCHEDULE TAG MFRMODEL CFM SP FAN HP MAX POWER V/PH/HZ WEIGHT Ib in WC RPM SONES EF -1 GREENHECK I SBE -11-12O-4 1 657 .500 953 1/4 1 16.2 1 120/1/60 60 NOTES: 1. FANS SHALL BE GREENHECK, COOK, PENN OR APPROVED EQUAL. 2. PROVIDE FAN WITH EXTERNAL WIRING PIGTAIL, GRAVITY DAMPER, OSHA MOTOR SIDE GUARD, WEATHER HOOD, BEARINGS WITH GREASE FITTINGS, LINE VOLTAGE THERMOSTAT, AND ENERGY EFFICIENT MOTOR, 3. PROVIDE HI—PRO POLYESTER DARK GRAY FINISH. UNIT HEATER SCHEDULE TAG MFR MODEL KW POWER V/PH/HZ MCA MOCP UH -1 I MARKEL P3P5110CA1N 10 480/3/60 15 20 NOTES: 1. UNIT HEATERS SHALL BE MARKEL, CHROMALOX, TRANE OR APPROVED EQUAL. 2. PROVIDE UNIT HEATERS WITH BUILT—IN THERMOSTAT, POWER DISCONNECT SWITCH, AND WALL MOUNTING BRACKET. TO PCP1 ALARM HORN LOUVER & MOTC TO GENERATOR EXHAUST FAN & GRAVITY LOUVER -- DSG ATS PP1 EF -1 F-1 E S DSU LP1-3 POWER PLAN 3/4" = 1' — 0° STUR61LL ENGINEERING ONB SOUTH MAIN Sr. LEXINGTON, NC 27292 (336 23&1249 PH. (336; 236-6393 PAX Revisions :Ai iooi� o' Drawn By: RWL Chocked By: RWS City Engineer. CCB Scale: AS SHOWN Date: 07/13/2016 E102 SHEET 31 OF 35 _P2:: 120/240 VOLT, 1 PHASE, 4 WIRE, 100A, 222 KAIC, 1. SE RATED Qz O NW 03 � U UC ZIA W N pU 3:: p� Z W QU (NEMA 3 Jp � � U i N d N N N J ,R MANUAL TRANSFER SWITCH z � J OPER- N (MTS) UTILITY 2 120/24OVAC, 1 PH, 4W, 30A NEMA 4X SS ENCLOSURE N ECP REG. FlTFE NEMA 4X SS ENCLOSURE 30" HIGH, 36" WIDE, 12" DEEP ^b Qz O NW 03 � U UC ZIA W N pU 3:: p� Z W QU 3 Jp t7,K la/f MAN HOLE 7 ONE -LINE DIAGRAM NOT TO SCALE WEATHERHEAD, FOR CONNECTION TO POWER CO. DELIVERY METERING CABINET, PROVIDED BY UTILITY CO., MOUNTED BY ELECT. CONTR. SQUARE D NQOD 100A MCB 120/240V 1 0, 3W PANEL W/5 - 20A.IP-BREAKERS SUITABLE FOR USE AS SERVICE ENTRANCE. NEMA 3R ENCL. I I I I #8G, 1 /2"C 30 FT. CLASS 3 WOOD POLE (SOUTHERN YELLOW PINE) W W W fa/f N N MANUAL TRANSFER SWITCH W/ 30 AMP POWER CORD INLET BOX. CONTRACTOR TO COORDINATE PLUG WITH OWNER. 30"x36'x12' NEMA 4X SS ENCLOSURE r WITH PADLOCK TO HOUSE FLOW INDICATOR/TRANSMITTER, CHART RECORDER, & GFCI OUTLET. 1-5/8' STAINLESS STEEL UNISTRUCT SUPPORT (TYP.) CLASS 1 DIV. 2 LC FOR SENSOR CABLE GROUP D LOCATION L EMPTY 1"C FOR FUTURE LP2-1: METERING MANHOLE NOTES: 1. RACEWAY PENETRATIONS THROUGH SLABS SHALL BE SEALED WITH IMPERVIOUS MATERAIL SUFFICIENTLY TIGHT TO PREVENT WATER INFILTRATION. 