HomeMy WebLinkAbout20171523 Ver 1_More Info Received_20171213Strickland, Bev
From: Brad Luckey <bluckey@pilotenviro.com>
Sent: Wednesday, December 13, 2017 10:06 AM
To: Williams, Andrew E CIV USARMY CESAW (US)
Cc: Homewood, Sue; Van2_Hurley@usharriecharter.org; Steve Hubrich
Subject: [External] RE: USACE Action ID SAW -2017-01797 Uwharrie Charter Middle School
PCN -Randolph County INCOMPLETE NOTIFICATION
Attachments: Uwharrie Exhibit 12-13-17.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to report.spam@nc.gov.
Good Morning Andy,
On behalf of the Applicant, Pilot has provided the below responses and attachments as requested. Please let me know if
you need additional clarification. Thanks.
1) Traffic control and pedestrian safety are the largest factors why moving the crossing westward and then to the north
is not feasible. Traffic enters and exits from US 220 Business and the current design has a stacking que for dual lanes of
1,100 linear feet for peak demand during student drop-off/pick-up. Additionally, the current design does not interfere
with staff/visitor parking accessing parking lots by crossing student drop off/pick-up traffic pattern. The current design
allows a free flow of movement for vehicles back towards US 220 Business without a crossing pattern. If the crossing
was moved westward to avoid wetland impacts and then continue to the north then there would be a need for a stop
sign and staff/visitors to cross pedestrian drop-off/pickup traffic. Additionally, the resulting driveway length of a more
westward design would not meet the anticipated vehicular stacking requirements during peak pedestrian and student
drop-off/pick-up.
2-4) Please find the attached updated impact exhibits that addresses these requests.
Sincerely,
Bradley S. Luckey, PWS
336.708.4997 (c)
336.310.4527 (o)
PO Box 128
Kernersville, NC 27285
www.pilotenviro.com
bluckey@pilotenviro.com
-----Original Message -----
From: Williams, Andrew E CIV USARMY CESAW (US) [mailto:Andrew.E.Williams2@usace.army.mil]
Sent: Wednesday, December 6, 2017 5:11 PM
To: Van2_Hurley@usharriecharter.org; Brad Luckey <bluckey@pilotenviro.com>
Cc: Sue Homewood (Sue. Homewood@ncdenr.gov) <Sue.Homewood@ncdenr.gov>; Williams, Andrew E CIV USARMY
CESAW (US) <Andrew.E.Williams2@usace.army.mil>
Subject: USACE Action ID SAW -2017-01797 Uwharrie Charter Middle School PCN -Randolph County INCOMPLETE
NOTIFICATION
Brad
The attached PCN for the Uwharrie Charter Middle School (SAW -2017-01797) is incomplete.
The Nationwide Permit (NWP) condition 23(a) (Mitigation) states: The activity must be designed to and constructed to
avoid and minimize adverse effects, both temporary and permanent, to waters of the United States, to the maximum
extent practicable at the project site.
Additionally, the NWP condition 32(b)(4) (Pre -construction notification) states: The description of the proposed activity
and any proposed mitigation measures should be sufficiently detailed to allow the district engineer to determine the
adverse environmental effects of the activity will be no more than minimal and to determine the need for compensatory
mitigation or other mitigation measures.
In order for use to continue evaluating the proposed project, please provide the following information:
1. A brief explanation of the roadway location and how it relates to avoiding the wetland impact area. Based on a review
of the proposed drawings and the preliminary stream/wetland drawings provided for the site visit, it appears the
roadway could continue westward further onto the site prior to turning north. This could potentially allow the road to
only impact two stream segments and no wetland areas.
2. Please provide a set of drawings/plans of the proposed fill and structures that clearly indicate the jurisdictional
features on the site. The current drawing does not clearly show the jurisdictional features. Please consider using color
and/or heavier line weights/hatching to distinguish jurisdictional waters from other features.
3. Please provide larger scale plans/drawings (plan view) of each impact area. These plans/drawings should clearly show
the proposed fill and/or culvert superimposed over the stream/wetland areas. In many cases, since streams have a
meandering pattern, the impact length of the stream is longer than the length of straight culvert being placed within it.
Please indicate both the culvert length and length of permanent and temporary impacts on the drawings.
4. Please provide larger scale profile and cross section plans/drawings for each road crossing. These should indicate the
pipe(s) diameter, clearly indicate the depth of pipe burial, and show the existing and proposed channel bed. Please show
the proposed imbedded rip rap on these drawings for the appropriate crossing.
Please provide the requested information within 30 days, or your application will be withdrawn. Feel free to contact me
with any questions or concerns.
