Loading...
HomeMy WebLinkAbout20171568 Ver 1_CAMA Application_20171206c N.- Coastal Management ENVIRONMENTAL QUALITY 12/5/17 MEMORANDUM: TO: FROM: SUBJECT: Applicant: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director YEE FO o 6'J eonrI Karen Higgins Division of Water Resources Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Carteret Community College c/o David Cerino Project Location: Carteret County, 301/303 College Circle, in Morehead City Proposed Project: Construction of a mariculture demonstration center Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 26, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE Nothing Compares, - State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Carteret Community College c/o David Cerino 2. LOCATION OF PROJECT SITE: 301/303 College Circle, in Morehead City, Carteret County. Photo Index - 2006: 39-8050 grid H-14, grid G-15,16 & 18 Longitude: 34°43'19.05 Latitude: 76°45'35.81 3. INVESTIGATION TYPE:. CAMA/D&F 4. INVESTIGATIVE PROCEDURE:Dates of Site Visit —11/17/17 Was Applicant Present — No Photos Taken — Yes 5. PROCESSING PROCEDURE: Application Received: Officially Submitted: 11/3/17 Complete —11/3/17 Office - MHC 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City- Certified 9/28/2007 Land Classification from LUP — Public Institutional/Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: Yes (D) Intended Use: Public/Government (E) Wastewater Treatment: Existing — Morehead City Sewer Planned - None (F) Type of Structures: Existing — research pier, platform and slip with boatlift, riprap, buildings, existing utilities Planned-Mariculture Demonstration Center (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FTTAXD OTHER (A) Shallow bottom N/A 542 ft2 N/A (B) Open water N/A N/A 596 ft2 shaded/Inc. (C) High Ground N/A 4,000 ft2 N/A (D) Total Area Disturbed 5,138 ft2 (E) Primary Nursery Area: No (F) Water Classification: HQW/SA Open: Yes 8. Project Summary: The proposed project is for the construction of a Mariculture Demonstration Center to provide hands on training for the shellfish industry via workshops, seminars, short courses and community college curriculum courses. Field Investigation Report Carteret Community College 301/303 College Circle Page 2 of 3 9. Narrative Description: The Carteret Community College/Sea Grant project is located at 301 and 303 College Circle within Morehead City, Carteret County. The site is found by following 70 East (Arendell St.) towards Carteret Health Care hospital. The college will be located directly across from the hospital entrance along Arendell St. The site location is along the west side of the college property and at the NCSU Center for Marine Sciences and Technology building (301/303 College Circle). The college property is 26.9 acres (1,171,764sf) in its entirety and 0' to 5' above nhw depending on location and is along Bogue Sound. The upland vegetation mainly consists of lawn grasses and trees. There are wetlands along this area of the property and consist of Spartina alterniflora, Spartina patens, Juncus roemerianus and non -coastal wetlands. There are existing groins and breakwaters along the property (cove areas) that were pennitted in the past. The Division of Water Resources classifies this area as HQW/SA Waters. This area of Bogue Sound is not designated as a Primary Nursery Area and is open to the taking of shellfish. The Morehead City Land Use Plan classifies this area as Public Institutional with Conservation within the AECs. Water depths within this project location are -6 inches nlw/mlw to -1.5' nlw/mlw (field verified), depending on location. The bottom substrate is sand and there are SAV located and marked within the middle cove. The width of the waterbody within this location is approximately 2,800 feet per Google Earth. 10) Proposed Development: Due to the proximity of the CMAST and CCC buildings, easy access, ADA compliancy and existing classroom facilities, the applicants are proposing the demonstration center within this location of the CCC property. The applicants are proposing to construct a covered pavilion area, as well as non -permanent culture gear such as bottom cages, floating oyster bags, floating cages, netting panels, FLUPSY and a floating platform. There would be 4 bottom culture netting located within the most western cove, 9 total locations of floating/suspended gear (4 in middle cove, 3 in most eastern cove and 2 along the west side of the existing pier), 11 total of bottom cages (3 in middle cove, 6 in the eastern cove and 5 along the east side of the existing pier). The FLUPSY would be located along the southeast side of the existing pier (secured to the pier and held in place by anchored with helical screws) as well as a floating platform with gangway along the north- east side of the existing pier. Per the applicant no anchors, riser pipes or bottom culture gear will be placed within 5' of marked SAV. Per the installation specifications for the type of gear (off bottom cages, floating bags, LowproGro cages, Oystube baskets, OysterGro floating cages), the equipment would be held in place by spans or lengths of rope, pvc risers, weights, rebar or other staking material. All portions of the development would be approximately 1,000 feet from the most eastern riparian access line and a minimum of 15' from