HomeMy WebLinkAbout20171640 Ver 1_CAMA Application_20171220ROY COOPER
Governor
MICHAEL S. BEGAN
Secretary
Coastal Management A,� 2DII BRAXTON DAVIS
ENVIRONMENTAL QUALITY I nn IAIA--- Director
December 19, 2017
TO: Karen Higgins 6 0 1 7 1 6 4 0
401 & Buffer Permitting Unit
DWR/Water Quality Permitting
FROM: Heather Coats, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aD-ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA Application Review
Applicant: James Pratt & Beverly Miller
Project Location: 709 Shoreline Drive W., adjacent to the A/WW in Sunset Beach, BR Co.
Proposed Project: to construct a private pier and docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Heather Coats at the address above by January 12, 2018. If you have any
questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATED
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
910-796-7215
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
I. APPLICANT'S NAME: James Pratt & Beverly Miller c/o Southern Palmetto Environmental Consulting, LLC
2. LOCATION OF PROJECT SITE: 709 Shoreline Dr. W. adjacent to the AIWW in Sunset Beach, Brunswick County
Photo Index - 2006: 2-6206, 5 I -K
Lat:33°87'84.4"N Long: 78°53'30.3"W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —11/01/2017
Was Applicant Present —No
5. PROCESSING PROCEDURE: Application Received — 09/14/2017, Complete 12/13/2017
Office - Wilmington
6. SITE DESCRIPTION:
(A)
Local Land Use Plan — Brunswick County
Land Classification from LUP — Conservation
(B)
AEC(s) Involved: ES, EW, CW, PTA
(C)
Water Dependent: Yes
(D)
Intended Use: Private
(E)
Wastewater Treatment: Existing — None
Planned - None
(F)
Type of Structures: Existing — Single Family Residence
Planned — New private docking facility
(G)
Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION: [AREA]
DRFDGED FILLED OTHER
(A) Vegetated Wetlands (Coastal Wetlands)
^' 3300 sq. ft.
(shaded)
(B) Non -Vegetated Wetlands
" 1831 sq. ft.
Open Water
(incorporated)
(C) Other
Uplands
(D) Total Area Disturbed: — 5.131 sq. ft. (0.12 acres)
(E) Primary Nursery Area: Yes
(F) Water Classification: SA; HQW Open: No
8. PROJECT SUMMARY: The applicant proposes to construct a private pier and docking facility capable of
accommodating of up to three (3) vessels.
Pratt & Miller c/o Southern Palmetto Environmental Consulting, LLC
Page Two
9. PROJECT DESCRIPTION
The applicant's property is located at 709 Shoreline Dr. W., adjacent to the AIWW in the town of Sunset
Beach, Brunswick County. Directions from Highway 17 south of Shallotte: Turn Left onto Seaside Rd.
SW/NC-904 and travel approximately 3.60 miles. Turn right onto Sunset Blvd N/NC -179 Bus and
travel approximately 1.25 miles. The project site will be located on the left hand side of the street.
The project site measures approximately 1.5 acres in area and is currently developed with a single
family residence. The property has approximately 91 feet of shoreline frontage and maintains an
elevation approximately 12.8' above Normal High Water (NHW). High ground vegetation consists
mainly of hardwoods including live oaks, pines, and red cedar as well as natural shrubs and herbaceous
vegetation. Coastal wetlands consisting primarily of Smooth Cord Grass (Spartina alterniflora) extend
waterward approximately 550' waterward of the NHW mark.
The waters of the AIWW are classified SA; HQW by the Division of Water Resources and ARE
designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries. They are
CLOSED to the harvest of shellfish.
10. PROPOSED PROJECT:
The applicant proposes to construct a private pier and docking facility capable of accommodating of up to three
(3) vessels. The proposed project would consist of a pier measuring approximately 6' in width by 636.5'
in length, which would span an area of Coastal Wetlands measuring approximately 550' in width. The
pier would terminate at a fixed platform ("Fixed Pierhead 2") measuring approximately 17' in width by
13' in length (See Figure No. 6). A finger pier measuring approximately 3' in width by 12' in length is
proposed to extend off the northeast corner of the platform and run parallel to the shoreline. A second
finger pier, measuring approximately 3' in width by 25' in length is proposed to extend off the southeast
corner of the fixed platform and run perpendicular to the shoreline, providing access to the two (2)
proposed boatlifts. As proposed, Boatlift #1 would measure approximately I F in width by 20' in length.
