HomeMy WebLinkAbout20171650 Ver 1_B-5687_Permit_Drawings_20171017_20171221Highw�y North Carolina Department of Transportation ��'
Stormwaier i,�+ `I
,,.,,,.�,,,� Highway Stormwater Program s.J�_�
STORMWATER MANAGEMENT PLAN ---
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 45641.1.1 TIP No.: B-5687 County(ies): Warren Page 1 of 1
General Project Information
WBS Element: 45641.1.1 TIP Number: B-5687 Pro'ect Type: Brid e Re lacement Date: 8/22/2017
NCDOT Contact: Matthew Lauffer, PE Contractor / Designer: Trenton Cormier, PE
Address: NCDOT Hydraulics Unit Address: ICA Engineering, Inc.
1590 Mail Services Unit 5121 Kingdom Way, Suite 100
Ralei h, NC 27560 Ralei h, NC 27607
Phone: 919 707-6703 Phone: 919 900-1608
Email: mslauffer ncdot. ov Email: trenton.cormier hdrinc.com
Cit /Town: Warrenton Count ies : Warren
River Basin s: Ca e Fear CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Description
Project Length (lin. miles or feet): 0.15 Surrounding Land Use: Low Residential, Wooded
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. ac. ac.
Typical Cross Section Description: Lickskillet Road (SR 1620): 2 paved lanes (total 20' wide), 4' shoulder on each side (7' Lickskillet Road (SR 1620): 2 paved lanes (total 20' wide), 4' shoulder on each side.
with guardrail).
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 760 Year: 2025 Existin : 380 Year: 2011
General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed to replace Warren County Bridge #43 on Lickskillet Road (SR 1620) over Shocco Creek. The existing
(Description of Minimization of Water structure is an eight span bridge (4@15'-0"; 2@15'-1.5"; 2@15'-4.5") and is a timber deck on I-Beams supported by timber caps on timber piles. The proposed structure is a
Quality Impacts) three span (1 @35' (21 "PCCS), 1@75' (24"PCCS), 1@25' (21 "PCCS)), with 4' deep caps. This structure has been designed to have as little environmental, wetland, and surface
water impacts as possible. 2:1 roadway fill slope will be used in the wetland areas to minimize wetland impacts. The permanent drainage easement (PDE) will be set to have as
little wetland impacts as possible.
To avoid direct discharge of bridge storm water into the receiving water, deck drains are not required for the proposed bridge. Storm water impacts to the stream have been
minimized by utilizing grated inlets and pipes to collect bridge storm water and use rip rap outlet protection at 13+65 LT to dissipate energy to provide a diffuse flow (non-erosive
sheet flow) in a wooded area. This diffuse flow will run for a distance of 12'+/- before entering the buffer. On the same southwest quadrant, an existing roadside ditch outlets at
11+50 LT with a non-erosive outlet velocity and sheet flows 160' before entering the buffer. At the southeast quadrant an existing roadside ditch has outlet at 12+30 RT and will
be turned out by the proposed fill slope. At the northeast quadrant there is an existing ditch that outlets at 18+82 RT. This ditch flows for 70'+/- before entering the wetland as
non-erosive sheet flow. At the northwest quadrant there is an existing ditch that outlets at 17+10 LT. This ditch will be retained and the proposed fill slope will be lined with toe
protection. The ditch outlets and will become a non-erosive sheet flow 150'+/- before entering the buffer. Due to the nature of low impact bridge replacement, the increases in
stormwater discharges (post vs pre condition) are insignificant and the existing ditches do not need to be modified. Therefore, additional stormwater measures are not required.
Waterbod Information
Surface Water Body (1 : Shocco Creek NCDWR Stream Index No.: 28-79-22
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Nutrient Sensitive Waters NSW
Other Stream Classification: None
Impairments: None
A uatic T&E S ecies? No Comments:
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Project Includes Bridge Spannin Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No
Deck Drains Dischar e Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
•�
�
V
�
�
O
V
� I'� I I. (�) I \(�) I'� I I-I �'� 1'� C�) I. I\'�
II� I� I� I C�) \(�) I I-I I� j I-I `� .'� 1�
WARRE1�l CD U1�lT�'
1
erean arera eaws6r as�(p rm �� �e
�V e�ie JW`y���A �L
F�
MTAT&PRW961' N4 F.A.PRO].N6 A�N
45641.1.1
PERMIT DRAWING
SHEET 1 OF 8
LOCATI011t: BRIDGE NO. 43 OVER SHOCCO CREEK 01V SR I620 (LICKSKILLET ROAD)
TYPE OF WORK GRADI11tG, PAVING, DRAI11tAGE A11rD STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
,�o,,
3 ��P
O $
�P
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY III.
GRAPHIC SCALES
50 25 0 50 100
`11` 11 �f�
PLANS
so zs o so ioo
PROFILE (HORIZONTAL)
10 5 0 10 20
PROFILE (VERTICAL)
DESIGN DATA
ADT (2011) — 380
ADT (2025) = 760
V = 55 MPH
CLASS = LOCAL
SUB REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT — 0.126 MILES
LENGTH STRUCTURE TIP PROJECT = 0.026 MILES
TOTAL LENGTH TIP PROJECT = 0.152 MILES
P�epare0 /n the Office of Hatch Mott dlacDonalO for
.
DIVISIOIV S
NORTH CAROL7NA DEPARTMENT OF TR9NSPORTATION
20l8 STANDARD SPEC7FIC,-ITIONS
RIGHT OF WAY DATE: TIM JORDAN, PE
J U N E 12 � 2 0� 7 PROJECT ENGINEER
TRENT CORMIER, PE
LETTING DATE: a,nx.�uucs e.vcwaEa
MAY 23, 2018 R
NCDOT CONTACT: LISA GILCHRIST, EI
ROADWAY DE37G1V ENGINEER
HI'DRAULICS ENGINEER
GLI
PLANS PREPARED BY.•
M PO Boz 700
Fuquay-Vorina, NC 27526
�919J552-2253
N�OTT �919) 552-2254 (Faz)
MACDONALD www.mo+emaccoiNameriws
LICENSE NO. F-0669
�'�� I ICA
ICA Engineering,lnc.
5121 Kingdom Way,
s��,e ,00
Raleigh, NC 27607
NC License No: F-0256
� I
DETAIL A
TOE PROTECTION
� Ho� io S�alo) `F�e�te<
NAiUpq� ,�� �\S�oPe
GROUNp F`
d
Geoterc�ile
d= i Ft.
Type ofl+ner= Closs B Rip-Rap
-L- STA.11+70 TO 12-20 RT
-L- STA. 17+10 TO 18+50 �T
B�
♦ E%ISTING
DETAIL B
BANK STABILIZATION
( Noi �o scale�
_ � �
%"r- Nws �
EXCAVATION � 4
GEOTEXTIIE �
CL II RIP RAP FILI ^�
Type of Liner= CL455 II RIP RAP
-L- STA. 14+70
TO SM�CD SPR/NGS � �
_ �
E%ISTING �itCH
-L- STA. 15+35
O
E B HARRIS &
ANNE T HARRIS
—�— rvi �ia. u
E%ISTING DITCH OUTLETS HEA
AND BECOMES DIFFUSE FLOW
V10=1.9 fps �NON-EROSNEJ �
�PUE PUE PUE�y
j - \
_ _ x�x —
_ ��` ��
�_�— — —
ICKSK/[lt7 /d7 - cw M,,,. __
EXISTING �ITCH WILL OUTLET HERE
AND BECOME DIFFUSE FLOW
V10= 1.4 Fps (NON-EROSIVE)
TOE PROTECTION
SfE D"eTWL A �
F.ST. 25 TONS RIP RAP
ESI.6� SY GEOiE%iILE
O -L- PC
E B HARRIS & h_,;,,
ANNE T HARRIS ,� �w�
Q��= �.4 cfs ' I I
V10= 0.776 fps � �
(NON-EROSIVE)
CLA55 9 RIP RAP
[5T. I TON
EST. 5 SV GEOTEXTILE
eM-z
� 15" CSP
W2 ELBOWS . �,yt,�. ' �
�
�
SEE ENLARGED
AREA ON
� NEXT SHEET
J
Y
� —
�'00�5
EROSION CONTROL COMMITMENTS:
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE ARE45, THE CONTRACTOR MAY
PERFORM CLEARING OPERATIONS BUT NOT GRUBBING OPERATION UNTIL IMMEDIATELY
PRIOR TO BEGINNING GRADING OPERATIONS.
- ONCE GRADING OPERATIONS BEGIN IN IDENTIFIED ENVIRONMENTALLY SENSITIVE AREAS,
WORK SHALL PROGRE55 IN A CONTINUOIS MANNER UNTIL COMPLETE.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, EROSION CONTROL DEVICES
SHALL BE INSTALLEDIMMEDIATELY FOLLOWING THE CLEARING OPERP.TION.
- IN AREAS IDENTIPIED AS ENVIRONMENTAILY SENSITIVE AREAS, "SEEDING MULCHING" SHALI
BE PERFORMED ON THE AREAS DISTURBED BY CONSTRUCTION IMMEDIATELY FOLLOWING
FINAL GRAOE ESTA6LISHMENT.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, SEEDWG MULCHMG SHALL
BE DONE IN STAGES ON CUT AND FILL SLOPES THAT ARE GREATER THAN 20 FEEf IN
HEIGHT MEASURE ALONG THE SLOPE OR GREATER THAN TWO ACRES IN AREA,
WHICHEVER IS LE55.
- SPEQAL SEDIMENT CONTROL FENCE WILL BE INSTALLED ALONG THE TOP OF THE STREAAA
BANK. STANDARD SILT FENCE WILL 8E INSTALLED ALONG THE TOE OF SLOPE PARALLEL
TO THE STREAM. ONCE THE DISTURBED AREAS OF THE PROIECT DRAINING TO THE
SPECIAL SEDIMENT CONTROL FENGE HAVE BEEN STABILIZED, THE SPECIAL SEDIMENT CONTROL
FENCE AND ALL BUILT UP SEDIMENT ADIACENT TO THE FENCE WILL BE REMOVED TO
NATURAL GROUND AND STABILIZED WITH A NATIVE GRASS MIX.
- ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THROUGHOUT THE PROJECT LIMITS,
WILL BE CLEANED OUT WITH V2 FULL WITH SEDIMENT, TO ENSURE PROPER FUNCTION OF
THE MEASURES.
- COIR FIBER MATTING WILL BE INSTALLED ON THE FOOTPRINT OF UNCLASSIFIED STRUCTURE
EXCAVATION NEAR THE STREAMBANKS.