the western riparian access line. The dimension of the gear are as follows; Field Investigation Report Carteret Community College 301/303 College Circle Page 3 of 3 • Bottom Cages: 45.5" lx 41 w x 25"h with 6 legs • Floating Bags: 40" 1 x 18" w (w. floats) 12 bags per 30' span (6 bags on each of line) • LowProgro cages: 36" 1 x 24" w x8" h (total of 12 cages per 60' span) •Oystube basket: using 4" sch. 80 pvc riser 4' above water; 36"1 x 12" h with 12 baskets per 75' span *Protective netting panels: up tp four 10' x 10' panels and 4 each of 4' square mesh bags and cages *Floating platform with gangway: 7' x 20' platform with a 4' x 20' gangway •Flupsy: 12' x 24' but can be configured to a 10' x 20' if necessary To accommodate outside training, the applicants are proposing a covered pavilion area (includes pumps and 3000 holding tanks over existing impervious) within the existing aquaculture equipment area. The pavilion would be 40' x 70', located over existing impervious and 30' to 50' landward of normal high water. A total of 16.16% of impervious surface would be covered within the AEC. The existing impervious coverage is unknown for the entire tract. 11. Anticipated Impacts: The proposed development would shade and usurp 542sf of shallow bottom habitat, 596 sf of open water and grade, fill and disturb 4, 000 sf of high ground. Because all proposed development is located within the existing pier location as well as cove areas, there should be no navigation issues. Name: Heather M. Styron Date: 11/30/17 Office: Morehead City DCM MP -1 APPLICATION for Major Development Permit (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Carteret Community College Bogue Sound Shellfish Aquaculture Demonstration Center Applicant 1: First Name Ml Lest Name MI John Last Name Hauser Applicant 2: First Name MI Last Name State NC David Cerino 6314 ext. If additional applicants, please attach an additional pages) with names llsfed. FAX No. Mailing Address PO Box City State 3505 Arendell St City Morehead City N.C. ZIP Country Phone No. FAX No. 28557 USA 252 - 222-6114 ext, - Street Address (if different from above) City State ZIP 301 College Circle Morehead City NC 28557- Email E cerinod@carteret.edu 2. AgentI.Contractor Information Business Name North Carolina Sea Grant Agent/ Contractor 1: First Name Charles MI R Last Name Weirich Agent/ Contractor 2: First Name MI Last Name Malting Address 30,3 College Circle PO Box City Morehead City State NC ZIP 28557 Phone No. 1 252 -222 - 6314 ext. Phone No. 2 ext. FAX No. Contractor # Street Address (it dlfterent from above) City State ZIP Email crweiric@ncsu.edu (✓ 5 5 <Form continues on back> 282-808-2808 .. 9-888-4RCOAST .. www.nccoastalmanagement.rnet Form DCM MP -1 (Page 2 of 8) APPLICATION for Major Development Permit 252-808-2808 :. 4-888-4RCOA5T :: www.necoastaimanageinent.net Form DCM MP -1 (Page 3 of 6) RECEIVED APPLICATION for Major Development Permit NOV # 3 2017 3.: Project Location County (can be multiple) Street Address o State Rd. # Carteret 301/303 College Circle Subdivision Name City state Zip WA Morehead City NC 28557 - Phone No. Lot No.(s) (if many, attach additional page with fist) 252 - 222 - 6114 ext. I 1 I I a. In which NC river basin is the project located? b, Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade []Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. if applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. 1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes NNo [INA Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.%) 2,665 1,171,764 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A, NWL (normal water level) (if many lot sizes, please attach additional page with a list) 0-5' ❑NHW or NNWL e. Vegetation on tract Uplands on site are mostly maintained grasses with areas of gravel and concrete. Wetlands along the shoreline contain wax myrtle, ground bushes, weeds, and grasses. f. Man -trade features and uses now on tract Education facilities owned and operated by Carteret Community College and NC State University g. Identify and describe the existing land uses adjacent to the proposed project site. NC Division of Marine Fisheries Headquarters (east) and private residence with pier (west). h. How does local government zone the tract? 1. Is the proposed project consistent with the applicable zoning? Op (Attach zoning compliance certificate, if applicable) ®Yes DNo DNA J. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes NNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. DYes NNo [INA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes NNo [INA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :. 