Boatlift #2 would measure approximately 13.5' in width by 20' in length and would abut the 15' Adjacent
Riparian Corridor Setback to the east. A third fixed finger pier measuring approximately 3' in width by
13' in length is proposed to extend off the southwest corner of the fixed platform and run parallel to the
shoreline, terminating approximately 3' from the adjacent riparian line to the west, for which the
adjacent property owner (Lide) has waived for the proposed encroachment into the 15' setback. A
second, partially covered, fixed platform ("Fixed Pierhead 1") is proposed to extend waterward off the
southwest corner of "Fixed Pierhead 2". "Fixed Pierhead 1" is proposed to measure approximately 10'
in width by 25' in length and would contain a roof covered section measuring approximately 7' in width
by 14' in length. A proposed floating platform aligned perpendicular to the waterway is proposed to
extend off the westernmost finger pier and would measure approximately 6' in width by 16' in length,
providing an additional slip for docking, for a total of 3 slips proposed for the facility. The proposed
floating platform would also encroach into the 15' adjacent riparian corridor setback to the west, for
which a waiver has been obtained by the adjacent property owner to the west (Lide).
Pratt & Nfiller c/o Southern Palmetto Environmental Consulting, LLC
Page Three
According to the application, water depths in the vicinity of the proposed slips range from
approximately -2 to -3' @ Mean Low Water (MLW). The proposed docking facility would extend a
total distance of approximately 130' into a water body measuring approximately 525' in width. As
proposed, this distance would conform to the 1/4 width rule and would not exceed the U.S. Army Corps
of Engineers 80' Federal Channel Setback. The docking facility, as proposed would not exceed the
established pier head line between docking facilities located at 811 Shoreline Dr. W and 701 Shoreline
Dr. W. The proposed new docking facility would meet an established pier -head line for piers that have
similar use but would exceed the directly adjacent piers to east and west.
11. ANTICIPATED IMPACTS
The proposed docking facility would incorporate approximately 1,831 sq. ft. of Estuarine and Public
Trust Area and would shade approximately 3,300 sq. ft. of Coastal Wetlands. Minor increases in
turbidity should be expected during construction. The proposed configuration of the docking facility
would provide docking space for three (3) vessels in water depths ranging from approximately 2' to 3'
@ MLW.
Submitted by: Sean Farrell - Date: December 18, 2017 Office: Wilmington
SouthernPalmettoEnviromental
December 3, 2017
Debbie Wilson, District Manager
N.C. Department of Environment and Natural Resources
N.C. Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3545
Subject: Major Permit Application for Proposed Residential Dock Facility
709 Shoreline Drive Dock
Brunswick County Parcel ID# 255LA007
Sunset Beach, Brunswick County, North Carolina
Ms. Wilson:
We have prepared a complete application package in order to provide a residential docking
facility for Mr. James Pratt and Ms. Beverly Miller of 709 Shoreline Drive in Sunset Beach, North
Carolina. This application package is considered complete and it contains all of the pertinent
information required in order for your office to approve these proposed actions. The following
narrative explains the history, our approach, purpose, and need as well as any applicable
agency oversight during this development process.
Background
The project site is located along the banks of the Atlantic Intracoastal Waterway (ICW) in
Brunswick County. The applicants wish to construct a residential docking facility and since
adequate water depth and the edge of marsh was greater than 400 feet from their upland
shoreline, the need for a CAMA Major Permit was determined. The applicant's riparian rights
extends well into the ICW and adequate water depths have been discovered between the edge
of marsh and the federal channel setback. In addition, there are several docks within the area
several lots over from each side of the applicant's property line and the proposed dock will
conform to these surrounding structures with respect to size, shape, boat storage capacity, and
distance from the shoreline. Since the project area is located within designated primary
nursery area, no dredging is planned.