Andrew Williams
Regulatory Project Manager
US Army Corps of Engineers
Wilmington District, Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
919-554-4884 ext. 26
CLASSIFICATION: UNCLASSIFIED
INV
INV 803
INV 801.13 -
INV ]93.30
STREAM -
WETLA
Opo
<_ INV 81B.B2
P\Q,G,n1 INV 811.]5
O�S'0 G
WETLANDS
ULAH FIRE DEPARTMENT
DB 970 PG 464
STREAM
RUSSELLS GROVE
BAPTIST CHURCH
o
0
Co
c C
0
Z,
V,
BRICK WALLS
lllllllllllllll\`
SEAL DATE:
10-16-2017
PROJECT NO:
2017-0100
SHEET
EX1
THE
RAINS GROUP
1139 HERMITAGE ROAD,
ROCK HILL, SC 29732
Tif C
�RI�IS
G�OU
PROJECT:
_J
0
0
2
U
Lu
p U
p z
b
UJ 0
Do
LU
Q =
_ CQ
<
U Q
Lu
Q
_
CLIENT'
Ui
U �
Z Cn
W
z > o
U D CV
Q:� Z
o
o J Q
U Q S
U p �
LEU
M
ORIG.PROJOATE : 10.17-17
SCALE: 1"= 100'
DRAWN BY: JDH
-
__ _
CHECKED BY DKR
-------------
X
J LJ_I
I
\\
0 J
♦♦ ``.
LU
- THE RAINS
GROUP, LLC
No P-0717
lllllllllllllll\`
SEAL DATE:
10-16-2017
PROJECT NO:
2017-0100
SHEET
EX1
STREAM
BURIED
P -SD -LINE 13
V 789.71
16.00 (CBNS -(FES 70))
I BED
RIP -RAP
THE
RAINS GROUP
1139 HERMITAGE ROAD,
ROCK HILL, SC 29732
d
TII�py 1r�I.}1
G�flU
PROJECT:
J
0
0
U
rn
W
J
Q U
Q Z
:5 0
LL 0
Cc
W
Q =
U Q
LU
Q
CLIENT.
ui
U ZD
Z U)
W
Z ti
U N
� o Z
O Q =
= U ry
U E �
W
m
= CV
cls
ItT
CHECKEDBV: DKI
Z
Q
J
LU �
3: U
Q
Q 75
Lu
U)
\\\ouwnn/i o.
THE RAINS
GROUP, LLC'
ND. P-0717 ,
i
SEAL DATE:
10-16-2017
PROJECT NO:
2017-0100
SHEET
EX2
0 a
STREAM
WETLANDS
—FD (FES 61)
PUMP AROUND
OPERATION DURING
PIPE CONSTRUCTION
SD -(FES 55) \
i \•.
WETLANDS 1\\ \
I ` _.. _..�..�••—.._.._..1 \ �. WETLANDS
STREAM J \ \
PERMANENTIMPACT
1600 SF WETLAND IMPACT FROM FILL
1"=30'
PERMANENT IMPACT
47 LF IMPACT FROM CULVERT/FILL
TEMPORARY IMPACT
10 LF FROM PUMP AROUND OPERATION
STREAM
.......... `
t _
1
I
1
1
1
1
1
INV. IN 788.25 (C'.
800
SD (CB 56)
GRATE ELEV:794.00
VINV. OUT 787.55
IN. IN 789.00 (CBMSD (C. 0))
INV. IN 787.65(CWD(CB 60)) 7
792
788
14 LF OF 36"Reinforced Concrete Q 3.66%-
784
22LF OF 36"
780
776
804
800
SD -(FES 61)
666 GRATE ELEV* 8.5793.89
INV. 780
�TREAM BED
7
788
-11LF OF 36" RCP p 2.27%
784
780
P -SD -LINE 9
1"=30'
THE
RAINS GROUP
1139 HERMITAGE ROAD,
ROCK HILL, SC 29732
d
TII�py 1r�I.}1
G�flU
PROJECT:
J
O
O
U
U
LL
J
0U
CD z
:5 O
oo� 11�
Lu O
Cc
LL
Q =
2 cf)
U Q
W_
Q
CLIENT.