11-888-412COAST :: www.nccoastalmanagement-net Form DCM MP -1 (Page 4 of 6) APPLICATiON for Major Development Permit m. () Are there wetlands on the site? ®Yes ❑No (i) Are there coastal wetlands on the site? ®Yes []No (ii) If yes to either () or (ii) above, has a delineation been conducted? []Yes NNo (Attach documentation, ff available) n. Describe existing wastewater treatment facilities. Wastewater is captured and processed by the Morehead City sewer system. o. Describe existing drinking water supply source. Drinking water is provided by the Morehead City water distribution system. p. Describe existing storm water management or treatment systems. Stormwater treatment via wet detention and infiltration, 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial NPubliclGovernment j] Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of the proposed Shellfish Mariculture Demonstration Center is to provide a site for hands-on training of entrepreneurs and existing shellfish producers. NC Sea Grant is partnering with CCC in development of the demonstration center and the educational focus will be on how to properly site, build, and manage a shellfish farm using best practices, thereby supporting development of shellfish maricuiture in the state. The demonstration center will also serve as a site to conduct ongoing experiments to help develop best management practices for the industry including evaluation of various culture gear types, shellfish strain performance, stocking and culling strategies, mitigation of blofouling, and evaluation of native shellfish species with potential for culture in NC. Daily operation of the center will involve maintaining and managing culture gear and livestock. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where It is to be stored. The long term plan for the in -water portion of the site is to install non -permanent structures (anchor screws and PVC pipe risers) for support of various water column culture gear types. In addition, installation of non -permanent bottom culture gear including netting, mesh bags, and cages is planned. Shellfish culture activities will be supported by construction of a covered area on land (Aquaculture Pavllilon). Access to the waterwill be improved by a gangway and floating dock installed adjacent to the exiting pier. Please see attached project narrative for details. d. List all development activities you propose. 1. Construction of a 5' wide by 20' long aluminum gangway and a 7x20' floating platform. 2. Construction of pavillion and stormwater harvest system, 3. Installation of shellfish culture gear. 4. Deployment of a floating upweller system e. Are the proposed activities maintenance of an existing project, new work, or both? New work. f. What is the approximate total disturbed land area resulting from the proposed project? 4,000 Zsq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Two water streams exist that are discharged into Bogue Sound through a pipe located under the existing pier. 1. A raw water system that feeds flow-through tanks, primarily for shellfish. This water is discharged into Bogue Sound after a single pass through the tanks. 2. Water from the Carteret Community College Aquaculture teaching facility (Howard Building) floor drains. This includes discharge from flow-through and recirculating aquatic animal systems. Less than 100 lbs. of feed is used by the entire facility in a typical year. Other water discharged in this stream is freshwater used to wash equipment. 252-808-2808 :. 1-8138.4RCOAST .. www.nccoastaimanarjement.net Form DCM MP -1 (Page 5 of 6) NOV 2Q17 APPLICATION for Major Development Permit Will wastewater or stormwater be discharged Into a wetland? �� eg ®No []NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ®NA Is there any mitigation proposed? []Yes []No ®NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional.information In addition to this completed. application torm,.(MP-4) the following items below, if applicable, must be submitted In order for the application._ package to be complete. Items (a) -. (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mall. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name NC.pivision of Matine Fsheries Phone No. 252-726-7021 Address 3411 Arendell SL Morehead City, NG 28.557 . Name Albert and Marie Libby Phone No. 305-238-0324 Address 147 Banks St., Morehead City, NC 28557 Name Phone No. Address .. g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NC Coastal Stormwater Permit No. 960424 CAMA 143-97 h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, If necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification. and Permission to' Enter. on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 081 /17 Print Name John Hauser Signature" r `; 252.808-2808 :: 1-888-4RCOAST :: www.nccoastairnanagernent.net Form DCM MP -1 (Page 6 of 6) Please Indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ®DCM MP -3 Upland Development ®DCM MP -4 Structures Information APPLICATION for Major Development Permit 252-808-2808 :. 9-888.4RCOAST :. www.nccoastaimanagament.net EE, t IV Form DCM MP -3 NOV ,.0 3. 2017 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) DCM MHD CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND D�VELOP1V1E71rT �r ?r ;, ,v: p, �. - � ��X? ..m ,n .�: �?S,'�,. .a,... ..: •:o. .. .. �:, . ,-, '. ... .e,.�uhrc �, Y.�. .: 7I Si � t =.� a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. Demonstration pavilion (structure over aquaculture equipment) c. Density (give the number of residential units and the units per acre). n/a e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? []Yes 0No ®NA (ir) If yes, list the date submitted: g, hive the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking, 16.16% i. Give the percentage of the entire tract to be covered by Impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. unknown - multiple permitted stormwater treatment systems on-site J. Describe proposed method of sewage disposal. none proposed or needed for this project Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Two water streams exist that are discharged into Bogue Sound through a pipe located under the existing pler. raw water sys em that feeds flow-through an s, primarily for shellfish. this water Is discharged Into Bogue Sound after a single passthrough the tanks. 