February 5, 2009
DWQ EXP # 08-0965v3
Lincoln County
EXPRESS REVIEW ACCEPTANCE LETTER
Mr. Ken Beuley
TKC CXXVIII, LLC
5935 Carnegie Boulevard, Suite 200
Charlotte, NC 28209
Project Name: Crate and Barrel Distribution Center
On June 26, 2008, the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to you
to place fill or otherwise impact 0.012 acre of wetland and 820 linear feet of an unnamed tributary to
Larkard Creek in order to construct the "Crate and Barrel Distribution Center" in Lincoln County. In
order to meet the Stormwater Management Condition (Condition #2) of the Certification for this project,
the 401 Oversight/Express Permitting Unit of the DWQ received a request from Mr. Mansour Edlin of
Mansour Edlin Consulting on February 2, 2009 for acceptance into the Express Review Program.
This letter advises you that your project will be accepted into the Express Review Program once the
following items are received:
a. The application fee of $1500.00 made payable to the North Carolina Division of Water
Quality [Stormwater management plan with three (3) drainage areas];
b. Three (3) complete and collated copies of the most current Express Review Stormwater
Management Plan Application available at
http://h2o.enr.state.nc.us/ncwetlands/documents/ExpRevSWMAppV2 pdf
Three (3) copies of all supporting information pertaining to this project including
i. Design calculation sheets for all proposed BMPs sized for both on-site and off-site
drainage, if any;
ii. Most current BMP Supplement for each proposed BMP including Design
Summary and Required Items Check List (available at
littp://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items;
iii. A signed and notarized Operation & Maintenance Agreement for each BMP;
d. Three (3) copies of full size plans (with detailed construction information) shall include the
following:
i. Entire site plan with existing and proposed contours and delineated drainage areas
to the BMPs;
ii. Erosion and sediment control plans;
iii. Plan views and cross sectional details of all BMPs and associated structures with
elevations;
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX: 919-733-6893
Internet: http:l/h2o.enr.state.nc.us/ncwetlands/
NorthCarolina
N I
aturallry
An Equal Opportunity 1 Affirmative Action Employer
Ken Beuley
Crate & Barrel Dist. Center SMP
Page 2 of 2
February 5, 2009
iv. Construction sequence and planting schedule for the proposed BMPs;
e. One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale
or color). If the plans are too large to store in TIFF format, they can be stored in PDF.
Details of the Express Review Program requirements can be found at:
http://h2o.enr.state.nc.us/ncwetlands/express review.htm.
The clock for this project will not start until receipt of the completed application package and
required fee. If the impacts are greater than indicated on the Initial Interest Form and/or the services
are different, you may be required to remit an additional fee.
If you have any questions or wish to discuss these matters further please do not hesitate to call Joseph
Gyamfi or Lia Myott Gilleski at 919-733-1786.
Sinc ly,
n Cyndi Karoly, Supervisor
1 401 /Express Review Oversight Unit
CBI{/jg
cc: Steve Chapin, USACE Asheville Regulatory Field Office
Alan Johnson/Barry Love, DWQ Mooresville Regional Office
File Copy
Matt Matthews, DWQ Wetlands and Stormwater Branch Manager
Mansour Edlin Consulting, 1515 Mockingbird Lane Suite 802 Charlotte, NC 28209