Loading...
HomeMy WebLinkAbout20171570 Ver 1_401 Application_20171217d�OF W A rEq< fl Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18.27 or General Permit (GP) number: RGP197800056 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): NX 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes NX No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ YesX❑ No 2. Project Information 2a. Name of project: Town Commons Kayak Launch 2b. County: Pitt 2c. Nearest municipality / town: Greenville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Greenville 3b. Deed Book and Page No. MB25-175 3c. Responsible Party (for LLC if applicable): Lamarco Morrison, MSCM, Parks Planner, City of Greenville 3d. Street address: 200 West Fifth Street 3e. City, state, zip: Greenville, NC 27835-7207 3f. Telephone no.: 252-329-4432 3g. Fax no.: 252-329-4435 3h. Email address: LMorrison@greenvillenc.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Becky L. Ward, PE 5b. Business name (if applicable): Ward Consulting Engineers, PC 5c. Street address: 4805 Green Road, Suite 100 5d. City, state, zip: Raleigh, North Carolina 27616-2848 5e. Telephone no.: 919-870-0526 5f. Fax no.: 919-870-5359 5g. Email address: bward@wce-corp.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 4688426946, 4688329979 1b. Site coordinates (in decimal degrees): Latitude: 35.615 Longitude: -77.3688 1 c. Property size: 19.92 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Tar River 2b. Water Quality Classification of nearest receiving water: QNSW 2c. River basin: Tar 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Please see documentation attachment 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,650 3d. Explain the purpose of the proposed project: Please see documentation attachment 3e. Describe the overall project in detail, including the type of equipment to be used: Please see documentation attachment 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases in the past? ❑ Yes ❑ No ❑X Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown 5b. If yes, explain in detail according to "help file" instructions. Please see attached supplemental documentation attached for further information. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes/No - W2 Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Riprap/Soil Lifts Stab. Tar River PER Corps 15 57 S2 P Floating Dock Abutment Tar River PER Corps 15 15 S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 72 3i. Comments: Please see documentation attachment Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 0 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: NA 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑X Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 T Construction Access Tar River No 1,100 360 B2 T Grading Tar River No 1,300 0 B3 P Concrete Sidewalk Tar River No 320 0 B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 2,720 360 61. Comments: Please see documentation attachment Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Please see documentation attachment 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Please see documentation attachment 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Due to the proximity of the river and the limited sidewalk impacts no diffuse flow is planned for this 65 foot long ❑ Yes ❑X No sidewalk addition. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 9 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project is located in a developed park with a total of 11 % impervious. Within the project area the total impervious is 9%. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Greenville ❑X Phase II 0 NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑X Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑X Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? F1 Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Pleas see attached supplemental information. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The Essential Fish Habitat Mapping Program at www.habitat.noaa.gov/protection/efh/efhmapper/index.htmi was used to identify that the area as not within an essential fish habitat. The project requires work on the bank of the stream only. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC Historical Preservation Office website (www.hpo.dcr.state.nc.us) was searched and no sites were listed for this property. In addition, no architectural structures or archaeological artifacts were noted during preliminary surveys at the site. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: A No -Rise flood study has been performed for the improvements to the site. No change in floodplain will occur as a result of the floating kayak launch installation. 8c. What source(s) did you use to make the floodplain determination? The effective models were obtained via NCFloodmaps. Agnat.ure / Applicant/Agent's Printed Name n s Signature Date (Ageid only if an authorization applicant isprovided.) Page 10 of 10 M --- Gol -------�, R — ------------ —- �- Col � t - -_ ------ ---------- t ---- - ---- - yo (30 3--'------__ - _ -� ' - J p _ • �e.Gl `�„" ` � .� \\` ppb aazasa /` nBl S 1 NO „ \ ♦♦♦` LU - mN \ I \ 1 '' -"-- — --- -----------�: B 2 ` IN \ LU \ \ 1.!'' \ 1 ��`` � ��� LpD ------------------------ - . s it i `�` �`♦ � \\ ```\.� I \\ -01 _ \ \ i� 1 __________________\` ` BUFFE 1 BUFFER `.�, .. .� ZONE ! ZONOE 1 I \ EXISTING �*ETLANDS 3 WARD CONSULTING ENGINEERS, P.C. s uu� •o o Bell 4806 Green Rd, Suite 100 RalWlgk NC 27618 Phone 919) 870-0688 Fa:(919) 870-6869 ,..rd•wca-oorP.c= I� SEEMS O g _ o �w H W O � O LEGEND B 1 BUFFER IMPACTS SSTREAM IMPACTS EXISTING TREE pmff TREE REMOVAL DOE' 11-17-2017 10 5 0 10 20 SCALE 1"=10' BUFFER WACT EXHW Town Common Floating Kayak Launch Photo Log, Greenville, NC Photo 1: Southern river bank looking upstream at proposed Floating Kayak Launch location. Photo 2: Parking lot area at the proposed walkway connection. Photo 3: Southern river bank looking downstream at proposed Floating Kayak Launch and walkway location. Location Map, USGS Quad Map, NRCS Soils Map ,4T'+7". Ir r- �L_'- ` l o.. 111je. z 11 1 1 11 .11 EMEND TOWN COMMONS KAYAK LAUNCH OHIO, oil PROJECT LOCATION MAP � 11 ffi rr)�s F CITY OF GREENVILLE, NORTH CAROLINA DATE: NOV 3. 2017 WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 0 Bb 4 Soils Legend" Bb - Bibb complex 300 150 0 300 600 CrC - Craven fine sandy loam, 6 to 10% slopes W - Water WaB - Wagram loamy sand, 0 to 6% slopes SCALE: 1"=300' TOWN COMMONS KAYAK LAUNCH ,�Aw I SOILS MAP CITY OF GREENVILLE, NORTH CAROLINA DATE: NOV 3. 2017 WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 r <r i 0 Bb 4 Soils Legend" Bb - Bibb complex 300 150 0 300 600 CrC - Craven fine sandy loam, 6 to 10% slopes W - Water WaB - Wagram loamy sand, 0 to 6% slopes SCALE: 1"=300' TOWN COMMONS KAYAK LAUNCH ,�Aw I SOILS MAP CITY OF GREENVILLE, NORTH CAROLINA DATE: NOV 3. 2017 WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 --L" �„ Ay -MOJECT AREA - LATITUDE: 35.3657 LONGI70#E:77.2255 4 0 - ammmmmon ANNEII&II TOWN COMMONS KAYAK LAUNCH USGS QUAD MAP CITY OF GREENVILLE, NORTH CAROLINADATE: NOV 3. 2017 GREENVILLE SE, NC, 2016 WARD CONSULTING ENGINEERS, PC �U 4805 Green Road, Suite 100919 870-0526 Raleigh, NC 27616 FAX �919� 870-5359 Town Common Floating (C1 V Greenville NO R T H CARO L INA Park Topographic Survey and Planting Plan: THE EAST GROUP 324 Evans Street Greenville, NC 27858 Telephone: (252)758-3746 Tar River Topographic Survey: JARVIS CONSULTING, INC 212 South Main Street Bath, NC 27808 Telephone: (252)923-0302 Kayak Launch Greenville Recreation and Parks 2000 CEDAR LANE GREENVILLE, NC 27858 WARD CONSULTING ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Telephone (919) 870-0526 Fax (919) 870-5359 Construction Documents CIVIL - STRUCTURAL - PLANTING INDEX OF SHEETS Sheet No. Description 1 TITLE SHEET 2 GENERAL NOTES AND CONSTRUCTION SEQUENCE 3 OVERALL SITE PLAN 4 EROSION CONTROL PLAN 5 DEMOLITION PLAN 6 PROPOSED PLAN 7 BANK STABILIZATION PLAN 8 PLANTING PLAN 9 DECORATIVE HARDSCAPE PLAN 10 ACCUDOCK DETAILS 11 SITE, ABUTMENT, AND EROSION CONTROL DETAILS 12 MISCELLANEOUS DETAILS Structural Consultant: LYSAGHT & ASSOCIATES STRUCTURAL ENGINEERS 120 Saint Mary's Street Raleigh, NC 27605 Telephone: (919)833-0495 V M ar 13344 �YNN'E��•``�, GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES INSIDE THE LIMITS OF DISTURBANCE. THE CONTRACTOR IS RESPONSIBLE FOR HAVING ALL UTILITIES LOCATED 48 HOURS PRIOR TO MOBILIZATION TO THE SITE. "CALL BEFORE YOU DIG." NORTH CAROLINA ONE CALL CENTER, DIAL 811. 2. THE CONTRACTOR SHALL FOLLOW OSHA GUIDELINES AND UTILITY OWNER GUIDELINES WHEN WORKING NEAR UTILITIES. 3. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE MOST RECENTLY ADOPTED EDITION OF THE TOWN OF CARY STANDARD SPECIFICATIONS. 4. CONTRACTORS SHALL VERIFY ALL DIMENSIONS IN FIELD. ANY DISCREPANCIES THEREOF SHALL BE REPORTED TO THE OWNER AND DESIGNER, PRIOR TO PROCEEDING WITH THE WORK. 5. NO TREES OR SHRUBS NOT SHOWN FOR REMOVAL ON THE PLANS SHALL BE REMOVED WITHOUT AN APPROVAL FROM THE TOWN OF CARY THROUGH A PLAN REVISION. WORK SHALL NOT COMMENCE WITHOUT THIS APPROVAL. 6. BASE TOPOGRAPHIC AND PLANIMETRIC INFORMATION GENERATED FROM FIELD SURVEYS WITHIN THE PROJECT. TOPOGRAPHY SUPPLEMENTED WITH NC FLOODMAP CONTOURS. 7. BENCHMARK CONTROLS ARE SHOWN ON THE EXISTING CONDITIONS PLAN. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING THE CONSTRUCTION SURVEY. THE DESIGNER WILL COORDINATE AVAILABLE AUTOCAD DRAWING FILES TO THE SURVEYOR FOR THE PROPOSED DESIGN AND BASE SURVEY DATA OBTAINED IN THE DESIGN PHASE OF THE PROJECT. 8. PLAN VERTICAL DATUM: NAVD 1988 9. PLAN HORIZONTAL DATUM: NC STATE PLANE COORDINATES NAD 83. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGED ITEMS DURING CONSTRUCTION INCLUDING BY NOT LIMITED TO, EXISTING ROADS, SIDEWALKS, CURBING, LANDSCAPING, ETC. 11. CONTRACTOR SHALL MAKE EVERY EFFORT TO PREVENT DAMAGE TO TREES WITHIN THE TREE PROTECTION AREA. IN THE EVENT OF DAMAGE, REPAIR ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM IMMEDIATELY. A. ROOTS: REPAIR ROOTS BY CUTTING OFF DAMAGE AREAS AND PAINTING THEM WITH TREE PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS. B. TREE BARK: REPAIR DAMAGE TO BARK BY TRIMMING AROUND DAMAGED AREA, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT. C. TREE LIMBS: CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR MAIN BRANCH. USE A SEPARATE CUT TO AVOID PEELING BARK FROM HEALTHY AREA OF THE TREE. 12. FEMA FLOOD HAZARD AREAS ARE LOCATED ON THE SITE PER FIRM 3720468800K DATED JULY 7, 2014. ACCESS, STAGING AND STOCKPILE AREA NOTES: 1. CONSTRUCTION EQUIPMENT LIMITED TO ONLY AREAS WITHIN THE LIMITS OF DISTURBANCE AS SHOWN ON THE PLANS. 2. ALL AREAS OUTSIDE THE SHOWN LIMITS OF DISTURBANCE AREA TO REMAIN IN THEIR NATURAL CONDITION. 3. THE CONTRACTOR SHALL ESTABLISH STOCKPILE AREAS WITHIN LOD AS SHOWN ON THE PLANS TO CARRY OUT THE WORK. NO PAYMENT SHALL BE MADE TO REPAIR ROAD/PARKING LOT. SURFACES AS A RESULT OF STOCKPILE ACTIVITIES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS MATERIALS DELIVERED TO THE PROJECT SITE. MATERIALS NOTES: 1. THE CONTRACTOR IS RESPONSIBLE FOR STOCKPILING ALL MATERIALS AS STATED ABOVE. 2. SITE SPOIL: ALL REMAINING EXCAVATED MATERIALS OTHER THAN TOPSOIL SHALL BE CONSIDERED SITE SPOIL AND SHALL BECOME THE PROPERTY OF THE CONTRACTOR TO PROPERLY DISPOSE OF OFFSITE IN AN APPROVED PERMITTED LANDFILL OR RELATED PERMITTED FACILITY. EROSION CONTROL NOTES: 1. SCHEDULING OF A PRECONSTRUCTION CONFERENCE WITH THE ENGINEERING DIVISION IS REQUIRED PRIOR TO INITIATING LAND DISTURBING ACTIVITIES. FOR SCHEDULING PLEASE CALL (252) 329-4467. A 24-HOUR NOTICE IS REQUIRED. NO PERSON MAY INITIATE A LAND DISTURBING ACTIVITY BEFORE NOTIFYING THE CITY OF THE DATE OF THE LAND DISTURBING ACTIVITY. 2.NO LAND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL APPROPRIATE EROSION CONTROL MAY PROCEED UNTIL EROSION CONTROL MEASURES ARE INSPECTED AND APPROVED BY THE CITY. 3.SEEDING AND MULCHING OR OTHERWISE PROVIDING GROUND COVER DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION FOR ALL EXPOSED SLOPES IS REQUIRED WITHIN 21 WORKING DAYS OF COMPLETING ANY PHASE OF GRADING. 4.CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH MAJOR STORM EVENT. FAILURE TO MAINTAIN EROSION CONTROL DEVICES MAY RESULT IN AN ISSUANCE OF STOP WORK ORDER OR CIVIL PENALTIES UP TO $5,000 PER DAY OF VIOLATION. SITES UTILIZING SEDIMENT TRAPS MUST ALSO SPECIFY A MAXIMUM DEPTH OF SEDIMENT PRIOR TO CLEAN OUT. 5.THE CITY ENGINEER RESERVE THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL MEASURES SHOULD THE PLAN OR ITS IMPLEMENTATION PROVE TO BE INADEQUATE. 