2, Water from the Carteret Community College Aquaculture teaching facility (Howard Building} floor drains. This includes discharge from Oow•through and recirculating aquatic animal systems, Less than 100 lbs. of feed Js used by the entire facility in a typical year. Other water discharged In this stream Is freshwater used to wash equipment. d. - Size of area to be graded, filled, or disturbed including roads, ditches, etc. 4,000 sf f. Last the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. only the structure over the aquaculture system proposed h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (1) Has a site development plan been submitted to the Division of Water Quality for review? []Yes NNo []NA (ii) If yes, list the date submitted: k. Have the facilities described in item (i) received state or local approval? []Yes MNo RNA If yes, attach appropriate documentation. m. Does the proposed project Include an Innovative stormwater design? ®Yes []No []NA if yes, attach appropriate documentation. Rainwater harvesting for reuse 252-800-28082 :: 1-888-4RCOA5T :: www.ncconstairnanagernentmet revised: 12126106 Form DCM MP.3 (Upland Development, page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) _ _public system by Town of Morehead City o. When was the lot(s) platted and recorded? n/a n. (f) Will water be Impounded? Yes EjNo []NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? QYes ONo MNA 252-808.2a08 :: 1-888-4RCOAST :: vvww.nccoastaimana[tentent.net revised: 12/26/06 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Eillo'n32017 d� M,CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please Include all supplemental information. 1 DQCKING'F.4CILITY/MARINA'f:Hl�RiCTERISTICS' ;f ©Thlssecttonnotappllcable `.a.. a. (I) Is the docking facllity/marina: b. (i) Will the facility be open to the general public? ❑Commercial OPublic/Government ❑Private/Community ❑Yes ®No c. (i) Dock(s) andlor pier(s) d. ([)Are Finger Piers included? ❑Yes DNo (ii) Number 1(gangway) If yes: (iii) Length 20' (ii) Number (iv) Width 5' (iii) Length (v) Floating ❑Yes []No (iv) Width (v) Floating ❑Yes []No e. (i) Are Platforms included? ©Yes ❑No f. (i) Are Boatlifts included? ❑Yes ❑x No If yes: If yes: (li) Number 1 (Ii) Number (iii) Length 20' (Ili) Length (iv) Width 7' (iv) Width (v) Floating [AYes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. n/a 0 ❑ Full service, including travel lift and/or rail, repair or (It) Number of slips exlsting maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: n/a m. (i) Will the facility have tie pilings? ❑Yes ®No (it) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). nla 1. (!)Will the facility be open to the general public? []Yes ❑x No 252-808-2808 ;: 1-888-4RCOAST :: www.nccoastaltnanagement.net revised: 12/27106 Form DCM MP -4 (Structures, Pasje 2 of 4) ..:..s a, Check each of the following sanitary facilities that will be included In the proposed project. NIA ❑ Office Toilets ❑ Toilets for patrons: Number: Location: ❑ Showers ❑ Boathoiding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. N/A c. Describe the disposal of solid waste, fish offal and trash. N/A d. How will overboard discharge of sewage from boats be controlled? NIA e. (I) Give the location and number of "No Sewage Discharge" signs proposed. 2 T (II) Give the location and number of "Pumpout Available" signs proposed. NIA f. Describe the special design, If applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of? NIA h. Give the number of channel markers and "No Wake" signs proposed. N/A 1. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. NIA j. What will be the marina policy on overnight and live -aboard dockage? k, Describe design measures that promote boat basin flushing? N/A t. If this project is an expansion of an existing marina, what types of services are currently provided? N/A 252-808-2808 :: 1-888-4RCOAST :: www. nccoastalmanaste►nenCnet revised: 12/27/08 V Form ®�IU1 MP (Strucfiures, Page 3 of 4) �y q ED m. Is the marinaldocking facility proposed within a primary or secondary nursery area? N V V '0 3 2017 Iy ❑Yes ❑x No n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? D- V& H ® CITY DYes ❑No B o. Is the marina/docking facility proposed withln or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW []SAV []SB []WL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes x❑No If yes, give the name and address of the leasehoider(s), and give the proximity to the lease. 3 BQATHOUSE (iric}udrng c"oyered �iftsJ " QThrs secfrori le hof applicab a. (i) Is the boathouse structure(s): []Commercial ❑PubliclGovernment ❑Private/Community (ii) Number (iii) Length (iv) Width Note; Roofed areas are calculated from dnipline dimensions. 4 7 GR0lN (e g ;wood; sheefprle, etc 'lf,a rock �ro1n, `useMPy2 4ycay�tloh and Frll) xi ®This secflon'nof'applicable .. , a. (i) Number (ii) Length (iii) Width 5BREAKINATFi�wood, n sheefprla, etc'j "(sactloh- of applicable. a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands .a.s•; `mr�n' r:x:✓:.;..'