All proposed docking structures were designed based on a recent riparian survey completed by
Registered Surveyor, Rick Thompkins of Thompkins Surveying of Ocean Isle Beach in 2016. All
depths and property markers illustrated on the attached drawings were identified by
Thompkins Surveying. V
2 1 P a g e
Description of Proposed Structures
The applicant(s) intend to construct a residential docking facility for their family and their
guests. Construct a residential docking facility for personal/private use with three slips and with
a proposed walkway of greater than 400 feet. Specifically, the applicant proposed to build a
636.5 -foot walkway from the property owners upland area to a fixed, partially covered
pierhead (10ft.x 25ft.) with two boat lifts (1-13.5ft.x 20ft. & I-11ft.x 20ft.) and one floating
dock (6ftx16ft).Additionally an access ramp (3f.tx16ft.) and three finger piers will be
constructed to access all components. Since the applicant's shoreline is 91 feet wide,
regulations allow for 8 square feet per foot or 728 square feet. The current design less gangway
and boat lifts is 721 square feet that is less than the maximum square footage of 728 square
feet. Additionally, the walkway and its fixed structures will be elevated four feet above normal
high water to prevent any access, small craft navigation, and tidal flow issues down below. The
elevation of the proposed dock height was designed to be similar to the nearby dock to the
south at 715 Shoreline Drive.
Regulatory Coordination
Prior to submitting this package, SPE contacted Sean Farrell on multiple occasions in August
2017 to discuss the proposed dock plan and to review our preliminary drawings. Mr. Farrell
provided crucial comments, direction, and all necessary forms to be able to submit this
package. The included package is a result of the multiple conversations and correspondence
concerning this project during August 2017.
Adiacent Landowner Official Notification
When any development activity along the riparian corridor is proposed, the adjacent riparian
property owners must be notified and given the opportunity to comment. The landowner's
riparian area is determined by a vector extending perpendicularly from the ICW channel
centerline to the common property corner along the water -ward boundary of the subject
properties. And the riparian area was identified by Thompkins Surveying in 2016. These lines
were drawn on the plans from the most recent survey to determine the distances the proposed
structures are to these riparian area designations.
Adjacent landowners are Clara Moorman of Fayetteville, North Carolina and Dr. Lanneau Lide of
Columbia, South Carolina. Dr. Lanneau Lide was sent a waiver form and the signed waiver is
attached. Since the dock is greater or equal to 15 foot from her shared riparian line, Clara
Moorman was mailed a certified mailing announcing the design and plans that contained the
application package including the drawings and locations of the proposed structures for review.
The proof of certified mailing (green card) and the waiver sent to these landowners are
attached.
\EU
r i, 0
www.southerupalinettoencironmetit.a1.com
8300 Parasol Court - Mvrde Keach, SC 29579 - (843) 685-2108 - Fax (843) 808-O460
3 1 P a g e
Closin
The applicants are very excited about constructing a docking structure enable water access and
temporary/habitual boat storage along the ICW outside of the Sunset Beach home. The
additional length of docking structure was required to access deep water docking. Every attempt
has been made to add functionality and to protect the environmental resources of which these
structures are to be placed.
Acting as agent for James Pratt and Beverly Miller, we hereby request this major application be
reviewed by your office and a Major CAMA Permit be issued after having concurred with our
findings. Should you have any questions or require additional information, please feel free to
contact me at your convenience.
Sincerely,
Jeff Burleson, R.F., CWB
Principal
www. southe rnpalmettoe nvironrnenta1.coin
8300 Parasol Court - Myrtle Beach, SC 29579 - (843) 685-2.1.08 - Fax (843) 808-0460
RON MF -1
APPLICATION for
Mayor Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
709 Shoreline Drive Dock
Applicant 1: First Name
MI
Last Name
James
Pratt
Applicant 2: First Name
MI
Last Name
Beverly
Miller
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
State
709 Shoreline Drive
Sunset Beach
NC
ZIP
Country
Phone No.
FAX No.
28468
USA
843 - 687 - 2506 ext.
