1, PURPOSE AND NEED FOR ACTION �
This section describes the proposed action, the purpose of the project, and the need for the project. Updates to
supporting information since the Final EIS was published are described, induding new Census data, updated land use
plans, and recent improvements along existing US 74. The reader is referred to the Final EIS foradditional data and
information that have not changed since the Final EIS.
The purpose and need statement for the project was originally developed in 2007 and documented in the "Final
Statement of Purpose and Need for the Monroe Connector/eypass" (PBS&J, February 2008), the Draft EIS (March
2009J, and the Final EIS (May 2010). Although supporting information has been updated, the purpose and need for the
project remains unchanged.
In concfusion, based upon a review of new information and public and agency comments received to date, the purpose
and need for the project remains unchanged.
1.1 PROPOSED ACTION
As stated in the Final EIS Section 1.1.1, the NCDOT�, in cooperation with the FHWA, proposes
to construct a project known as the Monroe Connector/Bypass, which would be a controlled-
access toll road extending from US 74 near I-485 in Mecklenburg County to US 74 between the
towns of Wingate and Marshville in Union County, a distance of approximately 20 miles.
Figure 1-1 shows the project study area.
The proposed project begins and ends on existing US 74 in order to provide continuity for the
US 74 corridor. On the western end, the project would begin at I-485, another controlled-access
facility. On the eastern end, the proposed project would terminate on US 74 between the towns
of Wingate and Marshville. This is where existing and projected traffic volumes decrease and
the study area transitions to a more rural character.
The project is included in the Charlotte Regional Transportation Planning Organization's
(CRTPO) 2035 Long-Range Transportation Plan (LRTP) and its Transportation Improvement
Program (TIP). The Project is included in the NCDOT 2012-2020 State TIP (STIP) as Project
R-3329 (Monroe Connector) and Project R-2559 (Monroe Bypass) as a toll facility. Previously,
the Final EIS reported that project was in the NCDOT 2009-2015 STIP. Similar to previous
state and local TIPs and the conclusion in the Final EIS, current fiscally constrained planning
documents do not have sufficient funds available from traditional sources in the foreseeable
future to construct all priority projects in the state.
1.1.1 EVALUATION OF NEED FOR PROPOSED ACTION
FHWA and NCDOT have re-evaluated the primary needs for the proposed action and
determined that those needs have not changed since the Draft EIS and Final EIS.
US 74 is the major east-west route connecting the Charlotte region, a major population center
and freight distribution point, to the North Carolina coast and the port at Wilmington (North
Carolina's largest port). In addition, US 74 is the primary transportation connection between
Union County, the fastest growing county in North Carolina between 2000 and 2010, and
1 On July 27, 2009, NCTA became a division of NCDOT (NC Session Law 2009-343). Where applicable, references to NCDOT as a separate
agency have been removed.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-1
PURPOSE AND NEED FOR ACTION z=r•��r.�.��
Mecklenburg County/City of Charlotte, the economic hub of the region. Although Union County
is the fastest growing county in the State, it is the only county adjacent to Mecklenburg County
that does not have a high-speed interstate-type facility connecting it to Mecklenburg County.
US 74 also serves as an important commercial corridor for Union County residents and
businesses, with many retail, commercial, and employment centers having direct access to/from
US 74. In Union County, most employment is concentrated in the City of Monroe or along
existing US 74.
Because of its statewide and regional importance, NCDOT designated the US 74 corridor as a
Strategic Highway Corridor (SHC) and it is also designated as part of the North Carolina
Intrastate System. Consistent with local planning documents, these state designations call for
this corridor to serve high-speed regional travel. The SHC designation specifically calls for a
freeway. The North Carolina Intrastate System designation calls for a multi-lane facility with
access control and grade separations (if warranted by traffic volumes).
Finally, the US 74 corridor is designated as part of the National Highway System Strategic
Highway Network (STRAHNET), which includes roads that provide defense access, continuity,
and emergency capabilities for movements of military personnel and equipment.
Since the Final EIS, the existing roadway corridor has been reevaluated and the factors
supporting the needs for the proposed action have been updated. These are summarized below,
with more details provided in Section 1.2.4.
Existinct and Proiected Roadwav Capacitv Deficiencies. Currently, US 74 in the
project study area is a four- to six-lane arterial roadway with speed limits that range from
35 miles per hour (mph) to 55 mph along the corridor. As shown in Table 1-1, the weighted
average posted speed limit is 49 mph. There is limited control of access along the facility;
meaning there are numerous driveway access points, turning points and intersections, including
27 at-grade signalized intersections. Thus, traffic signals and the lack of access control cause
delay and congestion during typical week day peak travel times.