W
U Z
Z U)
u.l
UCC\I
0!� O Z
O Q S
= U ::D
U p p
LU
m G
M
CHECKEDBV: DKI
` `\yUuuUi2�Gi
THE RAINS
GROUP, LLC'
No. P-0717 ,
i
SEAL DATE:
12-13-2017
PROJECT NO:
2017-0100
SHEET
EX3
1/2 DIAMETER OF PIPE OR 12" COARSEAGGREGATE 6" EARTH FILL COVERED BY
WHICHEVER IS GREATER DEEP LARGE ANGULAR ROCK
— =III=III—I T I-1 T 1—i �'-
�I�— �I IIIIIIIII 111,,,111—��
""SIF.-Jill ll�l�il„ _ III III—III
m III_r
FILTER FABRIC .� IIIIIIIII-
CAP ACITYOFPIPECULVERTS� III -„i III -III - I„1 3
TOGETHER FULL FLOW — I / I Of I �EARTHFILLCOVEREDRY
ELEVATION I/ j1 1♦ V LARGE ANGULAR ROCK
08
BANK HEIGHT
IYI I
0
8g ,
COARSE.. p°O �op� �0
°°Oo
°o°poo °Oo0°p0
°�OIW,°o°oo°YO0
y
00000
00000 0
°Oo 000
DIVERSION
° g 0,4µ1y1
p00
O°0oop°
C.
o� a
0000
I1 I S / / I+I °i� All
o0 Oo�ooO
°a
0°
° 000
00000 0
0 0 0 0' O °O O
°p°o
0 0
0 ° 0 00 0
o°
0
o° °° O o°O
op
Opo°o�OoQp
moo°
°.SIL
„SURFACE FLOW DNERSION
o��
0pO
°
°o°o 000 0
°000°0
o°o °
STANDARD TEMPORARY STREAM CROSSING OPTION 7
; 1_ ,
FIT
�25'MMIMUM
TOP OF BANK
TOP OF BANK
PLAN VIEW
STANDARD TEMPORARY STREAM CROSSING XEET 1 oT -
5' MAXGIIM
BANK HEIGHT
IYI I
uh � VIV'll� I
y
SURFACE PLOW
y
DIVERSION
° g 0,4µ1y1
I1 I S / / I+I °i� All
STONE APPROACH SECTION 5:1
1611
�l
0 MAXIMUM SLOPE ON ROAD
i�STONE OVER
FILTER CLOTH
SURFACE FLOW DIVERSION ORIGINAL STREAMII
„SURFACE FLOW DNERSION
STREAM CHANNEL �✓ ,
STONE FILTER CLOTH
STANDARD TEMPORARY STREAM CROSSING OPTION 7
; 1_ ,
FIT
Re��yo II Rrx. EaA
p� :.E....�.
',ANCHORBRIDGEMATTO < T°J ux Rorx
TREE, OR OTHER uvs
PERMANENT OBJECT WIT REM
E °
SUFFICIENT STRENGTH, °REAren Mi MMx TEx Eo°r
1 USING STEEL CHAIN OR SRIRAE wlmx.
1 CABLE.
J 1
NK �� i 1A�yr aPx.xR
R .Y6A o o nas gJ�P9� xreA
ERs
rxEar.E.M.rrxE°oM.r°.MEEE°oEo.
PERSPECTIVE VIEW
M.�'H �o ow::.:.:ro MI.
EMM
1/4 SUPPORTED 1/4 SUPPORTED
SURFACE FLOW SURFACE FLOW
DIVERSION BRIDGEMAT DIVERSION
``ORIGINAL
STREAMBANK
STREAM
SIDE VIEW
STANDARD TEMPORARY STREAM CROSSING OPTION -EET 1 pE 3
Work ASR
Diversion Pipe
Energy Dissipation
sm
ImperviousDik-
Note:
Ensure To Anchor All Pumps and Pipes Securely
Source: NCDOT BMP's for Construction and Maintenance Activities (August 2003)
Diversion Pipe
Pipe Diversion Piped Diversion Detail
Detail
June 1-1, Luso
Drawing Not Scaled
THE
RAINS GROUP
1139 HERMITAGE ROAD,
ROCK RILL, SC 29732
Ti«�RI�IS
G�OU
PROJECT:
O
O
U
W
� U
p z
b
Uj
W0
~ W
Q CQ
_ Q
U
LU
IY
Q
2
CLIENT'
W
U �
Z Cn
UJ
Z /
U p N
H Q:� O Z
C J Q
U Q =
= U
U p �
WC
m G
r
= N
M
ORIG.PROJ.DATE : 10.1]-17
SCALE: 1"= 100'
DRAWN BY: JDH
CHECKED BY: DKR
m
J x
J W
Q �
w CD
> z
O J
P -
w
- THE RAINS '_
GROUP, LLC
'A\\
"Ok ulll/TI7]''
=R
o"4'4;...BB...o
4$
44
_.mo__��lL%dP�c '
SEAL DATE:
10-16-201 7
PROJECT NO:
2017-0100
SHEET
EX4