�-f•'•'?" yil L:-ri^:{•� .S,j.6.r�. ;.i,.:'J;:�r,��.f=�`s"f.`. ;`IaN;.a."'a^ . -Svai ,.xn�t•td :.(Qr'U'.�oG P.WIN 47,r'"'R5 ;i,.I 1", S�" ' �-�"" a f. ', ;�.,"_'f,::;?rt` :'tt�` ! �r`1::-t�'(�,i>'�3;�iiice`1..,'� 'S'•-;a:�k,.�,JG,'.T�4�';,i< �. n;:.7.i¢•:L.°.lt,!i.. x':__r n( ot ap llcable�:: - a. Is the structure(s): b. Number ❑Commerclai ❑PubliclGovernment ❑Private/Community Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e, Are of the swing d. Description of buoy (color, inscription, size, anchor, etc.) 252-808.2808 :: 1.888-4RCQAST n www.nccoastaimanagement.net revised: 12127106 Form DCM MP -4 (Structures, Page 4 of 4) a. Proximity of structures) to adjacent riparian property lines 700' west;150V east Note: For buoy or mooring piling, use arc of swing Including length of vessel. c. Width of water body 0.5 mile e. (1) Will navigational aids be required as a result of the project? E]Yes ❑No IMNA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 850' west; 1500' east d. Water depth at watetward and of structure at NLW or NWL unknown a. Give complete description: 1. Constructlon of a V wide by 20' long aluminum gangway and a 7x20' floating platform. 2. Construction o pavilion and s ormwa er harvest system. 3 Installation of shellfish culture oear. The long term plan for the in -water portion of the site Is to install water will be Improved by a floating dock Installed adjacent to the exiting pier. structures (anchor screws and PVC pipe risers) for support of various )nt bottom culture gear including netting and mesh bags an cages for n r—rud arca nn Land AKA the Aquaculture Pavillion. Access to the 252.808-2808 :: 1-888-411GOAST a www.nccoastafmanagement.net revised: 12127/06 CARTERET COMMUNITY COLLEGE/NC SEA GRANT SHELLFISH MARICULTURE DEMONSTRATION CENTER RECEIVED PROJECT NARRATIVE N0T.03 2017 Primary Applicant: Dave Cerino, Carteret Community College Agent: Chuck Weirich, NC Sea GrantDCM1m MHD CITY Background: In 2015, Weirich and Cerino, along with Ami Wilbur and Troy Alphin of UNCW developed a proposal entitled "Expansion and Diversification of the North Carolina Shellfish Aquaculture Industry" that was submitted to the NOAA Aquaculture Extension and Technology Program. The proposal was successful and funds were received to initiate work that involves comparison of oyster gear types and different native oyster strains at industry partner sites, evaluation of sunray venus clams as a means to diversify the industry, and establishing shellfish mariculture demonstration centers at UNCW and at a site on Bogue Sound shared by NCSU CMAST and CCC in Morehead City. Permitting is being requested for the latter component of the parent project. Permitting for culture activities was initially sought via a research lease through NCDMF, however due to the presence of SAV on the site it was deemed necessary to seek CAMA permitting. Purpose: The purpose of the proposed shellfish mariculture demonstration center is to provide a site for hands on training of entrepreneurs and existing shellfish producers via workshops, seminars, short courses, and community college curriculum courses. NC Sea Grant will partner with CCC in development of the demonstration center and the educational focus will be on how to properly site, build, and manage a shellfish farm using best practices, thereby supporting development of shellfish mariculture in the state. The demonstration center will also serve as a site to conduct experiments to help develop best management practices for the industry including evaluation of various culture gear types, shellfish strain performance, stocking and culling strategies, mitigation of biofouling, and evaluation of native shellfish species with potential for culture in NC. Shellfish mariculture demonstration centers are critical to industry development and several state institutions have established centers including Auburn University and Louisiana State University (Figure 1). Site description: The proposed site consists of a 26.9 acre parcel of land containing the Carteret Community College (CCC) Campus and the North Carolina State University Center for Marine Sciences and Technology (CMAST). CCC and CMAST maintain two adjacent Research Sanctuaries, located on Bogue Sound and the ICW with a total acreage of approximately 0.6 acres (Figure 2). The site includes a research pier and associated infrastructure and 2.5 coves with constructed tombolos. Sediment samples from 10 locations in the research sanctuaries were obtained in 2015 and submitted to the University of Florida for analysis, revealing predominately sandy bottom with some loamy sand bottom which are suitable for bottom clam culture. Depth at the site ranges from 0 m on the northern edges of coves to approximately 10 in at the southern border of the site proximal to the ICW. There is considerable current at the southern edge of the site. Salinity ranges from 28 to 34 ppt. There is SAV present in one of the coves of the site (Figure 3). Dr. Dave Eggleston of CMAST has characterized and marked existing SAV growth. Site attributes: Because the proposed demonstration center is located adjacent to CMAST and CCC, the site will be accessible without the need for a vessel. In addition, the site is ADA compliant with classroom facilities in place that