TABLE 1-1: Speed Limits on Existing US 74
Speed Approximate
Limit US 74 Segment from West to East Segment Length
(mph) (miles)
55 I-485 to Fowler Secrest Road (SR 1754) 8.2
45 Fowler Secrest Road to US 601(Pageland Highway) 5.5
55 US 601 (Pageland Highway) to east of Presson Road 3.0
45 East of Presson Road to Wingate City Limit 0.2
35 Wingate City Limit to Old Highway 74 (SR 1740) 1.4
45 Old Highway 74 (SR 1740) to Olde Country Lane 0.7
55 Olde Country Lane to 0.3 mile west of Marshville Town Limit 1.5
45 0.3 miles west of Marshville Town Limit to Marshville Town Limit 0.3
35 Within Marshville Town Limit 2.5
49 Weiqhted averaqe speed limit* 23.3
Source: Existing and Year 2030 No-Build Traffic Operations Technical Memorandum (PBS&J, March 2008).
*Weighted average speed limit = sum of individual segment lengths x speed limits divided by total length
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-2
PURPOSE AND NEED FOR ACTION z=r•��r.�.��
In the Final EIS, traffic simulation software was used to estimate that average speeds on
existing US 74 through the project area range from 20 to 30 mph during peak hours, and were
expected to decline to 20 mph by 2030 (Final EIS Section 1.1.2).
Since 2007, NCDOT implemented several measures to improve traffic flow along existing US 74
and partially mitigate congestion (listed in Table 2-2), as recommended in the July 2007 US 74
Corridor Study (Stantec). However, there is still congestion along the corridor during a typical
day. As described in greater detail in Section 1.2.4, current real time travel information
available from INRIX, Inc., which was validated through travel time field surveys, shows that
average travel speeds during peak hours are still lower than posted speed limits.
Based on midweek traffic volumes for all of 2011 and 2012 and August 2013, the average peak
period travel speed through the corridor ranges from 37 mph to 41 mph in the westbound
direction, and 42 mph to 45 mph in the eastbound direction. These average speeds compared to
the corridor weighted average posted speed limit of 49 mph show that congestion exists along
US 74 today, and it will only get worse because traffic volumes are expected to increase in the
future due to projected growth in Union County.
In summary, real-time travel flow information demonstrates that US 74 currently experiences
congestion during peak periods of the day, and the corridor does not currently operate as a high-
speed facility (average speed of 50 mph or greater), nor will it in the future without substantial
improvements.
1.1.2 PURPOSE OF PROPOSED ACTION
Based on NCDOT's review of changes and updates to project information, the purpose of the
proposed action has not changed since the Draft EIS and Final EIS. The purpose of the project is
to improve mobility and capacity within the project study area by providing a facility for the
US 74 corridor from near I-485 in Mecklenburg County to between the towns of Wingate and
Marshville in Union County that allows for high-speed regional travel consistent with the
designations of the North Carolina SHC program and the North Carolina Intrastate System,
while maintaining access to properties along existing US 74.
1.2 PR0.7ECT SETTING AND HISTORY
The project setting, the existing road network, and public and agency involvement in the
development of the purpose and need are discussed in more detail in Section 1.4 of the Draft EIS.
Changes and updates to these sections are noted in the summary below.
PI'oleCt SettlnU. There are no changes to the project setting described in the Draft EIS and
referenced in the Final EIS. The majority of the project study area is within Union County, with
a portion adjacent to (and northwest o� I-485 within Mecklenburg County. Portions of the
project study area are within the jurisdictions of the Towns of Mint Hill, Matthews, Stallings,
Hemby Bridge, Indian Trail, Wingate, and Marshville; the Village of Lake Park; and the City of
Monroe.
Public and Actencv Involvement in Development of the Purpose and Need. There
are no updates to the history of public and agency involvement presented in the Draft EIS. A
formal scoping letter was distributed on January 5, 2007 to solicit early coordination and input
(AppendiY A-3 of the Draft EIS). Purpose and need also was discussed at five coordination
meetings with environmental resource and regulatory agencies in 2007. Public comment was
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-3
PURPOSE AND NEED FOR ACTION z=r•��r.�.��
solicited at the first series of Citizens Informational Workshops, held in June 2007. A majority of
the citizens providing written comments supported the use of tolls and the purpose of the project.
1.2.1 TRANSPORTATION SYSTEMS
The project's designation in various national and statewide networks and its relationship to
other transportation modes are discussed in more detail in Section 1.5 of the Draft EIS. There
are no changes or updates to these sections since the Final EIS.
1.2.2 SOCIAL AND ECONOMIC CONDITIONS
Section 1.6 of the Draft EIS discusses population and employment, commuting patterns, and
growth and development patterns. This information from the Draft EIS is summarized in
Section 1.1.6 of the Final EIS. Since that time, 2010 Census data has become available. It is
presented in Appendix D and summarized below.
ReUlonal Context. There are no changes to the regional context since the Final EIS, with the
exception of an expansion of the MUMPO planning area. The project study area is part of the
MUMPO planning area, which at the time of the Final EIS included all of Mecklenburg County
and the western and central portions of Union County. MUMPO's governing body approved a
new planning area boundary on July 17, 2013 due to growth of the Charlotte urbanized area.
The new MUMPO planning boundary extends to include most of Iredell County. As of
September 2013, MUMPO is now known as the Charlotte Regional Transportation Planning
Organization (CRTPO). The Charlotte-Mecklenburg County region is the commercial capital of
the Carolinas, and Charlotte is the largest city in North Carolina.
