Loading...
HomeMy WebLinkAbout20171650 Ver 1_PCN Form Submission_20171221Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 12/21/2017 10:58:35 AM (Start Event) Accept by Carpenter,Kristi 12/21/2017 2:39:15 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: December 26, 2017 5:00 PM 12/21 /2017 10:59 AM E-PCN Submittal ��� �lulslaa af Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 15, 2017 Ver 2.2 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx A. Processing Information County(or Counties) where the project is located:* Warre n Is this project a public transportation project? *(') C�' Yes C' No Is this a NCDOT Project?* r Yes C' No (NCDOT only) T.I.P. or state project number: B-5687 WBS # 45641.1.1 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: 03 - Maintenance NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply r% 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress r Non-404 Jurisdictional General Permit rJ Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: �' Yes C•' No For the record only for Corps Permit: �' Yes C�' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes �' No 1f. Is the project located in anyof NC's twentycoastal counties?* C' Yes C•' No 1h. Is the project located in a designated trout watershed?* f Yes C•' No Link to trout information: http://w�nn�v.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Chris Murray 1b. PrimaryContact Email:* cmurray@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (919)220-4633 1d. Who is applying for the permit? I7 Owner r Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: Not available 2c. Responsible party: (for Corporations) 2d.Address Street Address 2612 N. Duke Street Address Line 2 �� Durham Fbstal / Zip Code 27704 2e. Telephone Number: State / R-ovince / F�gion NC Country USA (xxx)x�c-xxxx (919)220-4633 2f. Fax Number: (xxx)x�c-�ocx 2g. Email Address:* cmurray@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Replacement of Bridge 920043 over Shocco Creek on SR 1620 (Lickskillet i Road) 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Warrenton 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Take US 1 north from Raleigh, take US 501 north to Louisburg, turn right and take NC 561 north/east in Louisburg, turn left an take NC 58 north, turn left and travel north west on Parktown Road and turn left and travel south on Lickskillet Road to project site. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 2951533861, 2951785866 and 2951690870 2b. Propertysize: (in acres) 1.96 2c. Project Address Street Address near 1853 Lickskillet Road Address Line 2 �� Warrenton Fbstal / Zip Code 27589 2d. Site coordinates in decimal degrees State / Rovince / F�gion NC Country USA i Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For e>cample, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* 36.27072 ex:34208G04 Longitude:* -78.13063 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Shocco Creek 3b. Water Resources Classification of nearest receiving water:* 28-79-22; Class C NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Tar-Pamlico RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Wooded land and scattered residential housing. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent B-5687 usgs topo.pdf 145.84KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent B-5687 soil map.pdf 223.9K6 Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0.09 ac 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 140 feet perennial 4f. Explain the purpose of the proposed project:* Replacement of Bridge 920043 (eight-span) 121 foot long bridge due to bridge deterioration. Bridge currently has a sufficiency rating of 53.2 out of 100 and is considered functionally obsolete. Replacement bridge is a three-span bridge that is 135 feet long. The new bridge will span Shocco Creek. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* Replacement of Bridge 920043 with a newthree span bridge. Equipment will include backhoe, mini excavator, dump trucks, crane, etc. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent B-5687 FINAL Culled plans for environmental permitting.pdf 4.4MB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C•' Yes �' No !' Unknown Comments: Yes by A�dom Environmental, Inc. on 9/19/16. 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved �' Unknown C' fWA Corps AID Number: Exarrple: SAV�2017-99999 SAW-2016-02509 Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Sandy Smith Auiom Environmental, Inc. 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. I Delineation visit w/ Eric Alsmeyer on 12/13/16 5d1. Jurisdictional determination upload C7ick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes r No !' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands rJ Streams-tributaries rJ Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland * Site 1 P N�p label (e.g. Road Qossing 1- Qalvert, F2rrrnnent (P� or dewatering, etc) Terrporary (� Site 1 P N�p label (e.g. I�ad Qossing 1- CLlvert, F2rrranent (P� or dewatering, etc) Terrporary (� Bottomland Hardwood Forest Bottomland Hardwood Forest 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Fill Yes Both 0.070 (404, 10) or CMR(401, (acres) other) Mech. Clear Yes Both 0.080 (404, 10) or L7�ft(401, (acres) other) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.090 2g. Total Wetland Impact 0.090 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site #- Reason for 3b.lmpact impact * type * Site 1 P N�p label (e.g. Fd�ad Q-ossing 1) F2rrranent (Fj or Terrporary (� Site 1 T N�p label (e.g. I�ad Qossing 1) F2rrrenent (P'j or Terrporary (� 3c. Type of impact* 3d. Stream name * Bank Stabilization Shocco Creek Dewatering Shocco Creek 3e. Stream Type * Perennial F�rennial (F�2) or interrrittent (IfV� Perennial F2rennial (FH�) or interrrittent (INn "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 142 3i. Total temporarystream impacts: 20 3i. Total stream and tributary impacts: 162 3j. Comments: 3f. Type of Jurisdiction * Both Both 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. r Neuse r Catawba r Goose Creek r Other 6b. Impact Type * Site 1 allowable bridge Location and C errpt, Allowable, allowable w/ rritigation 6c. Per or Temp* P F�rrranerd (P� or Terrporary (� �J Tar-Pamlico r Randleman r Jordan Lake 6d. Stream name * 6e. Buffer mitigation required?