- EMBANKMENT CONSTRUCTION AND GRADING SHALL BE MANAGED IN SUCH A MANNER TO
PREVENT SURFACE RUNOFSDRAINAGE FROM DISCHARGING UNTREATED INTO THE RIPARIAN
BUFFER. INSTEAD ALL INTERIM SURFACES WILL BE GRADED TO DRAIN TO TEMPORARY EROSION
CONTROI DEVICES. TEMPORARY BERMS, DITCHES, ECT. WILL INCORPORATE�, AS NECESSARY, TO
TREAT TEMPORARY RUNOFF BEFORE DISCHARGING IN TO THE RIPARIAN BUFFER �AS SPECIFIED
IN THE NCDOT BMP MP.NUAL�.
2
P G SEAMAN JR & OTHERS
.� .
�� 1
� .•.�� �
�• -
��'.,�.�_ �z.
'4/dC�i��_. • �—
�����`A -� . . —
..;�,.u��>,,�r�.;� .
't'fi;;�f��• . . !!'!.'�
/ �� � � i .. . - .Rv�- x
if �if
� iF - lE 1F
1 � � / � �
�
�100�5 � � � '
� �
� � WOOOS �
___ _- / m'
' '�-_-_-_ _-_ �
L- PT S7o.14+05.39
l3+OOA0
CLA55 II RIP RAP
(STRUCTURE PAY ITEM)
USE iMPERVI0U5 DIKE
NCDOTSTANDARD BMP
ALONG STREAM BP.NK TO
DEWATER AND ISOLATE
AD)ACENT WORK AREA
TO INSTALL PROPOSED
INT. BENT IN THE DRY.
INSTALL BANK STABLIZATION
SEE DETAIL B
EST.355 TONS RIP RAP
[5T.775 SY GEOTEXTILE
USE IMPERVIOUS DIKE
NCDOT STANDARD 9MP
ALONG STREAM BANK TO
DEWATER AND ISOLATE
ADIACENT WORK AREA
TO WSTALL PROPOSED
INT. BENT IN THE DRY.
INS'fALL BANK STABLIZATION
SEE DETAIL B
EST. 75 TONS RIP RAP
EST. 140 SY GEOTEXTILE
]�]LA�T �IlE6�
�I�IC]E ll
ENVIRONMENTAL COMMITMENTS:
- BEST MANAGEMENT PRACTICES FOR BRIDGE DEMOLITION AND REMOVAL WILL BE IMPLEMENTED DURING THE REMOVAL
OF THE EXISTING BRIDGE.
- THE BRIDGE WILL BE REMOVED FROM THE TOP DOWN, FIRST REMOVING THE ASPHAIT WITH CONTAINMENT MEASURES
IN PLACE TO PREVENT ASPHALT FROM DROPPING INTO THE STREAM. THE METHOD OF CONTAINMENT WILL BE
PROPOSED BY THE CONTRACTOR AND APPROVEO BY THE ENGINEER. THIS WILI BE FOLLOWED BY REMOVAL OF THE
DECKING, GIRDERS, ETC., AND FINALLY THE WOODEN PILES. AN ATTEMPT WILL BE MADE TO REMOVE THE PILES;
HOWEVER, IF THIS CANNOT BE ACCOMPLISHED WITH MINIMAL SUBSTRATE DISTURBANCE, THE PILES WILL BE PINCHED
OFF ONE FOOT BELOW THE MUD LINE AS DIRECTED BY THE ENGINEER. THE CONTRACTOR WILL NOT BE ALLOWED
TO DRAG REMOVED TIMBER PILES ON OR ACRO55 THE STREAMOED.
- IF STILL PRESENT AT THE TIME OF CONSTRUCTION, A FALLEN TREE CROSSING THE STREAM BELOW THE EXISTING
BRIDGE WILL BE REMOVED TO PREVENT POTENTIAL BANK EROSION CAUSED BY THE TREE. THE ENGINEER WILL
EVALUATE IF THE ROOT BALL CAN REMAIN IN PLACE. THE REMOVAL OF THE TREE IS CONSIDERED INCIDENTAL TO
CLEARING AND GRUBBING.
EXISTING TIMBER ABUTMENTS WILL BE COMPLETELY REMOVED.
viv-i.r rps �i�vi�-crtvaiv��
TOE PROTECTION
SEE DETAIL A
WOODS �EST. h5 TONS FIP RFP
ESf. I50 SY GEOTEXTILE
u
%ISTING �ITCH
—PUE PUF
PUE PUE
PUF�G�
.. .. . .. .. .. .. �y
v -' ST��-'�xjr
�
-'_-_
_---- ��
T b TO PMK TOWN ROAD
- SR /fi20 �
� — - x��`— 458�' oN �TREES = Ti
if iE iF iF iE
� � � `Y \\
� N�e — \ —
� � � � �yte\ WOODS
� �
� \
. � � � � � � } � �
. L — ___y��e__ ___________y��e_---�
�
\
�� i
i m
` �
N`
O
CLEMON KEARNEY
�EXISTING DITCH OUTLETS HERE �pxisTiNG oiicn
AND BECOMES DIFFUSE FLOW
V10= 7.6 fps (NON-EROSNE�
LEGEND
� DENOTES FILL IN
WETLAND
�DENOTES PERMANENT
IMPACTS IN SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
,K, ,x, DENOTES MECHANIZED
CLEARING
l0o O
50 100
SCALEe I"= 100' HORIZe
DETAIL A
TOE PROTECTION
� Ho� io S�alo) `F�e�te<
NAiUpq� ,�� �\S�oPe
GROUNp F`
d
Geoterc�ile
d= i Ft.
Type ofl+ner= Closs B Rip-Rap
-L- STA.11+70 TO 12-20 RT
-L- STA. 17+10 TO 18+50 �T
DETAIL B
BANK STABILIZATION
( Noi �o scale�
_ � �
%"r- Nws �
EXCAVATION � 4
GEOTEXTIIE �
CL II RIP RAP FILI ^�
Type of Liner= CL455 II RIP RAP
-L- STA. 14+70
-L- STA. 15+35
O
_�_. �������� � i..'� / /.�/� /..i���.��I��� i������i j�-_'__ ..._. ANNETHARRS , ��'0%i/ -'\i � I�� �'� �"._ ..-----_-_-- � \ \ I I � i: __ INTHENCDOTBMPMP.NUALI� . i I I � , i . � i i j /, ; I, I'; . i '� j ; � .
� ��� / i i/�� _ I I � � m � � . _ "�; �22, i i i � J i i � e I I i i�' _ - � .. � I � I I I � I l � � i., ; i�
,� ! 1 � I I ( � I I � �` � =11 1jI�1 { i�/ . - �;�� ��.�i i/\ii/ ' ' _�//A� ) ! / / / ! � _ -_- .. . � . . j i � � ` i� �� �, � I I I I I � I � I I � ' I ' I .
� ���� j I 1 � II � � �rlll��(�.-==��1N�,,,:;,�� � ..;' �-� - -� �7B_ �ll(�_` l/�(i ";,,-� . = - - - . . �.. r .. ` . � I I I I I �I � �� �II �ii�l
' �' ' i i � m � � �� 1 n���i, =�,- _� ,'/ / ..- , , :,`� y-�- �� i^.5iz -� ���� , li ,, 2' � I�� li � I i I I� N� � � i � � i ii I i i� i iti
_ I i i � ��� -- _ I � I
'� �°' � ,� �� � � i �� 1 I�' ��. � I I , .' ;� �� /� � ata= o.a ds .� �� � �� � � ��'-�.� ; � � - f!'L �� �I�I I I I I� I I I I � m I I I � I I I i i
" � � 1 ��,�, r � �� 2 . � � � = /I I I � I � I I I I I �
��'� �' ��,' i��� ���, ��� '�V�i�i�:�' � B�GI P� E_ 8=5687� ' �� �, �� � i E'�D��PROJ£CT��B�568� �� ,� i i ��� �� �i i I I��i � i� i � I I a� i i i I � i i i�
i V10= 0.776 fps �.` 0�
� � � � ' � � I� � ti i �HON-Eaosive� ' � P G SEAMAN JR & OTH�RS ' � � � � c]� ` �
; / / � / / / / ` � ' � ._ � /- - � / -- V � � � ��� . - � AND BECOMES DIFFUSE F{OW L-' P�., �O. I.9'�' .�� . / / 1 1 I � � 1 \ \ \ I I I I I � � I I I � I I � I ( ' �
i -L- POT SYa N+50.00 ti �
/ . � � 1 � I�+ �' .� CL4S5 B RIP RAP ..
� �/ � / '/ / BM'I' � �Ilr�� � . . � �- -� EST'1 TON . ���� EXISTING DITCH OUTLETS HERE . � � � 1 � I 1 \ \ � 1 1 � l � I � � � � I I � I\\
. ' � ' . / I, . . : .. EST. 5 S GEOTEXTILE � � � , , � �� ' ,� . . . i � 1 � 1 � \ 1 \ ` \ \ \ � � \ � � 1 � ��.., \
�� r, I9' A D BECOMES DIFFUSE FLOW � / 1
/ . � i ��III i' ' E�iISTING DITCH OUTLETS HERE r I �OODS V10-1.9 fps (NON EROSIVE) . / � 1 � \ � � � � � � � � \ � � � , � � �NS
/ ' � ' . . 41N , V1�1=1.9 fps �NON-EROSIVEJ WOOU , ��� � BM'Z , � ._. ,.' . . . � /� l� / ) � _ _J \ 1 N\ \ , S ... .\ \ � \ �� � �
ik^ M ° ; � � ,� � � \ \�J�. \\� \ \� � �'
,�� � � � I.. � �p �� � - TOE PROTEC7FC�1N 1I \ . \ `
i � E%SYING dIiCHI.',. ' I' . � \ � � - '� . : .. ��{' . _ � \ EXCAVATION � . . � / J � I � W \ \�� � ' .�? ry��� '..
I L- ;POT 5�0. l0-f� ` � Y is csa ` ', � � unnirs �' � � � � \ � � e � � �C- \�`
� ;,',. ' �,� i " -- � - N �� W2 ELBOWS �': . - . �... � �'. '. �gZ CLASSIIRIP RP.P / � WOODS . k5T.65TXON5 RIP RAP // 4 j � � ��SYlI. �O'�'/:i.lN .. �
� � � . � , . � � I � I : ru! ''. .rue e� `` " � .. �' �Y. - �. . _ ' " ',' ` \ �• '?�.:' � I3TRUCTURE PAY ITEMI' ' -' � EST_ 1 � 57 GEOfE%TILE ; ./ - � - i i �1` / / I \ `., \ , � \ .