Population and Emplovment. Since the Final EIS, 2010 Census data became available,
and the same trends that occurred from 1990 to 2000 continue from 2000 to 2010. As discussed
in Section 1.3.1.1 of the Final EIS, the population of the Demographic Study Area (33 Union
County and 6 Mecklenburg County Census Block Groups surrounding the project study area)
grew 49.0 percent between 1990 and 2000. Based on 2010 Census data, the Demographic Study
Area grew another 49.3 percent between 2000 and 2010. Union County as a whole grew
46.9 percent from 1990 to 2000, and 62.8 percent from 2000 to 2010. Union County had the
highest percentage of growth among all North Carolina counties from 2000 to 2010. The
population and employment of both Mecklenburg and Union Counties are expected to increase
through the year 2030. Additional information on socioeconomic characteristics of the project
study area is provided in Section 4.1.1. Growth trends are discussed in more detail in
Section 1.6 of the Indirect and Cumulative Effects Quantitatiue Analysis Update (Michael Baker
Engineering, Inc., November 2013). Union County has exhibited strong growth in the past, and
the factors driving those trends are poised to continue attracting growth to Union County
regardless of whether the Monroe Connector/Bypass is constructed.
Commutinct Patterns. Based on 2006 data reported in the Draft EIS and Final EIS,
61 percent of Union County's residents commuted to outside Union County for work. Since the
Final EIS, updated information is available regarding place of work. Based on commuting data
from the US Census Bureau for 2006-2010, approximately 50 percent of workers living in Union
County commute outside of Union County for work. Of the workers that commute outside of
Union County, approximately 85 percent commute to Mecklenburg County.
According to the 2007-2011 American Community Survey (ACS) five-year estimates, over
87 percent of Union County workers (that work outside the home) drive alone to work.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-4
PURPOSE AND NEED FOR ACTION z=r•��r.�.��
Approximately ten percent travel to work in a carpool (mostly 2-person carpools), and only
around one percent use public transportation, bicycle, or walk to work. In addition,
approximately 46 percent of workers residing in Union County travel 30 or more minutes to
work.
GI'owth and Development Pattel'ns. There are no substantial changes to regional growth
and development patterns since the Final EIS. According to the CRTPO 2035 LRTP, the
southern and eastern portions of Mecklenburg County, which is the area along the Union County
line, is expected to be one of the most rapidly growing areas in the region.
1.2.3 TRANSPORTATION AND LAND USE PLANS
As discussed in Section 1.7 of the Draft EIS, the transportation needs and goals of the
Mecklenburg-Union County region relating to roadways are addressed in three inter-related
plans: the NCDOT 2009-2015 STIP, the CRTPO 2030 LRTP, and the Mecklenburg-Union
Thoroughfare Plan. The proposed action is included in each of these plans in a manner that is
consistent with the SHC and the North Carolina Intrastate System visions for the facility and
corridor. Each of these plans has been updated, or is currently being updated, as described
below.
Between the Draft EIS and Final EIS, the CRTPO 2030 LRTP was updated to 2035. The
Monroe Connector/Bypass project is included in the CRTPO 2035 LRTP as a regionally
significant project and is ranked as the CRTPO's number one project. The project is designated
as a toll facility in the 2035 LRTP, and the design concept and scope included in the 2035 LRTP
are consistent with the Preferred Alternative.
Since the Final EIS, the STIP has been updated to the 2012-2020 STIP. The project is included
in this STIP as a NCTA project.
The most recent Mecklenburg-Union Thoroughfare Plan (2004) will be replaced by the
Comprehensive Transportation Plan (CTP), in accordance with NC General Statute 136-66.2. A
draft version of the CTP dated June 2013 is available. The Monroe Connector/Bypass is included
on the Highway Map of the Draft CTP as a recommended freeway (CRTPO Web site:
www.mumpo.org/plans-programs/comprehensive-transportation-plan).
Land use plans are discussed in Section 3.3 of the Draft EIS and Section 1.3.1.3 of the Final EIS.
Several local governments have updated their land use plans and/or other planning documents
since the Final EIS. The Town of Fairview adopted a new land use plan in 2010 that added some
commercial nodes at major intersections in the project study area, but otherwise the updated
land use plans do not include major changes in the project study area. Changes in growth
expectations, land use, and zoning based on interviews with local planners were incorporated
into the updated quantitative assessment of indirect and cumulative effects, as summarized in
Section 4.5.
1.2.4 ROADWAY CONDITIONS AND OPERATIONS
Section 1.8 of the Draft EIS discusses roadway conditions and operations along existing US 74
within the project study area. There were no changes to this information in the Final EIS. Since
the Final EIS was published in May 2010, additional improvements have been implemented by
NCDOT along the existing US 74 corridor, including signal timing optimization, signal phasing
modiiication, increased turn lane storage lengths, and lane assignment modifications. These
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-5
PURPOSE AND NEED FOR ACTION z=r•��r.�.��
improvements, many of which implement the recommendations of the US 74 Corridor Study
(Stantec, July 2007), are discussed in Section 2.4.