* Shocco Creek No 3g. Stream 3h. Impact width* length* 20 142 Average (feet) (linear feet) 20 20 Average(feet) (linearfeet) 6f. Zone 1 impact* 5,159 (square feet) 6g. Zone 2 impact* 214 (squarefeet) 6b. Impact Type * Site 1 allowable road crossing Location and Exerrpt, Allowable, allowable w/ rritigation 6h. Total buffer impacts: Temporary impacts: Permanent impacts: Total buffer impacts 6i. Comments: 6c. Per or Temp* P F�rrranerd (P� or Terrporary (� Zone 1 0.00 Zone 1 5,572.00 Zone 1 5,572.00 6d. Stream name * Shocco Creek Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. aick the upload button or drag and drop files here to attach docurrent B-5687_Permit_Drawings_20171017. pdf Fle rrust be FDF Zone 2 0.00 Zone 2 1,830.00 Zone 2 1,830.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization 6e. Buffer mitigation required?* No 4.28M6 6f. Zone 1 impact* 413 (square feet) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Project involves removal of e�asting eight span bridge and replacement with a three span bridge that will span Shocco Creek. Minimization efforts are fully outlined in attached NCDOT-prepared Biological Assessment. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* I Department will attempt to minimize wetland and stream impacts during construction inspection of project. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes �' No 2b. If this project DOES NOT require Compensatory M itigation, explain why: Use of Nationwide Permit 3 does not require compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *'* Recent changes to the stormwater rules have required updates to this section ."* 1. Diffuse Flow Plan 6g. Zone 2 impact* 1,616 (square feet) 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C�' Yes C' No 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? � Level Spreader rJ Vegetated Conveyance (lower SMNT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diffus Flow Documentation Gick the upload button or drag and drop files here to attach docurrent B-5687 stormwater management plan.pdf Fle type rrust be FDF 2. Stormwater Management Plan 143.48KB 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C�' Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C•' Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C� Yes C' No 1c. If you answered "yes" to the above, has the document review been finalized bythe State Clearing House? (If so, attach a copy of the NEPAor SEPAfinal approval letter.)* C' Yes C•' No Comments:* MCDC completed for the project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes r No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. I Project only involves replacement of deficient bridge. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes G No C' f�/A � 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C� Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C� Yes C' No 5c. If yes, indicate the USFWS Field Office you have contacted. I Raleigh 5d. Is another Federal agency involved?* C' Yes C� No 5e. Is this a DOT project located within Division's 1-8?* C•' Yes C' No C' Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* I Tree clearing impacts will be reported on the department-maintained database for compliance with Northern long- eared bat. Project has biolocical conclusions of MALTAA for dwarf wedgemussel and MANLTAA for Tar River spiny mussel, yellow lance and Atlantic pigtoe. Project went through formal consultation with USACE and USFWS. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Available mapping. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) I Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* f Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* State HPO coordination 7c. Historic or Prehistoric Information Upload aick the upload button or drag and drop files here to attach docurrent 16-06-0061 Hist Arch NoSurvey.pdf 1.75M6 B-5687 Warren No Archaeological Survey Required Form.pdf 5.08M6 Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) I Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* G Yes C' No 8b. If yes, explain how project meets FEMA requirements: Bridge designed by NCDOT Hydraulics Unit 8c. What source(s) did you use to make the floodplain determination?* Available mapping Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent B-5687 BA_Final.pdf 9.23M6 USFWS signed BO.pdf 433.26KB Fle rrust be FDF Signature * r% By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Christopher A. Murray Signature Gh�JS �t/�r4Y Date : current_date Initial Review Is this project a public transportation project? *(?) C� Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* 20171650 Version#* Reviewing Office* Central Office - (919) 707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings Is a payment required for this project?* C� No payment required f Fee received C' Fee needed - send electronic notification