LOCATI0111: BRIDGE NO. 43 OVER SHOCCO CREEK 011i SR 1620 (LICKSKILLET ROAD)
TYPE OF WORK GRADI11rG, PAVING, DRAIIIIAGE A11tD STRUCTURE
BEGIN PROJECT B-5687
-i - c-rn ii�-Gnnn
T�-� :-h'r7�`� �; - \
-- `,PRIN�;�, ,RG� -- --
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY III.
. ,
GRAPHIC SCALES
50 25 0 50 100
�
PLANS
50 25 0 50 100
I
PROFILE (HORIZONTAL)
10 5 0 10 20
PROFILE (VERTICAL)
DESIGN DATA
ADT (2011) = 380
ADT (2025) = 760
V = 55 MPH
CLASS = LOCAL
SUB REGIONAL TIER
6EG/N 6'RIDGE i
-L- �lo.l=r+^i(7n\
� �
� �
'^r'^ %t,:_r�
U��lt `_=�KILI L-1 F',_! --. � ---i -- .
i � � * � f � _
�` ' � � �',
H_F��IN �APPP,JACH SLaB
-L- �ro. ; ? r16.'6
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT = 0.126 MILES
LENGTH STRUCTURE TIP PROJECT = 0.026 MILES
TOTAL LENGTH TIP PROJECT = 0.152 MILES
END C�l;'IO�E
-L- Sta. 15+C��94
ENJ APPh�ACH �L�7B
i -L- Sto. /?+75.�4
/
i
� . t , x.
�' �------.,e----------.�a-----
�"
�
rn
� '.
F�epar�°d in tY,� Ofrice of Natch hPaff MucL�onald fn�
DIVISION 5
NORTH CAROLlNA DEPARTMENT OF TRANSPORTATION
2018 STANDARD SPECIFlCATIONS
RIGHT OF WAY DATE: TIM JORDAN, PE
JUNE 12� 2��7 PXOJECI bNGINEtR
TRENT CORMIER, PE
LETTING DATE: �„�D��,�s Ln��,��
MAY 23, 2018
NCDOT CONTACT: LISA GILCHRIST EI
�°,i
�3 ��P
�P
END P
—L— S
— — TO P�ARI< TUWN P,D
ROADWAY DESIGN ENGINEER
HYDRAULICS ENGINEER
P.E.
����� �I SHETCS
SHIEaCT
�
IIFSCRIP'IION
DOCUMENT NOT CONSIDERED FINAL �
UNLESS ALL SIGNATURES COMPLETED
PLANS PREPARED BY:
M PO Box 700
Fuquay-Varina, NC 2752b
(919� 552-2253
MOTT (9191552-2254 �Fax�
MACDONALD wwv..monmoc.coMamericas
LICET�SE NO. F-0669
��� ICA
ICA Engineering,lnc.
5121 Kingdom Way,
s��,e ,00
Raleigh, NC 27607
NC License No: F-0258
�
��
a
0
�
0
di
0
v
0
�
U
0u�
��
J�LLI
�lS. �
�U
t� OI
;i d
ti�
� p L
CJ�y
+
r C L
Q 0 iL
SEE TYPICAL SECTIONS
BREAK POINT
,` oA.��?'��AR���'1'�,.
.�24��FE55/pN:s�:
SEAL
" i 022966 i °
� `�''F'YG I NFEV�`� �`��`�
•'.�e , � �o�.
�'� � S.II ryov+e���•
DOCUMENT NOT CONSIDEREO FINAL
UNLE55 AlL SIGNATURES COMPLETEO
�
�
2
d
�
E�
d�
� t�
�m
v<J
a
�
� ��
s
�J�
� o
��
� :
SY
DETAIL A
TOE PROTECTION
� Noi io 5cale� �o g
ROU p� � 3�F`�S\oP
d��� �eme.�ae
d= i F.
Type of Liner= Class 8 Rip-Rap
-L- STA.11+70 TO 12+20 RT
-L- STA. 17+10 TO 18+50 LT
Eivn1-I
•7
DETAIL B
BANK STA8ILIZATION
�Noito 5<ole�
`��.. Hw5 /I — —
EXCAVATION l /J
GEOTEYiILE —' � J
CL II RIP RAP FILL J '�
Type of Liner— CL455 II RIP RAP
-L- STA. 14 I� 70
-L- STA. 15+35
O
E B HARRIS &
ANNE T HARRIS
DB 899 PG 83
-L- POT Sta.11+50.00
+20 -L-
30.10' L7 \ _
55' LT \\
\ JL
�T
�r� P�E P�E � P�E � �
+50 -L- z`
2995 '�,
� ��' �, • 40' LT
ry0��
��aP
� a
�P
O
O
�
�
OUANTi i Y FOR E�:LAVATION UMIT; I�" IN�LUDED
m� ur�c�ns�iFiE�> >r�urTunE �x��AvnTiord
ceNTF_e I..IiaE nF
[REEe is
P�OPEaTr uNE
I 0� JSTB-� - �C �/ /
+05.39 -L- I - � ` / J 2
40' LT O
55' L7 `� � � S' '� e�" � P C SEAMAN JR & OTHERS
CLASS 8 RIP RAP . � �� ��' ND REFERENCE
EST. 7 TON - �
E5T.5 SY GEOTEXTILE � �, - �
BM-'_ \, ��. zB � �
� � �b ' �S \. �. EXCAVATION
15" CSP , ' LIMITS . .
\ � CL455 II RIP RAP '
W2 ELBOWS �� �V � � �� V � az �ISTRUCTURE PAY ITEM) +75' LT . �
�ruE vuBEGIN SBG��e �..p� PUE r ru� � vue—�—ruE- vue vue�puE—
+bl LT rl� �� \ lo B � �� +90=L- �.
+00 -L- � � ' T � �T l7YPJ'*
,. ./71 ao� �T � � . � _ / . . �. �, . i � i � 55' LT
` - N 30° 3i' _ _ I�_ _ F
426" E
� �.
' �
E„< N��_ --_._—� - `_ � _ . ,o ✓,F
_
_ . _. _ .�� R�� �. -
� sa �-,�'� ;
30-05' RT � . i
45' RT /
TOE PROTECTION i /
SEE DETAIL A � °' -
EST. 25 TONS RIP RAP
E5T.60 SV GEOTEXTILE
O-L- PC Sto. 13+00.00/
E B HARRIS & .
ANNE T HARRIS _ . �
DB 899 PG B3 .
ENVIRONMENTAL COMMITMENTS:
- BEST NJ+NAGEMENT PRP.CTICES FOR BRIDGE DEMOLITION AND REMOVAL WILL BE IMPLEMENTED DURING THE REMOVAL
OF THE EXISTING BRIDGE.
- THE BRIDGE WILL BE REMOVED FROM THE TOP DOWN, FIRST REMOVING THE ASPHALT WITH CONTAINMENT MEASURES
IN PLACE TO PREVENT ASPHALT FROM DROPPING INTO THE STREAM. THE MEfHOD OF CONTAINMENT WILL 8E
PROPOSED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. THIS WILL BE FOLLOWED BY REMOVAL OF THE
DECKING, GIRDERS, E7C., AND FINALLY THE WOODEN PILES. AN ATTEMPT WILL BE MADE TO REMOVE THE PILES;
HOWEVER, IF THIS CANNOT BE ACCOMPLISHED WITH MINIMAL SUBSTRATE DISTURBANCE, THE PILES WILL BE PINCHED
OFF ONE FOOT BELOW THE MUD LINE AS DIRECTED 8Y THE ENGINEER. THE CONTRACTOR WILL NOT BE ALLOWEO
TO DRAG REMOVED TIMBER PILES ON OR ACRO55 THE STREAMBED.
- IF STILL PRESENT AT THE TIME OF CONSTRUCTION, A FALLEN TREE CROSSING THE STREAM BELOW THE EXISTING
HRIDGE WILL BE REMOVED TO PREVENT POTENTIAL BANK EROSION CAUSED BY THE TREE. THE ENGINEER WILL
EVALUATE IF THE ROOT BALL CAN REMAIN IN PLACE. THE REMOVAL OF THE TREE IS CONSIDERED INCIDENTAL TO
CLEARING AND GRUBBING.
EXISTING TIMBER ABUTMENTS WILL BE COMPLETELY REMOVED.
�
G$EU�TL3 -; . ,. 1 � � -� � i��
- __.. ,__ �
,_ Nt � � �� �
1�� .
� � ^Y I
�+oo -�- � . � � , �
45' RT � +Oi39 -1-� � \
j y. � 45' RT i
� 55' RT I �
� � "
-L- PT B Sta. I4+05.39 - - - - ��\
� CtA55 II RIP RAP J 1 1
�STRUCTURE PAY ITEMJ
USE IMPERVIOUS DIKE \\
� NCDOTSTANDARD BMP ��
ALONG STREAM BANK TO
DEWATER AND ISOLATE
ADIACENT WORK AREA
TO INSTALL PROPOSED
INT. BENT IN THE DRY.
INSTALL BANK STABLIZATION
SEE DETAIL B
EST. 355 TONS RIP RAP
E5T.175 SV GEOTEXTILE
USE IMPERVIOUS DIKE
NCDOT $TAN�ARD BMP
ALONG STREAM BANK TO
DEWATER AND �SOL4TE
ADIACENT WORK AREA
TO MSTALL PROPOSED
INT. BENT IN THE DRY.
INSTALL BANK STABIIZATION
SEE DEfAIL B
EST. 75 TONS RIP RAP
EST.140 SY GEOTEXTILE
v .
GREU-TL3 I .'., . �, 1A�� . _ �
_ -.-. -- _-_
_ - - _ . - - _ _ _ . _ _ �.
'. . � L -- F�' � o -- - - ,.