Due to improvements along the US 74 corridor since the Final EIS was published, the previous
roadway conditions presented in Section 1.8 of the Draft EIS (and summarized in Section 1.1.2
and Section 1.1.8 of the Final EIS) have been updated to more accurately reflect existing
conditions. Updated information on existing and projected roadway conditions and operations is
presented in the following sections.
Existinct US 74 Characteristics. US 74, also known as Independence Boulevard in
Mecklenburg County and Roosevelt Boulevard in Union County, is a four- to six-lane highway
within the project study area, with 27 at-grade signalized intersections, additional unsignalized
intersections, and numerous commercial and residential driveway connections. The traffic
signals are shown in Figure 1-1. The Final EIS reported 26 signalized intersections, but this
number has been updated to include a new signal at the entrance to the Poplin Place Shopping
Center (Wellness Boulevard) in Monroe. Trafiic signal spacing ranges from less than 1/ mile to a
maximum of 21/2 miles. The characteristics of US 74 discussed in Section 1.8.1 of the Draft EIS
remain valid, except for the changes described above.
The speed limits posted for US 74 within the project study area are shown in Table 1-1. Posted
speed limits were verified in May 2013, and there have been no changes since the Final EIS.
TI'avel Tlmes AIonU the US 74 Col'1'Idol'. Travel times are discussed in Section 1.8.2 of the
Draft EIS and summarized in the Final EIS based on the Existing and Year 2030 No-Build
Traffic Operations Technical Memorandum (PBS&J, March 2008). The Draft EIS and Final EIS
reported that, based on traffic simulation computer models (Sim Traffic), average travel speeds
in 2007 on US 74 in the project study area were estimated to range from approximately 20 mph
to 30 mph during the peak hour, and were expected to decline through 2030.
To account for improvements to the US 74 corridor since the Final EIS was published (see
Section 2.4 for a description of these improvements), FHWA and NCDOT collected new travel
time information to update travel performance along the existing corridor. The update includes
travel time runs conducted along the US 74 corridor in March 2013, and the use of a larger set of
trafiic flow information available from INRIX, Inc. INRIX (www.inrix.com) is a company that
provides real-time, historical, and predictive traffic flow information based on blending real-time
road sensor data with real-time data points from GPS-enabled vehicles and mobile devices. The
results are described below.
The results of the travel time runs conducted along the corridor in March 2013 are documented
in the memorandum titled US 74 Corridor Trauel Time Comparison (HNTB, October 2013),
which is incorporated by reference and available for review on the project website. For these
travel time runs, US 74 through the project study area was driven eastbound and westbound on
midweek days in March 2013 for the AM (6:30-9:00 AM), noon (11:30 AM-1:30 PM), and PM
(4:00-6:00 PM) peak periods. The travel time runs were conducted on midweek days (Tuesday-
Thursday) to represent average weekday trafiic conditions since conditions on Mondays and
Fridays typically have higher variability. The travel time runs were conducted based on
standards published by the Institute of Transportation Engineers (ITE) (Manual of
Transportation Engineering Studies, 2nd Edition, November 2010) and FHWA (FHWA Trauel
Time Data Collection Handbook, March 1998). Based on these field travel time runs, corridor
average travel speeds are approximately 40 mph eastbound and westbound during all three peak
periods.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
f�:
PURPOSE AND NEED FOR ACTION z=r•��r.�.��
The March 2013 travel time runs were compared to INRIX data to determine if INRIX data could
be used to describe existing conditions for a broader set of time periods. INRIX data was
obtained for segments along the corridor for the same time periods as the field travel time runs
to provide for a direct comparison. Combining the corridor segment data, INRIX data results
show average travel speeds of approximately 44 mph eastbound and westbound during all three
peak periods. In comparison to the field travel time runs, INRIX data generally shows slightly
faster average travel speeds and slightly shorter average travel times. Therefore, average
speeds and travel times based on INRIX data are deemed reasonable to simulate existing
conditions, with the speeds reported in INRIX likely being equal to or slightly faster than actual
driver experience.
INRIX data was then obtained and analyzed for each midweek day for all of 2011, all of 2012,
and for August 2013. Based on a review of the data, the peak periods are lunch and evening
(PM) for eastbound travel on US 74, and morning (AM) and evening (PM) for westbound travel.
Table 1-2 presents the results for eastbound peak hour travel speeds compared to speed limits,
and Table 1-3 presents the results for westbound peak hour travel speeds. In order for the
speed limits to match up with the segment data provided by INRIX, a weighted average speed
limit had to be calculated for the posted speed limits between US 601 (Pageland Highway — the
easternmost intersection of US 74 and US 601 east of Monroe) and the easternmost segment
within the Marshville town limit. It should be noted that US 74 east of US 601 (Pageland
Highway) is where the corridor begins to transition to a more rural character and traffic volumes
are lower than the more urban/suburban segments of US 74 to the west that comprise the
majority of the corridor.