2. ALL EQUIPMENT SHALL BE LISTED BY AN APPROVED THIRD -PARTY TESTING AGENCY SUCH AS UL. 3. COMMERCIAL POWER TO THE METERING MANHOLE SITE SHALL BE PROVIDED BY DUKE POWER. CONTRACTOR TO ESTABLISH ELECTRIC SERVICE TO SITE. BILLING ACCOUNT WALL BE SWITCHED TO TWO RIVERS UTILITIES (TRU) UPON ACCEPTANCE. MAN HOLE 7 POWER RISER DIAGRAM NOT TO SCALE 30"x36"X12' NEMA 4X SS ENCLOSURE TO HOUSE FLOW INDICATING TRANSMITTER, CHART RECORDER, AND GFCI OUTLET METER—-. J—LP2_1 I FIT2-1: PROPOSED ELECTRIC—' LLP2 UTILITY POWER POLE `MANHdL"7 4,.\ � J Revisions: MAN HOLE 7 SITE P,AN\ / _ f W 5 Drawn By: RWL / Checked By: RWS Ci�TURGILL 0 s SSHOWN ENGINEERING / Date: 07/13/2016 PONE SOUTH MAIN ST. E103 1 �3r 3�r2238-12249'PH 27292 ® 336) 23393 FAX SHEET 32 OF 35 \✓1 ..1 O U O O ac a� 3 Revisions: MAN HOLE 7 SITE P,AN\ / _ f W 5 Drawn By: RWL / Checked By: RWS Ci�TURGILL 0 s SSHOWN ENGINEERING / Date: 07/13/2016 PONE SOUTH MAIN ST. E103 1 �3r 3�r2238-12249'PH 27292 ® 336) 23393 FAX SHEET 32 OF 35 ONE -LINES HEAVY LINES INDICATE NEW WORK - - - - LIGHT LINES INDICATE EXISTING EQUIPMENT CONDUIT EXPOSED - - - - - - - - - - - - - CONDUIT CONCEALED -O TRANSFORMER WITH PRIMARY AND SECONDARY p YZ VOLTAGE, KVA RATING AND CONNECTION INDICATED. 150 KVA "LP" CIRCUIT NUMBER 2. SHORT DASH INDICATES PHASE 12.47 KV -480/277V CONDUCTOR, LONG DASH INDICATES NEUTRAL CONDUCTOR, 3PH,6GHZ CIRCULAR DASH INDICATES GROUND WIRE. �/ ONE -UNE SHOWING POWER, CONTROL CABLE AND CONDUIT MCC -3:3#6, #6G, 1.5" CIRCUIT NO. MCC -3 WITH THREE (3) #6AWG, 20 FOUR #12AWG, AND A #6 EQUIPMENT GROUND SIZE PER ONE -LINE IN A 1 1/2" CONDUIT TO A 20 HP LOAD. DENOTES ALL OR PART OF CONDUIT IS UNDERGROUND I—e Il� 3P-50 LOW VOLTAGE AIR CIRCUIT BREAKER, LJ 3 POLE, 50 AMPERE 3P-30 TTTI FUSE AND DISCONNECT SWITCH MIN. � S3 SIZE 3 COMBINATION MAGNETIC MOTOR STARTER HEAVY LINES INDICATE NEW WORK - - - - LIGHT LINES INDICATE EXISTING EQUIPMENT CONDUIT EXPOSED - - - - - - - - - - - - - CONDUIT CONCEALED -O CONDUIT TURNING UP, CONDUIT TURNING DOWN 3TIIF - LP -2 TYPICAL HOMERUN TO BE ROUTED TO LIGHTING PANEL (ALL SIDES) "LP" CIRCUIT NUMBER 2. SHORT DASH INDICATES PHASE 2" MIN. CONDUCTOR, LONG DASH INDICATES NEUTRAL CONDUCTOR, PLANS CIRCULAR DASH INDICATES GROUND WIRE. �/ FLUORESCENT LIGHTING FIXTURE, SEE LIGHTING SCHEDULE T31 LIGHTING FIXTURE, SEE LIGHTING