6.ACCEPTANCE AND APPROVAL OF THIS PLAN IS CONDITIONED UPON COMPLIANCE WITH FEDERAL AND STATE WATER QUALITY LAWS, REGULATIONS, AND RULES. IN ADDITION, LOCAL CITY AND COUNTY ORDINANCES OR RULES MAY ALSO APPLY TO THIS LAND DISTURBING ACTIVITY. APPROVAL BY THE CITY DOES NOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL. a.PLEASE BE ADVISED OF THE RULES TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG WATERCOURSES IN THE NEUSE AND TAR RIVER BASINS. THESE RULES ARE ENFORCES BY THE DIVISION OF WATER QUALITY (DWQ). DIRECT ANY QUESTIONS ABOUT THE APPLICABILITY OF THESE RULES TO YOUR PROJECT TO THE REGIONAL WATER QUALITY SUPERVISOR, WASHINGTON REGIONAL OFFICE AT (252) 946-6481. SEEDING AND MULCHING: THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE STATED BELOW IF NOT STATED ON PLANTING STABILIZATION PLANS HEREIN. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE. ALL ROADWAY AREAS MARCH 1 - AUGUST 31 SEPTEMBER 1 - FEBRUARY 28 50# TALL FESCUE 50# TALL FESCUE 10# CENTIPEDE 10# CENTIPEDE 25# BERMUDAGRASS HULLED 25# BERMUDAGRASS HULLED 500# FERTILIZER 500# FERTILIZER 4000# LIMESTONE 4000# LIMESTONE WATER AND BORROW AREAS MARCH 1 - AUGUST 31 SEPTEMBER 1 - FEBRUARY 28 75# TALL FESCUE 50# TALL FESCUE 25 # BERMUDAGRASS HULLED 25# BERMUDAGRASS HULLED 500# FERTILIZER 500# FERTILIZER 4000# _F LIMESTONE 4000# LIMESTONE NOTE: 50# OF BAHIAGRASS MAY BE SUBSTITUTED FOR EITHER CENTIPEDE OR BERMUDAGRASS ONLY UPON ENGINEERS REQUEST. APPROVED TALL FESCUE CULTIVARS 2ND MILLENNIUM CHIPPER FOCUS MASTERPIECE QUEST TITAN LTD. AVENGER CORONADO GRANDE II MATADOR REBEL EXEDA TITANIUM BARLEXAS COYOTE GREENKEEPER MATADOR GT REBEL SENTRY TOMOHAWK BARLEXAS II DAVINCI GREYSTONE MILLENNIUM REGIMENT II TACER BARRERA DYNASTY INFERNO MONTAUK REMBRANDT TROOPER BARRINGTON DOMINION JUSTICE MUSTANG 3 RENDITION TURBO BILTMORE DUSTER JAGUAR 3 OLYMPIC GOLD SCORPION ULTIMATE BINGO ENDEAVOR KALAHARI PADRE SHELBY WATCHDOG BRAVO ESCALADE KENTUCKY 31 PARAISO SIGNIA WOLFPACK CAYENNE FALCON II, III, IV, & V KITTY HAWK PICASSO SILVERSTAR CHAPEL HILL FIDELITY KITTY HAWK 2000 PIEDMONT SOUTHERN CHOICE II CHESAPEAKE FINESSE II LEXINGTON PURE GOLD STETSON CONSTITUTION FIREBIRD MAGELLAN I PROSPECT I TARHEEL ON CUT AND FILL SLOPES 2:1 OR STEEPER CENTIPEDE SHALL BE APPLIED AT A RATE OF 5 POUNDS PER ACRE AND ADD 20# OF SERICEA LESPEDEZA FROM JANUARY 1 - DECEMBER 21. FERTILIZER SHALL BE 10-20-20 ANALYSIS. A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 1-2-2 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PLANT FOOD AS A 10-20-20 ANALYSIS AND AS DIRECTED. ALL AREAS SEEDED AND MULCHED SHALL BE TACKED WITH ASPHALT. CRIMPING OF STRAW IN LIEU OF ASPHALT TACK SHALL NOT BE ALLOWED ON PROJECTS. CRIMPING STRAW MULCH: CRIMPING SHALL BE REQUIRED ON PROJECT ADJACENT TO ANY SECTION OF ROADWAY WHERE TRAFFIC IS TO BE MAINTAINED OR ALLOWED DURING CONSTRUCTION. IN AREAS WITHIN SIX FEET OF THE EDGE OF PAVEMENT, STRAW IS TO BE APPLIED AND THEN CRIMPED. AFTER THE CRIMPING OPERATION IS COMPLETE, AN ADDITIONAL APPLICATION OF STRAW SHALL BE APPLIED AND IMMEDIATELY TACKED WITH A SUFFICIENT AMOUNT OF UNDILUTED EMULSIFIED ASPHALT. STRAW MULCH SHALL BE SUFFICIENT LENGTH AND QUALITY TO WITHSTAND THE CRIMPING OPERATION. CRIMPING EQUIPMENT INCLUDING POWER SOURCE SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER PROVIDING THAT MAXIMUM SPACING OF CRIMPER BLADES SHALL NOT EXCEED 8". SEQUENCE OF CONSTRUCTION A. GENERAL SITE PREPARATION 1. THE CONTRACTOR IS REQUIRED TO PERFORM DATE STAMPED VIDEO INSPECTIONS AND TAKE PHOTOGRAPHS OF THE PROPOSED CONSTRUCTION AREA, INGRESS AND EGRESS ROUTES, ADJACENT PROPERTY'S DRIVEWAY, WALKWAY, TREES INCLUDING TRUNK AND OVERSTORY, LANDSCAPING AND STRUCTURES, STAGING, AND STOCKPILE AREAS BEFORE MOBILIZING TO THE SITE IN ACCORDANCE WITH THE GENERAL CONDITIONS. APPROVAL TO MOBILIZE TO THE SITE SHALL NOT BE GRANTED UNTIL THE CONTRACTOR HAS PROVIDED AND RECEIVED WRITTEN APPROVAL OF THE CONTENT FROM THE CITY. 2. CONTACT NC 811 TO LOCATE EXISTING UTILITIES IN VICINITY OF CONSTRUCTION LIMITS. PERFORM ALL UTILITY IDENTIFICATION AND MARKING/FLAGGING AS NECESSARY. 3. COORDINATE WITH UTILITY COMPANIES TO RELOCATE OR PROTECT UTILITIES. 4. MOBILIZE CONSTRUCTION EQUIPMENT. 5. STAKE CONSTRUCTION LIMITS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 6. INSTALL SEDIMENT/EROSION CONTROL FENCING, INLET PROTECTION, TURBIDITY CURTAINS, AND ALL OTHER EROSION CONTROL MEASURES AS NECESSARY AS SHOWN ON THE EROSION CONTROL PLAN. THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONSTRUCTION OF THE PROJECT TO PREVENT EROSION, OFF-SITE SEDIMENTATION, AND SEDIMENT FROM ENTERING THE TAR RIVER. WHEN THE MEASURES ARE COMPLETE CALL FOR AN INSPECTION BY THE ENGINEER. 