SC
Street Address (if different from above)
City
State
ZIP
Email
james.pratt@hgtc.edu
2. Agent/Contractor Information
Business Name
Southern Palmetto Environmental Consulting Llc
Agent/ Contractor 1: First Name
MI
Last Name
Jeff
Burleson
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
8300 Parasol Court
Myrtle Beach
SC
ZIP
Phone No. 1
Phone No. 2
29579
843 - 685 - 2408 ext.
843 - 808 - 0460 ext.
FAX No.
Contractor #
843 808 0460
Street Address (if different from above)
City
State
ZIP
Email
SOUTHERNPALMETTO@YAHOO.COM
�f
<Form continues on back> _
>> 207
252,-808.2808 ., 1-888-4RCOAST , www.nccoastairnanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Brunswick
709 Shoreline Drive
179B
Subdivision Name
City
State
Zip
Western Section of Twin Lakes Development
Sunset Beach
N. C.
28468 -
Phone No.
Lot No. (s) (if many, attach additional page with list)
- - ext.
Parcel IN 255LA007, I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Lumber
A.I.W.W.
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
A.I.W.W.
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
i. Is the proposed project consistent with the applicable zoning?
Sunset Beach
4.
Site Description
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
91
1.5 acres (65,340sq.ft.)
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
1.5 acres, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
12.8' ®NHW or ❑NWL
e.
Vegetation on tract
Wooded and maintained lawn areas in uplands with residence and salt marsh waterward of mean high water.
f.
Man-made features and uses now on tract
Residential home with associated structures
g.
Identify and describe the existing land uses adiacent to the proposed project site.
Residential homesites
h.
How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
MR2
(Attach zoning compliance certificate, if applicable)
®Yes ❑No [INA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No [INA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA
National Register listed or eligible property?
E D
<Form continues on next page>
262-808-2808 . 1-868-4RCOAST . wwrw.necoastaimanagement.net
. Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ®Yes []No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
n/a
o. Describe existing drinking water supply source.
public water
p. Describe existing storm water management or treatment systems.
none- sheetflow
5. Activities and impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Project purpose is to provide residential docking facilities and a temporary/habitual boat storage area for accessing public
resource waters for the property owners and guests of 709 Shoreline Drive.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
The dock and all of its components will be constructed using a combination of barge -mounted construction equipment,
typical terrestrial construction equipment accessed via land, and by using standard power/hand tools. All construction
activities and methodologies will be handled by a licensed marine contractor using standard dock construction techniques.
d. List all development activities you propose.
Construct a residential docking facility for personal/private use. Specifically, the applicant proposed to build a 636.5 -foot
walkway from the property owners upland area to a fixed, partially covered pierhead (10ft.x 25ft. & 13ft.x17ft.) with two boat
lifts (13.5ft.x 35ft. & 10ft. x 25ft.) and one floating dock (6ftx16ft).Additionally an access ramp (3f.tx16ft.) and three finger
piers will be constructed to access all components.
e. Are the proposed activities maintenance of an existing project, new work, or both? no, new construction
f. What is the approximate total disturbed land area resulting from the proposed project? n/a ❑Sq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No [INA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Construction of temporary/habitual docking structures into the waters adjacent to the Atlantic Intracoastal Waterway
i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No [INA
If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ®NA
j. Is there any mitigation proposed? []Yes ®No []NA
If yes, attach a mitigation proposal. — �—
3
_j
<Form continues on back>
252-808--2808 . 1-888-4RCOAST . www.nccoastaimanagement.net
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
8. AddWanat Intonnallion
__._
In addition to rhes coffg led applicoon form, (w.1) rt►e v"ng if&W below, X applicablerfxusr be xilyn tied in oar k,* the appHcabon
P 90 to be meta. ftM (a) - M ale appka* to any mW dieveildpixlig app*al n. Peaw oaf tare appkaftor!
ms!'rtx_*ori boolulet on how to propody pnW9t1tA rt9gr *9d items below.
a A project narrative
b -An accurate, dated work plat (including planview and cross-sectional drawings) drawn to scale. Please give the present status ct the___ _
proposed protect Is any portion already complete? It previously authonzed work, clearly indicate on maps, plats drawings to distinguish
between work completed and proposed.
c A site or iocation map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site
d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties
e The appropriate application fee. Check or money order made payable to DENR
'f
A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such.
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed protect to the Division of Coastal Management.