SCHEDULE ----��—�—�- UNDERGROUND CONCRETE ENCASED DUCT BANK a—a—a—a—a— UNDERGROUND DIRECT BURIED CONDUITS r,ROHNn cnNnIJMnR $3 WP GFI DQ WP .44 JB 0 0 0 ABBREVIATIONS ATS AUTOMATIC TRANSFER SWITCI CB CIRCUIT BREAKER DS DISCONNECT SWITCH DSU DISCONNECT SWITCH UTILITY EX EXISTING MPC MINI POWER CENTER MTS MANUAL TRANSFER SWITCH PCP PUMP CONTROL PANEL REC RECEPTACLE SINGLE POLE SWITCH NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR ROUTING ALL CONDUITS. THIS SHALL INCLUDE ALL CONDUITS INDICATED ON THE ONE-UNES, PLANS, AND PANEL SCHEDULES. 2. WETWELL IS CLASSIFIED HAZARDOUS, CLASS I, DIVISION 1, GROUP D BY THE NEC. ALL CONDUITS ENTERING THIS AREA SHALL BE PROVIDED WITH SUITABLE SEALOFFS. CONDUITS IN HAZARDOUS AREA SHALL BE RIGID STEEL. 3. CONTRACTOR SHALL FIELD VERIFY EQUIPMENT LOCATIONS PRIOR TO INSTALLATION OF CABLE AND CONDUIT. 4. ALL ELECTRICAL WORK SHALL CONFORM TO THE NEC, NC STATE BUILDING CODE, AND ALL LOCAL CODES AND ORDINANCES. 5. ALL ELECTRICAL EQUIPMENT SHALL BE THIRD PARTY LISTED AS REQUIRED BY THE STATE OF NORTH CAROLINA. 6. UNLESS OTHERWISE NOTED, EXPOSED CONDUIT SHALL BE RIGID STEEL. CONDUIT FOR TELEPHONE AND CONDUIT NOT ENTERING HAZARDOUS AREAS MAY BE PVC SCHEDULE 40 AS ALLOWED BY CODE. 7. GROUND ALL METAL PARTS AND COMPONENTS. 8. DISCONNECT SWITCHES SHALL BE HEAVY DUTY, SERVICE ENTRANCE RATED, RATINGS AS INDICATED. 9. CONTRACTOR SHALL CONTACT POWER UTILITY PRIOR TO ORDERING EQUIPMENT. 10. UNLESS OTHERWISE NOTED OR REQUIRED, ALL POWER CABLE SHALL BE COPPER, UL LISTED, THWN. 11. ANY AND ALL NUTS, BOLTS, ANCHORS, FASTENERS, OR OTHER MISC. METALS SHALL BE OF 316 STAINLESS STEEL UNLESS OTHERWISE DIRECTED BY THE ENGINEER PRIOR TO INSTALLATION. 12. INSURE THAT NO DISSIMILAR METALS ARE IN CONTACT WITH EACH OTHER. USE NYLON WASHERS OR SPACERS TO PREVENT CONTACT. 13. ALL CONTROL PANELS ETC. ARE TO BE NEMA 4X WITH ALL HINGES ETC. MADE FROM STAINLESS STEEL. 14. COORDINATE EXACT UTILITY REQUIREMENTS WITH SERVING UTILITY. PROVIDE METER AND BASE IN ACCORDANCE WITH UTILITY. GROUND SERVICE AND EQUIPMENT IN ACCORDANCE WITH NEC ARTICLE 250. (CURRENT EDITION) 15. CONTRACTOR SHALL PROVIDE 5 -SETS OF OPERATION AND MAINTENANCE MANUALS FOR ALL EQUIPMENT. 16. CIRCUIT BREAKER DISCONNECT SWITCHES (UTILITY & GENERATOR) SHALL BE LABELED AS SUITABLE FOR USE AS SERVICE EQUIPMENT (SUSE). 