' � 1 1 s . . , _. � . : � `� � ..
� � !� I I I � �� , � ' '�' � � - . - - - ` ...' .
I I , l ,\ \ � �'\ � � uE '� \ E� � \uBEGIN � BG E '. gr `.. . � �' � P �.g �t PU PIIE �PUE � PUE PUE I ..ESISTING �ITCH \` I '1 \ / / / I � •� •'
� � I � I I '� �' � - � _ V . � � � . F 61 LT ` �,. � . , rue-� >ue � - - ; �£� J , � ' . � �
�
I " -'- . . �� _
� � � I � I � ' , exis n -�i. � � . . ; '. � �. . . , . - . rue 1 � . � I . . ��� ' �
. . . ` - ' � .. � 2
� � I I 1 � ' >_. . 4 �.—� -, . . . - �� .
I I � � ,- - - _ � - -�. _ T ' � c. . .
" � i I I -�;_, . TO SHCCCV SP�L17 J , o .. ---�-�� ._ - . . ���- ` . .. � . _ -
. , - -. - _� � ��I X _ .�_ �X X-.". '�S
I � � � +- uc,r$X/utT /a� 1 ^� _ �\
e -_
, � � ,, sa � � ' - -
_ �
' � � �' - > � � -- - ---- �T � �,�r,
78 2GI T6 2G�
' /1 � 11 ', 9a S Ei.. I,_.� � _ N —_ _ . ....
� � � �� ��
\
o� / � � �� A � V 'i . . , � � �niE� -�F- -�-� x----=� ••:
� � � �a it • �'
i
� .
, � � � �
- � / � / / FJtISi1NG ohcn, � � ; . " .. . " " � ;�
' �
� �i.
_ ' � / / / i � �� - . , i � ` � -'� i * � - � .��
�
, / � � � � � EXISTING �� DITCH WILL OUTIET HERE � �'� � I � � � 'x' - '�' �'
/ / � � AND BECOME DIFFUSE FLOW � � ' r � ' y �
SEE ENLARGED
AREA ON
� NEXT SHEET
EROSION CONTROL COMMITMENTS:
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE ARE45, THE CONTRACTOR MAY
PERFORM CLEARING OPERATIONS BUT NOT GRUBBING OPERATION UNTIL IMMEDIATELY
PRIOR TO BEGINNING GRADING OPERATIONS.
- ONCE GRADING OPERATIONS BEGIN IN IDENTIFIED ENVIRONMENTALLY SENSITIVE AREAS,
WORK SHALL PROGRE55 IN A CONTINUOIS MANNER UNTIL COMPLETE.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, EROSION CONTROL DEVICES
SHALL BE INSTALLEDIMMEDIATELY FOLLOWING THE CLEARING OPERP.TION.
- IN AREAS IDENTIPIED AS ENVIRONMENTAILY SENSITIVE AREAS, "SEEDING MULCHING" SHALI
BE PERFORMED ON THE AREAS DISTURBED BY CONSTRUCTION IMMEDIATELY FOLLOWING
FINAL GRAOE ESTA6LISHMENT.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, SEEDWG MULCHMG SHALL
BE DONE IN STAGES ON CUT AND FILL SLOPES THAT ARE GREATER THAN 20 FEEf IN
HEIGHT MEASURE ALONG THE SLOPE OR GREATER THAN TWO ACRES IN AREA,
WHICHEVER IS LE55.
- SPEQAL SEDIMENT CONTROL FENCE WILL BE INSTALLED ALONG THE TOP OF THE STREAAA
BANK. STANDARD SILT FENCE WILL 8E INSTALLED ALONG THE TOE OF SLOPE PARALLEL
TO THE STREAM. ONCE THE DISTURBED AREAS OF THE PROIECT DRAINING TO THE
SPECIAL SEDIMENT CONTROL FENGE HAVE BEEN STABILIZED, THE SPECIAL SEDIMENT CONTROL
FENCE AND ALL BUILT UP SEDIMENT ADIACENT TO THE FENCE WILL BE REMOVED TO
NATURAL GROUND AND STABILIZED WITH A NATIVE GRASS MIX.
- ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THROUGHOUT THE PROJECT LIMITS,
WILL BE CLEANED OUT WITH V2 FULL WITH SEDIMENT, TO ENSURE PROPER FUNCTION OF
THE MEASURES.
- COIR FIBER MATTING WILL BE INSTALLED ON THE FOOTPRINT OF UNCLASSIFIED STRUCTURE
EXCAVATION NEAR THE STREAMBANKS.
- EMBANKMENT CONSTRUCTION AND GRADING SHALL BE MANAGED IN SUCH A MANNER TO
PREVENT SURFACE RUNOFSDRAINAGE FROM DISCHARGING UNTREATED INTO THE RIPARIAN
BUFFER. INSTEAD ALL INTERIM SURFACES WILL BE GRADED TO DRAIN TO TEMPORARY EROSION
CONTROI DEVICES. TEMPORARY BERMS, DITCHES, ECT. WILL INCORPORATE�, AS NECESSARY, TO
TREAT TEMPORARY RUNOFF BEFORE DISCHARGING IN TO THE RIPARIAN BUFFER �AS SPECIFIED
. , rue � We � � rue � � I � �0�
" � .-'� � � I 1 � � ♦ A
v . . . _ " . - . . I J sn i ' i� � � r � l � \
.� �
�— ` �. � -
�;� -- ,--- --- -- *-- _ �- = �---� �� \�
� �
�
- - - � � � `�
' - - . 978 d57 � � b �-� TO PARK T044'N' 90A0 -. � � � \ \
_ LlCKSKIf1Er RO - SR /620 . � � �
. . �"��L�['!?'LCl.;n n`il�{tL.n' - __" __ ..... ... ... .. .. .. . _' - -- - —_- \\
_ _ _ � - . .. _. ��.. ' 2 �
. �
� ` 3� �� � �
� - \
� X � _ " s�- ., , � � � �
— ��
- ��� iF iE .iF� iF iE . A r ' � � � � � � � V � \
�.. �' 45�8- O�N TREE�S / 1
� } �. � �'\ \ . ' `s � _ - _. \��� � \�\ \\ \\ �\ \\ �
' �i6� -. - ��' \ � • � .. _ _.. � _ _' � \ � 1 � � \ \
� �\ \ 1 1 � \
\ � � `� � , \ ��� �,�8� �oos � � � - - - - � \ \ � I I �
� � `. � � �� �� �., �_, ��_ '-� � I � � � I �
\ � . � � \ � � � � '� EXI5TING DITCH OUILETS HERE. � I J � I % � I
� � � �' � � . � \ EXISTIWG oircn �
, L� _ _ _ _��q_ - - - .� - - � -��L -,- 1 �� �� AND, BECOMES DIFFUSF.FLOW �' � � ) J / � / � I � ,
' m ' � I V10=. 1.6 fps��(NON-ERO5NE� . , I � � � / / � /
)
� � � � . _ I � I / / / / / / / � ,
_ / � -. `, ) � � y�'l� � / /
, Z• _. -- / I � " ���� ' // � � � // // // /
�' � � � /
Z i� ��� �,� �- ���� � i i �� i�� r� i i i ��'
/� _- _ Q� _,� � _ -i ����SZZJ /�� i � � �� i i � �'L� �� �� i
i 3 __ � __, ����' -' � /�' �� �� i �� �� i f' i � /; i
�.�,. ��� � "� � ; - ' i / /_�� /� /� ///� /� �/ �/ // / I �/ /
+ � � � � i � CLEMON KEARNEY i � � � � � - = i / � � � � � � i � / / / i I � I
/
� m � _' _ t c/ �/ � / r�/ � / , � i � / i / / � � \ \ \ \ i
� _ .. y � ` � � .. ( / � � . � - / / / l I � \ \ \ � \
.. ,-.. - rz\ �\ �\ \ � �... ��\ \ � �\ \ / / � � � � \ \ \ i
'W'- i �i / \ \ \ \ � ` � � � \ � / �\ � � � \ � \ \ � �
� \�� �� �� �� 2�� \\ \\ \\ � \\ � I I � // /� � I� �� �� \� \� �
, ' � \ � \ \ \ \ \ � 1� � I I � l \ � \ \ 1 �
I/ / \\ �\ \ � \ \ \ \ \ \ N � � � � \ \ � �� �� � I � 1
) // \\ \ \ � 1 ) \ 1 � \ � � � � � \ � � � � � 1 � 1
l i �� \ \ \ � 1 � I 1 � I � I \ � \ \ � ; 1 1 �
�`\/_ :c� \ � � � � � I � I I � / � � � � \ .. � . ,
� , � � � . i r � i � i i � � `� � �` � LEGEND �
� DENOTES FILL IN
WETLAND
�DENOTES PERMANENT
IMPACTS IN SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
,K, ,x, DENOTES MECHANIZED
CLEARING
n i � i �� � � �' / 1 vio= i.a tps �NON�eosive� � � �� , , � . � m �� � � = 2
� � l l l I i� �� / ����" soepRoiee�ar�N� �� �' i�o�si � i ���1 � li � *� � � �� `' I � e
_ � T , '�, � . � w000s / m �' � ���
`3 / I � I � / f`�'1 � EST. 60 SY�N aEO EXTICE- � I , � �
'r � / / � 1 � / `i t / G/;-, . ,..,,_.. , \ �I '- . '�-w�.e----�- � �
/ - _ - _
1 , E57 1' LO RIP RA'P � J I \' __
� � � i i i i i � -O � i i i L- _ PT S�a.14t0�.39 �\,
_ , % j ' I I I ./ ' LC= PC 57a.13�i00A0 i � i , �,.
� 1 \ \ E B HARRIS�& , �. i i -' i� � � � unss li`Riv anP
� I � l \ \ � ANNE T HARRfS� � . � 1,� / / / � � (STRUCTWRE PAY ITEM) ';� '.
_ '/� / I \ \ ` / ' ' / � '
_ , - ' ✓ � i A A � . , ' �' � i i i� � i � . � � use iMaeewous �qiKe . . j�.