will facilitate meeting and educational opportunities. Also, as part of the grant from NOAA, CCC received funding for the construction of a covered pavilion next to the demonstration site which will be incorporated into training activities. The site is suitable for deployment of water column as well as bottom culture gear and the presence of SAV would allow collaborative research to be conducted with Dr. Eggleston to evaluate SAV/shellfish aquaculture interactions. Site plan and gear deployment: The long term plan for the site is to install non -permanent structures (anchor screws and PVC pipe risers) for support of various water column culture gear types. In addition, it is planned to install non -permanent bottom culture gear including netting and mesh bags and cages for clam culture. No anchors, riser pipes, or bottom culture gear will be placed within 5' of SAV areas and no water column culture gear will be placed above SAV areas. An initial plan for the layout of gear types on the site is shown in Figure 4. Please note that this is only an initial suggestion and gear and associated structure will be placed according to permit guidelines, if approved. Initially, the following oyster culture gear types are proposed to be deployed: off bottom cages (Figure 5), floating bags (Figure 6), LowProGro® cages (Figure 7), Oystube® baskets as part of a long -line culture system (Figures 8 and 9) and OysterGro® floating cages (Figure 10). As described in Figures 6-8, spans or length of rope or line supporting floating or suspended gear will range from 30 to 75'. Anchor screws will be twisted fully into the bottom manually and PVC risers will be jetted in via water pump. For clam culture, deployment of protective netting panels, mesh bags, and mesh cages is proposed (Figure 11). These gear types will be secured to the bottom with weights, rebar, or other staking material. Access to the CMAST cove with SAV will be allowed only through a single marked pathway to avoid foot traffic through the SAV. Access to the portion of the site close to the research pier will be improved by the addition of a floating dock with gangway (Figure 12). The bottom underneath this proposed location is sand with some rocks, no vegetation is present on this part of the site. To support the shellfish culture activities on the site and demonstrate shellfish nursery techniques, nursery tanks will be maintained within the pavilion area and a Floating Upweller System (FLUPSY) (Figure 13) will be deployed on the East side of the pier. Research on the use of tidal flow to support shellfish growth within the FLUPSY will be evaluated. The FLUPSY will be secured to the pier and the East end will be anchored with helical screws. Access to the floating platform will be gained from the pier. Additional nursery facilities and workspace will be sheltered by the construction of a demonstration pavilion, an open sided covered area located between the Howard Building and the Shoreline (Figure 14). A Stormwater Management Permit Application has been submitted to NCDENR for this project. Environmental monitoring: Salinity and water temperature of the site will be monitored daily. As part of the NOAA grant monthly assessment of primary productivity of the site will be conducted through chl a measurements: In addition, Dr. Eggleston will continue regular sampling and assessment of SAV. Storm and hurricane plan: The site will be managed according to CMAST and CCC storm and hurricane policy. If deemed necessary, gear and associated structures will be secured or removed to prevent loss as well as marine debris. rj ,.� . � r- P + ,w NOV .0.3 2017 Figure 1: Shellfish aquaculture demonstration centers have been established at several locations in the US including Auburn University (L) and LSU (R). Figure 2: Existing CMAST and CCC research sanctuaries in Bogue sound proposed for establishment of a shellfish aquaculture demonstration center. RECEIVED NOV .0 3 2011 DC M- MHD CITY Figure 3: Western cove located at the CMAST research sanctuary showing location of SAV clumps. SAV is monitored regularly and as of August 2016, the major species is Zostera marina, with some Halodule wrightii. Oto W PR d tt . IRS G'iWh ure CCC .�, Facilit Legend rig:... Bottom culture (predator netting) W�� , — Floating/suspended gear main line F Screw anchor or PVC pipe `e Bottom Cage d� �- Rack and Bag no Floating Upweller Dock and Gangway._:_ Submerged Aquatic Vegetation Area Designated walkway Figure 5: Diagram of proposed off -bottom cage deployment (L) and photo of individual cage with mesh bag inserts (R). Dimensions of cages are 45.5" L x 41" W x 25" H with 6" legs. Figure 6: Diagram of proposed floating bag deployment (L) and photo of individual floating bag (R). Dimensions of bags are 40" L x 18" W including floats. A total of 12 bags will be deployed per 30' span (6 bags on each side of line). RECEIVED NOV 0 3 2017 CjVj- MiHD CITY Figure 7: Diagram of proposed LowProGro ° deployment (L) and photo of individual cage (R). Dimensions of cages are 36" L x 24" W x 8" H. A total of 12 cages will be deployed per 60' span. 4" sched 80 PVC riser (extending approx. 