,' �'� N 25° 59' /7,9 E - _ � � � - - -� �- _�-
.. �, — N 27' 44' 45.0" E
. GREU-TL3 . _ _ — — — .. _ ._ . .. _. _
-�_ - _ - -�--�----�r��.�--
, __ � �
TOE PROTECTION
_SEE DE(AIL A
EST. 65 TONS RIP RAP �i j
EST.1W SY GEOTEXTIIE /T &�
PUE PUE .,�._
—�
- PT
+50 -L- -65 -L-
�� 30' LT 30.10' LT
� 40' LT 50' LT
rue ruE—r�.��.
v :� � �
_ �w�a� � -
\ . �\ � � -y, � 1 � �w,A ., �� -
�
� +90 -L- �
45 RT � � � \
....L� �55'RT wie---}._.---------w�s_--_.-'
.:� m�. - �- -
� "
r
d
I � �\ 3
� � �\ �
\� _� q CLEMON KEARNEY
\ '1-. �B B88 PG 837
M\ * {
�\ � CEMTER LINE G�
C�EEn ii
FR��PE�7Y _INc
IMPERVIC�US DIK� ��HALL BC i=ONSIDEP.ED
INCIDENTAI_ TO THE REMQV�L. uF TNE
EXI_TINi� STRUCTURF
-L -
Pl Sto 13+52.72 Pl Sto 20+12.50
p= 4° 32' 24.7" (LTJ p=/° 45' 27.1" (RT1
D= 4° l8' 28.6" D= l° 24' 2l7"
L = /05.39' L = 125.00'
T = 52.72' T = 62.50'
R = 1.330.00' R = 4,075.00'
50 -L-
30' RT
45' RT
�IFL�. ��7I';i11�A��, ����J� ��QI�I�F1��
FOR STRUCTURE PLANS SEE SHEETS S-1 THRU 5-24
��
��
��
5 LL�
6 i
^ m
N �
M O
a
^ ��
s =
��� �
� �o
� o
—;r
� :
S Y
�
�
a\
GRAPHIC SCALE
25�
PLANS
25�
PROFILE (HORIZONTAL)
5YG�G�
PROFILE (VERTICAL)
� � � � �� � � � � : ��� i � � ��� ��� � � � �-i � � �� ��� ��� i .1 � ��
II� I � � I � I (�) \ (�) I � 1-I I � � I-I \��" . �� 1 " �
I'' I.'� :`��� I�(�� I'� I'' I'� (�� I'' (�) � I�� I1�
II-I I � i I-I ��� � . �� 1 � 1: I'� C�) � I (�) \ c � (�) \ " I � I'� (�) I .
BEGIN TIP PROJECT B-5687
-L- POC STA 11 + 50.00
SHOCCO SPRINGS ROAD
THESE EROSION AND SEDIMENT
CONTROL PLANS COMPLY WITH
THE RLGULATIONS SET FORTH
BY THE NCG-010000 GENERAL
CONSTRUCTION PERMIT EFFECTIVE
AUGUST 1, 20I6 AND 1SSU6D BY
THE NORTH CAROLINA DEPARTMENT
OF ENV/RONMENT AND NATURAL
RESOURCES DIVISION OF WATER
RESOURCES.
WARREI� CO U1�TY
�� i��� �v�d �� ��v �� 1��
�VIE]E� �l[����� ��]E]E]�
-L- STA 14+27.06
-L-
Prepared !n tf� Office of:
H�� I �C�e►
ICA Engineering,ln<.
5121 Kingdom Woy,
s���e ioo
Roleigh, NC 27607
H� u�e�,e Na F ozsa
Deslgned by:
ALEXANDER D. SNIDER, PE 3064
NAME LEVEL 77( CERTIFICATION NO.
END BRIDGE
-L- STA 75+64.94
SR 1620 (LICKSKILLET RD.)
ti�`�
g3 ��P
r1P�
END TIP PROJECT B-5687
-L- POT STA 19 + 50.00
TO
PARK TOWN RD
-�
ReVleWed ln tle Offlce of:
ROADSIDE ENVIR011tMENTAL U11IIT
1 South Wi/mingron St.
Raleigh, NC 27611
2018 STANDARD SPECIFICATIONS
RevieWed by:
DONALD PEARSON, EI CPESC
preas srems eamat=r a�m�(s rea sxecr rorn�
sxeeTs
e�= �•,� 7 E�1
ere'Ia Pflol.tm r.sPBol.Nn DR9(8umoer
ERO�ION A�D �E�I�IENT �ONTROL MEA�iI�
� � �
if�a.�,i Teon�o,ary ��9� IID�f�6 ,a
�����4 �e,��mrar� �o�ersoom � ,� �
1`rX�,�l �ennpornr7 �i�E r'emce _ _ _ _ _ _ _ _ _ _ _ _ _
1�.�1 �Q�ecia� �e.d�iauemt �omGro� p'emce _ _ _ _ _
1 1 I'empom�ry 13erons nwd. S�o�e ��61IDP. .. . . . . .. �~
1 ��i S61e Il$asao� "Tree ]6 . . . . . . . . . . . . . . . . . . . �
1���1 'Il'e��mxaay Ro�k �alt Clie�k �y�,e=.� �
�e��,oaaP� �o�� sa�t c:�,e�� �y�e�.� w,t� O
Nfl�o-tSmg �vd �ofl�a�g�l�a��d�e 6��NgD �
163S.Q'3 �'ed��oP��9 �8m�k S;9E �'V�e�Ik °ll'sre-]�_ _ _ _ _ _'
W,etle % Cod� �'[6=� W�ttle- - - - - - - - - - - - - - - - - � -'"-
0
watt�a6'co;e �;bor wet�ia �
.dnt90 �o1�acPs'Oano��e QIDt�M1D
1634.�1 �e��eraeo Roc➢� �eds�emt ➢��su °J["a�e��_ _ _ _ _ _
1 'f�Q'L 'll'em,�o�ar9 ff$m�� �P�om��r Il�,�� '�'r�P �. _ �
i�.�1 IBo�Q� Pa@� I 1 t�e��� oo� 'll'Pan `�'y��-� _ �
1�4�Q�i Ra�k Po�e I 1��e�Vs�,e�o� �C'Par '�"yw� �3_ �
1�iQ.Q4 Sr;�L'„g ➢�syo� �
l��i rJ-�ecia� �Ei��img ]�nsun_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ �
�o�k de�le& �e�li�newk "d°rtmp:
i�axpi �r�e � AD
i6���� �,�� �. _ - - - - - B �
1��3 '�'y�e C' . . . .. ... . . ... . . .. . . . . . . .. . .. . . Ca
5k;�,�er �aa;n �
�I'�ere� �k�smever II$ns�n. �
Imf�ltr�c�on 93as;� _ _ �
TI�IS PROJ�CT CONTAINS
�ROSION CONTROL PLANS
POR CLT �IiING :1ND
GItUBBING PHASC Or
COi�'STRliCTIOv.
I:NVTRONM�NT.ALLY
SENSI'I'IVE �aRF.�1(5) EXIST
ON TFI1S PROJECT
Refer To E. C. Special Provisions
for Special Consideratio»s.
THIS PROJECT HAS
BEEN DESIGI�ED 1'O
S�NSITIVC R'AT�RSH�D
S1'A.n'DA1tUS.
Roed��uy Stxndurd Drxsa�ngs
"fhe following roadwuy english smndzvds as aVPear in "lio�dway S[andurd Urmvings"- Roudwuy Design
l"nit - N. (:. Uenartment of "I'ransportvtion - Itulcigh. N. C., dated JUnuary 2018 and the Intest
rcvison theretu are upplicablc to this project und by referenec hcreby un considcrcd a purt oF
these plaus.
16U4.01 finilroad 1?rocion Control Detnil 1632.01 Rocic Inlet Sed'uncut Trnp Type A
IGO5.01 Temporan• Sil[ Fence I632.02 Rodc Inler Sediment Trnp Type 13
I606.01 Spcciul Scdimcnt Control Fcncc 1fi32.03 Rocic [nlet Sediment'1'rap 'Pype C
I60Z01 Uravel Construction Isntrance 1633A1 Trmporwy Rouk Silt (]heck Type A
162:.01 Tempora�ry Berms and Slope Drains I633.02 Temporury Rocic Silr Cheuk Type B
1630A1 Riser Rusin 1634.01 'I'emnorary Rocle SeJiment Uam 'I'ype A
1630.0? Sih Basin l�rpe 13 1G34.02 Temporan� 2uck Sediment Uam "f��pe B
1630.03 "I'emvorary- Silt Uitch 1635.U1 Rock Pipe Inlet Sediment Trap Type .�
1630.04 Stillin� Basin 1635.02 Roelc Pipe Inlet Sedimcut Tre�p Type 6
1630.05 Temporary Diversion I640.01 Coir fiber B�ffle
1630.06 Special Stilling l3asin 1645.01 Temporury Streum Croesin,�
I(r31.01 Mutring Instullation
WATTLE WITH POLYACRYLAMIDE (PAM) DETAIL
EXCELSIOR WATTLE
2' ( MAX . )
MATTING
2 IN.
_ .Gc�1�
SLOPE
��
ISOMETRIC VIEW
2' UPSLOPE
STAKE
, �> :� �
ti� , ,
/ � K ' \ \
� '� ih� �. \ �
`�%':
CROSS SECTION
VEE DITCH
S I t C-
EDGE OF PAVEMENT
2' DOWNSLOPE
STAKE
ee nse / 2' UPSLOPE
�� STAKE
T���, � /
�
,
� �� � r �
� �
� " :v�, , �' �� � .k, � x
TURAL GROUND
NATURAL GROUND
�% �i ��� i
MATTING � �'� �� \ 2' DOWNSLOPE
CROSS SECTION STAKE
TRAPEZOIDAL DITCH
FLOW --
NOTES:
USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND
WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE
TO WEDGE WATTLE TO BOTTOM OF DITCH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
U SHAPE NOT LESS THAN 12" IN LENGTH.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE
AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS.
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT
LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
TO BE APPLIED TO EACH WATTLE.
INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE
WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY
PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN.