7. IDENTIFY STAGING AND STOCKPILE AREAS AS SHOWN ON PLANS. ALL EXCAVATED MATERIAL SHALL BE STOCKPILED WITHIN STAGING AREAS OR THE LIMITS OF DISTURBANCE FOR LATER USE AS FILL MATERIAL OR DISPOSAL. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING APPROPRIATE STABILIZATION MEASURES AROUND THE STOCKPILE AREA(S) TO PREVENT EROSION AND SEDIMENTATION. ANY STOCKPILE MUST BE STABILIZED IF INACTIVE FOR MORE THAN 7 CALENDAR DAYS. 8. REMOVE TREES AND DEBRIS AS SHOWN ON PLANS WITHIN THE LOD. 9. REMOVE AND DISPOSE OF ALL CONCRETE CURB AND GUTTER AS NECESSARY TO COMPLETE WALKWAY INSTALLATION. 10. ALL WASTE MATERIAL, DEMOLITION DEBRIS, OR OTHER RUBBISH SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED PERMITTED LANDFILL OR RELATED PERMITTED FACILITY IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. B. SIDEWALK, ABUTMENT, AND FLOATING KAYAK LAUNCH CONSTRUCTION 1. CONTRACTOR SHALL GRADE THE RIVER BANK AS SHOWN ON THE PLANS TO ALLOW FOR THE CONSTRUCTION OF THE CONCRETE SIDEWALK, CONCRETE ABUTMENT, AND INSTALLATION OF BANK STABILIZATION MEASURES. AVOID DISTURBING THE EXISTING UTILITY POLE. 2. EXCAVATE RIVER BANK AS NECESSARY TO INSTALL CONCRETE ABUTMENT. 3. DRIVE PILINGS FOR CONCRETE ABUTMENT AND INSTALL CONCRETE ABUTMENT AS SHOWN ON THE STRUCTURAL PLANS. 4. INSTALL RIPRAP TOE PROTECTION AND VEGETATED SOIL LIFTS AS SHOWN ON THE PLANS. 6. INSTALL FLOATING KAYAK LAUNCH IN ACCORDANCE WITH MANUFACTURER GUIDELINES AND AS SHOWN ON THE PLANS. 7. CONSTRUCT CONCRETE WALKWAY AS SHOWN ON THE PLANS. C. GENERAL SITE COMPLETION 1. COMPLETE SITE SEEDING AND PLANTING AS DESCRIBED IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. 2. REPAIR AREAS USED FOR CONSTRUCTION ACCESS, CONSTRUCTION ACTIVITIES AND STOCKPILE LOCATIONS. SURFACES SHALL BE RESTORED TO PRIOR CONDITIONS OR BETTER. 3. SEED AND MULCH STAGING AREAS, STOCKPILE AREAS, AND ANY REMAINING NON -VEGETATED AREAS. 4. COMPLETE SITE CLEANUP AND STABILIZATION AS CALLED FOR ON THE PLANS AND SPECIFICATIONS. 5. EROSION CONTROL DEVICES SHALL BE REMOVED FROM THEIR RESPECTIVE LOCATIONS ONLY WHEN THE STABILIZATION OF THE ADJACENT GROUND HAS BEEN ESTABLISHED. 6. OBTAIN FINAL APPROVALS FROM CITY. 7. COMPLETE AS BUILT SURVEY AND SUBMIT THREE (3) COPIES OF RECORD DRAWINGS AND COMPLETED RECORD DRAWINGS CHECKLIST TO CITY. 8. DEMOBILIZE. WARD CONSULTING �I�ENGINEERS, P.C. ll�� FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com x 0 z w O U SEAL: \ ;��\\{411fffPllr Ir: �CARO` 13344 r�ffffllll l��\\ PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW GENERAL NOTES AND CONSTRUCTION SEQUENCE SCALE: NTS SHEET NO. 2 w. PROJECT AREA 1 E. cr iC I I :I T � St. �-- AI vel I enth St. t 1 VICINITY MAP SCALE: 1 "=400' I I 1 o I 1 a 1 I I I 1 I I 1 I I I I 1 I I I 1 I 1 02 I 1 1 I 1 1 I 1 I An, 0 2 . ` \ C>, 1 _ 1 EXISTING FLOODWAY EXISTING _ 500 YEAR FLOODPLAIN EXISTING ` ...... - - 100 YEAR FLOODPLAIN _ ------------- - p - \ ROJECT OPOSED AREA \ _ YAK LA H —20.— Ce jr tv 1 Z aa -------- -- \��� -�_- --�- ST --- \\ \\ ` ® _-_\\`; _ _ / \ �\ EXISTING EXISTING —�_�"\\\` `\\ \\ ® ® \\\ `J` / FLOODWAY 100 YEAR l FLOODPLAIN 1 \ \ ---------------- ---- Ilk -- _—_ � \ •_ \ � l \ 2s / r, sic \ \ \ � \ \ \ � _ _ —\\^\ \—i/ ,\\\ \\ \ �h��\ \ /^) \\\ \` \\` —= \\ lr��l 11\ \I\ ✓ I \\ 1 I 24 22 24 I/// — i ij �:\�\\�\ \ —\\ —_■� l/� ®\\ ^\ \�� \i�\�`/ \\ # C`\� ` \ \~\`�53'� �`\` —��1� \ r \\\� \\\\\ �\ �Z / / \11p o f 26 CITY OF l 1 -- \____—\ i�`l_ •ill \ \\��\� \ \\/ s��!\C� \�_ e I I 1 \_ GREENVILLE \ �` r `� —� —� `� \ `��� �'.` \ ®�. `��\�� ` ► — -- � -erg —W \ \ / \ ^ \` \ \ \ . �. \ 3 \\ \ c _ \ y \ \ S \\ �\- SS_ .�TOWN COMMONS _ / /�\\ \\ \ \ \ \ ��.