4' above water surface l t I"ne zi /! z p �/ s ! f 15.5' l' R 44' Screw anchor 1 IUJl.1 -coate me a ension i Figure 8: Diagram of proposed Oystube° basket deployment using a long -line suspension system(L) and photo of individual basket (R). Dimensions of baskets are 36" L x 12" H. A total of 12 baskets will be deployed per 75' span. RECENED NOV .0 3 2017 Figure 9: Installing screw anchor and PVC risers for long -line system deployment at industry partner site (L). Note floating bag line in left of photo. Photo on right shows installed risers and tension line set at drying position. Figure 10. OysterGro floating cages are increasingly popular among NC oyster producers but their use has not been evaluated with respect to production capacity and biofouling control strategies. Left, oystergro.com illustration showing feeding and air exposure placements, Right, OysterGro floating cages deployed at an NC industry partneri site N0'J 32017 Figure 11: Examples of protective netting panels to protect clams grown on bottom (L) and clam plastic mesh culture cage. Up to four 10' x 10' panels and four each of 4' square mesh bags and cages are proposed for the demonstration center. Dods lA*Load ltmwft ImPsa tDo&IneLoad30fftKB ".3:3Tit'aE?�madE2lSark iavasdiFsz�t2'crra�Il�: An�mg at'�Ysumgx. FZ'�x�da�s mtamt dmrag�s, ias'�s�Es exnead by '.mm4i€natromo#'EZUmrk Fsr rhm:c. asal.'sr '�atta:3mau>�a'a FLISmcE i'zaw3oct __ 13 nr usA Fiu�eet Name: �9i5EC; �. kvet5w�:v Pt�Y Cf;S' Distribr�trs2u�: t':�tArk ai�wnw DMUZ br. AC DM (at 't DSGNN* [eat t!xr O*" EZ Dock. JAC 838 But Rouaq so MOMM �&%CK cF $5708 PhMr 1 (BM61%.8153 Fax(413#i}i3 Gcnml !dotes: PTog.rt i�angt +.++�aa&aw.wMfr us ��mwws+�w+�ivs•rw,r.ww+ri a�e� �girNPrini7�,:+� c.as z..+wuei..ura0 '�'P��' «cn.yvc iv aku. `xgpiY'13'mmfi� aPLe Figure 12: Schematic of proposed floating dock with gangway RECENED NOV 1 3 2017 DCBM- VMHD CITY Figure 13: Diagram of a Tidal Floating Upweller System --------- - STOM.NVATER DATA WME: SOL94D BOGLE S"L wxrrH oPr HOwAFO WILONO Preliminary Drawings p Not For Construction Figure 14a: Location of Demonstration Pavilion (Yellow) and rainwater storage tanks (blue) that will be used for stormwater management CE l, V E DO NOVO,, 8 2017 Nfid, H' C fl T Y EXISTING HOWARD BUILDING A E- OF EXISTING PUMPS (GOULDS BOOSTER PUMP. MODEL YGBCOS14JO. 7GPM, 1J2HP. 6OHZ. 1PH) 10, kbEMONsfrRATION-PAVIL �I i Figure 14b: Inset of 14a Location of Demonstration Pavilion (Yellow) and rainwater storage tanks (blue) that will be used for stormwater management ------------- ------" — s - '112-T TOR »—'— PROPOSED STRUCTURE btTiSDPoRY b - iDEMCNJ5TRATION PAVILION) FROM GR0�2: r ti^ > .1 lr j 40.00 1 00 --------------------------------- 1 1 EX.SANDFILTERS� v t tC.3 4'GUTTER ( ,� JTTC;. .a.. �.., :r5 .Uy1EH .... ,. EX.BUILDING i �^ - - - -- -:- - -- ----------- ' # ° '- - - �-- ix. ELEVATED SEAWATER :NTAKE dSCREEN SYSTEM �B" - - - - .� -a- ..�r - DUAL3000 GALLON PROPOSED LOCATION HOLQING TANKS A OF EXISTING PUMPS (GOULDS BOOSTER PUMP. MODEL YGBCOS14JO. 7GPM, 1J2HP. 6OHZ. 1PH) 10, kbEMONsfrRATION-PAVIL �I i Figure 14b: Inset of 14a Location of Demonstration Pavilion (Yellow) and rainwater storage tanks (blue) that will be used for stormwater management Work Plat c/a,f f f), ffT �y 61 �Yyy6 �Y �� W� Nlrt TO f ro 1m04FA0 c ! SITE SHEET W 14 PROJECT N PMT66-12 DESIGN FILE As PMT66-12/PN166-12 AOUACULTDRE SHELTER.DGN 100 50 0 100 200 SCALE:1"= 100' VICINITY MAP CAMA DATA TRACT ACREAGE - 26.92 AC APPROXIMATE AREA WITHIN TV AEC - 194.692 SF 502 IMPERVIOUS - 59.403 SF APPROXIMATE EXISTING IMPERVIOUS WITHIN 75'AEC - 30.477 Sf IMPERVIOUS REMOVED - 1.119 SF 1'ERVICUS PROPOSED - 2060 SF APPROXIMATE IMPERVIDf1S WITHIN 75 -AEC - 31.456 SF PERCENT IMPERVIOUS - 16.162 C �VED NOV .® 3 2011 0c M,� dHD CATV SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE CLIENT: CARTERET COW.WNITY GDLLEGE RDC ADDRESS: bXENARUMCITY. STRE2655T RANN: RDC/GYT PHONE, 252-222-6114 6666 Lleex66 NO. G-u4T YN.sRTINR N N X.I a _--__A___ s______- _____.. - r &RY 4a ------------- III .... ----------- A I� E4.6M4FIL , . • � .' �l -- ---� - _: = •. - - jyL3VAN 01I41 *All A- ----------- F4Iu STORMWATER DATA ,rtw. Aw.. ,PN, SIVER BASIN - MI TERM SDUND RTpE IYINa STREAM _ RP,Y EAM CLASS SA,NOR 1YP-24HP 6TMY � ).KIM ENI ST IND NR ICA &DG - I615F TOTPOSED SN[[LLTER 2160 SF AL IMPEPVIODS TO TREAT - 2141 SF VaL11E.TO TREAT/REUSE - 612CF 1SNII GALLONSI .......... YOLUYF PROVIDED = 6000 GALLONS I2-1000 GALLON TA1R51 PIAP ING PATE - T GPM _..__.... ........ REUSE GRAYpOM - 12.11 NQH,S BOGUE SOUND BOGUE SOUND REVISIONS: LI 1) E ��.�✓ LI.� N E l PROPOSED PLAN -- 1\16P .V Z O T SOUTH OF HOWARD BUILDING el CARTERET COMMUNITY COLLEGE i1 .,:TANA-T.11I _ iINiJT. IT Ki S MOREHEAD CITY. CARTERET CtlMTY. NOPTN CAROLINA CLIENT, CARTERET COMMUNITY COLLEGE ESIGNED: OC ADDRESS, 3500 ARENOELL SN EET gANN: R p2,� {p}� ®�r��� !.'�9' (yI MOREHEAD CITY. C 2655T RDC/GYT arty I y p 1[�,-„F/ 1C y PHONE, 252-222-6114 ROC 10 5 0 10 20 BTA.OUD BNGINBE)t (;,P.A. RDC SHEET R3 OF 4 ( SCALE: 1 -= 101 1N1A XIaHYAY et Y%13H2AD CIYT.R.C.2M1 DATE: E6Y)24fAt19 LICRX]2 NO. C-KtT 1/li/IT PROJECT K: PMT66-it DESIGN FILE •: PM166-12/PM166-12 AOUACU.TURE SHELTER.DGN RONALD D.CULLVNB4 P.6. 2, ...... _. ._. _ ......_� ... _ .. .. .. _. .. .. .._ _. R : . NC 26551 YOflEHEAO CITY, �. PHONE, 292-222-6114 ROC 19 - YrF 6,rx � D P—OST., n:i» v. 1e........_._... ........_...... . _. -` ,_ _i '. DoserCll. ..,. LIU GATE: Y066N61D CITT. M.0 BN'6T 1P6W 24t-1116 LICMB6 NO.C-0NT 7/11/1-6 .._.._.. . _..... .._._ .... .............. ....... :. loan nn .. ___....... ._......