� PAM -,� ��
i'�.�-��, �z oz.� %' �
AMJ ����' '-PAI
INSET A �� �Z' � INSET B �1 oZ' �
INSET C
,
' �\�\���\���, -- x \ \��\�
/ � .S N1
�� �ZII(M��IV.� /
%UPSLOPE �"
; ,��� ; /DOWNSLOPE�
STAKE �� � �,���r� STAKE
� �.� i
,
4
/ /// � � ' � � PAM
/ � �� � ; � x,h �` � � 1 OZ. )
VAR. 'u�V ��` �,Yx
PAM—� � ��;;+ �—�See Inset B
�i oz.� ,`�� \
�
2'(MIN.� � <�i 6'(MIN,)
�? , - ,
�; / ✓ �.<: � ' /�
TOP VIEW
,
�
MATTING����
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
SEDIMENT CONTROL STONE
STRUCTURAL STONE
1' MIN
EXCELSIOR
MATTING
FLOW
B-- � ll
A `� J - `� A
, n.. ., J _ vJ. c; , �
`'a o�a o`� � �� ��`,a� --�o ��a �
O � p O D �'J ID �LD n. ��� O D� G D �
� `�G� ��7 .�.`��L' � �O �. �. �O �J �
�p�oo�c c��v�+ �o�' c�i' �,�opJop�Jc
�%✓ � G �O � ��' % O r.=, �cf7 � �G ��
p L. p p p �/� /', O �^ C� �^ D � O. ��(�
� •��'O � rG� nGOG� -0 0 0'J�? o O`� o`� ��'�.
� r7 r� �� r� �G � ��'-, � �O � "'� � �0 � � ,�- ��-
,�Z��o`O� aJQ � ooG�¢o�60�,� �,—�
^r, _ � .. ^�, �� � ,
��o,�o ��� u��',`-f,�`��vo ,.� `
o � � � � � o
��go��,'��� �o�0�,�4'0�' ,� '=
ff]],�v� c� m�
// � p O C� p G D p ' C�7 C D�-
/ �.O "� �+�' �.� � J � � � �
� � ��G occo`�c� o �
-��o o �
/ ; c'J � � '= � = `°? c�
� � �=�'n
B
EXCELSIOR
MATTING
PLAN
2/3 CHANNEL
WIDTH
�`�
� �' �� o� �
_ � � �.�
�� ��;��.� ��..� ��,y�
�^�� h
� ���:
�
/
SECTION A-A
See Inset A
NOTES:
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
ACCORDANCE WITH ROADWAY STANDARD DRAWING N0. 1633.01.
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
TO BE APPLIED TO EACH ROCK SILT CHECK.
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
INSET A
CLASS B STONE
1' MIN_�_�,
�`'c°
H = 2' MIN �' � � � �.
� � �-
i `' " o `'� o "�" o `-
�'O �-�.`O r�'O r'� O �`O
SECTION B-B
12„
EXCELSIOR
MATTING
�i
— CLASS B STONE
Pv�-?T TO ��- ��E
II�I��I�I(�)\ (�I�� HI��I-I\�V� �1"�
�"I� �'l�l�: (�I�� \(�I'�"l�l �I � �.�� ['�(�)I.I \ �
SOIL STABILIZA T101� TIMEFRAMES
>�l l ,�_ 1;�� ��>��'�',�r'l �' l l�!l� _�> I ,�C�li l �-�,�T 1��:�1`�� T 1������ 7 i�;r � r �',�1 ��i'� � � ,A' �� '� �';_ /; -��,� ,�.
PERIMETER DIKES9 SWALES9 DITCHES AND SLOPES 7 DAYS NONE
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 30l 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2019 14 DAYS ARE ALLOWEDo
SLOPES 3alOR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'IN
LENGTHo
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4el 14 DAYS NONE,EXCEPT FOR PERIMETERS AND HQW ZONESo
DETAIL A
TOE PROTECTION
� no� m s�mel � re�
NA7URA� \ °� 5\ap0
GROUNO � F`\
d
Geete.�ile
d= 1 Fi.
Type of Liner= Closs B Rlp-Rop
-L- STA. 11+70 TO 12+20 RT
-L- STA.17+10 TO 18+50 LT
DETAIL B
BANK STABILIL4TION
�N �ro xaiol
r%;� �ws �1
EXCAVATION � S
GEOTE%TILE
Cl II RIP RAP FILL r f
Type ol Liner- CLA$$ II RIP RAP
-L- STA.14+70
-L- STA. 15-35
�� � � � - n;ti / / �li
=l " / /
// � i U� /__-_-__i / / /
� � /
� / _ _ O �/ �/ �/
�� � � � E B HARRIS & � � �
�� I �� ANNE T F�RRI� � I
_ I e - _ D6 899 �G �3 � _ �2� /
� � I - , �,,' _-\` L\ �i
� � tl - _I �� ��- �� '�
1 � I I �� �_�� � t�
1 � I� � � z'Sr-�_�� / �, �-,F�
�� w'I � � `� \BEGI PROJECT B-5687 Q,� � - ; �
� I�.I j �i d- POT SYo. 11+50A0 iti�� cuss a rsir rsnr i�
[3M-i / � / I � -- --� _ esr. i roN i ;' �
�� � I � I � II \ \\ � \ \ - EST. 5 SV GEOTE%1'ILE / �
/ +2�-L- � ('
� \
I 3se�irT I i � W000s �� BM-2 -�
� ��, .,4. I .in"�'`'c:- \ 50�T�kPER � t5" csr \\
�,d � �� �``n�^�4'an Li Rr `R� W2 ELBOW$ ;-t,
� l P�EsN �E,: : . � . . �E �''-"' �;� E ;r, E : �
PUE
b � \ � BEGIN SBG
� \ J \ +61 LT 1
� °°s ' ��. \ �
� X� _' � �
_,�
1 - _�� — �_ �.
��Ao �-- - - -
��—' -
l � LICKSK/[.[� Rp SR �7
�� � .. -.�i- �._ 2�6BST i L� _ �
� �„� . � �
I i�+,r', �"�"-`` \, i
�� ��� � � A �/I�I
/ 1 \ \ \ \ I I �
/ 1 � \ � i 1� I I�
/ �` i TOE PROTECT�N W��P� I '� � �
/ ' SEE DETAIL /� i i
= . EST. 25 TON6' RIP RAP J � I.
. � EST. 60 SY ,GEOTEXTILE / ` � -'� — —
ry� _ O / �. I. � I ��
� � i
i .� -L- SYa. l3-NX7A0 ' � ' i
\ E B HARRIS & � ,� � '`�'
� ANNE T HAR�IY� �`"�, j �j� �
� � DB &99 PG f� � � j
\ I '. I c;..�
� . � � � � / . ' �
\ / , I ��
� \\� �\� �� / �� - .
I e � �
_ _i � � � � � �-
' � \ _ 1
� �
� . _ � � . � . V `� i .
� _. � \\ \� ' `\
�
� \\� I
� - / I \ I
���\ 1 � 1 , , �
��� I I �
\��` � � , . / �
� ENVIRONMENTALLY SENSITIVE AREA
SEE PROJECT SPECIAL PROVISIONS
EROSION CONTROL COMMITMENTS:
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS,THE CONTRACTOR MAY
PERFORM CLEARING OPERATIONS BUi NOT GRUBBING OPERATION UNTIL IMMEDIATELY
PRIOR TO BEGINNING GRADING OPERATIONS.
- ONCE GRADING OPERATIONS BEGIN IN IDENTIFIED ENVIRONMENTALLY SENSITIVE AREAS,
WORK $HAII PROGRE55 IN A CONTINUOIS MANNER UNTIL COMPLEfE.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, EROSION CONTROL DEVICES
SHALL 8E INSTALLEDIMMEDIATELY FOLLOWING THE CLEARING OPERATION.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, "SEEDING MULCHING" SHALL
BE PERFORMED ON THE AREAS OISTURBED 8Y CONSTRUCTION IMMEDIATELY FOLLOWING
FINAL GRADE ESTABLISHMENT.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITNE AREAS, SEEDING MULCHING SHALL
BE DONE IN STAGES ON CUT AN� HLL SLOPES THAT ARE GREATER THAN 20 FEET IN
HEIGHT MEASURE ALONG THE SLOPE OR GREATER THAN TWO ACRES IN AREA,
WHICHEVER IS LESS.
- SPECIAL SEOIMENT CONTROL FENCE WILL BE INSTALLED ALONG THE TOP OF THE STftEAM
BANK. STANDARD SILT FENCE WILL BE INSTALLED ALONG THE TOE OF SLOPE PARALLEL
TO THE STREAAA. ONCE THE DISTURBED AREAS OF THE PROJECT DRAINING TO THE
SPEQAL SEDIMENT CONTROL FENCE HAVE BEEN STABILIZED, THE SPECIAL SEDIMENT CONTROL
FENCE AND ALL BWLT UP SEDIMENT ADIACENT TO THE PENCE WILL BE REMOVE� TO
NATURAL GROUND AND STABIUZED WITH A NATIVE GRA55 MIX.
- ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THROUGHOUT THE PROJECT LIMITS,
WILL BE CLEANED OUT WITH 1!1 FULL WITH SEDIMENT,TO ENSURE PROPER FUNCTION OF
THE MEASURES.
- COIR FIBER MATTING WILL BE WSTALLED ON THE FOOTPRWT OF UNCL4551FIED STRUCTURE
EXCAVATION NEAR THE STREAMBANKS.
- EMBANKMENT CONSTRUCTION AND GRADING SHALL BE MANAGED IN SUCH A MANNER TO
PREVENT SURFACE RUNOFF�DRAINAGE FROM DISCHARGING UNTREATED INTO THE RIPARIAN
BUFFER. INSTEAD ALL INTERIM SURFACES WILL BE GRADED TO DRAIN TO TEMPORARY EROSION
CONTROL DEVICES. TEMPORARY BERMS, DITCHES, ECT WILL INCORPORATED, AS NECESSARY, TO
TREAT TEMPORP,RY RUNOFF BEFORE DISCHARGING IN TO THE RIPARIAN BUFFER (AS SPECIFIED
IN THE NCDOT BMP MANUAL�.
` r �S_ �
— � \/ (� \
� �
�---------- QUANTITY FOR EXCAVATION LIMITS IS INCLUDED
IN UNCLASSIFIED STRUCTURE EXCAVATION
1TER LINE_OF .. - .