17. SEAL ALL CONDUIT PENENTRATIONS TO WET WELL WITH CLEAR SILICONE (TYP.) 18. ELECTRIC EQUIPMENT SHALL WITHSTAND 120 MPH WIND GUSTS. 19. GROUND ALL METAL PARTS AND COMPONENTS. 20. UNLESS OTHERWISE NOTED OR REQUIRED BY CODE, CABLE SHALL BE TYPE THWN STRANDED COPPER. Z /A" l�L1A�ICCA THREE WAY SWITCH WEATHERPROOF SWITCH DUPLEX RECEPTACLE, 120 VOLT GROUND FAULT CIRCUIT INTERRUPTER WEATHERPROOF RECEPTACLE TELEPHONE OUTLET JUNCTION BOX z LIGHTING PANEL a MISCELLANEOUS PANEL COMBINATION MOTOR STARTER DISCONNECT SWITCH GROUND ROD ELECTRICAL LEGEND AND ABBREVIATIONS NOT TO SCALE TYPICAL ELECTRICAL HANDHOLE DETAIL NOT TO SCALE FINISH GRADE STONE FREE COMPACTED BACKFILL 5" MIN. COVER < Mr 5 6" WIDE (MIN WARNING TAPE WITH METAL STRIP (ALL SIDES) Drawn By: RWL 2" MIN. Checked By: RWS City Engineer:CCB AS SHOWN Date: 5 INIGINEIRK CONDUIT TYPE PER NB SOUTH MAIN ST. LEXINGTON, NC 27292 O236-6393 093 FAX SHEET 33 OF 35 SAND ORSPECIFICATIONS. = SIZE PER ONE -LINE SELECT FILL (STONE FREE EARTH) 2, MIN. DIRECT BURIED CONDUIT DETAIL NOT TO SCALE GRADE M CADWELD CONNECTION RING GROUND #2 AWG BCW GROUND ROD COPPERCLAD 3/40 X 10'-0" LONG 2'-6" OR 6" BELOW FROST LINE, WHICHEVER IS DEEPER Revisions: GROUND ROD DETAIL < Mr 5 NOT TO SCALE Drawn By: RWL STUP61LL Checked By: RWS City Engineer:CCB AS SHOWN Date: 5 INIGINEIRK E10418 NB SOUTH MAIN ST. LEXINGTON, NC 27292 O236-6393 093 FAX SHEET 33 OF 35 2- 2 . "2" 12' TYP ALL SIDES EXHAUST MUFFLER GAS TANK VIBRATION ISOLATION PAD /- 1" CHAMFER TYP. TOP OF SLAB 4" MIN. TRANSFORMER PAD NOTES 1. THE CONTRACTOR SHALL INSTALL CONDUITS 1" ABOVE THE TOP OF THE CONCRETE PAD TO PREVENT WATER FROM ENTERING THE SWITCHBOARD. CONDUIT AREA LIMITED TO AREA INDICATED. 2. NOTE USED. 3. THE CONTRACTOR SHALL VERIFY TRANSFORMER LOCATION AND DIMENSIONS WITH THE DUKE POWER COMPANY PRIOR TO INSTALL TRANSFORMER PADS. TWO PADS ARE REQUIRED. 4. THE TRANSFORMER PADS SHALL HAVE 4 FEET CLEARANCE ON SIDES OTHER THAN CONDUIT SIDE. THE CONDUIT SIDE SHALL HAVE 10 FEET CLEARANCE. 5. CONCRETE MIX PLACED IN PAD SHALL MEET THE FOLLOWING DESIGN REQUIREMENTS: A. 28 -DAY COMPRESSIVE STRENGTH OF 3000 PSI. (MIN) B. MAXIMUM WATER/CEMENT RATIO OF 0.50. C. MAXIMUM SLUMP OF 4 INCHES. D. AIR -ENTRAINMENT CONTENT BETWEEN 4 AND 8 PERCENT. 