� � � � !' � � � � � / � i � � � I , � NCDOT STAMDARD BMP -
-- I \ 1 ' % ' I. � � / � I I 1� I ALONG STREAM �BP.NK TO �1
-' � -' / � I • � �� � I �/ / / � - � � I ( � , DEWATER AND I�OLATE
_ . . _ _ _ _ i I \ '�. \ ., � � � � � l � _ c / / i I / \ I � 1 � �,DJAfENT WORK AREA *�
- _ _ .- - - - i � \ � � \ � � \ � � � � � � � � \ � \ _\ \ � � I � TO INSTALL PROPOSED -..
- ' � � \ }, � � � \ � _ � - ` � � INT BENT IN TFj£ DRY �
_ . . __ - - - - - - - - � - - j � � \ \ v� � � � � � � � � � ` � � � \ S/N � - -INSTAkL� $ANK STRBI:�TION _ � 1 ��
�/ _____ -'_ZJ�J-�� I \ \� \� N \ \� \ \ \� \\ `� \ � � _, �\ \ \\ \ \� � EST.DETATONS'(IP RAP � �-:',..�
- � - — - - - - -- _ _ _ _ _ I I � \ � \ � \ \ S� � \ � � \ � � � � �� � \ � \ �\ �ST. 175 �SV GEOTE%TILE .`"
- ------ --- --- -� I \ \ � \ � \ � � � \ � N� �� � \ \ � ��..I I I
- - \ � \ � � � � � N \ � USE IMPERVIOUS 41KE � I �
- . - _ -_ _ _ _ - ` � � � ` ` ' - � - � I I I \ � \� � \ \\ \ � \ \ � � � \l � \ \ � �\ � y /I � NCDOT STAIVDARD 6MP I � I �
� � � �- - I \ \ � \ � I I � 1 \ � ALONG�� STREAM BANK TO I �f%� �
DEWATER AND ISOLATE �
\
- .__--___ __�3p ��,_'-,_ /I II I \ \ \\ \� \� \� 1 1 11 I II I I , � I - �TOJANSTALLJBOPOSED I ,�%,
- � � �� - . � .. \\� _`��� '''--� 1 1 1 � \ � � � 1 � I I I I � � I . ' INT.BENTIN THEDRY '�
_ , � - -- -� - _ � �� � � . I � \ . 1 � i � I � . I � I i - INS'fALL BANK STABLIZATION
� SEE DETAIL B
EST. 75 TONS RIP RAP
EST. 140 SY GEOTEXTILE
ENVIRONMENTAL COMMITMENTS:
- BEST MANAGEMENT PRACTICES FOR BRIDGE DEMOLITION AND REMOVAL WILL BE IMPLEMENTED DURING THE REMOVAL
OF THE EXISTING BRIDGE.
- THE BRIDGE WILL BE REMOVED FROM THE TOP DOWN, FIRST REMOVING THE ASPHAIT WITH CONTAINMENT MEASURES
IN PLACE TO PREVENT ASPHALT FROM DROPPING INTO THE STREAM. THE METHOD OF CONTAINMENT WILL BE
PROPOSED BY THE CONTRACTOR AND APPROVEO BY THE ENGINEER. THIS WILI BE FOLLOWED BY REMOVAL OF THE
DECKING, GIRDERS, ETC., AND FINALLY THE WOODEN PILES. AN ATTEMPT WILL BE MADE TO REMOVE THE PILES;
HOWEVER, IF THIS CANNOT BE ACCOMPLISHED WITH MINIMAL SUBSTRATE DISTURBANCE, THE PILES WILL BE PINCHED
OFF ONE FOOT BELOW THE MUD LINE AS DIRECTED BY THE ENGINEER. THE CONTRACTOR WILL NOT BE ALLOWED
TO DRAG REMOVED TIMBER PILES ON OR ACRO55 THE STREAMOED.
- IF STILL PRESENT AT THE TIME OF CONSTRUCTION, A FALLEN TREE CROSSING THE STREAM BELOW THE EXISTING
BRIDGE WILL BE REMOVED TO PREVENT POTENTIAL BANK EROSION CAUSED BY THE TREE. THE ENGINEER WILL
EVALUATE IF THE ROOT BALL CAN REMAIN IN PLACE. THE REMOVAL OF THE TREE IS CONSIDERED INCIDENTAL TO
CLEARING AND GRUBBING.
EXISTING TIMBER ABUTMENTS WILL BE COMPLETELY REMOVED.
]�]LA�T �IlE6�
�I�IC]E ll
l0o O
50 100
SCALEe I"= 100' HORIZe
���1
� � P
O a
�P
1l��Jl:s JL ��� ��JLsJLs JL ���
���� �
LEGEND
� DENOTES FILL IN
WETLAND
�DENOTES PERMANENT
IMPACTS IN SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
,K, ,�, DENOTES MECHANIZED
CLEARING
40 0
20 40
SCALEe I"= 40' HORIZe
m
t
���1
�� P
O a
�P
1l��Jl:s JL ��� ��JLsJLs JL ���
���� �
8-5687 - WARREN 43
>ADWAY DE51GN
ENGINEER
SHEEf NO.
ENGINEER
HATCH MOTf MAC�ONAID 18 E, LLCI ICA ENGINEERING
LICENSE NO. F-066g LICENSE NO. FO]58
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepare n t e
ox��e or:' M
M Po so. ��
MpT7 FuQuoy-Vonno, NC t)526
MAC�ONPID www.in �mo . m
1 ICA En9inevring, Inc.
F/� '�A R'vleigh��NC�2160)
PERMIT DRAWING
SHEET 5 OF 8 C��-Tic
LEGEND
� DENOTES FILL IN
WETLAND
�DENOTES PERMANENT
IMPACTS IN SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
,K, ,�, DENOTES MECHANIZED
CLEARING
40 0
20 40
SCALEe I"= 40' HORIZe
Z3
_ ry
��
a�
wm
zo
�Zv
oWo
�a 'O
V�
. . . . . . . . . . . . .. �. �. �. �. . . . . �. �. . . . �. . �. . . �. �. . . . . . �. . . . . . �. �. . . . �. �. �. . . . . PROIECT REFERENCE SHEET NO.
.... . ... .... . ..�.�. �.�. �.�.. .�.�.�. �. .�.�. ��.�.�. �.. �. .� .�.�.�. �. �.�.�. �5687 - WARREN 43 5
. . . . , ..,. . ..... ... ... .... .. ...... .. .... ...... ..... . ...... ...,. . . . . ROA�WAY DESIGN HYDRAULICS
. . . . � . . . . . � . . . . . . . . . . . . . . . . . . . . I . . I . i i . . . . i :. I I i � i � I I � . i . . � . . . . . �. . . . . i . . � . . . �. . i ENGINEER ENGINEER
i : . i i . . �. .:. . �.
.. i... ' i ... .._ ... .... �... i...�. i_..i. ..i. .i. I i. I i. .I i i.. i i. _-I ......�
I Ii' I I,II I I I I I �
_ _ _ . � ', , ', � �
; ' � ,' '' � � I � �� ;:: �� � �� � � � �,! �, r� j
�
�h� � t�h h� � '' �h �1� t�h h� � � �h
:.
� _�� ; :
_ � �� : �
�_ � _ _�� � ��
- - - __ _ _ -_ _ _ _ _ -_ _ _
�i i,- . i i. . i i. i i --. �i 7ii i I ii-�� ��� �i
i ---i-� � i - r . i. . �:.. i . . .. .. .. .. ri 17� �'. i i �-'_ri r'�--ri .. .
. _ . .. . . � �. . . . �.. .. . . - . . �. �. . . . . _ . . . �. .. . . . . . . . . . . . - . . . . . . . �- . .
. . . .... .. ... .�... . .... .. .... ...: : ��:.: ..�. �...� � � � � � � � � � �� � �,-..-.. . . . . ..�I.
� � � � � � � � - ; 1 - .! ; i. ; �� � . �i. . ; i. _. .. , ..... ..._.! . �.. : MOTT MACDONALU 18 E, LLC ICA ENGINEERING
.. . ..... . ... .... . .... . ... . ..
� . . . . . . , , . .
. . . . .. . . . . . . . : . . .. . . I .. .l . .. .l . . . . . 1-1 L_ .l . .. . . . . . . . . . I . � I� I �. . I� � I I � . I. .. LI . . .. I .. .. I I I . .. _. I I _ I I I. . ... _I I . - . LICENSE NO. F-0669 LICENSE NO. F-0]58
, , , �1 1 �_ 1 � I_I__ 1 1 � � , , , , , , �
- - — �: � � � � �: _
.e
;.._ .... ._.. ..._ .... .._. .... _,.. _ :.. -- _ M
- �� � � � � � � i � � i DOCUMENT NOT CONSIDERED FINAL
: � � : : � � UNLESS ALL SIGNATURES COMPLETED
, . . . . . . . , . . . , . , . . . Hice of.
I I I I
_
�.: :. . . �� :. . . . . . . . :. . :. . . :. �. .:. . . . .:. . . ,. ��.:. I ���. I � . PO Bo ]00
.. . ... .. . .
. . .. . . . ..... ..
Prepare in
.. . . . . �. . .. � �:. . . , �- O ' .
. . . . . .. _. . . . . . . .. . . . � . . .� . . . .
. . � . � . . . . . . . . . ..i II i i...— .. .. .— . . . . .�. . . :.� . .:.. .
M
I� '" ' ' '" '' I I I I I I " I I 1 I -I I � ���d
. .. . �. . _. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . � . _ ww.mo mo
Fu � NC 1 '
.. . �... ... ..... . .. .... ... ... .... .. . .... ... .... .. . . ..
.. . . :I Moii qorvorna
mACooNnID
.�. I I I. . .: �� ��.i . II ICa Engneer.g i.<.
. . . I . . ' ': ' 11 S121 K'n dam WaY.
. . . . . _ _ . . _. i . . . . . . . . . . . . . . . . . .. . . . . . _ . . . . . . . . . . �. . . . . . . . � . . ii . II �i I I ,� ,�. I I I �� �� i. li li �. �� .. . . . i i _ i . . i . i i . : . _ i i . . . .. i '. . �. . i . . ..: � i i �._i i i . i i . . . �. I )f s� 9e ioo
:. . . . . . �:. . . . .. . . . :. .. .: � . . . :. � . . 1 . � . . . :. � . . 1 . . . �:: ' �. . :. :. . ._ ' .. . . . :. I .. . .. I . . . . � �r ` I 1�� ricle9M1:�Ho r�o�e
. .... . . � li '� _ . .
. . . . . .. . . . .. . .. . . .. � . i I I . . - .. . . . . ���:. ���:. . ._ . ��:. . ., ' . . . . . . . �:. .. .. ��:. : .._. _ _. _ .: . :. . .. . � . . . . I
... . ' ..... '.. .... .._.. . �. ..... � .. ...� ... .. . .... . '..:. ..:.�. : I .