CREGk IS i � � - -
OPERTY LINE : � .
,,��aa-- ��_
3 � �_--.� � ' si � i�--- ---i - - -
i r�
��`� l� _s%. � l _�= ---- �2�' �i
\', ,- l' � 1 �� p
�� T� �' m� ti P G SEAMAN .'�R & OTHERS
0 No Rt�kENcE
i
� /
4. /
1 WOODS /
�♦ i�
�"� -� EXCAVATION �
\�\ s �z � LIMITS CIytSSIIRIPRAP +10 L- woODs
� � � �� j3TRUCTURE PAY ITEM) 75• LT
.. � . �PUE PUE a�.....
�D� .,3'.:i:'S5�%�l�i�_..����:�.:. ._���;u�Il��
� £
/ � �-_��
r` � �
5 � ( ic WOO�S �I �
N
'_�_W�e__---- _-- � a
-L- ! PT Sto.14t0539
�`\ � CLA55 IiSRIP RAP
� �\ (STRUCTURE PAY ITEM)
\ ��
� � USE IMPERVIOUS DIKE
� NCDOTSTANDARD BMP
� ALONG STREAM BANK TO
' DEWATER AND ISOLATE
ADJACENT WORK AREA
I TO INSTALL PROPOSED
� INT. BENT IN THE DRY.
"�,. - -INSTALL BANK S7ABLIZATION
�' � $EE DETAIL B � �
� EST.355 TONS RIP RAP —
� EST. 175 SY GEOTEXTILE
\
�. �� USE IMPERVIOUS DIKE '�
NCDOTSTANDARD BMP �
� ALONG STREAM BANK TO
� DEWATER AND ISOLATE
� ADJACEN7 WORK AREA _
TO INSTALL PROPOSED
I INT. BENT IN THE DRY.
I INSTALL BANK STABLIZATION
SEE DETAIL B
I I EST. 75 TONS RIP RAP
� EST.140 SY GEOTEXTILE
A
/
/
/
,i
L'
TOE PROTEC��N
SEE DETAIIlA
`EST. 65 YONS RIP RAP
� EST.75G SY GEOTEXTILE
� /
L �
� - ut-r�rue
i'�f
GRAPHIC SCALE
5.0 0 5.0 � 0
��.[� -� -
a� P ���1
�\
PROJECT REFERENCE NO. � SHEET NO.
R/W SHEET NO.
ROADSIDE ENVIRONMENTAL PROJECT ENGINEER
LEVEL III CERTIFIED BY:
ALEXANDER D SNIDER, PE
CERTIFICATION NUMBER:3064
ISSUED: AUGUST 22, 2017
CLEARING AND GRUBBING
EROSION CONTROL FOR
CONSTRUCTION SHEET 4
� io /
- � � 30.10' LT
J C�F'7 50 uV .
E /
� �ve�� .L e
- ,�-�ti'���4r w-,�
_-_ - � _- --
� ro r�Vn; rqYN /ioao
. �, .—�,`�,-��, _� �.., .t,.— �, N 2T 44' 45.0' E
i� - �v.--=_--� - �
. � � � � � �� .��
4 �e - � _
4y000s \
\� �' �5� � � � � ��� � � �\� \ \�� � -
�- �t � � 4 � � � � �. y� '' . \� .
� � L _ --_�__--_--�------�---�� . �
�fd � �' �l � ' 1 � ��\
s � �� r -'' i i ' �
' i � ` ..5�� � �
� i � �� � .' , , _ -�%Z �;� _/
�� \ / '
, \ � 1 /�� /��
�` � \ � � I 3 �� .
��, ,� � � "-' I CLEMOH�KEARNEY � � � � . � �
, � m) �� �. � _ _ � / DB 888 PG 837 i /
1 \\� f' --_ � _ . < l /
4 ���' i ) �.G�Z� �� \ .. /
1 �- " �u�ly€rt uNE'BF� � \ � . '� �
1 � @�e�G� ,$ 2�, . . � �I I \/
r� �'AD �11NE � \ I I �
jt��� � �� � � ' �
i� � � \ . � . �r� I � , �
. � �� / �� \, , � � �� \\
t� // � . , � � \
" \ / _.L\�� \ . / % \
\� i DECK DRAIN� NOT REQUIRED \1
\ I �
IMPERVIOUS DIKE SHALL BE CONSIDERED
INCIDENTAL TO THE REMOVAL OF THE
EXISTING STRUCTURE
NOTE: NOTE: NOTE:
ALL EROSION CONTROL DEVICES SHOWN ARE LOCATED PLACE TEMPORARY ROCK SILT CHECKS TYPE - A AT UTILIZE SPECIAL STILLING BASINS FOR DRILLED PIERS
WITHIN EXISTINCrPROPOSED R/W OR EASEMENT. DRAINAGE OUTLETS.
DETAIL A
TOE PROTECTION
� No� io Smle� � he�
NATURAL 1°�F�o�
GRpUND 9.FpS
a
Geo�e.�ile
d= 1 Ft.
Type of Liner= Closs B Rip-Rop
-L- STA. 17+70 TO 12+20 RT
-L- STA. 17+10 TO 18+50 LT
DETAIL B
BANK STABILIZATION
� No� lo Scale)
-� 1-
�i// NWS �
excavnnoN ' s
GEOTEXfILE
CL II RIP RAP FILL r f
Type ol Liner= CL455 II RIP RAP
-L- STA, 14+70
-L- STA. 15+35
BM-1
\w +20 -L-
30.10' LT
— P�%' SY�. �Q.fOO.00 55' LT�
�
X�
TO S _�"�"�
�
A�VE T HARRIS
DB 899 PG 83
WOODS
� �
k�� �
��
n,r��1'��—� C
_ L�ET RD -=q � �8,� �
$S ELEC W/ :iac�r�i .« ...,. �...._.. _.
TOE PROTECTION
SEE DETAIL A
EST.25 TONS RIP RP,P
EST.50 $Y GEOTEXTILE
� -L- PC
B H RRIS &
NE T HARRIS }�`"'��,�
DB B99 PG 83 r
CENTER LINE Of
CREEI( IS
PROPERTY LII�E
��STe
I I '�
�� � ��.
ClP.SS B RIP RAP
EST. 1 TON �
EST.S Sv GEOTE%TILE : j
eM-z �
ti�
� 15" CSP `'+�
W2 ELBOWS �
.r�.�rlir��-iir� .
IE PUE E � R
BEGIN SBG q �.+ya^
+61 LT 1 �z, i.�,�; p
�
�
EROSION CONTROL COMMITMENTS:
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS,THE CONTRACTOR MAY
PERFORM CLEARING OPERATIONS BUi NOT GRUBBING OPERATION UNTIL IMMEDIATELY
PRIOR TO BEGINNING GRADING OPERATIONS.
- ONCE GRADING OPERATIONS BEGIN IN IDENTIFIED ENVIRONMENTALLY SENSITIVE AREAS,
WORK $HAII PROGRE55 IN A CONTINUOIS MANNER UNTIL COMPLEfE.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, EROSION CONTROL DEVICES
SHALL 8E INSTALLEDIMMEDIATELY FOLLOWING THE CLEARING OPERATION.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITIVE AREAS, "SEEDING MULCHING" SHALL
BE PERFORMED ON THE AREAS OISTURBED 8Y CONSTRUCTION IMMEDIATELY FOLLOWING
FINAL GRADE ESTABLISHMENT.
- IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITNE AREAS, SEEDING MULCHING SHALL
BE DONE IN STAGES ON CUT AN� HLL SLOPES THAT ARE GREATER THAN 20 FEET IN
HEIGHT MEASURE ALONG THE SLOPE OR GREATER THAN TWO ACRES IN AREA,
WHICHEVER IS LESS.
- SPECIAL SEOIMENT CONTROL FENCE WILL BE INSTALLED ALONG THE TOP OF THE STftEAM
BANK STANDARD SILT FENCE WILL BE INSTALLED ALONG THE TOE OF SLOPE PARALLEL
TO THE STREAAA. ONCE THE DISTURBED AREAS OF THE PROJECT DRAINING TO THE
SPEQAL SEDIMENT CONTROL FENCE HAVE BEEN STABILIZED, THE SPECIAL SEDIMENT CONTROL
FENCE AND ALL BWLT UP SEDIMENT ADIACENT TO THE PENCE WILL BE REMOVE� TO
NATURAL GROUND AND STABIUZED WITH A NATIVE GRA55 MIX.
- ALL SEDIMENTATION AND EROSION CONTROL MEASURES, THROUGHOUT THE PROJECT LIMITS,
WILL BE CLEANED OUT WITH 1!1 FULL WITH SEDIMENT,TO ENSURE PROPER FUNCTION OF
THE MEASURES.
- COIR FIBER MATTING WILL BE WSTALLED ON THE FOOTPRWT OF UNCL4551FIED STRUCTURE
EXCAVATION NEAR THE STREAMBANKS.
- EMBANKMENT CONSTRUCTION AND GRADING SHALL BE MANAGED IN SUCH A MANNER TO
PREVENT SURFACE RUNOFF�DRAINAGE FROM DISCHARGING UNTREATED INTO THE RIPARIAN
BUFFER. INSTEAD ALL INTERIM SURFACES WILL BE GRADED TO DRAIN TO TEMPORARY EROSION
CONTROL DEVICES. TEMPORARY BERMS, DITCHES, ECT. WILL INCORPORATED, AS NECESSARY, TO
TREAT TEMPORP,RY RUNOFF BEFORE DISCHARGING IN TO THE RIPARIAN BUFFER (AS SPECIFIED
IN THE NCDOT BMP MANUAL�.
QUANTITY FOR EXCAVATION LIMITS IS INCLUDED
IN UNCLASSIFIED STRUCTURE EXCAVATION
�� /
o�'
M1
e
� WJUL`S
4.�
\�`'� EXCAVATI
,, ii,� B LIMITS
`P S 2.