_ ... .._.. .... .. ..__.. _. __....... ........ .......... .............. _.... _... _... ..: .. ..... ... .........._ ... ..... .,IPE �� .... _...... ' TO'IRF E "'i0 �ILFIPC ... .. ....... ........ .... _... ..wV6 .... ... _ .. 12. .. .... ER,1ILY n i ..... ... ._..... ......DIAMETER 6.456. ... ... .. ._ .. .. As WALL .�. .�. �.... E(kG PLANER .....3000 1000 GALLON TANK -.. ... A RpUN0 GENERATOR �..... :-SNYDER'INOUSTRIES'INC� .... ......... ... ....... GALLON TANK 'SNYOER-INOUSTR IESiNC:" "" '- "" ' ..:. ..:.. .. .... ...._ ...... 10 ....-._ ': ) ..,..; .,' 11M T. -IT[TE FAIL OR APPROVED EQUAL OR APPROVED EQUAL 6 . ............. '.: ; - ....... .... ........ ..... ........ .L..T/I'DVERFLON. DISCHARGE TO .. ...... DISCHARGE TO ............. ... .... ..... ....... ....... T ........... _.._. _ :.-�.�..-. �.. ._.... ... .... .... .... .....CdICRETE.SLA6..._ .. ... .....CONCRETE.. SLAG............ .... .. _.. .. .... _...... ........ ...... ... ....._. .._.. ............. .._. ......... 6 ............... .... .... ........ ....... .... _. ... ........ ... ...... SWTHEflN CONCRETE MALL NOT .. ....... ........ ......... �... 5 ............ ..... .............. ..... ........ ...... .... L ..HOMNINTHISSECT lro14...................._............ ....... ...... LOCA710N OF .... _.. _ ... .. Z..CO... 2........ ._... ... .............. .... ......... _. .........................9005 UMP. L SECTION A -A 21 ._. __.._ _.......... _.. _......._ ........ __.... _. ..... ..... _.. ... ............ ... .......... .. ._..... _._. .. .._..... _... _. _._.__..._ ............__ .. _.._...... .......... _._ _.............. ... __......__... _..._.__ 17 16 ........_ ......... ii"cs 19LE __ .... ....... . _...... _.. NOTES: 15 .... _........ . _.. PIPE... .... .. _.... ... ..... RUCTURAL DESIGN BY 14-.. - - SHELTER AND TIONS ARE APPROXIMATE .. .... - -�' " HERS PILE LOCATIONS ,z ..-, ........ .. _ ... .. .. __... ANKS TO BE INSTALLED PER MANUFACTURER 11- -- ""3000 SACCON TALAR , ' - -- NASONRY NALL REQUIREMENTS AND SHOULD INCLUDE WIND SNYDER INDUSTRIES IHC .. i,P0UN0:LENERATOR- - 10 . ....... ........ ..........OR' APPROVED' E WAL ... _. . .. ...... ...... .. ... ... RESTRAINT CABLES T.._...__.. .. __.........__..._...._.._..........._..._...,..._..._-__.__... ... .. ._... __.... ..___......_ _._......___._.. __........ ...... ... ....... ...... _.... 6 ..................... - ... ._..... . .... ............ .... ...__.. .. ... ...E-61Stl,ia ........ .. .. ......... ._. ........... .......... - .._.._.... .._.._.... .... ..... .. __. _. ................ IS"ETI IF 4 PROJECT MY PMT66-12 DESIGN FILE N: PW66-12/PY166-12 AOUACIILTURE SHELTER.OGN 10 5 0 10 20 II SCALE W'=10' SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE WREHEAD CITY. CARTERET_ C_"TY. NORM CAROLINA CLIENT: CARTERET COMWNITY COLLEGE ESI GNED: fl0 DDRESS: 3500 ARENOESTREET R : . NC 26551 YOflEHEAO CITY, RDC/GCT PHONE, 292-222-6114 ROC BTROUD BN(iIN68RiN�,PA. =ROC 1 leu xlGx r e GATE: Y066N61D CITT. M.0 BN'6T 1P6W 24t-1116 LICMB6 NO.C-0NT 7/11/1-6 STATE o- s.. Real E,ktp n{ 114 1 A r. anatses as 01001 , 0 0 a� drt. fGi.i .1 :i j ' Excise Thx TaxLot No . ................•............................. Verified by . iby ..... ......... ....................................... ......... NORTH CAROU N% CWTERET ••:,��� The foregoing certilcito(s) of is (aro) certified to tl, cGrrect, chis ftlarltswre", np sented for regisfratian and recorded in this office in Qna Fa, This qday of ,19 at �o0'cloOk i�f. Sharon Piner egister By tt�ltt..• ,. ��� � aeputy Recording Time, Book end Page Parco) Identifier No. ..13 ..M. -14—F-4-22 ..................._._........... Countyon the ................ day of ..................... ....................... _........... 19............ Mail. afEer recording t0..,..........J .` .1:Li1.4,(.N..W(.... �. w{ .... ........................................:.......... ....................._.......... ..... ............... This Instrument was prepared by„HenrX S.. Manning, Jr.. , P. 0. BoX 109, Ralt�igh, NC 27602 Brief description for the Index 2 tracts Morehead Township NORTH CAROLINA GENERA, WARRANTY DEED THIS DEED made this ..... ZL..... day of ...........Aug.us.t................................ 19..$.6...., by and between GRANTOR I GRANTEE Standard Products of North Carolina, Incorporated Carteret Technical College 3505 Arendell Street hlorehead City, North Carolina. 28557-2989 . Enter In appropriate block for each party! name, address, and, tf appropriate, eharacter of enilty, e.g. corporation or partntrahip, The designtition Grantor and Grantee as used herein shall include said parties, their heirs,_suceessora, and assigns, and shall include singular, placitt,'masculin'e,,£eminine or.tieute"r• as required by context.._ WITNUSETH, that the Grantor, for a'valuable consideration paid by the Grantee, the reaelpt, of which is hereby acknowledged, has and by these presents does grant; bargain, sell and convey unto the Granttee•in fee simple, all that certain lot or parcel of land situated in the City of ..:.......t}ozehead•,",,,,,,•, MoreYiead .....;. Township, ......,•,,,C %KVA;Cet,,..,._,. County, North Carolina and more particularly deecrlbed as follows: ' See attaohed Exhibit A-.' WA Dat Auoe, Porn No.3 D ISIS, ntvbrd 1871,