HomeMy WebLinkAbout20081335 Ver 2_Approval Letter_20090204Y -WV TA
NCDENR
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
February 4, 2009
Mr. Dane E. Smith
Lake Hills Homeowners' Association
P.O. Box 383
Pfafftown, NC 27040
Natural Resources
Dee Freeman
Secretary
Re: Lake Hills Lake Construction, Forsyth County
DWQ #20081335, Ver. 2; USACE Action ID. No. SAW-2008-02586
Ut to Mill Creek [030704, 12-94-4, C]
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Smith:
Attached hereto is a copy of Certification No. 3779 issued to Mr. Dane E. Smith, of the Lake Hills
Homeowners' Association, dated February 4, 2009. In addition, you should get any other federal, state or
local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment
and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations.
If we can be of further assistance, do not hesitate to contact us.
z Sin ly
Coleen H. Sullins
CHS/cbk/Ym
Attachments: Certificate of Completion
cc: Becky Fox, EPA Region 4, 1307 Firefly Road, Whittier, NC 28789
U.S. Army Corps of Engineers, Raleigh Regulatory Field Office, Wilmington District
Sue Homewood, DWQ, Winston-Salem Regional Office
DLR Winston-Salem Regional Office
File Copy
Matt Matthews, DWQ Wetlands and Stormwater Branch Manager
Rocky Powell, Clear Creeks Consulting, LLC, 1317 Knopp Road, Jarrettsville, MD 21084
Filename: 081335Ver2LakeHillsLakeConstruction(Forsyth)401_IC
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX: 919-733-6893
Internet: http://h2o.enr.state.nc.us/ncwetlands/
NorthCarolina
Natumllrf
An Equal Opportunity 1 Affirmative Action Employer
Lake Hills Homeowners' Association
Page 2 of 2
February 4, 2009
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-
500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ)
Regulations in 15 NCAC 2H, Section .0500 to Mr. Dane E. Smith of the Lake Hills Homeowners'
Association, NC to fill or otherwise impact 0.94 acres of 404/wetland in the Yadkin River Basin, to
construct a 3.2 acre amenity pond at the site. The site is located on the southern side of the existing drained
Lake Hills lake, adjacent to Lakeview Drive, northwest of Bethania, in Forsyth County, North Carolina,
pursuant to a joint application and Public Notice issued October 16, 2008 (received by the DWQ on
October 16, 2008), and by additional information received from you on January 30, 2009.
The application and supporting documentation provides adequate assurance that the proposed work will
not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the
State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,
302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the
supporting documentation, and conditions hereinafter set forth.
This approval is only valid for the purpose and design submitted in the application materials and as
described in the Public Notice. If the project is changed, prior to notification a new application for a new
Certification is required. If the property is sold, the new owner must be given a copy of the Certification
and approval letter and is thereby responsible for complying with all conditions of this Certification. Any
new owner must notify the Division and request the Certification be issued in their name. Should wetland
or stream fill be requested in the future, additional compensatory mitigation may be required as described
in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a
change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in
writing and a new application for 401 Certification may be required. For this approval to be valid,
compliance with the conditions listed below is required.
Conditions of Certification:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Type of Impact Amount Approved Units Plan Location or Reference
404/Wetland 0.94 (acres) Application and Public Notice
Sediment and Erosion Control:
2. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
Lake Hills Homeowners' Association
Page 3 of 3
February 4, 2009
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control
measures and stormwater routing and treatment shall be on site at all times.
3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the 404/401 Permit Application. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur;
4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval
from the Division. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, design and placement of temporary erosion control measures shall not be conducted in a
manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream
and down stream of the above structures. All sediment and erosion control devices shall be removed
and the natural grade restored within two (2) months of the date that the Division of Land Resources or
locally delegated program has released the project;
5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor
within these boundaries approved under this authorization shall be clearly marked with orange warning
fencing (or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with GC 3705;
Continuing Compliance:
Mr. Dane E. Smith of the Lake Hills Homeowners' Association , shall conduct construction activities
in a manner consistent with State water quality standards (including any requirements resulting from
compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of
State law and federal law. If the Division determines that such standards or laws are not being met
(including the failure to sustain a designated or achieved use) or that State or federal law is being
violated, or that further conditions are necessary to assure compliance, the Division may reevaluate
and modify this Certification to include conditions appropriate to assure compliance with such
standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the
Certification, the Division shall notify Mr. Dane E. Smith of the Lake Hills Homeowners'
Association , and the US Army Corps of Engineers, provide public notice in accordance with 15A
NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504.
Any new or revised conditions shall be provided to Mr. Dane E. Smith of the Lake Hills
Homeowners' Association , in writing, shall be provided to the United States Army Corps of
Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and
shall also become conditions of the 404 Permit for the project;
7. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an
NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued
to the project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
permit [applicable to construction projects that disturb one (1) or more acres], full compliance
with permit conditions including the sedimentation control plan, self-monitoring, record keeping
Lake Hills Homeowners' Association
Page 4 of 4
February 4, 2009
and reporting requirements are required. A copy of this permit and monitoring report forms may
be found at htW. //h2o. enr. state. nc. us/su/Forms Documents. htm. ;
8. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 Permit.
If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written
request within sixty (60) days following receipt of this Certification. This request must be in the form of a
written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If
modifications are made to an original Certification, you have the right to an adjudicatory hearing on the
modifications upon written request within sixty (60) days following receipt of the Certification. Unless
such demands are made, this Certification shall be final and binding.
This the 4`h day of Fe ry 2009
z ION F QUALITY
Coleen H. Sullins
CHS/cbk/ijm
3779
Beverly Eaves Perdue, Governor
Dee Freeman, Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
DWQ Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to return
this certificate to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail
Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the
applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
1, , hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional
(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having
been authorized to observe (periodically, weekly, full time) the construction of the project, for
the Permitee hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature Registration No.
Date
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htto://h2o enr state nc ushicwetlands
NorthCarolina
Amurally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/ 10% Post Consumer Paper