� �a ��� �fliQn �r �iQ�ee7 r�7�1�j!��
(V��� �rru, ��'�n��{�iR1� -
I �✓ .n�i=�:'.��'a: �'"�,��'�.�.
� �- � 1
. J �. . _I_ •
CLA55 II RIP RAP J 1 1
(STRUCTURE PAY ITEM) 1\
USE IMPERVIOUS DIKE
NCDOT STANDARD BMP
ALONG STREAM BANK TO
DEWATER AND ISOLATE
ADIACENT WORK AREA
TO INSTALL PROPOSED
INT. BENT IN THE DRY.
INSTALL BANK $TABLIZATION
SEE DETAIL B
E5T.355 TONS RIP RAP
E5T.775 SY GEOTEXTILE
USE IMPERVIOUS DIKE
NCDOTSTANDARD BMP
ALONG STREAM BANK TO
DEWATER AND ISOLATE
ADIACENT WORK AREA _
TO INSTALL PROPOSED
INT. BENT IN THE ORY.
INSTALL BANK STABLIZATION
SEE DETAIL B
EST. 75 TONS RIP RAP
EST.140 SV GEOTE%TILE
z
P G SFJI�IAN �t & OTHQtS
No R�weNce
�P +
PAY ITEM� �
—tue ruc
TOE PROTECTION
SEE DETAIL A
WooGs EST.65 TONS RIP RAP
EST.150 SY GEOTEXTILE
-PUE PUE
vu[ ruc�
— — 'cY,l5' BST
�� �o� na� c ,N���,,,� e„ _ �e Ka
— � � ,*�1�"- 4S6VJ ON-TREES =T
� � � � �
.
w`� _ � —
� � � � � � �,�� Woous
\ � \
�
c� \ � � � i ic � �
�'. L _ --_y��--------------�_---�
N y m'
�\ S.
d'
3
� y � CLEMON KEAR�Y
� \ `� ti\ DB 888 PG 83T
N1 1 CENTER LINE OF
CREEK IS
PROPERTY LINE
IMPERVIOUS DIKE SHALL BE CONSIDERED
INCIDENTAL TO THE REMOVAL OF THE
EXISTING STRUCTURE
GRAPHIC SCALE
5.0 0 5.0 � 0
��.[� -� -
FINAL EROSION CONTROL FOR
CONSTRUCTION SHEET 4
1
��1
�P
Q a
�P
50' LT
�rue ,...
PROJECT REFERENCE NO. � SHEET NO.
R/W SHEET NO.
ROADSIDE ENVIRONMENTAL PROJECT ENGINEER
LEVEL III CERTIFIED BY:
ALEXANDER D SNIDER, PE
CERTIFICATION NUMBER:3064
ISSUED: AUGUST 22, 2017
��iro Pawc raVN rmao
� ly 27'44'45.0' E
h ��, , �, ,�,, ,n,
DECK DRAINS NOT REQUIRED
NOTE: NOTE:
ALL EROSION CONTROL DEVICES SHOWN ARE LOCATED UTILIZE SPECIAL STILLING BASINS FOR DRILLED PIERS
WITHIN EXISTINCrPROPOSED RrW OR EASEMENT.
PI�ANTING DETAILS
SEEDLING / LINER BARTROOT PLANTING DETAIL
r:i�►��r.ce�
7. Locate a hceling-in site in a shxdy, �rcll
proCecteJ area.
2. Excavate a flat bottom trench
12 inclies dccv �nd tvovidc draina,�e.
3. Back611 the trcnch with 2 inc
rottcd sawdust Place a 2 inoh
well ro[ted sawdust ut a sloping
at one end of the trendi.
4. Pl�ce ai .aingle laye� nf plxnts
against the sloping end so that
die root collar is ut ground lecel.
�. Ylflce ss 2 inch laver of scell rotte
sawJust over the roots maintuinin�
u sloping angle. -
6. Repeat lacers of plants and sawdust
es neces.sary and �va[er diorooglily.
DIBBLL PLANTING METHOD
USING THE KBC PLANTING 13AR
L Inserr planting bxr
as shown :u�d F�dl himdlc
rowa.rd pl�ntcr.
4. Pull handle of bar
Cow�ard planter, firming
soil at butmm.
I J -
W=1�-�-�!- I-I-
u �i . 1�i�1r�i�
��im �i'° � �imi-�
LL lil �=11 L W
� I �T I�HJ �f
I�I. i� ii-il_
2. Remove plunting bsr
nnd place secdling rit
wrrcct dep[h.
5. Push handle forwurd
lirming soil �f [op.
PI.ANTING NOT�S:
PL1NTf\G 6AG
During plan[ing, seedlinqe
shull bc kcp2 in x moist
cssnvas b�g or similar
conf:uner to pree�ent [l�e
root ys[cros from drying.
K13C PL:1\''1llVG B�1R
Plunting bur shv11 hbve a
bladc ��it6 n triungular
cross scction, and shall
bc 12 inches long,
4 inchcs widc vnd
1 incU thick at center.
ROOT PRUNiNG
�111 scedlings shall be root
pruned, il necessary, so tlia[
no roots estenJ more th�n
l0 inehcs helow the
roof collav.
�- � 2 inch
i —i I—!
� H I I' '�I I�� I I' �I I
m I I! � n�71-
L- 11� -i I
� I TI I��fl i� J����
3. Inscrt plunting bar
2 inchcs rowurd planter
from seedling.
T¢ PRol6cT R I
I o�o B-5687 RIi-1
REFORESTATION
❑ TR�� Ii�FORESTATION SHAI.L Br PI.AN'1'ED 6 FT. TO 10 P`T. ON CENT�R, RANDOVI SPACING,
AV�RAGING 8 Ii T. ON CENT�R, APPROXINL=�TEI,Y 680 PLANTS I'ER ACRE.
REFORESTATION
D4I.Y'l'Ulil:, 7'Y'PI:, SIZ�, AND TL'RNISH SIIAI.[, CONFOR�ti1 TO THE FOLLOR'ING:
33% LIRI011ENDRON TULIPIF�RA
33% PLATANUS OCCIDENTAI.IS
34% BETiJI,A �VIGItA
TliLIP POPI.AR 12 in - 18 in BR
AIVIERICAN SYCt11VIORE 12 in - 18 in BR
RNER BIRCH 12 in - 18 in BR
REFORESTATION DETAIL SHEET
ti.�.�.�O.T. - 9t�P ➢�SYIDE ENL'IR�ONM�NT �L UNIT
DETAIL A
TOE PROTECTION
� No� �o Scole) \ �ec
GRO� \ �.�F;�Sopg
d��,� �
�",�" `— �aa,e.,��a
d= 1 FI.
Type ofL'iner= Closs B Rip-kop
-L- STA. 11+70 TO 12+20 RT
-L- STA. 17+10 TO 18+50 LT
DETAIL B
BANK STABILIZATION
(No�fo S�olo�
l!�'r�; Z, NW5 /�--
EXCnVAiION —� y= /J
GEOTEXTILE—' J
CL II RIP RAP FILL "� �
Type of Liner- CL455 II RIP RAP
-L- STA. 14+70
-L- STA. 15+35
O
E B HARRIS &
ANNE T tiARRIS
DB 899 PG 83
-L- POT Sta. 11+50.00
FMC,i
V +20 -l-
3o.to' LT \
-L- POT Sto. 10+00.00 ss �T `, wc,:�os
,ti � �'� �� s�
R �I
� � PUE P E PUE
� +50 L
F x_riNc k �� 29 95 L7 ��- -�
EXIST 0/H POWER ���--��—a,��
TO REMAIN _ _ _ �_ ��� - _
_r" "'�,.v, o N 30 3% 426 = —
E—'
__ C i l�„�i /iY - _
— _ Jfi 5Si W
� �E FLEc' Wi IB F�LaSi ANG Wn
s� F� `r�� �^ � ao ao>r�
45' RT
TOE PROTECTION / W�i�p�
SEE �ETAIL A
EST.25 TONS RIP RAP
EST.60 SY GEOTEXTILE
O
E B HARRIS &
ANNE T HARRIS
DB 899 PG 83
ENVIRONMENTAL COMMITMENTS:
-THERE SHALL BE NO IMPACTS TO THE STREAM CHANNEL OR CLEARING/GRUBBING OF TREES OR VEGETATION ALONG THE
STREAMBANK FROM ANY UTILIN WORK.
-CONTRACTOR WILL USE NCDOT APPROVED EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES AND
MAINTAW THEM AS NECESSARV ON THE DEPARTMENT'S RIGHT OF WAY OR LEGALLY OBTAINED EASEMENTS. THE
METHODS fOR EROSION CONTROL FOR THIS PROJECT MUST MEET EXPECTATIONS OF DESIGN STANDARDS IN SENSITIVE
WATERSHEDS.
-IN AREAS IDENTIFIED AS ENVIRONMENTALLY SENSITNE AREAS, EROSION CONTROL DEVICES SHALL BE iNSTALLED
IMMEDIATELY FOLLOWING LAND DISTURBING ACTIVITIES.
-CONTACT THE RESI�ENT ENGINEER AND DIVISION ENVIRONMENTAL OFFICER PRIOR TO ANY WORK CONDUCTED IN THE
DEPARTMENT'S RIGHT OF WAY OR LEGALLY 08TAINED EASEMENTS.
EXIST. POWER I
.ND 0/H LINES
+05.39 -L-
40' LT -
55' Li
CLASS B RIP RAP
EST. 1 TON -
E5T.5 SY GEOTEXTILE \���
B M �' \
� wrz eisows 'y�, \�c
. � �._ � �.r' �\ . \
lE P11
BEGIN SBG���a.
+bl LT
.,�QO.--� '
40' LT \ ���.
F i no�� :
i-EiJTEF LPdE Or
CREE'r, 15
PuO�Eerr �w_
�/ /�STB
� `I ��
20,,
;��iP
/a
��p�
�UAIVTiTY FOR FXCqVAT10N UMIT� IS il�lCWDED
IN L�PV�LAS�IFIEf` �TRUCTUkE ExrAVATIOf�
0
0
*
�
� ry `
,A E � i{��
�'��.T`-L � � 4l" MTLk—`-' � �� 1
R � rv� ' r Ir ryryry ._ _
_ ' � � ��u'„'-� 1��
� _� � � -. ' ..