Name Lanneau D. Liffe Jr Phone No,
Address 1400 Sher*ood Road Cokrnbia, S.0 29204
~Name Clara H. MoormanPhone No
Address 249 Ellington Street Fayetteville. N.0 283115
_.__._....._.._..._..._._-_.._..... ...._.............................
_..____...___....._._.
Name Phone No,
Address
9 A list of previous state or federal permits issued for work on the protect tiact. include permit numbers, permittee. and issuing dates
n Signed consultant or agent authorization form, if applicable.
Wettand delineation: if necessary
A signed AEC hazard notice for protects in oceanfront and inlet areas (444st be signed by property owner)
K A statement of compliance with the N,C, Environmental Policy Act (N.C.G.S 113A 1-10): ifneoessary If the project involves ex{xanditure
of public funds or use of public lands, attach a statement documenting compliance with the. North Carolina Environmental Policy Act
T. CerWkaOm aid POrmissim to Enter on Lancs
I understand that any permit issued in response to this application will allow only the development described in the application
The project will be subject to the conditions and restrictions contained in the permit.
certify that I am authorized to grant. and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project
further certify that the information provided in this application is truthful to the best of my knowledge.
Date 11/2712017 Print Name Beverly Miller Ind James Pra,ttft
SiGInalif t� irl 'R_•f ^�f �.t�. 4.. r•�'•� PSC..: J I.LnO'f/
Please indicate application attachments pertaining to your proposed project.
QDCM MP -2 Excavation and Pili Information F1DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development ,
®DCM MP -4 Structures Information,-
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
4. DoC#QWFAC9JTY1AVWNA C RACT $TWS ❑Tft section rV app cable
a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
❑Commercial ❑PublicJGovemment ®Private/Com munity ❑Yes ®No
a (i) Docks) ardor pier(s)
(ii) Number
1
(iii) Length
635ft.
(iv) Width
Eft
(v) Floating
❑Yes ®No
e. (i) Are Platforms included? ®Yes ONO
If yes:
(ii) Number 2
(iii) Length 25' (fixed) : 1 T(fixed): 16' (floating)
(iv) Width 10' (fixed) : 13' {,flied): 6' (flopting)
(v) Floating 19Yes ONO .
Note: Roofed areas are calculated from dhpline dmrenwns.
g. (i) Number of slips proposed
3
(ii) Number of slips existing
0
. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water: dredging for basin and/or channel
®Open water; no dredging required
❑Other, please describe:
k. Typical boat length: 20-30ft.
m. (i) Will the facility have tie pilings?
®Yes ONO
(ii) if yes number of tie pilings?
3 on floating dock
d. (i) Are Finger Piers included? EgYes ONO
If yes:
(ii) Number 3
(iii) Length 12ft. 25ft. 13ft
(iv) Width 3—ft.
(v) Floating ❑Yes ®No
f. (i) Are Boatfkfts included? ®Yes ONO
If yes;
(ii) Number 2
(iii) Length 20ft: 20ft
(iv) Width 11 ft: 13.5ft
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips: 1
Dry storage; number of boats: 2
❑ Boat romp(s); number of boat ramps:
❑ Other, please describe:
j, Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
open runatxwt boat, possibly dosed cabin
I. (i) Will the facility be open to the general public?
❑Yes ®No
1-)CAi WILMINGTON, NC
1 2017
=,^;. ,.. •L7437Q w` JrS,,.,r i . ....
e
_... ..._.
Form DCM MP -4 (Structures, Page 2 of 4)
2. DOCKING FACIL. MMARINA OPERATIONS 0This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h- Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes []No
-T-
252-808-2808
r
252-808-2808 :: 1-888-4RCOAST ;, ww nccoastaimanag me_nt,n t. revised: 12:'27,106
Form DQM MP -4 (Structures, Page 3 of 4)
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes []No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
[]CW ❑SAV OSB
❑WL ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) 0This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Government ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from drip/ine dimensions.
4: GROIN (e.g., wood, sheetpile, etc: Pf a nock groin, use MP -2, Eyddvafrorf and Fill.-)-- : RThis section not applicable I.