�� �\ \ �\ \\ ; \ \�\ Ss \--A I> ss RS \\�\` \ �\ m — \ \ \\`\ \ \ `\\`\\\ \ \" \ \ \ 26 24 SS - U 1't' N'R. 1 ► I I 1T s S eas Sw� \ • l �_ —\ . as `� `� \\ ` �\ - �� \ Illlli�iiIlii\\1111 ` ► �� SS EXISTING EXISTING \ ss �__ - �• %� \ `\ \ \ lr?ter"I \\II 1 I1� I ' 500 YEAR I I _ w _ I 1 2= 1 I ,W3 1 1 1O� 1 8 II, ods �oSs�� 1 I G� c, _ _ � 1 ' 1 As 3 . � ���t U��,� � '• —� 1 � \ � t 11 pl l l \t \\c\/�\ \ Y itQw y ss _ \ y \uG�ue LQOf ti J __� 1 I �• 1 a J � � SS _ --j 1 I 1 E 10, FLOODPLAIN NOTES: 1. PROJECT SURVEYS BY: SURVEY OF GREENVILLE TOWN COMMON BY: THE EAST GROUP 324 EVANS STREET GREENVILLE, NC 27858 252-758-3746 SURVEY OF EXISTING PIER AND CHANNEL BY: JARVIS CONSULTING, INC 212 SOUTH MAIN STREET BATH, NC 27808 HORIZONTAL DATUM NAD83 VERTICAL DATUM NAVD88 2. TOPOGRAPHY SUPPLEMENTED OUTSIDE OF SURVEYED BOUNDARIES FROM NC FLOODMAPS. TBM Property Owner Address Pin Number 1 City of Greenville 105 E First St 4688329979 2 City of Greenville 0 E First St 4688426946 3 Robert Thomas Montaquila 119 Baker St 4688521818 4 Robert Thomas Montaquila Sandra Butterworth Faulkner Trustee City of Greenville Jeffrey J Grabowski 0 Baker St 117 Baker St 110 Baker St 108 Baker St 4688522709 4688522715 4688522619 5 6 7 4688522622 8 Thomas Fleming Taft Sr 104 Baker St 4688522534 02 I 1 1 I 1 1 I 1 I An, 0 2 . ` \ C>, 1 _ 1 EXISTING FLOODWAY EXISTING _ 500 YEAR FLOODPLAIN EXISTING ` ...... - - 100 YEAR FLOODPLAIN _ ------------- - p - \ ROJECT OPOSED AREA \ _ YAK LA H —20.— Ce jr tv 1 Z aa -------- -- \��� -�_- --�- ST --- \\ \\ ` ® _-_\\`; _ _ / \ �\ EXISTING EXISTING —�_�"\\\` `\\ \\ ® ® \\\ `J` / FLOODWAY 100 YEAR l FLOODPLAIN 1 \ \ ---------------- ---- Ilk -- _—_ � \ •_ \ � l \ 2s / r, sic \ \ \ � \ \ \ � _ _ —\\^\ \—i/ ,\\\ \\ \ �h��\ \ /^) \\\ \` \\` —= \\ lr��l 11\ \I\ ✓ I \\ 1 I 24 22 24 I/// — i ij �:\�\\�\ \ —\\ —_■� l/� ®\\ ^\ \�� \i�\�`/ \\ # C`\� ` \ \~\`�53'� �`\` —��1� \ r \\\� \\\\\ �\ �Z / / \11p o f 26 CITY OF l 1 -- \____—\ i�`l_ •ill \ \\��\� \ \\/ s��!\C� \�_ e I I 1 \_ GREENVILLE \ �` r `� —� —� `� \ `��� �'.` \ ®�. `��\�� ` ► — -- � -erg —W \ \ / \ ^ \` \ \ \ . �. \ 3 \\ \ c _ \ y \ \ S \\ �\- SS_ .�TOWN COMMONS _ / /�\\ \\ \ \ \ \ ��.�� �\ \ �\ \\ ; \ \�\ Ss \--A I> ss RS \\�\` \ �\ m — \ \ \\`\ \ \ `\\`\\\ \ \" \ \ \ 26 24 SS - U 1't' N'R. 1 ► I I 1T s S eas Sw� \ • l �_ —\ . as `� `� \\ ` �\ - �� \ Illlli�iiIlii\\1111 ` ► �� SS EXISTING EXISTING \ ss �__ - �• %� \ `\ \ \ lr?ter"I \\II 1 I1� I ' 500 YEAR I I _ w _ I 1 2= 1 I ,W3 1 1 1O� 1 8 II, ods �oSs�� 1 I G� c, _ _ � 1 ' 1 As 3 . � ���t U��,� � '• —� 1 � \ � t 11 pl l l \t \\c\/�\ \ Y itQw y ss _ \ y \uG�ue LQOf ti J __� 1 I �• 1 a J � � SS _ --j 1 I 1 E 10, FLOODPLAIN NOTES: 1. PROJECT SURVEYS BY: SURVEY OF GREENVILLE TOWN COMMON BY: THE EAST GROUP 324 EVANS STREET GREENVILLE, NC 27858 252-758-3746 SURVEY OF EXISTING PIER AND CHANNEL BY: JARVIS CONSULTING, INC 212 SOUTH MAIN STREET BATH, NC 27808 HORIZONTAL DATUM NAD83 VERTICAL DATUM NAVD88 2. TOPOGRAPHY SUPPLEMENTED OUTSIDE OF SURVEYED BOUNDARIES FROM NC FLOODMAPS. TBM DESCRIPTION ELEVATION NORTHING EASTING #1 PK NAIL 5.94' 683075.45 2484937.19 #2 PK NAIL 10.19' 683006.99 2484944.08 PROPERTY INFORMATION O O PROPERTY 1.25 ACRES 19.10 ACRES AREA= DISTURBED AREA= 0.23 AC 0 ZONING= OR OR TAX MAP NUMBER= 4688329979 4688426946 PARCEL 27654 23797 NUMBER= STREET 105 E. 1 ST ST 0 E. 1 ST ST ADDRESS= GREENVILLE NC, 27835 GREENVILLE NC, 27835 LEGEND WARD CONSULTING !'4I;ENGINEERS, P.C. L -in FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward@wce-corp.com z U z a J Y cf) Q r a z O O U z 3:: O SEAL: ��ti4{IIIf .►"N CA R6 = •oF 5 13344 r '� ' •• NGIN'� ,Ifs �: PERMIT SET DATE: 11-17-2017 REVISIONS: NC FLOODMAP CONTOURS JARVIS CONSULTING CONTOURS EAST GROUP CONTOURS — - — - — - — STREAM CENTERLINE - - PARCEL DRAWN BY: JSV - - - - - - - - EFFECTIVE FLOODWAY CHECKED BY: BLW - - - - - - - - - EFFECTIVE 100 YEAR FLOODPLAIN EFFECTIVE 500 YEAR FLOODPLAIN — LIMITS OF DISTURBANCE 100 50 0 100 200 SCALE 1"=100' OVERALL SITE PLAN SCALE: 1 "=100' SHEET NO. 3 q E�TERQN \ \\ / i \ --------------------------�\ \`\\`\`�' -- - 4 TURBIDITY — — — — — — - 11 CURTAIN ----- 1 SILT FENCE (TYP.) 0� QOM —TC DO1 001 --------------- ------'�\- _ --- _ _a __O _07 ------------------- \\ _ Goy--_ ----------- \\\\\ \`\ \\\ d ° d d ° eO e \ ,44% \ x/ \ 111 111 \ ° a d n //Q'' co iii\\� II / \\ ----------•vim / /// `\ ` /// \V? I 1 j 1 Ifill \ EXISTING 11 CURB INLET Ili /1\\ TAGI G AND �' �,�,�I_ II\ \\ STOCKPI E A EA a �' Wo III liil \\ \-' I � -♦' ♦ � / �`. / � \` 2 BLOCK AND GRAVEL i �' ♦ ♦ , ��\ `��/ `� \\ I I yl \\ 1 1 1 CURB INLET�OO I ♦ \ N-1 PROTECTION I� i \\\ ♦ / ♦ ♦ i %� III L6 \ I I ; \\� ♦'♦, f` `.