�+oo � �- ��� \
�'� . 45 RT +0539 -L-i � ; \
� j � 45' RT i
��� 55'RT I �
�r I ; �- wGo�- i r "
] _ _ _w� - - - - - - _ �
% _i _ org c+„ i�in� z�
CLA55 II RIP RAP J 1 1
(STRUCTURE PAY ITEM)
\
� �
�'.'�' USE IMPERVIOUS DIKE
NCDOTSTANDARD BMP
ALONG STREAM BANK TO
S DEWATER AND ISOLATE
_ ADIACENT WORK AREA
TO INSTALL PROPOSED
. INT. BENT IN THE DRY.
INSTALL BANK STABLIZATION
SEE DETAIL B
EST. 355 TONS RIP RAP
EST.175 SY GEOTEXTILE
USE IMPERVIOUS DIKE
NCDOT STAN�ARD BMP
ALONG STREAM BANK TO
DEWATER AND ISOLATE
ADJACENT WORK AREA _
TO INSTALL PROPOSED
INT. BENT IN THE DRY.
INSTALL BANK STABLIZATION
SEE DEfAIL B
EST. 75 TONS RIP RAP
E5T.140 SY GEOTEXTILE
REMOVE EX. POLES AND AERIAL
CABLE. EXIST. BURIED CABLE
TO 8E ABANDONE� IN PLACE.
EXIST. PHONE PEDESTALS TO
BE REMOVED AND REPLACED.
I
� I O
0� �!� � P G SEAMAN JR & OTHERS
e'� NO REFERENCE
w000;
UTILITIES BY OTHERS
TOE PROTECTION
SEE DETAIL A
CL455 II RIP RAP ��p _�_ �v'-' E�5 EST. 65 TONS RIP RAP .���1 - a{-[,5' -L- PT StO. 20+75.
r�STRUCTURE PAY ITEM� 75, �T �EST. 150 SY GEOTE%TILE Ll F� RT
� +50 -L- +65 -L-
ue pue �' ; 30' LT 30.10' LT\
+90 L °E rue in�P.� �
40 �T ..oF �,.�� r�w .�- / P0E p�E � 40' LT 50' LT EXIST 0/H POWER
E TO REMAIN
� `
P�J��PUE PUE— �,
�,. p ' _ _ _ � � ^-' ..rz`}'� ,'`�`' - -�N 4.� 3-*-
+�.�, - _ . -- - _ � -., _ �n
�J}� � �GREU TL3 = - - - - - - - - - - - - _- - � ��� `
- � - - - �. o � er - ro FaRd� rnwr✓ e�uao
- ' - N 25` 59' 17.9 E ucnshiuFr Rc e o � �
� --- . ., . {. �-� � � � _ f�� _ � - � ,�- �� ��.,�— - N 2% 44' 45.0" E
i��s�._� i� __ - � _ .. _ _�-"y.� -- - ��
��-' -
,�� ���n— ^ --x�T�' 45BW CiP TRf�S-�RLIM� �
R 4
_ �' f � �
\ '
� I 'Y ;\ 1 q � � � � W07D5
C 1
�
+90 -L- �
�-; 45'RT# � �\
a � 55'RT } ... �.------w�e- - \�-
o,� � L � � _w�n- -
�, e'
c, 272 FEET OF CENTURYLINK COPPER PHONE CABLE
� `� � INSTALLE� BY TRENCHLESS METHODS 70 FEET BELOW
\ \< THE CREEK AND 2-FEET INSIDE NEW R/W.
4� 1,790 FEET TOTAL PLOWED IN BLIRIED PHONE CABLE
� 4 �
TO TIE BACK IN NORTH AND SOUTH OF THE PROJECT.
� �= � O
�� L �� ���� CLEMON KEARNEY
�� 1 OB 888 PG 837
4
\ CEN�ER LINE iiF
\ CREEK ii
FF!iPE�Ty _INf
IMPEPVIOUS DIKE ��HALL B� �_OPJSIDERE�
INCIDENTAL TO THE REMQVAL. uF THE.
EXISTING S I RUCTUkF
-L-
Pl Sta 13+52.72 Pl Sto 20+12.50
p= 4° 32' 297" (LTl p=/ 45' 27.1" (RTI
D= 4° l8' 28.6" D= l° 24' 2/.7"
L = 105.39' L = I25.00'
T = 52.72' T = 62.50'
R = 1,330.00' R = 4,075.00'
50 -L-
30' RT
45' RT
I DECK DF�Aif�iS N���T RE�,�UIRED�
FOR STRUCTURE PLANS SEE SHEETS S-1 THRU 5-24
�
�10
�UO
1�I+OD
BEGIN BRIDGE
F�LL FACE cv FND BEfV� 1
STAe 14+27v06 -L-
GeP, EL. 222,34
BEGIfJ FRO�lT SLOPC
STA. 19+19.09 -L-
�.Pa EL. 222._1.
APF'ROXIMATC
IVA7URA1_
GI;�JLII�lD LTyE
— �� Tl�rt � —Ti — �
F�
,; �
�
��i
�'-Q" MINe PILE I
EMF��D. ITYP„I
HP 12 X �3 STCEL ='1LE5
(TYF'. EAe tND BCNT)
� I
r' EARTI-I FFRPv�
�� �I e ?14�ri5
�
W.P '1
_ STAe 19-Z7aGl. L-
- F i LL FACE CJ �ND 6EPJT 1�
k \
- B�GIN APPRGACH SLAB �
� STA.14+1b-;6 -L- � ��
�.
� i 0 r 1 r, =i 1'
� PT �TA.14+05.39 -L- �
i
=' BEGI�I FRON I SLOPE ;
- ST�e 1�+19,OJ -L-
�=1 A�` II
RTF FAN
(7 YP.I
SPAN A
1= I X,
I'-7" BFRM
NORMAL TG CAP (TYPJ
LOW CHORD na
EIVD BENT 1
+i
� EI e 2P9�70
N
`" +�
� +i
w i-
i J rl
:,
��w � J
� � —
�. ' T,��ii �-�_U_ ��
U�dCLA»IFiED
�1I IJSTURF
EX�VA rlilN
(TYPJ
END BENT 1
0
SI.OFE T�
URAIN
��XCAVATE TO-
E�e ��iaezo -
36'-9 �i5„
s�AN A
l�+ni;
SPAN B
t IX, F1X.
FIX,
BASE aISi-HARI=E
([j7rinj
EXISTING EL_ 'Z1.t�Q
�LIBST�UCTUFE—
( i YFei 1,i
q ��ws, +� ,��
h � � E� �l�.�n H h�� � � 1,1; �;
ii �� �� ii �� ��oi�-� ii ii � w ii /�„�
�--- I I z � � I I I I; ; L LI �
�� I I ;,,, `o I I I I � w � ��
� �� t,, II � fl II� �T
� _� � I I
I I I I �-�' / i
�����j�_ `'� G'i I I _LL__ _1 �
� I I --- --L�—_ ----- I I —--- � �51_OFt TO
I I DRAII�
+i
BANK SIABILIZATION� - CXCAVATE lu
(ROADWAY GETAIL = v -LL.214.20 ±
AI�ID PAY ITFM? ��"
� �i —BAfdK �TAEi! =7ATTOP,1
�`' (ROADWAY DETAIL
AND PA! ITEM)
SPAN C
FIX, FT_X
1'-9"MI�I. tARTH BcRM _
NORMAL TO CAP (TYf�.)
LOW CHORD c�
+� IEGJD 6ENT �
EL� 220.�3
;r
�
, `��� �\ \
\\ � � \
\� � � �
\\ � �\
4 � �\
\�\� � ���
0\ % \
\
\�\\�\ �\�
\
��� � ��\
\\ � \ �
4 � \�
\\ \ \�
��
BENT 1
SECTION ALONG � SURVEY -L-
(SECTIOI�S <J EPJD BEI�ITS AND EENTS ARE �a R1�HT ANGLF_51
TOTAL FiRIDGE LENr.TH = 137'-10�/e"'(F1LL FAi�� TG FILL FACE)
(5'-1�i4„
sPar,i �
-E-'/e' �'s�
� �
�; .
� � �AUk �TPBILIZAT.T.GI'� �
♦ I �1AL1W4'� DETAIL �_ .
APJD � AY ITEM)
W,P. °;' �s, \
�TA.19+�= a,� -L- � BRIU�E �
�FP�T 1 ��fIIR�L I_T��JE �TA.!4+JE.C�D -L- A
BENT 2
�
� �'� �
� �
�� �A �� A � ��
\ \ \ \ u, \
\ �\ \\� �\ � �� \
� �
.� � �\\\ \\\ �\\\ \\\\\ � \\\
\\ \ �� �\ \ \�
\ \ \
\ V A A �
� � . ��, ��i_ � _i�.�, �i��„
\� � l I"Yh',) �\ \
\..�s �\ � \ \\
�� � \ \ \
\� � \ \ \
\� �XISTINC�� ��
BANK �Te�F'II_I�ATIG�!
iROAUWAY JCiA?�
API� FAY IT�MJ
SUB�TRU+=TUI�E
� r,r P.,
� �s
\
\
_ ;�
��s.
��
\
W��. "=
STn.15+35.57 -L
E'ENT = ( �.I�ITR01_ I_IfJ�
PLAN
�PILE� ANL DRILLED PItRS �JO�i SHnWN SPJ PLAN VIEW)
1
<r
a
Ef�ID BRIDGE
FiL_L FACF ��� FI�1D B„F„I'VT 2
STAD 15+G4.94 -L-
G.P. EL. 2�2.92
BEGIi� FRONi SLOPE
STA. 15+72.91 -L-
G.P. EL. 222.96
� 1'-6" TO UNCLAS�IF � tC�
STH7LICTURE �XCAVATION (TYP�)
i
�I �
_��— —
� 2 -m���
�.
�
1'-��"MTN, J
(TYPJ "'
�
� �LOPE li�zel (TYF'!