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) NThis section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s):
❑Commercial ❑Public/Government ❑Private/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
L V FE
2017
252-805-2808 a. 11-888-4111COAST ;: vvvv r caastap raan .gement, et revised: 12/27'06
P Al,
a Proximity Of structure($) to adjacent riparian property lines b Proximity of structure(s) to adjacent docking facilities
6ft, to west 15ft.. to east. 147ft to east and 178ft to west
Note For buoy or moonng oiling, use are of swing inctudng length
of veswi
c Width of water Dody
508ft maL§hline Lo marshdine
e it) Will navigational aids be required as a msult of the projectl
C]Yes ®No CNA
(w If yes. explain what type and how they will be implemented
d Water depth at waterward end of structure at NLVV or NWL
3.32ft at NLW
8, OTHER ®TW section Trot applicable
a Give complete description
1 1/27t2017
Date
709 Shoreirie Drive Dock
PMjW NWV
James Pratt and Beverty Witter
rit Name n
ji
LOCATION MAP
a
fiSea T
Plant tio
mp
709 SHORELINE DRIVE DOCK
BRUNSWICK COUNTY
DATE: 9/5/17
PROPOSED ACTIVITY:
DOCKING FACILITY
APPLICANT: JAMES PRATT &
BEVERLY MILLER RECEIVED
IGURE DCNI, WILMNGTON, f
• OVERVIEW
?�9 1
PLAN
VIEW # 1
�lv l
1 ,
l
� 1
l ,
1 ,
lip -
1 ,
- l
l 1 PLAN
' VIEW #2
1 '
,m m
«,e,t,e
- _
-- m,... -- ---------- -- -----VIEW #3
p.V �l UMD(
_ -- -- -- L
DRAWINGS ARE FOR PERMITTING ONLY AND
SHOULD NOT BE USED FOR CONSTRUCTION
PROPOSED ACTIVITY:
709 SHORELINE DRIVE DOCK DOCIUNG FACILrrY
BRUNSWICK COUNTY
APPLICANT: JAMES PRATT &
DATE: 1 1 /24/17 BEVERLY MILLER
FIGURSCALE IN FEET
too' o' too'
PLAN VIEW # 1
DRAWINGS ARE FOR PERMITTING ONLY AND
SHOULD NOT BE USED FOR CONSTRUCTION
NHW
\I/
709 SHORELINE DRIVE DOCK
BRUNSWICK COUNTY
DATE: 1 1/24/17
w
L -L
_
01 2917
PROPOSED ACTIVITY:
DOCKING FACILfiY
APPLICANT: JAMES PRATT &
BEVERLY MILLER
IGURE SCALE IN FEET
425' o' 25'
• PLAN VIEW ##2
Depth above N W
@400' from NHW
I +2.38
I
_ � I
I
I
GS \ /
I \I .80
-�-2.
G5 G .45 \I / + MARSH
+ a.33 G 1.3G
1
I . 9 MARSH 1. 1.38
S POL G5
GS IPOL +0.,54 0•".78
+ +0.85
0.87
DRAWINGS ARE FOR PERIAITTING Q44LY AND
SHOULD NOT BE USED FO CONSLRUCTION
709 SHORELINE DRIVE DOCK
BRUNSWICK COUNTY
DATE: 1 T /24/17
GS v E C
7 2017
N RIW _.-
�
PROPOSED ACTMTY:
DOCKING FACILITY
APPLICANT: JAMES PRATT &
BEVERLY MILLER
IGURE SCALE IN FEET
5 25' 0125'
�IJ
3
a
VIL
ld
fl -
a
G5 2.9 16.01-
PLAN VIEW #3
G5
I + -0.41
N R�
AIWW -
r
--4 5`
E5tabli5hed
Pierhead Line
�� NG
.81 -3.32
th @Sp15etback)
65.28 (W►d , 04314311w
58
G5
+ -2.G2
L OF GH ANNE
� 251 Tp G
525' Width of
Waterbody
(1/4= 131.25)