' ' : ' ; ; ' � � � - : : : : � : : ' i VERTICAL SCALE HORIZONTAL SCALE
. - . . . . �. �. . . ... . . . - . . � i
-' —L— '',, � ;. , � ; ,.;.:,
--- " - �� '� : ' : : . . i � . . . i _ . . -i ---i- r � i i� � i i r :. i i . . : :.. � . �.. . i i i i i _ j I � 4' � 9 �' �P" Z�" � P z�' :
� r� � r II � � r r i �- I � � � � � ITITfC�� ITITfC�
�, r- � � -:__ . _ �� I -. I PERMIT DRAWING
_ _ __
_
I
,
I I
SHEET 6 OF 8
GLI
,. � sTn. n+5o.o0 � r I i I 11-� �,i i�r� $
, _ . _,_ _ ', �
, . _ . . . _ BEGIN GRADE i . . .
_ _ � � � I I � - � - -- i i i i � i i_ � i _. �-:_. ' -I —_I
_
- _ EL = 226.33' �rtr - - rtrr- -rtT r- rtrtrr- -rt Tr- -rtrtr - rtrr- -rtrt r- rtrtrr- -rt Tr- -rtrtr - - — - - - -- --
_
_ _ � � END GRADE
-- _ . _ i _
_,
_ _ _ � � = z � Z � � � _ � Z � i — STA. 19+50.00 __ _
- _� _ _ - �_ � k = _ �=k� _�� k= �=k � =kk= ��=k = _ �=k� _�� �_ �=k � =kk= ��=k = _ =$ � — __ = e� = 22a.oa� _ _ _ � '- _
, �
-- -_-- -- _ ___ � �-� - � _ - - �� � � �='�-. � � �-'�_� � � -� a � --� __- __-- - � � � � �, �� ���� : � � � ��,
— — - --- - � - - �� _�� �_ �� � ��-� � � -� � � -_� ���_ _� ��_ _�� _ _ _ _ _ �—�� � ��-
- - � 1 �_ �_ � , �'_- -�� � � � __
' ' _; ,' ,ti ; : . _=-- .;_! ' �' ' '' ' '
24Q ' —
23Q -_
220 -_
2�Q _.—
2�0 ==
190 _
. : • e: • e� e:
:� . �° .�a°� . ... �° • • a; •�a'
. . � � . .... . , �. . . . . .
. C . �E , . .� � ��9.� �
....
:— ,' .. .. . . . .
:
; � _ . � . , ... :;:. . ... ; . . °: •• °:
. . . .
. �. .. . . .. . ..
..
.
.,•.• . .
'. �, ` _ �
. �:,
��= ,� � ,�,I
:��� m � �� ���GI.. -- �a� p • �• ��
■ � -- �
� —� �� � �� �i:T ��.
— a . .�I• �
C�������� � � �a� �a:
.� . .
:����==�� :. .: � :
E�������= E°E=:�'; ... °;°�E�'�� .. �:;
. .�� �..� ��... E _
:����������:8: "� �C • �.�C : '�C�E��:�'�E�:�.�C
:���8������.y • , . . ■........Q�p�.
,$o -- . _
�%Q �... :i i 1..L_ i � L�_j 1:i: i_ .�_i , 1:::.
._ . . -T�= ' ------. _.._ .-. .._-. ._�r
160
��������
1
mo
�� ���
� �� � o.. ..........
_ � � ..
—
_ �= _ - : • : • ��:
������ • • „� • � „ ���� . e �
�� — ................ ;.., . ....
I�ii�l Ili li
• • � � � ���� I �I� ���I�I
,� . ,. ; ,. „ � • I ! ��� ! II� 9��!�
� e . II I�I�II I II�II IIII�I�I
� a �I a�l�� II� ��I�
� ������ ■ ���� i�Ii i�I�� ■ �I� �I GI�i ■ G�Ii ■ ��I�� G���i �Gil
F�=�
F__
14Q _ : : ; � � - - -_ - ___ ._ _ - - - -- _ _
-•- ---_ ------ —
-. _�_:_, �._,�1_ l�� . �1: L�_ �_ L�� � ��_:_� 1._L� :_,�� l��_: �1 _L �_:_,� . L�� ,_
� , r- ,_, .
-- — -- - - -
.". ' i T "- i i i- i _`"i i �_ .i i "_ . — " "_ _ "'
. .— i i 7 -T. i ._ ._ i i_. ._. ._._ ._
_ - - 1 i� - - _ - - - - _._ -- -
_ . .__ i. �1.��_ - -- -.� ._.- - � �' � � L-i �-. I .-.-I .-�- --- �-�-- --� ��---- :__...,..-,�__._i .__1 L...__,1. L:..._._�,.__�_.;
130 �
-. - - -- : - - _ . _ _ �- : _ - - - -- _ __ .
_ , ' - - - . , , _ � -•-' � •' ' � � �, „ ,� � - _ - ; „ ;
_ _ _ �
r
-.
� !-
_ � , ,� ,, :
� � ,,�_ ', � , ,
120 : : �
10 11 12 13 14 15 16 17 18 19 20
� �� C�����
�= : , ,, , , � ���=���= . .
=� � �������
�- —== �=��
m� —��� �
. � � �������
•` ����� �
�� � ��
� � ��
� �� �� ��
��
C a�� ��� C� ���� �
C E� ����_� �s�C��� �
� ����� ������� � �
=���_��������������
��� ��������m���C��� • �
��������������
� • � ��� � ����'"�
:.
� � mo���
� �� 1
i � � � :� / ��. �. .
��� ������:. . . . ,. . ,
� �3e���� e : � - , � I . -
���������'
f 1I
�� C I �
I /' / FI
�� I ' I" • f ,1/ '
/ ' /" � /
.�
�� ���� �� i . , .
I� /
_ 130
230
220
tio
200
150 140 130 120 110 100 9'0 80 TO 60 50 40 30 2:0 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
PitELI�fI�TARY FLA�T�9
Lo rror vy�s. Roa lwt�B�rnalmox
. . . . . . I . . . �� .
- ,
_ 220
PERMIT DRAWING
- SHEET 7 OF 8
tio
-
— I� , I i ETLAND i, I 2�
I � �
W �
0.020 o.00a � W
�� - 221.58 -_ T s ` . 2.\ . ��
�� . .. _ . .. .. . .. .. . .. . ._< . _ . _ .. .. _ . . . _. �
-------•----------
------L� � � � �\
-- _ �. �_----
j I — -, �
— ---�—�----�—�---------•------
2/0 _ � _
-- —�— . 2J�
, , � , � i
200 16 + 50.00 _ 200
�o ��
— — — , — — -
a�o _ 220
WETLAND I
� tio _ Zo
o i
�, _
3
E 200 _ 200
_ - BEGIN BRIDGE 14+28.50
� �0 . � . . . � . � . . . �� .
b - — ?e �
3 W o.oaa o.oaa W I
_ _
__ _ _ ��
5 220_ � � zz, s, ;— -� .\ _
c i i -- — !� -/. / � �{ �. \� _ — =—
� — -- —
E---�--1 /-------------- � ------•---------------�—e—�------
�---
E .
�° ti0 �- _ % _ _ 14 + 00.00 _ _ _ _ zo
�--__��----
n. . . _ . �. . . . �. . I � . . . . � `. .
u
200 � . 200
�
0
0
C n=^
� l.ilJ . . . . ��
N I
° SITE 1
�
o �o � �o
V
� - — ,
° 2/Q 2/Q
_ � � � , , i , � r i — —
� —L —
r 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 14+39 to 15+54 BANK STABILIZATION 0.07 <0.01 142 20
1 -L- 13+32 to 17+24 FILL IN WETLANDS < 0.01 0.08
TOTALS*: < 0.01 0.08 0.07 < 0.01 142 20
�Rounded totals are sum of actual impacts
NOTES:
September 2014
�
�
TO SHOCCO SPR/NGS ,qp
� " I ' .'� ' I ' I : (�) I � \ (�) I'� ' I ' I-I � � .'� 1'� C�) I . I \ '�
II�I ��I�I(�)\ (�)I� I-I I� i I-I `��.�� l��
WARRE1�l CD U1�lT�'
,
� <. ��
� I:�-.��� :, 0-
PERMIT DRAWING
SHEET 1 OF 7
LOCATI011t: BRIDGE NO. 43 OVER SHOCCO CREEK 01V SR I620 (LICKSKILLET ROAD)
TYPE OF WORK GRADI11tG, PAVING, DRAI11tAGE A11rD STRUCTURE
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY III.
GRAPHIC SCALES
50 25 0 50 100
`11` 11 �f�
PLANS
so zs o so ioo
PROFILE (HORIZONTAL)
10 5 0 10 20
PROFILE (VERTICAL)
DESIGN DATA
ADT (2011) — 380
ADT (2025) = 760
V = 55 MPH
CLASS = LOCAL
SUB REGIONAL TIER
� .�1���3[�� � � �► � _ 7�iI�1
�� END BRIDGE
—L— Sta. 15+i
�
'�\ <. � ��,� �
-n.�nlLLtT RD ,--o'� � �� 1
.
.
i r//*Y � � � _
�---- ' c
* Y
m,
___,�„____ _"__ � °'. °. c
\\
BEGIN APPROACH SLAB
-L- Sta. l4+/6.36
S/�E l
�"\ \
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT — 0.126 MILES
LENGTH STRUCTURE TIP PROJECT = 0.026 MILES
TOTAL LENGTH TIP PROJECT = 0.152 MILES
\ c- _ �--* � - � * � � Y �
� * ��
.
. . : �
j �` m : . .
_ ___p.______________�____�
�
\�
�� `
P�epare0 /n the Office of Hatch Mott dlacDonalO for
.
DIVISIOIV S
NORTH CAROL7NA DEPARTMENT OF TR9NSPORTATION
20l8 STANDARD SPEC7FIC,-ITIONS
RIGHT OF WAY DATE: TIM JORDAN, PE
J U N E 12 � 2 0� 7 PROJECT ENGINEER
TRENT CORMIER, PE
LETTING DATE: a,nx.�uucs e.vcwaEa
MAY 23, 2018 R
NCDOT CONTACT: LISA GILCHRIST, EI
,�o,,
3 ��P
O $
�P
ROADWAY DE37G1V ENGINEER
HI'DRAULICS ENGINEER
GLI
PLANS PREPARED BY.•
M PO Boz 700
Fuquay-Vorina, NC 27526
�919J552-2253
N�OTT �919) 552-2254 (Faz)
MACDONALD www.mo+emaccoiNameriws
LICENSE NO. F-0669
�'�� I ICA
ICA Engineering,lnc.