6. CONCRETE SHALL BE AFFORDED ADEQUATE CURE FOR A MINIMUM OF 7 DAYS. ADEQUATE CURE CAN BE PERFORMED BY WATERPROOF MEMBRANES, SPRINKLING OR SOAKING OR CURING COMPOUNDS. 7. PAD SHALL BE SUPPORTED ON A SUBBASE OF SAND, GRAVEL, OR CRUSHED STONE. THE GRANULAR SUBBASE IS TO BE A MINIMUM OF 4" THICK AND SHALL BE COMPACTED WITH VIBRATORY COMPACTORS. 8. DAMPEN THE SUBBASE PRIOR TO CONCRETE PLACEMENT. AT THE TIME OF PLACEMENT, THE SUBBASE SHALL NOT CONTAIN STANDING WATER. 2" COVER WELDED WIRE FABRIC (6" x 6") W2xW2 IF 000 O O0 0q\_ 14" — 24" /4 000 0 REINFORCING BARS NOTE 1 z#4 `�-- O 8" E.W. H 6WASHED STONE UNDER SLAB TRANSFORMER PAD DETAIL COMPACTED SUBGRADE B„ NOT TO SCALE F - w ELEVATION PLAN VIEW I GENERATOR NOTES: 1. THE SYSTEM SHALL BE COMPLETELY SELF—CONTAINED, COMPLETE WITH GENERATOR SET, DOUBLE—WALL, SUB—BASE FUEL TANK, FUEL FEED LINES, BATTERY SYSTEM, MAIN LINE CIRCUIT BREAKER, CRITICAL EXHAUST SILENCER, AND OTHER APPURTENANCES NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. 2. GENERATOR IS BE ANCHOR BOLTED TO SLAB PER MANUFACTURER'S INSTRUCTIONS. VIBRATION ISOLATION PAD TO BE INSTALLED BETWEEN PAD AND GENERATOR. 3. GENERATOR SYSTEM SHALL BE ABLE TO START AND OPERATE 5 KVA OF MISCELLANEOUS LOADS AND TWO (2) 17.5 HP MOTORS STARTED SEQUENTIALLY WITH 25X VOLTAGE DROP MAX.. 4. ENGINE—GENERATOR SHALL BE A 40 KW (MIN) WITH JACKET HEATER, WEATHER PROTECTIVE ENCLOSURE, AND ELECTRONIC GOVERNOR. CONTROLS SHALL BE AS REQUIRED FOR WW UFT STATION WITH NFPA 110 ALARM PACKAGE, EMERGENCY STOP PUSHBUTTON, ALARM HORN, OIL TEMPERATURE GAUGE, PRE—ALARM, AND SHUTDOWN, AND ADJUSTABLE POTENTIOMETER, COOLANT HEATER 110-120 VOLT AC, LOW FUEL ALARM LEVEL, DIESEL FUELED. SUB BASE FUEL TANK, DOUBLE WALLED FOR 24 HRS OPERATION. 5. CONTRACTOR SHALL CONFIRM PAD DESIGN WITH SUPPLIER PRIOR TO INSTALLATION. GENERATOR DETAIL NOT TO SCALE �_ WALL A5100 WALL BRACKET PVC COATED RIGID STEEL CONDUIT 4" HIGH CONCRETE PAD FINISHED GRADE FINISHED FLOOR 85100 HEATER BRACKET INCLUDED WITH A5100 VARIES CORE DRILLED HOLE e . GROUT a CONCRETE ENCASED REINFORCED DUCTBANK UNIT HEATER MOUNTING DETAIL NOT TO SCALE 30" BELOW GRADE (TYP) 3/4" X 10' COPPER CLAD STEEL ROD SECTIONS O 250MCM COPPER GROUND LOOP GROUND LOOP DETAIL NOT TO SCALE CORE DRILL DETAIL NOT TO SCALE THOMPSON NO. 28R 28/14 CU. DOWNLEAD CONDUCTOR TYPE "TA" CADWELD - COPPER EQUIPMENT GROUNDING CONDUCTOR, SIZE PER NEC