TABLE 1-2: Peak Hour Speeds Along US 74 Eastbound (2011, 2012, August 2013)
Weighted 2011 2012 August 2013
Avg Speed Peak Hour Peak Hour Peak Hour
Approx. Eastbound US 74 Segments Speed �imit to Avg Speed Avg Speed Avg Speed
Length Limit
(miles) (from west to east) �mph� Match INRIX (mph) (mph) (mph)
Segments �unch PM Lunch PM Lunch PM
(mph)
8 2 I-485 to 55 55 46 40 45 40 45 40
Fowler Secrest Road (SR 1754)
Fowler Secrest Road to
5.5 US 601 (Pageland Hwy) 45 45 35 38 37 39 38 38
(easternmost intersection of U574 and
US 601 east of Monroe)
US 601 (Pageland Hwy) to
3.0 east of Presson Road 55
0 2 East of Presson Road to 45
Wingate City Limit
Wingate City Limit to
1.4 Old Highway 74 (SR 1740) 35
0 � Old Highway 74 (SR 1740) to 45 46 47 46 48 47 49 48
Olde Country Lane
Olde Country Lane to 0.3 mile west
1.5 of Marshville Town Limit 55
0.3 miles west of Marshville Town
0.3 Limit to Marshville Town Limit 45
2.5 Within Marshville Town Limit 35
23.3 Corridor Weighted Average Speed (mph) 49 44 42 44 43 45 43
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-7
PURPOSE AND NEED FOR ACTION z�.r.��c•�.��
TABLE 1-2: Peak Hour Speeds Along US 74 Eastbound (2011, 2012, August 2013)
Weighted 2011 2012 August 2013
Avg Speed Peak Hour Peak Hour Peak Hour
Approx. Eastbound US 74 Segments Speed Limit to Avg Speed Avg Speed Avg Speed
Length Limit
(miles) (from west to east) �mph) Match INRIX (mph) (mph) (mph)
Segments �unch PM Lunch PM Lunch PM
(mph)
. .. . .•-. . .-
I-485 to Fowler Secrest Road (SR 1754) -9 to -15 mph below speed limit
Fowler Secrest Road to US 601(Pageland Hwy) -6 to -10 mph below speed limit
US 601 (Pageland Hwy) to within Marshville +3 to 0 mph about/slightly above speed limit
OVERALL CORRIDOR -4 to -7 mph below speed limit
Source: INRIX, Inc.
TABLE 1-3: Peak Hour Speeds Along US 74 Westbound (2011, 2012, August 2013)
Weighted 2011 2012 August 2013
Avg Speed Peak Hour Peak Hour Peak Hour
Approx. Eastbound US 74 Segments Speed Limit to Avg Speed Avg Speed Avg Speed
Length Limit
(miles) (from east to west) (mph) Match INRIX (mph) (mph) (mph)
Segments AM PM AM PM AM PM
(mph)
2.5 Within Marshville Town Limit 35
0.3 miles west of Marshville Town
0.3 Limit to Marshville Town Limit 45
Olde Country Lane to 0.3 mile west
1.5 of MarshvilleTown Limit 55
Old Highway 74 (SR 1740) to
�'� Olde Country Lane 4S 46 37 38 38 39 40 41
Wingate City Limit to
1.4 Old Highway 74 (SR 1740) 35
� 2 East of Presson Road to 45
Wingate City Limit
3.0 US 601 (Pageland Highway) to 55
east of Presson Road
5.5 Fowler Secrest Road to 45 45 38 37 39 39 39 36
US 601 (Pageland Highway)
8 2 I-485 to 55 55 38 43 41 44 40 42
Fowler Secrest Road (SR 1754)
23.3 Corridor Weighted Average Speed (mph) 49 37 39 39 41 40 40
. .. . -. .
Within Marshville to US 601 (Pageland Hwy) -5 to -9 mph below speed limit
US 601 (Pageland Hwy) to Fowler Secrest Road -6 to -9 mph below speed limit
Fowler Secrest Road to I-485 -11 to -17 mph below speed limit
OVERALL CORRIDOR -8 to -12 mph below speed limit
Source: INRIX, Inc.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-8
PURPOSE AND NEED FOR ACTION z�.r.��c•�.��
Table 1-2 and Table 1-3 show that the majority (60 percent) of the corridor (from I-485 to
US 601 (Pageland Highway — east of Monroe)) operates substantially below the posted speed
liinits, both eastbound and westbound during all peak periods. For the portion of the corridor
east of US 601 (Pageland Highway), eastbound operates at or slightly above the weighted
average posted speed limit, while westbound operates at 5-9 mph below the posted speed limit.
All speeds are still below the desired 50 mph.
For the overall corridor (Marshville to I-485), the weighted average posted speed limit is 49 mph.
Eastbound US 74 weighted average travel speeds range from 42-45 mph (4-7 mph below
weighted average speed limit), and westbound US 74 weighted average travel speeds range from
37-41 mph (8-12 mph below weighted average speed limit).