5121 Kingdom Way,
s��,e ,00
Raleigh, NC 27607
NC License No: F-0256
a
�I
� I
� ,
DETAIL A
TOE PROTECTION
� Ho� io S�alo) F�e�te<
NAiUpq� ,�� �\S�oPe
GROUNp F`
d
Geoterc�ile
d= i Ft.
Type ofl+ner= Closs B Rip-Rap
-L- STA.11+70 TO 12-20 RT
-L- STA. 17+10 TO 18+50 �T
DETAIL B
BANK STABILIZATION
( N i �o scale�
�w= �1
EXCAVATION � 4
GEOTEXTIIE f
CL II RIP RAP FlLl r
Type of Liner= CL455 II RIP RAP
-L- STA. 14+70
aM-i
�
— POT S�a. l0-1O0.00 Ex�s,�N� o�r���
E(ISTI
— T1
TO SM�CD SPR/NGS � -
_ �
�
exisriNc oircn J
-L- STA. 15+35
E%ISTING DITCH OUTLETS HEA
AND BECOMES DIFFUSE FLOW
V10=1.9 fps �NON-EROSNEJ �
�PUE PUE—
� — _
_ _ X�
�CKSK/[(t7�
O
E B HARRIS &
ANNE T HARRIS
EXISTING �ITCH WILL OUTLET HERE
AND BECOME DIFFUSE FLOW
V10= 1.4 Fps (NON-EROSIVE)
TOE PROTECTION
SfE D"eTWL A �
F.ST. 25 TONS RIP RAP
ESI.6� SY GEOiE%iILE
O —L— PC
E B HARRIS & h_,;,,
ANNE T HARRIS ,� �w�
4�0= �.4 cfs I I
V10= 0.776 fps u
�NON-EROSIVE)
CLA55 B RIP RAP
[5T. I TON
EST. 5 SY GEOTE%TILE
eM-z
� 15" CSP
W2 ELBOWS . �,fc,�.
�
�
�
O g P ,����
I P
/ ",,Lr �--�-- � 1-: `.
i i �
�
� � �� * _
� �
�100�5 � � � � �
� _ � WOOOS �
, — � _ _ _�_ _ _ _ _ _ _
— _ �
i_ or c+�,. iw.�.nc zo
ENVIRONMENTAL COMMITMENTS:
- BEST MANAGEMENT PRACTICES FOR BRIDGE DEMOLITION AND REMOVAL WILL BE IMPLEMENTED DURING THE REMOVAL
OF THE EXISTING BRIDGE.
- THE BRIDGE WILL BE REMOVED FROM THE TOP DOWN, FIRST REMOVING THE ASPHAIT WITH CONTAINMENT MEASURES
IN PLACE TO PREVENT ASPHALT FROM DROPPING INTO THE STREAM. THE METHOD OF CONTAINMENT WILL BE
PROPOSED BY THE CONTRACTOR AND APPROVEO BY THE ENGINEER. THIS WILI BE FOLLOWED BY REMOVAL OF THE
DECKING, GIRDERS, ETC., AND FINALLY THE WOODEN PILES. AN ATTEMPT WILL BE MADE TO REMOVE THE PILES;
HOWEVER, IF THIS CANNOT BE ACCOMPLISHED WITH MINIMAL SUBSTRATE DISTURBANCE, THE PILES WILL BE PINCHED
OFF ONE FOOT BELOW THE MUD LINE AS DIRECTED BY THE ENGINEER. THE CONTRACTOR WILL NOT BE ALLOWED
TO DRAG REMOVED TIMBER PILES ON OR ACRO55 THE STREAMOED.
- IF STILL PRESENT AT THE TIME OF CONSTRUCTION, A FALLEN TREE CROSSING THE STREAM BELOW THE EXISTING
BRIDGE WILL BE REMOVED TO PREVENT POTENTIAL BANK EROSION CAUSED BY THE TREE. THE ENGINEER WILL
EVALUATE IF THE ROOT BALL CAN REMAIN IN PLACE. THE REMOVAL OF THE TREE IS CONSIDERED INCIDENTAL TO
CLEARING AND GRUBBING.
EXISTING TIMBER ABUTMENTS WILL BE COMPLETELY REMOVED.
SEE ENLARGED
AREA ON
� NEXT SHEET
CLA55 II RIP RAP J `
(STRUCTURE PAY ITEM) �
USE iMPERVI0U5 DIKE
NCDOTSTANDARD BMP
ALONG STREAM BP.NK TO
DEWATER AND ISOLATE
AD)ACENT WORK AREA
TO INSTALL PROPOSED
INT. BENT IN THE DRY.
INSTALL BANK STABLIZATION
SEE DETAIL B
EST.355 TONS RIP RAP
[5T.775 SY GEOTEXTILE
USE IMPERVIOUS DIKE
NCDOT STANDARD 9MP
ALONG STREAM BANK TO
DEWATER AND ISOLATE
ADIACENT WORK AREA
TO WSTALL PROPOSED
INT. BENT IN THE DRY.
INS'fALL BANK STABLIZATION
SEE DETAIL B
EST. 75 TONS RIP RAP
EST. 140 SY GEOTEXTILE
]�]LA�T �IIE�
�I�IC]E ll
�'00�5
EROSION CONTROL COMMITMENTS:
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE ARE45, THE CONTRACTOR MAY
PERFORM CLEARING OPERATIONS BUT NOT GRUBBING OPERATION UNTIL IMMEDIATELY
PRIOR TO BEGINNING GRADING OPERATIONS.
- ONCE GRADING OPERATIONS BEGIN IN IDENTIFIED ENVIRONMENTALLY SENSITIVE AREAS,
WORK SHALL PROGRE55 IN A CONTINUOIS MANNER UNTIL COMPLETE.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, EROSION CONTROL DEVICES
SHALL BE INSTALLEDIMMEDIATELY FOLLOWING THE CLEARING OPERP.TION.
- IN AREAS IDENTIPIED AS ENVIRONMENTAILY SENSITIVE AREAS, "SEEDING MULCHING" SHALI
BE PERFORMED ON THE AREAS DISTURBED BY CONSTRUCTION IMMEDIATELY FOLLOWING
FINAL GRAOE ESTA6LISHMENT.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, SEEDWG MULCHMG SHALL
BE DONE IN STAGES ON CUT AND FILL SLOPES THAT ARE GREATER THAN 20 FEEf IN
HEIGHT MEASURE ALONG THE SLOPE OR GREATER THAN TWO ACRES IN AREA,
WHICHEVER IS LE55.
- SPEQAL SEDIMENT CONTROL FENCE WILL BE INSTALLED ALONG THE TOP OF THE STREAAA
BANK. STANDARD SILT FENCE WILL 8E INSTALLED ALONG THE TOE OF SLOPE PARALLEL
TO THE STREAM. ONCE THE DISTURBED AREAS OF THE PROIECT DRAINING TO THE
SPECIAL SEDIMENT CONTROL FENGE HAVE BEEN STABILIZED, THE SPECIAL SEDIMENT CONTROL
FENCE AND ALL BUILT UP SEDIMENT ADIACENT TO THE FENCE WILL BE REMOVED TO
NATURAL GROUND AND STABILIZED WITH A NATIVE GRASS MIX.
- ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THROUGHOUT THE PROJECT LIMITS,
WILL BE CLEANED OUT WITH V2 FULL WITH SEDIMENT, TO ENSURE PROPER FUNCTION OF
THE MEASURES.
- COIR FIBER MATTING WILL BE INSTALLED ON THE FOOTPRINT OF UNCLASSIFIED STRUCTURE
EXCAVATION NEAR THE STREAMBANKS.
- EMBANKMENT CONSTRUCTION AND GRADING SHALL BE MANAGED IN SUCH A MANNER TO
PREVENT SURFACE RUNOFSDRAINAGE FROM DISCHARGING UNTREATED INTO THE RIPARIAN
BUFFER. INSTEAD ALL INTERIM SURFACES WILL BE GRADED TO DRAIN TO TEMPORARY EROSION
CONTROI DEVICES. TEMPORARY BERMS, DITCHES, ECT. WILL INCORPORATE�, AS NECESSARY, TO
TREAT TEMPORARY RUNOFF BEFORE DISCHARGING IN TO THE RIPARIAN BUFFER �AS SPECIFIED
IN THE NCDOT BMP MP.NUAL�.
2
P G SEAMAN JR & OTHERS END PROJECT
—L— PC S7a. /9•
EXISTING DITCH OUTLETS HERE
AND BECOMES DIFFUSE FLOW
BEFORE ENTERING THE STREAM
V10=1.9 fps (NON-EROSIVE)
TOE PROTECTION
SEE DETnII A
S II RIP RAP WOODS EST. h5 TONS RIP RPP
iCTURE PAY ITEM� ESf. I50 SY GEOTEXTILE
PIIE PUf PUE p�E ESISTING �ITCH
PUE PUE� PUF
PUE
\
I �-Y �T I
iuwcrnic-r an - cw a:a�
-TU[ r. .-. _ PUe��
- - - - - b _ _ - _
�_ TO PMK TOWN ROAD
�' \� �Ct.y-- R' ,�� _x��`- 458�' ON�TREES = RWNs � " ' \
� � � � � �
�
�LB — � �
�;� W00�5
� � � � ic `�B\
\ � \
� EXISTING DITCH OUTLETS HERE
� � � � � � � � � AND BECOMES DIFFUSE FLOW
. L - - - -Y0.e- - - - - - - - - - - - -'N�e- - - - � BEPORE ENTERING THE STREAM
� V70- 1.6 fps (NON-EROSNE�
m+
�\ �\ \
N` `
\ �
�
O
CLEMON KEARNEY
LEGEND
_BZ �_ RIPARIAN BUFFER
ZONE 1 (30'�
—gZ 2— RIPARIAN BUFFER
zoNe z �zo•�
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
� ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
�BRIDGE CROSSING)
� ALLOWABLE IMPACTS ZONE 2
(ROA� CROSSING�
� ALLOWABLE IMPACTS ZONE 1
(UTILITIES�
� ALLOWABLE IMPACTS ZONE 2
(�T���T�ES�
DIiCFi
l0o O
50 100
SCALEe I"= 100' HORIZe
DETAIL A
TOE PROTECTION
� Ho� io S�alo) F�e�te<
NAiUpq� ,�� �\S�oPe
GROUNp F`
d Geoterc�ile
d= i Ft.