�—� L4�5 II
FIF RAF
� T Yr'. i
END BENT 2
1b+00
(-i9.0i509% N�)0���=05"�e
PVI S I A� 12+�;5�00
ELD = 2?1.66
VC� = 230'
(+10.4`L05): (+)ie9?UO:e
�VI S I A. 1�=SC�„r�Pi
F_L. _ ='?=.1.'
Vr_ _ �Q!J'
GRADE DATA —L—
HYDRAULIC DATAa
��E�IGN DISCHARGE _ �1 =�i� CF`�
�RE��LICNCY OF DLSI�P1 FLOuD =�5 YCAR
�E�IGN HIGH WATER ELEVATIGIV = 2�'un9
DRAINA�E AREA = 35.3 SQ. MI.
3��L LI�7-1AR6E f0� 170) = i�u7 CFS
oASE HIGH WA7ER FLEVATIOPJ = 221.�9
i!VEFTiSPPING �USn� DATA�
OVERTOPPING DISCHARGE - °.r�_�0
FREGIJENCY OF OVERTOPPING FLOOD = 500= YEAR
OVERTOFPING FLOOD ELEVATION = �:'.� # �
� �> i�iVER7pPPII�G OCCUR � AT RCADWAY �
;A� AT ;TAe � �+,�;e���, —�— Ar
�O��WAi' SU�ER 1-ilGil CRI�Ii7� �IDG
,�� HORIZONTAL CURVE DATA
P �� �z TA.���s� �z -�-
�$� v 4"- 1 7"iLLi
��Q,V �� = 4 'IP 8e��„
L = 1���S.i9'
T : z.�z
R = 133Q.00'
W.F'. �4
STAe15+r9elq -L-
j FILL FA_-E C� FP,ID BENT '
EIVD AFF'ROACH SLAB
� STA. 1�+7�.64 -L-
��� �LIRVFY -I_-
TO SP, Ir25
6t�:IN FRi�NT �LOP�
�TA= 1`+7=-91 -� -
'� �AFIH BERM
� �
\Fi �ir,��9
�
��,
�_�� � � �%
\ / ,;,
�
a��,��e,
� t
F�aN� Pr.rPnr,�r� av:
�IMPSON
� NGINEERS
�ASSOCIATES
li\
s��a�� oma� � o�-i�P
SWre tp0
Cary, �J�� 2�518
1919) 8`�2-045P•
fSl9) 352-0590 �;Faxl
W wW..S�RIC5r.f19nr��. _ pRl
�I�CN.uf�� No. r_ �zc�t I
1 HEFF� �rtTIFY TH-SE F�AN�
APE T-`iF A--('UILT PL,4I�J�
�G��o�o�i�,�,�ti G�����r�s
���u�1 U�IIu li f!7 ,f� ��rnl s��cc��IJ u U,S��I��iPl7io fi�9
PROJECT N0. 8-5687
WARREN COUNTY
STATION: 14+96000 -L-
SHEET 1�� � hEPLA�E� BRIDCt �4�
BM "' FR S?IKE IIV ��"PIfJF STAe 1?+39.00 -L-. 100' LTe, �Le 3�z0.�1
PFi�POSE� � UARDRAII..
(hUADWAY Gr � AII_ >a
PAY ITEM (T1'P.>
O
O
+
�
TO SR 1647
� I'T 51 A� i4 �G5�'9 -L- �,
� � ----- --
�
�-� —>_
� ,: X���.K�X—
_ —WLB—
y ___---
_ _ _ _w�e- �/
� � 4�`,,,,_�,,� -�
c , �-� � � �.
� W��uD�
�, �
�
`
� LRID =E +
�
S i P� -�1+9e.�ii:� -L- s
--- -�-- -----
50° �in� n�„
(T�I re�
—EXISTII�e�
STRUCTURE
.
;
`
� �ANI< STAE3ILTZATION
(ROADWAY GETAIL
AND PAY ITCM)
1
I
LOCATION SKETCH
w�,�-�u> 20��
�,� -- � -� � � r „ __ �p.� g3� P _ _
O
O
- � -L�S II +
N1P RA1 l9
� � (T�P�1
\ - -
--- � .
\\� �� SLkVEY -L-
�� Vr
�A V�� � TO �R 1625
�0 \ -
�A V�
�4�,� ----
- -
s� - �_�__
�
,A �._�� `� Wnt���;
`r� ' i /+
� �; � �
�-� FnR UTZLITv INFORMATIrN,>EE UTI�ITv
'� —. F�I..IA'�I� AI`ll� �,FE�_IAI. '�OVT�1�2b1�.
TOTAL BILL OF MATERIAL
i;LM�iVAL I't_�MANC�JT � _
�,_�„ _ II (. �1�=- � -
�� � DIA. �' 0"DIA. cTFEL i-A�TNG SSD i_S� � LA I IE� �,LASS A �'�IDGE REINFOR�TNG
DRILLED FIER DRIL�ED PIER -- SihU�TURE - APPkCiAi�H --
E>:TS7II�iG j�� _.pIL NOT IfJ SOIL F�-�R `�'-0"DIP.. INSPECTIDId i I ES i ING F_XCAVATTON �-���PJCRF_Tt cLABS � I EtL
STRIJ�-TIJRE DkILL=LD PIEHS
LS L� �F LF EA tA CY LS LB
�LIPFRS�TRUC��URE LS
EflL� NEbJT � - _2.q �,736
BtNT 1 �- 30.0 48�b Ib.9 9,�96
BEf!T � S i,�5 '0� � 7er 17.1 �,F J8
IJvD B�NT � LS '�',4 -e I ���
Ti:�T4L L'=, '�i.�:i 60.0 ?i,« � - i ;,G L� — �6G
TOTAL BILL OF MATERIAL
PILL DRIVTVJG VFRTI�AL u" X 1-9" �' 0' X�'-0`
Sf�11�AL COWMN RIP R�P LLGIEx�I�IL�
F��IIIFMEIVT ��fLJF' �Ir' 1�� r , riil�I� F'ETE � I I ASTi MLI,�i� N-' STF.� .SEL FFt�STkESSED A�L�F�Ti>>
FE�i�IrDRCIIIG -- . � i LA�� -I ruR
F��F2 HP iG X S3 IP�L FIL�� FJAhhIER I'EAl l'li�c C�iNCR�FIE c�NCRETE A«_��SMEI�I��
STEEL ',TF_EL PTLtS RA1L �� ����HICK) �FAI'JA�E i_O�tED �LAP_S CURED �LAB�_
LE E� IJ�e LF LF TGI�d �Y LS N0. I F Nu. U= LS
�UPFRSTRIJCTURE 27t��ft7 LS '0 GOO.UO 10 7SO�Qi7
END BENT 1 - 1�S 1�9 140
BEP�!T J L6���
BCNT � I,-':13
ENP C3EIVT - 100 15D 145
T��TAL �.1C1�� 1G li� _70a�97 �PS LS 2(1 ��ii(i.Ci�J IU ,O,l�i�2 L;
FOUNDATION NOTESe
FDF� LiF�ILLED I I�k�a "-- �E�iTEi�HI'JI'CAI SPEC�IAL PR�VIS1�'�N5 PI'1G S�C1 i ��; 47� �F THE
=TAN�ARD SPE�Ir1CAllnNSe
DRILLE� PIERS AT BENi 1 ARE DE�IGNED FOR A FACTORED RESISTaNCE OF 34Q Ti�NS PER
PIERD CHECR FIELD COPJDIiIGNS FnR THE REC�UIREQ TIP RE�ISTANrt OF 65 TSFn
PERMANENT �TEEL CASING: ARE R�f�UIRED �OR DRIILED PIERS AT BEf�IT 1. DO NQT EXTEN�I
PERMANENT STEEL CA�ING� BELLIW ELEVATI��N 197.0 FL WITHOUT PRIOR APFRr�VAL FROM THt
EGdGIIVEER.
�PdSTALL DRILLED PIERS AT BENT I TO A TIP ELEVATION NO HIGHER THAN 185.0 FT.AND
WT7H THE REQUIRED TIP RESISTANCE,
Ti-IE SCOUR CRITTCAL EL-CVATION FOR BENT 1 TS 2u4.0 FT. SCOUR �RITTr�L ELEVATIONS
qR: USEL� T� MnNITOR POSSIBLF SCOU� PROBLEMS DURING THE LIFE OF THE STP,UCTURE.
DRILLED PIERS AT BENT 2 ARE �ESI�NED FOFI A rAi�TQRED RESISTANCE OF 34� TL�NS PER
PIERD CHEChc FIELD CONDITIONS FOP, THE RECJUIRED TIP RESISTP.NGE OF 65 TSF,
PERMAIVE�IT STEEL CA�IN�S qRE RFfjUIRED FC1F L�RLLED PIERS AT LEIV7 e�0 PJOT EXTEP!D
PERMANENT STEEL CA� iN��=� BEL9W ELEVATIO�I �0�1.�:� F�eWITH0�1T �RIGR AFPROVAL FR�iM THE
[�i(,II��I�I �.
DkAWN BY: ��D_ ['fJ(1FEIt DATE. �-1!
U�iLCK.ED B't: Be�. COX DATE: �-11
�LsrcN ��vczniE�� or P�coPo: �aS. CUX oarE: �+-ii
NOTESo
ASSUMED LIVE Ln�1D - HL-93 UR �LTERP,I�TE LOADIN�.
THIS BRIDGE HAS BEEN DESIGNED IN AC�ORDANCE WITH THE AASHTO LRFD BhIDGE DESI�N SPECIFICATIGNS.
THIS BR10GE I� LOi�ATED IN SEISMIC ZCiNE 1.
USE IMPERVIOUS DIKE NCC10T �TANDARD BMP ALONG STREAM BANKS TO DEWATEP, AND ISGLAIE ADJACENT WORK AEEAS TC1 INSTALL
i�Rs=iPQ�tD SNTERIOR BEPJTS IN THE DRYe IMPERVIOUS DIk.ES �HALL B� COVd5TI7ERED IIVCI�FNTAL TO TH6 LUMF SUM PAY 1TEM �0�
f;CMOVAL OF GXISTING STRUCTURE.
