Loading...
HomeMy WebLinkAbout20081814 Ver 1_More Info Received_20090204°8' 19N 1 ESP NC Division of Water Quality 401 Oversight/Express Review Permitting Unit 2321 Crabtree Blvd Suite 250 Raleigh, NC 27604 Dear Ms. Cyndi Karoly; January 26`h, 2008 FEB 4 2009 DEWR - WATER QUALITY V01ANDS AND STORMWATER BRANCH This letter is in response to a request for more information concerning the House Creek Greenway project (DWQ Project #08-1814). Our original permit submittal occurred on December 12, 2008. Your letter requesting additional information was dated January 8 h, 2008. In this Request For More Information, attached to this letter, you requested additional information on 4 items. Please find the following responses to your request as follows: 1. The project consists of varying dimensions depending upon funding source and NCDOT requirements. As a result of the project having State and Federal funding involvement, the required greenway width is 10 feet in accordance with the NCDOT Division of Bicycle & Pedestrian Transportation guidelines. 2. Based on correspondence with Mr. James Shem of the Raleigh Regional office of the U.S. Army Corp of Engineers (COE), this project will be permitted through the NWP permit process. According to Mr. Shern, he has approved the use of NWP #14 for this project. 3. Please see attached table showing the square footage of Zone 1 and Zone 2 impacts for each location. The impacts areas are shown and calculated to the proposed construction easement lines. Actual buffer disturbance that the contractor will require for construction, staging, and clearance for setting cored slab bridge units may be less than shown. The importance of minimizing buffer disturbance to the minimum required for project construction will be discussed with the contractors during the pre-construction meeting. 4. Based on correspondence with Mr. James Shem of the COE, the mitigation required for the impacts to jurisdictional streams will be provided through purchasing credits from a local mitigation bank. No on-site mitigation will be utilized for the proposed project; therefore a mitigation plan as described in the Section VIII will not be necessary. Based on mitigation guidelines for buffer impacts associated with greenway projects, buffer mitigation is not required. Therefore, based on current regulations and correspondence with the COE, no additional mitigation will be required. Corporate PO Box 7030, Charlotte, NC 28241, (704) 5834949 3475 Lake ..d Blvd, Fort Mill, SC 29708, (803) 802-2440 Fat (803) 802-251.5 Ra1lei6k. 14001 Wertoo pkwy, (919) 678-1070 Fax (919) 677-1252 Wil®iapor, 2120-B Capital Or., Wdauo6u a, NC 26405 (910) 313-6648 Fax (910) 3136823 CoeewQ 4601 Curpotate Dr. NW., Cowmd, NC 26027 (704) 793-9855 Fax (704) 793-9665 w 'Vir weidac- NWP Permit submittal Proposed House Creek Greenway DWQ Project No 08-1814 January 26, 2009 We appreciate the opportunity to work with you on this project. Please contact Mr. Adam V McIntyre (632-5910) with any questions concerning this letter response or any details associated with the House Creek Greenway. Sincerely, ESP Associates, P.A. James R. Compton, PE Raleigh Office Manager corporate PO Box 7030. Chadom NC 28241. (701) 5834949 3475 Lakemont Bivd.. Fort milL SC 29708- (903) 802-2440 Fu (803) 802-2515 Rakij6. 14001 Wean Pkwy.(919)679-1070 Fax(919)677-1252 Wamiyyoo, 2120-B Capi al Dr., WA-00q NC 29405 (910) 313-6649 Fu (910) 313-6923 Coamrd, 4601 C rpm to Dr NW.. Cbwwk NC 28027 (704) 793-W55 Fax (704) 793-9965 ?F W ATF9 Michael F. Easley, Governor " o `O G William G. Ross Jr., Secretary 65 7 r North Carolina Department of Environment and Natural Resources Q Coleen H. Sullins, Director Division of Water Quality January 8, 2009 DWQ Project # 08-1814 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED City of Raleigh - Parks and Recreation Department P.O. Box 590 Raleigh, NC 27602-0590 Subject Property: City of Raleigh House Creek Greenway House Creek [030402, 27-33-13, C, NSW] REQUEST FOR MORE INFORMATION Dear Sir or Madam: On December 12, 2008, the Division of Water Quality (DWQ) received your application dated November 11, 2008,with additional information received from you on December 22, 2008, to fill or otherwise impact 52 linear feet of perennial stream (temporary impact), 189 linear feet of intermittent stream (permanent impact), and 45,435 square feet of Zone I Neuse River basin protected riparian buffers and 48, 612 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the proposed greenway project at the site. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please verify that the entire proposed greenway width is 8 feet or less. 2. Please verify that the USACE will be permitting your project under a Nationwide Permit and not an Individual Permit. Additionally, if this project is to be permitted under a Nationwide Permit, you state in your PCN application that it will be "14, 3 or 12", please identify which Nationwide Permit No. it will be. 3. Please update buffer impact sheets to show the square footage (numerical values) of Lone I and Zone 2 impacts. Additionally, assuming that the shaded areas on the buffer impact sheets are buffer areas proposed for impact, please explain why the amount of impacts at a number of locations appear to extend well beyond the footprint of the greenway trail. 4. Please provide more details on the in-stream enhancement. Section VIII, No. 1, states that the Enhancement Plan was attached, but no plan was in the application package. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone- 919-733-17861 FAX 919-733-6893 / Internet: 1=t //h2o.enc.state.nc.us/ncwetlands NOthCaro ina 94 127y An Equal Opportunity/Affirmative Action Employer - 50% Rccycled/10% Post Consumer Paper City of Raleigh Page 2 of 2 January 8, 2009 Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to discuss t04 matter. Sincer / Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/Ym cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Matt Matthews, DWQ Wetlands and Stormwater Branch Manager Jim Compton, ESP Associates, P.A., 14001 Weston Parkway, Suite 100, Cary, NC 27513 Filename: 081814CORaleighHouseCreekGreenway(Wake)On_Hold RHCG BUFFER ZONE AREAS ALIGNMENT SHEET LOCATION STATION STATION AREAICADDI -PREF1- 2 CL 20+80.00 21+35.00 2967.49 -PREF 1- 2 CL 21+43.00 21+81.00 2977.53 -PREF1- 2,3 RT 24+21.00 25+24.00 599.93 -PREF1- 3 LT 25+39.00 26+94.00 786.92 -PREF1- 4 LT 30+78.00 31+08.00 524.96 -PREF1- 4 LT 31+23.00 31+41.00 98.65 -PREF1- 4 RT 31+32.00 31+57.00 61.3 -HORTON- 6,7 CL/LT 23+77.00 25+70.00 3023.48 -HORTON- 7 CL/LT 26+18.00 27+33.00 966.14 -PREF2- 8,9 CL/LT 11+20.00 13+52.00 5437.28 -PREF2- 9 CL 14+32.00 14+67.00 2489.93 -PREF2- 9 CL 15+02.00 15+36.00 2289.67 -PREF2- 10 CL 19+90.00 20+25.00 1281.31 -PREF2- 11 LT 24+51.00 24+81.00 566.87 -PREF2- 11 LT 24+91.00 25+22.00 497.31 -PREF2- 12 LT 29+17.00 29+47.00 656.25 -PREF2- 12 LT 30+56.00 30+92.00 791.27 -PREF2- 15 RT 47+03.00 47+43.00 730.65 -PREF2- 15 RT 47+56.00 47+95.00 1999.07 -PREF3- 16 RT 13+43.00 15+76.00 5013.73 -PREF3- 16,17 RT 15+76.00 16+63.00 1493.79 -PREF3- 17 RT 16+63.00 18+20.00 2143.98 -PREF3- 18 CL 23+94.00 24+24.00 2819.25 -PREF3- 18 CL 24+36.00 25+10.00 2639.14 -PREF3- 19 LT 28+27.00 30+64.00 2578.89 BUFFER ZON E 1 TOTAL 45434.79 -PREF1- 2 CL 20+66.00 20+81.00 1213.62 -PREF1- 2 CL 21+81.00 22+55.00 2197.69 -PREF1- 2,3 CL/RT 23+13.00 25+65.00 3310.44 -PREF1- 4 LT 30+58.00 30+78.00 338.39 -PREF 1- 4 RT 31+57.00 31+79.00 137.49 -PREF1- 4 LT 33+50.00 34+52.00 1383.46 -PREF1- 5 LT 35+18.00 35+46.00 500.39 -HORTON- 6,7 CL/RT 23+77.00 25+70.00 4576.198 -HORTON- 7 CL/RT 26+40.00 27+43.00 2360.68 -PREF2- 8,9 CL 11+17.00 13+73.00 5173.02 -PREF2- 9 CL 14+13.00 14+33.00 1729.22 -PREF2- 9 CL/RT 14+37.00 15+58.00 1471.42 -PREF2- 10 CL 19+07.00 19+40.00 1202.07 -PREF2- 10 CL 20+23.00 20+46.00 773.47 -PREF2- 11 LT 24+30.00 24+50.00 391.81 -PREF2- 11 LT 25+22.00 25+43.00 221.23 -PREF2- 12 LT 28+96.00 29+16.00 424.49 -PREF2- 12 LT 30+92.00 31+17.00 519.59 -PREF2- 13 LT 37+47.00 38+01.00 105.42 -PREF2- 14 RT 39+32.00 40+18.00 655.77 -PREF2- 14 RT 42+39.00 43+82.00 911.35 -PREF2- 15 RT 46+84.00 47+04.00 303.37 -PREF2- 15 RT 47+96.00 48+80.00 1126.98 -PREF3- 16,17 CL 13+18.00 19+19.00 12275.67 -PREF3- 18 CL 23+49.00 23+87.00 1844.84 -PREF3- 18 CL 24+84.00 25+09.00 1392.2 -PREF3- 19 LT 27+71.00 28+60.00 981.91 -PREF3- 20 RT 30+89.00 33+40.00 1089.98 BUFFER ZONE 2 TOTAL 48612.168 BUFFER ZONE sf 1 sf 1 sf 1 sf 1 sf 1 sf 1 sf 1 sf 1 sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf 1 1 1 1 1 1 1 1.043 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 116 ACRES ACRES RHCG STREAM IMPACTS ALIGNMENT SHEET LOCATION STATION LENGTH -PREF1- 2 CL 21+36.00 59 If -PREF1- 3 CL 31+20.00 9 If -HORTON- 4 CL 26+54.00 31 If -PREF2- 6 CL 19+82.00 32 If -PREF2- 7 CL 29+54.00 12 If -PREF2- 8 CL 30+50.00 18 If -PREF2- 9 CL 47+45.00 28 If STREAM IMPACTS TOTAL 189 = LINEAR FEET ALIGNMENT SHEET LOCATION STATION LENGTH -PREF2- 5 CL 14+67.00 6 If -PREF3- 10 CL 24+54.00 46 If TEMPORARY STREAM IMPACTS TOTAL 52 = LINEAR FEET