Type ofl+ner= Closs B Rip-Rap
-L- STA.11+70 TO 12-20 RT
-L- STA. 17+10 TO 18+50 �T
DETAIL B
BANK STABILIZATION
( N i �o scale�
�w= �1
EXCAVATION � 4
GEOTEXTIIE f
CL II RIP RAP FlLl r
Type of Liner= CL455 II RIP RAP
-L- STA. 14+70
-L- STA. 15+35
� � . - . . . - E B HARRIS & : . , - -
- � �� �.� l�� / i... //'.�,_=i� II��I i i.i��, I //�--/-_ ANNE T HARRIS � �22�i i�i�i����� I � ^��
.'" i l I� � ����/ /�����il :�-� ,-, ��� �� �' _.
_'� �� � I I( �I I I��� rll����1��1�N1{ �� � _�i'���-t:�,.��/A�i/' � ,
= � � /J � �� �I � I� I 1 � ; I �I�I� �;- _' 1 'I I . �' �� �/ � , -, <\ ' ,�.
� I �1 � =� ,� i � -�
� /p� // / / �N� 1 1 1' 11.���1/ / -� / / f �'•t'�_ �
. " ��%�� �� � � I � � � 1 � �w���l�r �� � � � , � / � 9to oa dz. i'� �� � ,.
� � � � � � i � 1�� �i' : �= ' BEGI P � E _ 8=5687 � ' � � vio a ��e Ecs � ���
� � .' ,�,' ,��i , � � �y���i u ` �-L- POT SYa.N+50.00 � �titi°f � iNOH�os��e� �.
� / � 1�� �I �E� . � / CL4S5 BJtIP.RAP : .
. i � BM-I . � � Ipl � � . � - - - _ '' e5r i-PON -
� � � � / � � � , � � � I���� I �' ISTING DITCH OUTLETS HERE �- EST. 5 SY GEOTEXTILE � ,. ��
/ 1
� ; � :� r, I�. , qMD BECOMES DIFFUSE FLOW \ � �
� N , y�p=j.9 fpsANON�Rb51VEJ �,OOp �� �� � 8�
=L- �POT S�a. l0-I�.00 � ��' � � � �.. � �
, � E%SYING dIiCHI.�. � ' � \ ' P�
O g P ,����
I_` P
�
SEE ENLARGED
AREA ON
� NEXT SHEET
EROSION CONTROL COMMITMENTS:
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE ARE45, THE CONTRACTOR MAY
PERFORM CLEARING OPERATIONS BUT NOT GRUBBING OPERATION UNTIL IMMEDIATELY
PRIOR TO BEGINNING GRADING OPERATIONS.
- ONCE GRADING OPERATIONS BEGIN IN IDENTIFIED ENVIRONMENTALLY SENSITIVE AREAS,
WORK SHALL PROGRE55 IN A CONTINUOIS MANNER UNTIL COMPLETE.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, EROSION CONTROL DEVICES
SHALL BE INSTALLEDIMMEDIATELY FOLLOWING THE CLEARING OPERP.TION.
- IN AREAS IDENTIPIED AS ENVIRONMENTAILY SENSITIVE AREAS, "SEEDING MULCHING" SHALI
BE PERFORMED ON THE AREAS DISTURBED BY CONSTRUCTION IMMEDIATELY FOLLOWING
FINAL GRAOE ESTA6LISHMENT.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, SEEDWG MULCHMG SHALL
BE DONE IN STAGES ON CUT AND FILL SLOPES THAT ARE GREATER THAN 20 FEEf IN
HEIGHT MEASURE ALONG THE SLOPE OR GREATER THAN TWO ACRES IN AREA,
WHICHEVER IS LE55.
- SPEQAL SEDIMENT CONTROL FENCE WILL BE INSTALLED ALONG THE TOP OF THE STREAAA
BANK. STANDARD SILT FENCE WILL 8E INSTALLED ALONG THE TOE OF SLOPE PARALLEL
TO THE STREAM. ONCE THE DISTURBED AREAS OF THE PROIECT DRAINING TO THE
SPECIAL SEDIMENT CONTROL FENGE HAVE BEEN STABILIZED, THE SPECIAL SEDIMENT CONTROL
FENCE AND ALL BUILT UP SEDIMENT ADIACENT TO THE FENCE WILL BE REMOVED TO
NATURAL GROUND AND STABILIZED WITH A NATIVE GRASS MIX.
- ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THROUGHOUT THE PROJECT LIMITS,
WILL BE CLEANED OUT WITH V2 FULL WITH SEDIMENT, TO ENSURE PROPER FUNCTION OF
THE MEASURES.
- COIR FIBER MATTING WILL BE INSTALLED ON THE FOOTPRINT OF UNCLASSIFIED STRUCTURE
EXCAVATION NEAR THE STREAMBANKS.
- EMBANKMENT CONSTRUCTION AND GRADING SHALL BE MANAGED IN SUCH A MANNER TO
PREVENT SURFACE RUNOFSDRAINAGE FROM DISCHARGING UNTREATED INTO THE RIPARIAN
BUFFER. INSTEAD ALL INTERIM SURFACES WILL BE GRADED TO DRAIN TO TEMPORARY EROSION
CONTROI DEVICES. TEMPORARY BERMS, DITCHES, ECT. WILL INCORPORATE�, AS NECESSARY, TO
TREAT TEMPORARY RUNOFF BEFORE DISCHARGING IN TO THE RIPARIAN BUFFER �AS SPECIFIED
' i . - IN THE NCDOT BMP MP.NUAL�. � . � � . , , , �
�'� ��� i � I _- _ , � � � ' I� � ! 1 � � � � � , , .
- --- �.e\� i� � � � i- ;;__ i i � I���li��l ,i
�' � ��ll�' = �-� l� � i �� e�- _ �- � -- � - � � ` - � , I � � I I I I I I � I I � I i i� � � �
1B ' i9/;f, i _� � ���� -�, �-- -- -- -. - . , , �!� . � � I � � I I � I � I I � � I 1 � �� I � � r i
� �-��-- � ,�� 1�� -5-Z -- �-�A . �� i��� i � �� ti' i � I I I� I I I I N I I � � I I �� �� � � ���
��_ -�- �" 1- . . I � 'L ��I �I I � I I I I I � I I I a I I � I I � I � I I I i cn
� � � , . ,_� ; iI � . ..�. ` .. �... ,. �N� �� W2 ELBOWS 'e�
' � . . � � �� � 5. .. " �, '� �. l..-�. ��U�P�
i I �� I � � I � �PUS '.PUE C� ` ' .. ,'.. , � ,
l (" �E ' puE h'
I I I I , \ _ � `, � � BEGIN' BG E eZ ' /
' � � I �� 1 . �. \ � \ � � F 61 LT ` G � \. � ..
\
uE
' i I � I I I � ' ,, EXIs . R J!. �\ � ' ` ' /��Fa. \\
� � „ �� � •_ , -' . . s/':i
� I � � �- , . I � �- - �_ �Ca� ���' — � , .. . �
� � I I ro sriar,v SP�� '� - _ �---.�� -- - . �i�.�- � . _r
� � � �� � � , .�_ ueKSA7t�t7 /d7 - sR /6� � ,a�g� x - - x�y - � eer-i(� -
` � � - �g 78 2GI 13 2'�I
- � �J /I 11 1 � ., °8� S Ei� . 2�1_f. _ � N . __ _ - - _. _
. � � , , ���.� —�-'-X � � : _
- / \ \ . � , \ \ � � , ATE - --x - �.-X
�
� �� � // . � ' ' � T .-'-__ �� r� � i
/ ,+�,
- � / � / i� oasnNc ohcn, / _ . .. -. .. � . � _y��e=- � � �.-.
�
- � / / / � � r l l � � �
G' /�/ / / /� � �� � � / 1I V10- 1.4 f NON-EROSIVE . / ,, ') ' I I ,��� . .- � " �
'� / / ! : _ , 1 I i; ,
- ' i EXISTING��DITCH WILL OUTIET HERE � � \ �"
� / / � i � � AND BECOME DIFFUSE FLOW � � . i' � ' � '-
' / / / ps ( , ) , / / '. � ��^
� i l � i i � � i� �� , me pRo iLcnr�,qN , i �y�oops i I �� * � � I
_-
_ � ' � l � I i � � i � - esr s� tioN3� eiv gn� �� � i I i � � � � 1 t W000s � ;
m '
` l I � I � / f`�'1 � � -� EST. 60/SY,GEOTEXTICE; ;. I . '., � -1 _ �_ _. _ � _�- _ / � ,�+
; '.. ' . -_--
_. _-_
i � i i i i � � ��, -� ' ' i � ' , � i : � L- � PT SFa.14t05.�9
_ � � ti i � i i � - � � �� ,Lr PC 57a.13f00A0 � i i ' ,, - �
_ � � I � 1 \ \ E B HARRlS &, i,.� i J � cinss I['Riv anP
_ �� I � l \ \ � ANNE ,T HARRI�'- � '. � �� 1,� �� / / � (STRUCTWRE PAY ITEM) .
� �, .
, - � � / ✓ � / i I \\ \\ ` � � 1 �" � / � � i � �/ � � � use iMaeewous �qiKe . .
� � � 1 � � / �� � ' � . � NCDOTSTAMDARD BMP �
_ , - I \ \ ' j �� I. I // � / / � � � / � '� � I � �"\ � � ALONG STREAM �BP.NK TO
_ � -' / � I \ �� '' l I � / -� I � .'� ( DEWATER AND I�OLATE �
_ . . _ _ i I � \ � \ \ � l � ^ ( �� / � � \ I � l ' �.DJAfENT WORK AREA
---'----_ i' I � \ � \ � � \ \� \� � �1\ �� - � \ l I � TO INSTALLPROPOSED
- � ' _ _ _ - - - � � � 1 \ � \ \ \ \ � � ` -\ � � , INT BENT IN TFj£ DRY
. __------- � \\��� Bc^N��\�\ \ \� � \�`� �����\ \ ��S�N� `� � .SEETDETAILBKSTABI:�TION _
/ -------�'-23�J--�'-/ � \ \ \ � � � \ � � � \ �1\\ ♦ �.'� EST.355�TON5'(IPRAP
� . --------_� � � \ \ \ � � � \ S �� � �'� \\�\�\ �� �� �5T.175�SVGEOTE%TILE •
� \ \ � �� I
� . __---�-``'_�_`_` ____ lI �� `� \�\�\\� \�\�c,��� �\\ \�� � bNN� \ � \\� \�-�� � USEIMPERVIOU541KE �
� NCDOT STAPIDARD 6MP
L _ . - - - - -- � � �- � ` ' � � _ _ - � � \ \ � \ \ I \ � \ I I ALONG�� STREAM BANK (i
� � \ � � \
- � � I I � \ � \ \ � � I I � 1 \ \ � DEWATER AND ISOLATE T � I
- _-____ _ _- I
f .. .. - � -73p � � � � _ � � � / 1 I � \ \ � � � � I I I I � . -ADIACENT WORK AREA J
�� - � � � � � � � �. � � 1 I � V � � � � � I I � � � � � � - TO W STALL PROPOSED �=
- � � - - � - - I � � 1 � � � � I I � INT. BENT IN THE DRY .