INRIX data can be graphically illustrated using a software tool (Regional Integrated
Transportation Information System [RITIS]) from the University of Maryland's Center for
Advanced Transportation Technology Lab (CATT Lab) (RITIS Web site: http://vpp.ritis.org).
Exhibits 1-1 through 1-4 are screenshots from the RITIS software tool that graphically
illustrate the August 2013 average operating speeds (in mph) summarized in Table 1-2 and
Table 1-3. Green lines in the exhibits correspond to speeds of 49 mph or greater. Yellow, red,
and orange colors designate slower operating speeds.
Exhibit 1-1: Average Operating Speeds for US 74 Eastbound (August 2013 Lunch Peak)
16
16
Avcragc Spccd for US-74 �ast6ound bctwccn Matthcws Mint Hi[I Rd and MC-2Q5 f Elm 5t
_20d i�P.�.a 20_3 (everaTue, Ji`€c an�d T��i
n
�aztine���e
is'� �^.[.��
�
� i�aizn rnii
�
]d
15
Bd
Pd Y
64
oi
I� 20
16 i:lnn�r,y� �
06
/ �
�'E:i�
1F ' r' �� �1C
' �.,
� 2C
, TS i�
0-35■ 35-10■ �0-d5� �5-�9 �9-55 �55�.
2C
�� cs
FC3
1p
U�
�zoo
5
��
��
�6
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-9
PURPOSE AND NEED FOR ACTION z�.r.��c•�.��
Exhibit 1-2: Average Operating Speeds for US 74 Eastbound (August 2013 PM Peak)
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-10
PURPOSE AND NEED FOR ACTION zRr.��c•�.��
Exhibit 1-3: Average Operating Speeds for US 74 Westbound (August 2013 AM Peak)
Average Speed for US-74 Westbound betsnreen NC-205/Elm St and P�latthews Mint HiPI Rd
08:00 in Aug 2013 (2very Tue, 1Ned and Thu}
s� ►;� zie � 200� zas)
T rc
278
2]B 205
I` 21B
� 2]B
I
7d
01 2b5 21B
20
I �
7
I01. 200
I 205 21
�
21B
ao
I
B4
B6 fI �� zb
1_ \� — _ _ _ _ _ _. "_ _ __—_—-_
/ 75 ,�
20
07
: �
0- 35� 35 - 40■ 40 - 45 45 - 49 49 - 55 � 55.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-11
PURPOSE AND NEED FOR ACTION z�.r.��c•�.��
Exhibit 1-4: Average Operating Speeds for US 74 Westbound (August 2013 PM Peak)
While intersection and corridor improvements along existing US 74 (Table 2-2) have been
beneficial, present day operating speeds are still substantially less than desirable. Adding lanes
to the current facility would likely have little impact on the operating speeds because the
frequent intersections and numerous driveway access points are two controlling features of the
facility that limit the ability to raise the posted and operating speeds. The FHWA Benefits of
Access Management Brochure (FHWA Web site:
http://ops.fhwa.dot.gov/access_mgmt/docs/benefits_am_trifold.pdf) states that for every 10 driveway
access points per mile, the operating speed is decreased on average by 2.5 mph, up to a
maximum of a 10 mph reduction. The same brochure provides a table on the impact signal
spacing has on travel time, reproduced as Table 1-4.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-12
PURPOSE AND NEED FOR ACTION T�.�� ..
TABLE 1-4: Impact of Si nal Spacin on Travel Time
Signals Per Mile Increase in Travel Time (%)
2 --
3 9
4 16
5 23
6 29
7 34
8 39
Source: FHWA Benefits of Access Management Brochure (FHWA Web site:
http://o ps.fhwa. d ot.gov/a ccess_mgmt/d ocs/ben efits_a m_tri fo I d. pdf�
In regards to driveway spacing, in the westbound direction, the corridor has four one-mile
segments with 10-19 driveways, and six one-mile segments with 20-29 driveways; having an
impact of an approximately 2.5 mph reduction and a 5.0 mph reduction in operating speeds on
those segments, respectively. In the eastbound direction, the corridor has nine one-mile
segments with 10-19 driveways, two one-mile segments with 20-29 driveways, and one one-mile
segment with 30-39 driveways; having an impact of an approximately 2.5 mph, a 5.0 mph, and a
7.5 mph reduction in operating speeds on those segments, respectively.
In regards to traffic signals, the two densest areas of traffic signals can be seen on Figure 1-1,
and are from Fowler Secrest Road east to Secrest Shortcut Road (3.5 traffic signals per mile),
and from Stafford Road just east of US 601 North to Campus Park Drive just west of US 601
South (3.7 traffic signals per mile). The impact of this spacing places an extra 9-16 percent
travel time on corridor users.
Increasing traffic volumes also will negatively impact operating speeds along existing US 74.
Since traffic volumes are projected to continue to increase through 2035, the average travel
speed along existing US 74 will decline as traffic volumes increase due to anticipated population
and employment growth in the region. Based on 2008 and 2035 No-Build traffic forecasts
(HNTB, March 2010), average volumes along the US 74 corridor are projected to increase
approximately 34 percent.
