Loading...
HomeMy WebLinkAbout20171649 Ver 1_PCN Form Submission_20171221Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 12/20/2017 4:54:14 PM (Start Event) Accept by Carpenter,Kristi 12/21/2017 2:34:54 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: December 25, 2017 5:00 PM 12/20/2017 4:54 PM E-PCN Submittal ��� �lulslaa af Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 15, 2017 Ver 2.2 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx A. Processing Information County(or Counties) where the project is located:* Johnston Is this project a public transportation project? *(') C�' Yes C' No Is this a NCDOT Project?* r Yes C' No (NCDOT only) T.I.P. or state project number: i U-5999 WBS # � 47117.1.1 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply ri 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: �' Yes C•' No For the record only for Corps Permit: �' Yes C�' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C� Yes l" No Acceptance Letter Attachment Gick the upload button or drag and drop files here to attach docurrent i Kellie Dr Ext - Division 4- NS 01 - NWR (003).pdf 66.25KB FlLE TYFE MJST BE FflF 1f. Is the project located in anyof NC's twentycoastal counties?* C' Yes �' No 1h. Is the project located in a designated trout watershed?* C' Yes C' No Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* tccoggins@nacdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)717-8699 1d. Who is applying for the permit? r Owner rJ Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: State of North Carolina (NCDOT) 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address Address Line 2 �� FUstal / Zip Code State / Rovince / F�gion Country 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-x�cx 2g. Email Address:* tccoggins@ncdot.com 3. Applicant Information (if different from owner) 3a. Applicant is: C�' Agent C' Other If other please specify. 3b. Name: Chad Coggins 3c. Business Name: (if applicable) NCDOT Div. 4 3d.Address Street Address P.O. Box 3165 Address Line 2 �� Wilson Fbstal / Zip Code 27828 3e. Telephone Number: (919)717-8699 (xxx)xxx-xxxx 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* i tcoggins@ncdot.gov State / Rovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Kellie Drive extension form Booker Dairy Road (SR 1923) to Buffalo Road (SR 1003) i 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Smithfield 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. I Take US 70 north of Smithfield, NC to intersection with Buffalo Road (SR 1003). Turn west onto Buffalo Road (SR 1003) to intersection with Booker Dairy Road (SR 1923). Turn east on Booker Dairy Road (SR 1923) and travel about 0.5 miles to a left hand turn onto Kellie Drive. 2. Project Identification 2a. Property Identification Number: (t�vc RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 �� F�stal / Zip Code 2d. Site coordinates in decimal degrees State / Rovince / F�gion Country Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.53170 -78.32439 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* unnamed tributary to the Neuse River 3b. Water Resources Classification of nearest receiving water:* C, NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site is mostly wooded. Land use to the south and east of the site is school campuses and public parks. Land use to the north and west is forestry and agriculture. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent U-5999 Topo Map.pdf 190.01 KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. I (for DWR) C7ick the upload button or drag and drop files here to attach docurrent U-5999 Soil Map.pdf Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 223.96KB 4f. Explain the purpose of the proposed project:* The purpose of the project is to provide additional roadway connectivity to improve access to the educational facilities and community resources located in the northern portion of the Town of Smithfield. These facilities include: Smithfield — Selma Senior High School, Smithfield Middle School, the Neuse Charter School, Smithfield Community Park, and the Smithfield Recreation and Aquatics Center. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* The North Carolina Department of Transportation (NCDOT) proposes to extend Kellie Drive from north of SR 1923 (Booker Dairy Road) to SR 1003 (Buffalo Road). Proposed improvements include extending Kellie Drive appro�amately 0.62 mile along a new location alignment. The new roadway would be constructed primarily as two- lane curb and gutter facility with 16-foot wide lanes and 5-foot wide sidewalks in each direction. At the intersection with Buffalo Road, Kellie Drive will be widened to a three-lane facility with 12-foot wide lanes and an exclusive southbound left turn lane. The project will also make improvements along a 390-foot long section of Buffalo Road. These improvements consist of the addition of a southbound left turn lane and a northbound right turn lane. Heavy land clearing and road building equipment including constructions of a culverted wetland crossing would be used. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent U-5999 Project Plan.pdf 373.22KB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C� Yes �' No �' Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved C' Unknown C' N/A Corps AID Number: Exarrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other Chad Coggins �[y�Z�SI 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Sd1. Jurisdictional determination upload aick the upload button or drag and drop files here to attach docurrem Fle type rrust be F�F 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C•' No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 7a. Where are the impacts associated with your project? (check all that apply): � Wetlands r Streams-tributaries r Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland* Site 1 N�p label (e.g. I�ad Qossing 1- Qalvert, dewatering, etc) Site 1 N�p label (e.g. Fd�ad Q-ossing 1- QaNert, dewatering, etc) Site 1 N�p label (e.g. I�ad CYossing 1- CLlvert, dewatering, etc) P Headwater Forest F�rrrenem (P� or Terrporary (� P Headwater Forest F2rrranerd (P� or Terrporary (� T Headwater Forest F�rrranent (P� or Terrporary (� 2g. Total Temporary Wetland Impact 0.100 2g. Total Permanent Wetland Impact 0.420 2g. Total Wetland Impact 0.520 2h. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 2d. Wetland name *Ze. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Roadway Fill Yes Both 0.330 (404, 10) or CANR(401, (acres) other) Roadway Yes Both 0.090 Mechanized (404,10)orCMR(401, (acres) Clearing other) Roadway Hand Yes Both 0.100 Clearing (404, 10) or �(401, (acres) other) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The roadway was designed to cross wetlands at right angles and at the narrowest point practicable in meeting the purpose and need of the project. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:* All construction equipment will be staged and operated from upland areas. DOT will also install silt fencing to protect the streams and wetlands adjacent to project, and safety fencing will be used to delineate jurisdictional/environmentally sensitive areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C•' Yes C' No 2c. If yes, mitigation is required by (check all that apply): r DWR rJ Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank �J Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. fJ Yes 4b. Stream mitigation requested: (linear feet) 4c. If using stream mitigation, what is the stream temperature: 4d. Buffer mitigation requested (DWR only): (squarefeet) 4e. Riparian wetland mitigation requested: (acres) 4f. Non-riparian wetland mitigation requested: (acres) 0.420 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) ""* Recent changes to the stormwater rules have required updates to this section .*'� 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes C•' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Project is not located adjacent to any protected riparian buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C� Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes c' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes �' No Comments:* MCDC available upon request. � 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. The proposed roadway project addresses current connectivity concerns (i.e. level of service traffic demands) associated with area facilities including Selma Senior High School, Smithfield Middle School, the Neuse Charter School, Smithfield Community Park, and the Smithfield Recreation and Aquatics Center. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes C' No C•' f�UA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * r Yes c' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* �' Yes �' No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* C' Yes C•' No �' Unknown 5e. Is this a DOT project located within Division's 1-8?* C' Yes C' No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* � NLEB-Slopes & apps / signed 1-30-2017 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes �' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* GIS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * HEU clearance 7c. Historic or Prehistoric Information Upload Gick the upload button or drag and drop files here to attach docurrent 17-08-0026 no survey.pdf 487.98KB PA 17-08-0026.pdf 129.14KB U-5999 APE e-mail.pdf 88.42K6 Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes �' No 8c. What source(s) did you use to make the floodplain determination?* I FEMA Flood Map Service Center Miscellaneous Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent 47117.1.1_Permit Drawings final.pdf 2.66MB U-5999-bufferDeterm.pdf 179.59KB Fle rrust be Ft7F Signature * fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Chad Coggins Signature [lr�� ��a fr fr�!�I � Date: current_date Initial Review Is this project a public transportation project? *(?) C� Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* 20171649 Version#* Reviewing Office* Central Office - (919) 707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings Is a payment required for this project?* C� No payment required f Fee received C' Fee needed - send electronic notification