. -. -. .. � � � _ � � 1 I \ . � � i , I . . I I I i .. INS'fALL BANK STABLIZATION
� SEE DETAIL B
EST. 75 TONS RIP RAP
_ EST. 140 SY GEOTEXTILE
ENVIRONMENTAL COMMITMENTS:
- BEST MANAGEMENT PRACTICES FOR BRIDGE DEMOLITION AND REMOVAL WILL BE IMPLEMENTED DURING THE REMOVAL
OF THE EXISTING BRIDGE.
- THE BRIDGE WILL BE REMOVED FROM THE TOP DOWN, FIRST REMOVING THE ASPHAIT WITH CONTAINMENT MEASURES
IN PLACE TO PREVENT ASPHALT FROM DROPPING INTO THE STREAM. THE METHOD OF CONTAINMENT WILL BE
PROPOSED BY THE CONTRACTOR AND APPROVEO BY THE ENGINEER. THIS WILI BE FOLLOWED BY REMOVAL OF THE
DECKING, GIRDERS, ETC., AND FINALLY THE WOODEN PILES. AN ATTEMPT WILL BE MADE TO REMOVE THE PILES;
HOWEVER, IF THIS CANNOT BE ACCOMPLISHED WITH MINIMAL SUBSTRATE DISTURBANCE, THE PILES WILL BE PINCHED
OFF ONE FOOT BELOW THE MUD LINE AS DIRECTED BY THE ENGINEER. THE CONTRACTOR WILL NOT BE ALLOWED
TO DRAG REMOVED TIMBER PILES ON OR ACRO55 THE STREAMOED.
- IF STILL PRESENT AT THE TIME OF CONSTRUCTION, A FALLEN TREE CROSSING THE STREAM BELOW THE EXISTING
BRIDGE WILL BE REMOVED TO PREVENT POTENTIAL BANK EROSION CAUSED BY THE TREE. THE ENGINEER WILL
EVALUATE IF THE ROOT BALL CAN REMAIN IN PLACE. THE REMOVAL OF THE TREE IS CONSIDERED INCIDENTAL TO
CLEARING AND GRUBBING.
EXISTING TIMBER ABUTMENTS WILL BE COMPLETELY REMOVED.
]�]LA�T �IIE�
�I�IC]E ll
`� �� � , ' � �- '" ih ��� lI � I I � I i I � I � �� I I � �� I � I � � � I I i
��R & orH�Rs � ���� �o. l9 B ,pp� ' i� � � �� �� � � � � �� �i � i � I� � i � � I i � � � � � ` ��
� EXISTING DITCH. OUiLETS HERE . � � � � � I � � � \ ��\ � � I\ � � i �� � 1 � I\ I\ ����
,� AND BECOMES �DIFFUSE� FLOW � � � i � � � � \ � � � ` � ` � � � \ � � � ` �
BEFORE ENTERING THE STREAM i � � \ � � � � � \ � \ � \ � � � 1 `��, � � � j ��
V10-1.9 fps �NON EROSIVE�.', � I� , �'� ` \_ � 1 � � \ � \ � �� \ � '; \� ���� � .., � � �� � �
' TOt P�OTECTFON � / J � I N \ \ � '�,. S . \ \� � � � � '�. � �� �
- SEE DEfaIL A / , � � � � \ Ve � . � . �p �I���y \ -. y \ \ -� �.
� WOODS .- p5T_ 65 fiONS RIP; RAP� � i( � ' / 4 ` � � � � � � `, � /' � /`� �ra•`�Of` ��' �� �� �
'"� EST. I50 S7 GEOTE%TILE � - - /� / •. � ,
�. � -"� : '' , _ �\ � t� / � . � � ., � .
UE PUE I F�SISTING �ITCji . ' - , \ I I � / / / \� \ � �
. vUE-�.4UE vUE -� � t�� � � // � I \ �.
' F �PUF� / J� l ' � `� \�q
� P/ I Nf PU��� - � � � \� ��e. .\
- � \� �, T / � � � � I\ �\ \ � �\
— \
� \
�
_-_ � : _ r._.___' . �_ �-�:'' _T,-T--_I � .. � � \
\
__._ "____ _-_'_ .._ _._ _ _ -- � \ \ \
' - - . 978d57 � , � �-� TO PARlC TOWN 9�.40'.. � \ � \ � \� .�
LlCKSKILIEr RO - SR /620 . ' ,
... . . .—�_ __
. ._ __ ' ' - '•
- _ _ _ ' - .-..
- __' __ '_ '.. _. .. _. .' ' _. � .- . � .. � . .. . �S
\ \
T �_=X�tX'� "456�TREE�S .. �_ ' � \_..slRu�'R7�-� �' � \ � \ �?3V\�\�\ \�� \\
r _ � �' � � _ �s \��� \ \� �� � \� \
��� �' \\� �• \ �. � � � � -- - \�� \�� `\1 \\ �� \� �
� � � � � � � �� ��8� W�oo� � � V ' ` _ � � � � A 1 � 1 A
t . � � V � �A � �. �� �. �_ � � � I 1 I � �
\ � � ' EXISTING DITCH OU'RETS HERE - � ) / / I J I
� -' � / � � � �` � �� AND BECOMES DIFFUSE FIQW , EXISiIt�G DIiCH �� � � � � � / � / �
- - - - �- - - - - -? -N�L - �='� BEPORE ENTERING ��THE STREkM � / /
i
l . V70= l.fi fps.�NON-EROSNE� - _" t . I / / / � � / � / /
� i i i
� - � � ' ti � � , � i ' ,
�;;r` _ � � ., . "> ,' ,' ' sa�' i� i i �� i ,� i
__ � � J . � i' i� �� � � / i
.. _ P�2 � ��` � ZZ.`�/ � �� / i i i � /� i i� ,
� i ��5 � i� i �� i i ��ti � i
� ��/ � . - ' i'// -� / /�i�-J � / // / / � � / � / �� /
i 3 ,-' -' �� __- i' i� � �' �� i� � �� �� i i / � � l �
�� ���/�/ i� � CLEMO�RNEY , -f ���, � � i� / / i� �/ �/�� i� �/ / // � I I I
�� �� �� � ;� � �i� ,�� �� /� i� / / � � A �� A V �
' ' < \ . ('� � ,�� �' / / / l I � \ � \ \ \
\\��\ ... .. �\ 1 \
��\ �` \ �\ �2 ..\ ..,\ �\ \ �\\ ��\ ��\ �1 �\ � . //� �� i � \ \\ �\ �\ \\ � ;
�� � �� �� �� � � \ � \ I � I � / / � � \�\ \�� �\ \} � ,
\ \ \ \ \ \ � � l \
�I/ //\\ �\ � \� \ \ \ \ \ \ N � � I� \ \ l\ � �� �� � I 1 1 ,
J // A� A 1 � � � 1 1 � A � � � � A A V � � � � 1 1 l
� / \ � t , j I � .
� 1
` \ � -2'h . . . . �. � - � ' . . � � . , i I � � . �
LEGEND
_BZ �_ RIPARIAN BUFFER
ZONE 1 (30'�
—gZ 2— RIPARIAN BUFFER
zoNe z �zo•�
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
� ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
�BRIDGE CROSSING)
� ALLOWABLE IMPACTS ZONE 2
(ROA� CROSSING�
� ALLOWABLE IMPACTS ZONE 1
(UTILITIES�
� ALLOWABLE IMPACTS ZONE 2
(�T���T�ES�
l0o O
50 100
SCALEe I"= 100' HORIZe
BZ 1
LEGEND
RIPARIAN BUFFER
ZONE 1 (30')
RIPARIAN BUFFER
ZONE 2 (20')
ALLOWABIE IMPACTS ZONE 1
(BRIDGE)
ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE CROSSING)
ALLOWABLE IMPACTS ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(UTILITIES)
ALLOWABLE IMPACTS ZONE 2
(UTILITIES)
�P�
01�`
�Jl.:s JL ��� ��Jls� JL ���
���� �
40 0
20 40
SCALEe I"= 40' HORIZe
i�
C
N
E
C
W
W
LEGEND
_BZ �_ RIPARIAN BUFFER
ZONE 1 (30')
—gI 2— RIPARIAN BUFFER
ZONE 2 (20')
k �
ALLOWABIE IMPACTS ZONE 1
�;M (BRIDGE)
� ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 2
(BRIDGE CROSSING)
ALLOWABLE IMPACTS ZONE 2
(ROAD CROSSING)
ALLOWABLE IMPACTS ZONE 1
(UTILITIES)
ALLOWABLE IMPACTS ZONE 2
(UTILITIES)
�P�
PROJECT REFERENCE SHEEf NO.
8-5687 - WARREN 43 4a
ROADWAY DE51GN HYDR.4UUC5
^0�1 ENGINEER ENGINEER
HATCH MOTf MAC�ONAID 18 E, LLCI ICA ENGINEERING
LICENSE NO. F-066g LICENSE NO. FO]58
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepare n t e
ox��e or:' M
MPo so. ��
FuQuoy-Vonno, NC t)526
MAC�ONPID www.in �mo . m
1 ICA En9inevring, Inc.
F/� '�A R'vleigh��NC�2160)
ERMIT DRAWING
SHEET 5 OF 7 C��-Tic
�J�..d�l J.��� ���Jl_A� ���
���� �
40 0
20 40
SCALEe I"= 40' HORIZe
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
STRUCTURE SIZE / ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
SITE NO. TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
1 THREE SPAN from -L- 13+76 to -L- 16+13 X 5159 214 5373
X 413 1616 2029
TOTAL: 5572 1830 7402 0 0 0
Rev. May 2006
Rev.Jan 2009