In conclusion, even with improvements implemented along US 74 since the Final EIS, average
travel speeds along the US 74 corridor are still below 50 mph. Conditions are not expected to
improve in the future as traffic volumes increase; therefore average travel times in 2035 are
expected to be longer and average travel speeds are expected to decrease compared to existing
conditions, supporting the need for the project.
• � MONROE CONNECTOR/BYPASS
DRAFT SUPPLEMENTAL FINAL EIS
1-13
This page was intentionally left blank.
a
^ i � w� v
Y �, � h' � R� Y} �I i , �_- �"�
I
- �' i. ��. � ,. I . � /
� � �
i�
�
� _ ,N� - � � Legend
�i i , �� � _ � _ ;� �1 �,n.
�i �; � � � � � � �;, � ��.; � - � ���-t"�� � -�� _ � _ 0 Project Study Area
��
� � . __
�_�,,� 24 � ' , - , ,� �� , ;,�` - � ��' � � � "�� � =' � �. � Municipal Limits
,, F-
� V� �
; {�`- , � � '. � ��� - �__� Watershed Basin
� � �� � � ��
,� `Y _ - � �� �� �` _ � �'��_ � �l �" _ � � . . � ,_ Lakes
i �
� -� ��'� {� '� �� � � 218 � +� �' � � � �� Streams
� ;
I ' ' �'-, , _
, '
I - /� �_-� � ��,
r K � � - �; `� �� �`� � � :� � � � � ,
, _ �, �_ f! ,� �-' `� . Railroad
, ��_;C�� � � �-� - � �� � � � � � i
1 J �}/.:L� �5 14 \ \�-' . . I. '1 _/r��� ' . ' � � .
/\ \ � ' l�' r � � � . - �' � ~ � �J t
� �� ��� - � � ' /' • �
� �_ < , , �� � � � � � Fair-�e�iew � �• , � � �
h ., �`- � � � � � � � �
T.. rr,_ 5 Mint Hill ; . T � _. ��, , �; 7—>
� /
�
" _ 51 � � _ Y , �\ •
� `
`� �, z .. � � � . , ^r- , - � . • 1 '
� � �� . � _
� � . � � � �
i;
� 1 ' ' � � - ''�
. ,
�•
� � BEGIN - �,�-�_���,��o�Ro ��� ��� ,;��"� �, ,;l — ,. �,� �' � ��'�
. �
PROJECT T_ � ��% '. _ ,� �� �-
^__ti , -�.a , � , , !
/_ � , � �e.
_ ,
.
�f-- � � �
J � �
, ,
; �
. / � I y ��—� ` _ I � . O�y . � /� �WyERSRD _- _
74 j ` � L12 I (�'�/. —'� � !�O _ \ .1 \
/ � ��" ���y � � i , '� � �-
, ,
� ° ' � � y � �� � � � � < - Unionville � � �
� � � ��t, ,�� `\ / � , i
,� � ! Nemb Bri % � ` *, . � - � , � 205
` � 200 Z
�H�,� / , o � - � � �e,°�� m `" I� - ,
. ��S.Mi �. � .���-i�If►g$ , �� � ,N-� �., „ . c ��� . � �. �� m � �`-A� '�
�Lr�� � ��'� � �Q � . __ � � . � '..;,c a ��. � cM '.. � � ..,... ... � ��
��� j v ���. i� N,�eP . 601 3 SP�.� �' o ��;r o
rJ1 � J I�' � / " �;�p P�� -� � , `,, \ o ,�, . � �.. � � . , 0,.;' LN .p�G o . __�y.. 1 � , c,p,� Ro''., o ����� ^ �� � �''. ,, � 0 Mecklenburg and Union Counties
�
I" UNIONVILLE- N N R � �
� � � � � Lc7�i@� Pci�"� . . � � - . - :.. �� . \• . � � . _. - � o eR . �� � ' � � �. �' �� . I �� 0 North Carolina Counties
. . .� � �q�y�� ".. �� � . �� i� � �� �. �r� �� ` . . � . ,�� � � � �yo,, , i
� � \ � �
� � , � � � , �.. '�. � \ \x � I ��. s- � �
\\ \.._.� O 7/ N�{y R< �2 ' LIiIND__ AILRDQ�i� lSy cG : . \\ _/`�� � �� J .9m�/�\�' .�_ Sn GROVE HU RD .. � �+ z'�
Matfhews Qs � Nr ' TR o � Lake �
' . IpN �. Rl _
\ y�r/ � . aiRo . .... �p.� . ......_rR0\I � \ . .- � � . - �_ .__ SOUfC . nd
s 74 �r+ioNv� .� g Twitty �9
Z � � � i AU �y �
�,,,o ���ao`°��� ��cH �`, e� Mecklenburg County a
o<o �, i �- ! �� �" eo �, /� Nsoe�` ti��Y �' Union County G S
� � �Q ���_ �,oti�� _ �� � �� , �� _ —��� ro � g ���a���� ���oE.a , � Map Printed May 2013.
