Loading...
HomeMy WebLinkAbout20171597 Ver 1_More Info Requested_20171221Carpenter,Kristi From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: A rt, Norton, Apri) R Thursday, December 21, 2017 12:51 PM King, Art C Welch, Tim; Badgett, Rex; Carpenter,Kristi; Williams, Andrew E CIV USARMY CESAW (US) RE: Chatham County Bridge Replacement_Additional Information Request_NCDWR 20171597 GC4132_NW3.pdf Follow up Flagged I have reviewed your permit application. It has been determined that written approval is not required by NCDWR as the potential impacts are below the reporting threshold. I've attached a copy of GC 4132 which corresponds with NW 3. Please let me know if you have any questions or concerns. Thanks, April From: King, Art C Sent: Tuesday, December 19, 2017 11:51 AM To: Norton, April R <april.norton@ncdenr.gov> Cc: Welch, Tim <twelch@ncdot.gov>; Badgett, Rex <jsbadgett@ncdot.gov> Subject: RE: Chatham County Bridge Replacement_Additional Information Request_NCDWR 20171597 � *, Th� stormvvat�r manag�m�nt plan and impact tabl� ar� attach�d to th� �nd of th� p�rmit drawings. I vvill b� out th� r�st of th� day so pl�as� contact Tim W�Ich or R�x �adg�tt if you n��d any additional information. � From: Norton, April R Sent: Monday, December 18, 2017 12:41 PM To: King, Art C Subject: RE: Chatham County Bridge Replacement_Additional Information Request_NCDWR 20171597 Importance: High A rt, I have reviewed your application and it appears as though a stream determination has not been made by NCDWR. Stream SA is within the study area and the stream determination made by Kimley Horn does not appear to have been verified. Could you please verify if stream SA is impacted by the bridge replacement? Also, a soil survey and USGS map is typically included. Additionally, please include a stormwater management plan and wetland and surface water impact permit sheet. This project will be placed on hold if the additional information is not received by December 20, 2017. Let me know if you have any questions or concerns. Thanks, April From: Norton, April R Sent: Monday, December 18, 2017 10:21 AM To: King, Art C <ac_ki_n�(�_n�d_crt:.�crv> Subject: Chatham County Bridge Replacement Hi Art, I received your bridge replacement application (20171597). It appears as though you have submitted all required documents. I will be out of the office for the next two days, and on vacation beginning December 22nd until January 8t". I noticed that the letting date for this project was December 12, 2017. I'll try to get this permit issued before my vacation. Let me know if you have any questions or concerns. Thanks, April April R. Norton Environmental Senior Specialist Transportation Permitting Unit Division of Water Resources NC Department of Environmental Quality 919-707-9111 office 919-710-6516 mobile a.�a_ri.l..:_nca.rtcr n_..�`_�.._n�d_e_n_r:.�.crv 512 North Salisbury Street, 12t" Floor (physical) 1617 Mail Service Center (mailing) Raleigh, NC 27699 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,