;7
DRAWINGS ARE FOR PERMITTING ONLY AND
SHOULD NOT BE USED FOR CONSTRUCTION
709 SHORELINE DRIVE DOCK PROPOSED ACTMTY:
DOCKING FACILITY
BRUNSWICK COUNTY
DATE. 1 1 /24/17 APPLICANT: JAMES PRATT &
BEVERLY MILLER
FIGUR SCALE IN FEET
,G` 20' 0' 20'
w
Z.o
..�
3.a
P� 2
(225 9cem, 3 a
3. 5.7
3.a
�I2
G5
I + -0.41
N R�
AIWW -
r
--4 5`
E5tabli5hed
Pierhead Line
�� NG
.81 -3.32
th @Sp15etback)
65.28 (W►d , 04314311w
58
G5
+ -2.G2
L OF GH ANNE
� 251 Tp G
525' Width of
Waterbody
(1/4= 131.25)
;7
DRAWINGS ARE FOR PERMITTING ONLY AND
SHOULD NOT BE USED FOR CONSTRUCTION
709 SHORELINE DRIVE DOCK PROPOSED ACTMTY:
DOCKING FACILITY
BRUNSWICK COUNTY
DATE. 1 1 /24/17 APPLICANT: JAMES PRATT &
BEVERLY MILLER
FIGUR SCALE IN FEET
,G` 20' 0' 20'
SECTION VIEW #I
W
(1�5? r—'�] 25ftVft
. maws Door -6M.,
3�16'
(Prp. Dods Plush Meth
�11 2.9
Setback requvemerK
t-01
(P—r. Dock ie 1.5' from —tb—k)
posed Walkway will be
1-- NhW
..
14W�dtfi 59
of W t_b=-2(525')
Dock .. 3.8' from t—)
Bottom of Walkway (8.8)
NORMAL HIGH WATER (4.8)
NORMAL LOW WATER (0.0'
A L W. W.
1.53' 0.0, -1.8, -3.32'
(NHW) (0400' from NHW)* (Edge of (NLW) (End of (80' Channel
Marsh) Walkway) Setback)
*Depth 0400' marker calculated from known measurements taken along projected footprint.
DRAWINGS ARE FOR PERMITTING ONLY AND
SHOULD NOT BE USED FOR CONSTRUCTION
709 SHORELINE DRIVE DOCK
PROPOSED ACTIVITY:
BRUNSWICK COUNTY
DOCKING FACILITY
DATE: 1 1 /24/17
APPLICANT: JAMES PRATT &
NOT TO SCALE
BEVERLY MILLER
FIGURE
7
SECTION VIEW ##2 (. 1
Pierheads
-Fixed #1 Main Section (13'x17'[irregular]) 225sgft �' t ti
f.•tJ
-Fixed #2 (10x25) [7x14' Covered] 250sgR
•
'
- Rxed Three Flngerplers 31x131, 3x25,3x12'5tabhshecl Plerhead Line c�*J
-One Floating Dock 6x16' (Pro Dock is Flush with line) t-.•
-One Gangway — 3'x16' (Prop.
Proposed Walkway (636.5)
Note: Walkway length of 636.5' is from normal
Two Boadifts �� Setback requirement
boatllR #1 (IV x 20) �1
high water to aq[olning fixed plerhead.
boaHlR 02 (13.5'x20) (Prop. Dock is 1 .5' from setback)
Proposed Walkway will be
4' above NHW
/4 Width (I 3 I .25)
of Waterbody (525')
(Prop. Dock is 3.8' from line)
.........................
Bottom of Walkway (8.8')
Gangway
7
/3'x16'
NORMAL HIGH WATER (4.8) 1
1 Floater 6'x16'
J/
NORMAL LOW WATER (0.0)
..
•
.•
4
- - --- - - 2.38' 1.53'
0.0' -1.8'
(@400' from NHW)* (Edge of (NLW) (End of (80' Channel
Marsh) Walkway) Setback)
DRAWINGS ARE FOR PERMITTING ONLY AND
SHOULD NOT BE USED FOR CONSTRUCTION
709 SHORELINE DRIVE DOCK
PROPOSED ACTIVITY:
DOCKING FACILITY
BRUNSWICK COUNTY
DATE: 1 1 /24/17
N
APPLICANT: JAMES PRATT & NOT TO SCALE
BEVERLY MILLER
FIGURE
8