:
� F,,o Indian T'ra►I �� � % - �� � , , ��- � � � / �Marshville
.
� �
� , �, '' L —� �, <
. , � � �
., , , _ ,
,�J' � V� � ��� ',;_� �• � ,.� � � � �� � �yz� o�� �
\ , _
� � -" , � r>. R. � � � {�
. `
, ; , � � � � I
:
:
�
. ,. . � . y � ' i - i ` ,� -.` d`
:l
� � � � ��-� � / � \'C/ -, . � \ �� y , to �/ �, /q � ��.
r. � `�f/ � • 0 r,.���� / ` � A ' , . �c+ � � � � �� ��� � C,', �/ _
�
. _ � / � � � x � t0 H... _ �` ` '�-nNN - �f , /� � cY/ f' \, ,��� /4 . �
� �` � � a � � � � _ � H ' �a � � �. �� ' /�"� END
(� � �� � qR � � � _ P � �� �s�R� � � �'�Fsr�'` � 0 0.875 1.75
�
/,� ` Q► � ' � � `r_`�� � `onF o =o: i� e r- � � yl PROJECT � Miles
� ., � � �
C/I[� OI�P. . � � ��� � .. � I.�� '�S-� A��A _ . y`FJ �-� �� . , OLDHIGHWAYRDz� // �S
, .,; ` � 1 � '` � 'K �� � � � y��-� po_- ��i Monroe ' Wingate �'� j'� `, o
= v �
,
,., � , ` �`� , � ��
, �� �� - � � � _ '� ��� °�
-� � . _.�� o - , , , � i ��
�, � , � �' ��, o „ , o
� , %
��, a �y' � i � �,_ � i � , " �_ , , ,
% �>'��,- - � r �'" \ A �(�' J� o r _ '� x. �;: � — o � � � u � , : i H . � _ _ i r. :
� .� o � '��� �,�'. � �' '��� ���:� p��+��` � � �T�urnpike�authoroty
r
/ V' . t . , A�\ ' � �.. . , � 1
I.
t ' I +- � � (� – O GO �} ���\��
♦
v,
I � r � � �i' _��,yiroeRo �—� o�`� ��—�<,
� /
' . �. 5
Wedtlington. � �� r , . _
�,� � � � �, , C � / �,� � �. , ��_ , --� �-+� 74 � : � STIP PROJECT
� � � �, , �� '
-�. ._
�, t �' / , ha�rlott Monri e� , � _ : � _ _ --' � _� S„����E� `, ,
. _, p NO R 3329/R 2559
`, � J � __ `� _ MPR
� �'-{,.i .' � � �, � � ( — : /EXeP,Ut�V2 /'1�[pOfi � ,' � � `J� ��pMpNROE , , . ' '
� � �� �
_ ;
r ��—: --s �
-^
� ' � � Wesle �ha el �=! � �, �-� � _� � �,� �� � - � �� �� . , �
% �,�J y p �T , ,� � ,- ' � ' ' Mecklenburg County and
�-� ,r �V�F �
� i� ' � ��� ;� � � �eee 601 � � ' � Unlon Cou
� �� ,l�' 84 - �.� �, �`e'�o . ntY
�_
,
�. , � � �
j � , /� � �.. � - � t'� 1 � ��"� _ � � � � . . � , .
. � ,
� � � +l' - .�� -
_ � i � c--'
,
, _
� 1 �- 75 , �,
� ` � � � � � � j _� r � , �, _ • � r „ �
��� � ' - � _ ' , 1�� � . �
,, f_,
._ � , I � "
� � � '� � ' � MONROE CONNECTOR/
� �
-� ;
, � � �. � �i � �
� , ;- ' � y, , � 207 -� " �, � BYPASS
, s �,
. �
1� � �� _ �,. � `v
� - ' r
� �- r
�, �
:
A ' � � ��<`- �",L" —� / � ��.
\ 1
�
� �
I
� . ���:
_:� i , � _ � � � '
�,
i �
�� � , �_ - Lake � ' ��
� � ��� � ��� � �`�- . � . Monroe � � � � '
.
,� .
' 16 `/� '
, y T� ' .
} � ' _ . ,
-
; - . �� � , '� � � - ,� � . � PROJECT STUDY
�„ �, -,
i -- � -
,- �
, �
—iry _— F ' � , t' 4 � � -�_ � 7 .
! �,
i P �
� , ,, -L m v � ', _` � . . , , - AREA
�, _ __ ,,
li� v �.��a . � j� r � y - . � —
< '� �l � \
_ _
,
.
� � �`����, ��� � � � � � � � �� � � � 1 1
_ .
., ,. ,
, � � � , � .
� �� � � , . , , ,
� �� � � Figure
, _
�� � - '��� =
� �� �
:� 4 r_- .. � .
� —
�
,-_
,
�
� , � �� . . . , _ . �. .. ��'
, . � ,, ,
'. � .. . � . . . . . - '-��� �� ... �; �� � . . .