\ � \ 111 li I 0 6 ♦ \ ,LOp \ I , EXISTING �"� rt0 ; PARKING LOT LOp_ \\ N \ \, Aft / aft LOD LOD�I �� Alft,A*INSTALL BLOCK LOp (p \ ♦ AND GRAVEL L ♦ ♦ PROTECTION 1 i� \ \ i - i i ► LOp AS SHOWN PARKING SPACES ------------- 1 I \ \ \ \ \ I I I ill 1 I \ 1 1 1 \\ �-- 11 f O% EXISTING ---------------- \ �p� BOAT RAMP\\\ \ ---- ---__- \ —TI-- / 111111 `\ 0 \\\ G \ EXISTING \\\\ \\ FISHING PIE \ \\ \ �HORE LINE MEANDER LINE IS THE \\ ` APPROXIMATE MEAN HIGH WATER \\ \\ 1 LINE OF THE TAR RIVER \\ \\\ 1 (MEAN HIGH WATER LINE IS \ THE ACTUAL PROPERTY LINE) \ ` 1 \ \ \\ kk I , \\ it 1 \ \ / I/ / / / I � I , I I / I 1 f— DISTURBED AREA= 0.23 ACRES, 9,977 SF. NOTES: 1. INSTALL SILT FENCE AS SHOWN FOR DEMOLITION AND ABUTMENT CONSTRUCTION. REMOVE PORTIONS OF SILT FENCE AS NEEDED TO INSTALL BANK STABILIZATION. 2. CONTRACTOR TO PUMP INTO SILT BAG FOR ALL DEWATERING OPERATIONS. DETAIL 3 SHEET 12. LEGEND SURVEYED CONTOURS ----------- STREAM CENTERLINE EXISTING TOP OF BANK - - - - MEANDER/PROPERTY LINE EXISTING SHORE LINE STAGING AND STOCKPILE AREA BLOCK AND GRAVEL INLET PROTECTION SF SILT FENCE EXISTING TREE TREE REMOVAL TC— TURBIDITY CURTAIN 10 5 0 10 20 SCALE 1"=10' WARD CONSULTING !47;ENGINEERS, P.C. ll�� FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com z U z a J Y Q r a z O O U z 3:: O Z g limJ SEAL: '`til{IIIf IPI!*! *►N CABG ` 'OF s 13344 r . �YNN��r\`�, PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW EROSION CONTROL PLAN SCALE: 1 "=10' SHEET NO. 4 -----_---__, ------------. `\ \ --------------------------�\ \`\\`\`�' -- - 4 TURBIDITY — — — — — — - 11 CURTAIN ----- 1 SILT FENCE (TYP.) 0� QOM —TC DO1 001 --------------- ------'�\- _ --- _ _a __O _07 ------------------- \\ _ Goy--_ ----------- \\\\\ \`\ \\\ d ° d d ° eO e \ ,44% \ x/ \ 111 111 \ ° a d n //Q'' co iii\\� II / \\ ----------•vim / /// `\ ` /// \V? I 1 j 1 Ifill \ EXISTING 11 CURB INLET Ili /1\\ TAGI G AND �' �,�,�I_ II\ \\ STOCKPI E A EA a �' Wo III liil \\ \-' I � -♦' ♦ � / �`. / � \` 2 BLOCK AND GRAVEL i �' ♦ ♦ , ��\ `��/ `� \\ I I yl \\ 1 1 1 CURB INLET�OO I ♦ \ N-1 PROTECTION I� i \\\ ♦ / ♦ ♦ i %� III L6 \ I I ; \\� ♦'♦, f` `.\ � \ 111 li I 0 6 ♦ \ ,LOp \ I , EXISTING �"� rt0 ; PARKING LOT LOp_ \\ N \ \, Aft / aft LOD LOD�I �� Alft,A*INSTALL BLOCK LOp (p \ ♦ AND GRAVEL L ♦ ♦ PROTECTION 1 i� \ \ i - i i ► LOp AS SHOWN PARKING SPACES ------------- 1 I \ \ \ \ \ I I I ill 1 I \ 1 1 1 \\ �-- 11 f O% EXISTING ---------------- \ �p� BOAT RAMP\\\ \ ---- ---__- \ —TI-- / 111111 `\ 0 \\\ G \ EXISTING \\\\ \\ FISHING PIE \ \\ \ �HORE LINE MEANDER LINE IS THE \\ ` APPROXIMATE MEAN HIGH WATER \\ \\ 1 LINE OF THE TAR RIVER \\ \\\ 1 (MEAN HIGH WATER LINE IS \ THE ACTUAL PROPERTY LINE) \ ` 1 \ \ \\ kk I , \\ it 1 \ \ / I/ / / / I � I , I I / I 1 f— DISTURBED AREA= 0.23 ACRES, 9,977 SF. NOTES: 1. INSTALL SILT FENCE AS SHOWN FOR DEMOLITION AND ABUTMENT CONSTRUCTION. REMOVE PORTIONS OF SILT FENCE AS NEEDED TO INSTALL BANK STABILIZATION. 2. CONTRACTOR TO PUMP INTO SILT BAG FOR ALL DEWATERING OPERATIONS. DETAIL 3 SHEET 12. LEGEND SURVEYED CONTOURS ----------- STREAM CENTERLINE EXISTING TOP OF BANK - - - - MEANDER/PROPERTY LINE EXISTING SHORE LINE STAGING AND STOCKPILE AREA BLOCK AND GRAVEL INLET PROTECTION SF SILT FENCE EXISTING TREE TREE REMOVAL TC— TURBIDITY CURTAIN 10 5 0 10 20 SCALE 1"=10' WARD CONSULTING !47;ENGINEERS, P.C. ll�� FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com z U z a J Y Q r a z O O U z 3:: O Z g limJ SEAL: '`til{IIIf IPI!*! *►N CABG ` 'OF s 13344 r . �YNN��r\`�, PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW EROSION CONTROL PLAN SCALE: 1 "=10' SHEET NO. 4 WARD CONSULTING \�ENGINEERS P.C. FIRM LICENSE N0: C-2619 \�- 4805 Green Rd, Suite 100 \ Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 \\` RIVeR NE bward@wce-corp.com r ------------------------------------------ I I 1 1 \ \ \ \ U \ O \ \ Z � \ \ \ \ a _________-_ \ \ , \ -------------- a O ------------------------- REMOVE EXISTING CONCRETE AND DEBRIS ________-------------- - -- _3 FROM BANK WITHIN LIMITS ---- --------- ��_,, -___ -- - - OF DISTURBANCE----------------------- __ 2mmi QO��� \\\\ \\\\ O ---------- T -_,-__� / 401 OOl 003 `\�`�_----------`� _\ \\'�`- Q5,�BT-__-____-- ------ O `-------------------------------- __ ---------------- TT 00 \ 1 _-- �\----------------------�.