FOR OTHER �ESIGN DATA AND GENERAL NOTE,,SEE SHEET SN.
FOR ERGST�N CONTR01_ MEASURES, 5EE EROSTnN CCIIVTROL PLANS.
REMOVAL OF THE EXISTIIV� P,RIDGE SHALL GE PERFI�RMED SO AS PJUT TO ALLGW DEBRIS TO FALL II�dT�:i THE WATER, THE C�O�dTRA�TJR
SI-IALL �EMOVE THE EPIDGE ANLI SUBMIT FLAI�IS FOR DEM�LITI�N IN /�[�ORDANCE WITH ARTICLE �iu2-2 OF THE ST�NDAkD
SPECTFSCATTOIVS.
�IHE MATERIAL SHCiWN IN THE i�P,OSS-HATCHED AREA SHALL BE EX�qVATED FOR A CIISTANCE OF ?S FT.LEFT AND 30 FT.RIGHT OF
CE�ITERLTIVE ROAUWAY AS DIREr1ED ES'f THE EN�T_NEER. THIS WORIC WTLL BE PA�D FGR AT THE CnN7RACT WMP SLJM PRICE FOR
UNCI_ASSIFiED �TRUCTURE EkCAVATIDN. :EE SECTIQN 412 OF THE STANDARU SPECIFIGATIONS.
i HE EXISTING STRUCTURF CONSIS i 5 4F a SPANS n 15'-0", 2� 15'-1" AP,ID 2 n 15'-3i/_'�e THE _UPcRSTRU�TURE HAS A CLEAR
RC�AL7WAY WIDTH OF :9'-3"W1TH IIMBER 1LnUF� GN ��ONTINLIOUS STEEL I-BEAMS. THE END BENTS AND INTERIOR BENTS CONSIST
i�F TIMBGR tGaPS ON TIMBCR PILCS. THE EkISTING STRUCTURE,WI-IIi-H IS LOCATEQ AT THE STTE OF TIiF PRO�GSED STRUCTURE,
SI IA-L BC R�MDVED� THE CXI�TS�dG BRZDGE IS PRESENTLY PuSTED F4R LOAD LIMITa SHOLILD THE �T1tUCTUF�AL INTEi;RITY OF THE
uI;IU�=E �ETERI9RATE 11UF1N= C�NSTP.JCTLON ��F THE PRC]PUSED GRIDGE. THE LUAD I_IMIT MAY BE F2ELllCED AS F9UIdD f�d��ESSAIi'P
DURING TH� LIFE OF THE PR�JEC7.
THE SlJBSTBU�=TiJRE OF THF_ EXISTING 13RIDi�E IN�ICAIED pP,l THF PLANS IS Fr2nM THF CESI 1N�URMATION AVAILAdLE. S1NCE
� HIS 1PJFOi?MATIGN IS SHOWf�I FL�R THE ��ONVtPJ1ENCE OF THE CuN � nACTORe THE CONTRACTOR SHALL HAVF NO CLAIM WHA I SOEVtR
AGAINST I Hc DEFAFt i MENT OF TRAN�POR I A I ION FnF ANY DELAYS ��R A��I i IOf��IAL COST INCURRED BASE� Qf�l DIFFERCN�ES BE I WEEf��I
THE EXISTIN� _P,RID�E SUBSTRUCTURE SFIOWN QN THE PLANS PN� TH� AC�UAL CONUITI�NS /�T THC PROJECT SITEe
THIS STRUCTURE HAS 6FEf�l DESIGNED TN ACCORDANCE WITH "HEC l8-EVAWA�IN� SCOUR Ai BRTp�E�."
FOR SUBMITTAL OF WO�iKING DRAWINGS,SEE SPECIAL PR��VIS,TON'=,
FGR FAL�cWORK AND FORMWORKs�EE SFECIAL PROVISIONSe
�0� CP,ANE SAFET'f,SEE SPECIAL PROVISIONSe
FuR GROLT FOR STRUCTUP.ES.SEE SPECIAI_ PROVISTGNS.
As��HA�T wEAr�1Nc suRFACE zs z��c�uoEo i� ROAr�wUv ui��A�i�Tr�r �N r�oAowAv P�Aris.
IIVASMUCH A� THE PAINT �'lSTEM OPJ TN� EXTSTIN� STRIJCTLIHAL �TEEL CONTAIN� LEAD,THE CONTRALTOR'S ATTENTION
IS DTREi=TE� TO ARTICLE 10i-1 OF THE STAPdDAPD �PECIFIi=ATTfjNS. ANY �OSTS RE�ULTING FRnM COMPLIANCE WITH
AFPLICABLE STATE OR FEUERAL REGULATIONS FERTAINT�� TO FIANDLTNC 0� MATERIALS �ONTAINTNG LEA� BA�ED PAINT
SHALL BE TIVC:WDED TN THF FTL� PRTCE FOR '"I?EM�VAL OF EXTSTING STRUi=TURE AT STATION 14+9Fe0n -L-e"
FOR ASBESTOS ASSESSMENT FOR BkTDLE DEMOLITION ANO REN�VAiICiN qCTIVITIES,SEE SPECTAL PROVISInNSe
BEST MAIVArENENT PRaCTICES FOR BRrDGE �EM4LITIrpd APJD P.EMOVAL WILL BE IMPLEMEI'dTED DUPIPJG THE REMOVAL OF
I Ht EX1�TING 13RI76F_.
IHL B{R1DGE WILL BE REMOVED FROM 7HE TGP DOWN,FIRST REMOVING TH- ASPHALT WITN CQNTAINMGNT MEA�lJRES IN
PLACE TO PREVENT ASPI-I�LT FROM DR�PPING INTO THE STREAMD THE METFIn� GF C�Gf��ITAII�IMENT WTLL BE PROPC�SED HY
IHE CONTRACTOR AND APPROVED BY THE ENGIP�EER� THIS WILL BE FOLLOWED BY REMOVAL iiF IHE DECKII'JG,BEAM�,
E� C�, A�ID F �NALLY THE WOGDEIV PILES, AN ATTEMPT WTi L BE MADE T� F2EMnVE THE PII �S: HOWEVER, IF fHIS CAhINOT
BE qCCOMPLI�NED W1TH M1Pd1MAL SLJE35T�ATE DISTURBAN�-E. THE P1LES WILL t�E PTN�-H�D OFF DNE Fi�OT BEL�W THE
MU� LI�IE AS GIRE�TED BY THE ENGINEER. TNE Ci�NTRACTOR W.LI_L NOT BE AI_LOWFD TO DRAG REMOVED TIMBER PILES
ON OR ACRGSS THE STREAMf3FD.
EXSSTIf��lr; TIMBER ABUTMENIJ WILL BE �OMFLETELY' REMUVEDe
zivs s A�� uhl�� �o N i tr,� A � e�r� r z ro A rL� E��vA� lor� N�� i�ic;H��; TNA�v 1al.o � r. ANo
W1TH IHE RE��UIRED IIP Kt�1�TA�I�Ea
THE SrOUR CRITIra� ELEVaTION FOR QENT 2 IS 'C11v0 FTe ;rnUR CRITICA� E�EVA7I0�dS
ARE USED TO MONITOR FOSSIELE SGOLIR PR08LEM5 DURING THE LIFE OF TNE STRLICILIREe
SIn INSPErTION� MAY BE RE��UIRED FGR DRILLED FIER�, THE ENGII�F�R WILL DETERMIfdE
THE NEED FOR SID INSPECTIONS. F�R SI➢ INSFECTIO�IS.SEE St�7I0N 411 OF THE
STANDARG SPEc'"fFICATIONS.
�SL TIJBCS ARL RE��UIP,FD A�1D c SL TE�TIIJG MAY EE r`iEQUIRCD FGR DRILLED PI�RS TIIC
Ef�IGINEFR WTLL DETFRMINE THE NEED FOR CSL TESTTNGa FOR CSL TESTING,SEE
sECTzo�i ail oF Ti�E sTANOA�o sFEczFzcATzo�isn
FOR PILES,SF_E GEOTEt�RNICAL SPECIqL P�OVISIONS 41V� S-CTION 450 �F THE STP.NDAI�D
SPECIFICATIUN�.
PILES AT END EENT 1 APE DESIGNED FOR A FACTORED PESISTANCE OF 70 Tl�NS PER PILE.
DRTVE PILE� AT EIVD C�ENT 1 TD A REQLIIRED DRTVIIVG RESIST.4fVCF OF 120 T01�I5 PER PILEa
PILES AT ENU BENT 2 ARE UFSI��NED FOR A FAC�TORLD RESISTANCE OF 55 TuIVS PER PILED
DRIVF PILE� AT FND BENT l TQ A REOUIRFD DRTVIN; RESTSTANSF OF 95 iONS PER PILF
I��t�L��l�l��^`9G�U�V GLL��G9`;
I�,;��n �,uic>>7 flJl,:S� �riJl:� ir�j[nI,171.2Pi1a �fi�sili�''
F�aN� Pr.rPnr,�r:o a�:
�IMPSON
� NGINEERS
�ASSOCIATES
li\
s��a�� oma� � o�-i�P
s�ir� zoo
cary, rJS 2�s'19
i��a� e=,z-oane
f919) 352-0590 �;Faxl
W w W.S�RIC5r.f19nr��.�_ pRl
LICGN]111tE N0. C �S%t �
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PROJECT N0. 8-5687
WARREN COUNTY
STATION: 14+96000 -L-
Si,'EET �' Or �
STATE �F NORiN �AR9LiIVA
DEPARTMENT OF TRANSPORTATION
aa�Ezc�
GENERAL DRAWING
FOR BRIDGE ON SR 1620
(LICKSKILLET RD)
OVER SHOCCO CREEK
BETWEEN SR 1647 AND SR 1625
27'-10"CLEAR ROADWAY - 60° SKEW
RGVISIONS S�1EcT N0.
�i0. - . pPTE; - BY: POTF: S-=�
� hi TGTPL
NJ SiaCiTS
2 C! r_ a