Revisions: N O i O 3 7y\ ,�kdlif�+rf yJ Drawn By: RWL Checked By: RWS CityDTURGILL OWN 3 mNGINCCRING ONE SOUTH MAIN ST. NC 27292 )ARA Date: E10516 SHEET 34 OF 35 RA �39s FAL STONE FREE GRADE %— COMPACTED / BACKFILL \\\\\\\\\\\\\ 6' WIDE (MIN.) WARNING TAPE WITH METAL STRIP In I ! a CHAMFER EXPOSED CORNER .n CLEARANCE ' DIRECT BETWEEN CONDUITS FENCE GROUNDING CLAMP s 1 1/2' MIN TO FORMED ULTRAWELD CONNECTION WITH - LAP 6 WELD METAL EXCAVATION 11 i1 1 1/2' MIN — 3' MAX WELD METAL TO TOP SURFACE SOFT DRAWN TINNED SOLID COPPER CONDUCTOR BONDING NOTE: FENCE FABRIC TO GROUND 1' MIN CLEARANCE CONDUCTOR BETWEEN CONDUITS AND TI REBARS : 01 687 ' CATE JUMPER WITH ULTRAWELD HIGH IMPACT TYPE CONNECTION AND WELDMETAL. Drawn By. RWL SPACERS ON B'-0* Checked By:RWS CCB ClScale:lAS MAX CENTERS a i NOT TOSCALE STURGILL ���VII►��`�0V T _ 2' MIN ! a CHAMFER EXPOSED CORNER .n CLEARANCE ' DIRECT BETWEEN CONDUITS FENCE GROUNDING CLAMP s 1 1/2' MIN TO FORMED ULTRAWELD CONNECTION WITH - SURFACE. 3' MIN TO WELD METAL EXCAVATION ULTRAWELD CONNECTION WITH _ 1 1/2' MIN — 3' MAX WELD METAL TO TOP SURFACE SOFT DRAWN TINNED SOLID COPPER CONDUCTOR BONDING NOTE: FENCE FABRIC TO GROUND 1' MIN CLEARANCE CONDUCTOR BETWEEN CONDUITS AND REBARS : 01 687 ' CATE JUMPER WITH ULTRAWELD CONNECTION AND WELDMETAL. 1 — 1/2' X 8- CONCRETE BRICK UNDER SPACERS CONDUIT AS REQUIRED (TMP) GROUND CONDUCTOR WITH ULTRAWELD CONNECTION AND WELD METAL. CONNECT FENCE BONDING CONDUCTOR L TO GROUND CONDUCTOR WITH ULTRAWELD CONNECTION WITH WELD METAL TYP CONCRETE ENCASED CONDUIT SECTION NOT TO SCALE WALL LOUVER/DAMPER A COMBINATION AIRFLOW YYY BIRDSCREEN WEATHER TIGHT SEAL (TYP)\ xz EXTENDED SILL! LOUVER DETAIL NOT TO SCALE LOUVI BIRD EXHAUST FAN DETAIL NOT TO SCALE TYPICAL FENCE & GATE BOUNDING DETAIL NOT TO SCALE OSHA APPROVED SAFETY GUARD LEVELING TOP OF Revisions ! a CHAMFER EXPOSED CORNER .n ' DIRECT A E AS NOTED SCHEDULE _IL 4' -7 LEVELING CHANNELS FURNISHED BY CONTRACTOR. INSTALLED TO MATCH ,,,•••N CAR •• ,A Afo'". iOUSING EQUIPMENT FURNISHED. PAD DIMENSIONS DETERMINED BY EQUIPMENT FURNISHED. ;.'Q, Y NOTE: INCLUDE #4 BARS AT 8' EWEF. : 01 687 ' Drawn By. RWL EQUIPMENT PAD DETAIL Checked By:RWS CCB ClScale:lAS NOT TOSCALE STURGILL SHOWN ci ENGINEERING D"07/13/2016 E 106 SOUTH MAIN ST. LE-MNGTON, NC 27292 PAONE z38r�s 36 FAX SHEET 35 OF 35