� 15"PCT - -- _ -- _ — 0 - --- --- ---------------------_ ---\\ `�\ I 1 BOAT RAMPGQ 4- =- __ (101— - ="'� --- _ - _ '- 6"WT (TO REMAIN) \\ \ \\ I \\-------__\\ \\ I 1\11 Illiil ,� 00 CURB CUT AT WALKWAY —= _ �`� �Oj_ 1111 1 Illi \\ TIE-IN TO PARKING LOT 11111 1111 ^ \\ \\ \ -7-Z ILII\ \\\\ ------ / \\\ 6"MT EXISTING POST (TO BE REMOVED) V0 \ \\ EXISTING 1 1 r' \ /^�`\ �i / �\ \ EXISTP G \\ law,UTILITY POLE `� \\ i i \\\ �� i \ jii / `\ \ FISHING, PIER - i am(TO REMAIN) I I /l \ \-------- i \ 1 1 . / \ \ \ I EXISTING SIGN \ \ \ \\ (REMOVE AND REPLACE) / n ma' � >A� / / \I '--------- -- EXISTING1 TBM 1 CURB INLET I i ♦ ♦,` \\\\` SEAL: `ti►tirrr,*,. \ ♦ i \ \ \ ,* .� CAI?q�yz 1 1 l! /Il 1\Op it it `\\\ �' • \ \y �,\ \\ \ \ \\ \\\o \\\ LEGEND rtOD _ rtOD' `\'I 1, `\\ 00 \ \\ \ \ \ - - SURVEYED CONTOURS _---- 13344 \\ \ 11 LO �' I I ` \ 1 `\ ----- --------_ STREAM CENTERLINEMal . an ► II 1 \\\\ ,r \� 1 \\ ir'/ HORE LINE - — — — — EXISTING TOP OF BANK '% NGIN..... +LYNN \ \ ` i — — — — MEANDER�PROPERTY LINE �+ �r \ / i 1 • EXISTING 1 O EXISTING \\\ I ',\\\LOD L0� 11 �� PARKING LOT 11 POST \ \\�\ \ `\ \I /' ; EXISTING TREE It \\----------- 1 i LOD \ �'�, 1 i \ `\ \ \ PERMIT SET \ I I Ldp ♦ice 1 I r \ \ \ \ \ I rr TREE REMOVAL LOD DATE: 11-17-2017 �I I�\Ii \d' \`\ \\\ I \\\ \\ \\\N \\ \ I•,, / REVISIONS: PARKING I 11 \\\ \\ I `\ ; I \\ \\ `\ i ; CURB CUT AT WALKWAY SPACES EXISTING CONCRETE DEBRIS TO BE REMOVED r \ \ DRAWN BY: JSV \ 1 CHECKED BY: BLW \\ \\------------------\ \ \ 1 \ I I I DEMOLITION PLAN \ 1 \ \----------- 10 5 0 10 20 > \ 7 7 I �� \ \ ` 1 1 1► \\ \\ \\ r' SCALE: 1 =10 \ 1 1 11 SHEET NO. `y TBM 2' 1 1 1 1 `\ \ I \ r' SCALE 1"=10' 5 \�\ Op l CENTE ------------------------------------------ I It 1 1 \ \ \ \ \ \ \ \ \ \ \ \ ----------- - --------- \\ _ PROPOSED 30' LONG 1 2 \` 1 \ \� FLOATING GANGWAY ------------------------- `\ --_ AND CONTROL ARM18'\ \ \ � \ PROPOSED 24 X 2 \ \ FLOATING KAYAK LAUNCH ------------------------ \` ------------- \ - 3- PROPOSED SIDEWALK \ -------------------- (ADA COMPLAINT) 401 \\\\ \\ \ \ ` --'--------IV T � - � � - -___1 ---__ - - Q01 a � 003 \\ \\\ --- -{�0 007\\ t \\ -----------------\ \\\\ ------------------------Z__ „BT ______ ����� ---------- ---- ---�- -------- � Q \-'-------------_- - -_ — _ -gyp ----____ QC'O _-____---\ O� 15"PCT \`� cA -- � \A ,1=-- =- =--- -�_-= --__ - -efla =�_' _ _ - Q� F,� G _---- 4 _-1 --- �O BOAT RAMP `\ \\� = �9---_e _ _--_--___ ---- — _}-�"_ - - - - pQO� EXISTING \�`\ \\ l 1, iv., �100 _�`-_� _ _ --- _ _ - Qom,. 6"WT POST I c0 CURB CUT AT WALKWAY20"WT \I \ \ 111 TIE-IN TO PARKING LOT 8"MTS `�------- It \\1 11\II 111O \` e A d Ja ° 111 111 � \ a �\ ��\ -__\ \ 1111 `\ a 5 5% a �6' -\ \� `\ \ � 110 \ \ 11 \ i - MAX III \ EXISTING POST / (�- I'lu \\ \\ ,,-'__ _____________ \\ ,% ��\ (TO BE REMOVED) , / \ ii� V \�\ III I \ \\ it I Ili III I If III III I II I II I II III If III I II /I 11 /I II Igo`EXISTING 1 1 / \ � ISI \\ - UTILITY POLE � 6 1 , TBM 1 \\\ \\ / /\'v EXISTING �li 1� ' \ --------- 11 am CURB INLET EXISTING SIGN A 5 CONCRETE ABUTMENT (REMOVED AND REPLACED) \�\`\\ �' 11 TELEV.=3.0 FT. / \ /`� \ \ ------ �'1i OP --- ,1 _ � \/ \\ \ \ `EXISTING 'FISHING PIER LOQ I It O \ \\\ \ LOD an I I Ma - _ 'm1I i \.\ I \ \ \\ , ' EXISTING \\ i � ,LO *: F� OUTSIDE OF SOIL LIFTS WITHIN THE LOD BE MATTED WITH C-700 FABRIC, -- SEEDED, AND STRAW MULCH PRIOR TO CONTAINER PLANTING ------------------------ -- ------------------- --- 2-- - — _ • _ i - —• c - - C• n �',6 PROPOSED 24' X 18' J \ 00 \ --- OD �0 -- 1100 \ -- O \\ V \` SEE LANDSCAPE PLAN FOR PLANTINGS TOP OF \ STREAM BANK TO BACK ii % `�` �' • � �``:` , i � \0\\,�\' j ��� \ �� \ ` � OF EXISTING CURBi �' �. �/ � i �\ ♦,` `��\ i � LEGEND SURVEYED CONTOURS PROPOSED CONTOURS — — — — — — — — — — STREAM CENTERLINE _ 1 y\ ` EXISTING TOP OF BANK mm lwal wall MEANDER/PROPERTY LINE ,,\LOp— LOp �� • �� 00 \\\ \ PROPOSED RIPRAP CLASS I MIX _ Lod �LOD ' X ROOTED PLANT PLUGS L(p \ Q 1 GALLON CONTAINER PLANTS LOD �\ • GRASSES/SEDGE/RUSH 10 5 0 10 20 SCALE 1"=10' PLANTING NOTES: 1. TEMPORARY PLANTING WILL OCCUR IN ACCORDANCE WITH STATE LAND QUALITY EROSION CONTROL AND CITY OF GREENVILLE REQUIREMENTS TO STABILIZE AREAS OF BARE SOIL. 2. PRIOR TO PERMANENT PLANTINGS AND SEEDING, THE SITE SOILS SHALL BE PREPARED FOR PLANTING. WHERE NEEDED THE SOILS SHOULD BE RIPPED TO IMPROVE COMPACTED SOILS. IF NECESSARY SOILS SHALL BE AMENDED WITH STORED SITE TOPSOIL TO FACILITATE VIGOROUS PLANT GROWTH. EXOTIC AND INVASIVE PLANTS SHALL BE TRATED AND REMOED. 3. TEMPORARY SEED MIX TO BE SOWN SIMULTANEOUSLY WITH THE PERMANENT SEED. FALL, WINTER AND EARLY SPRING - RYE (GRAIN) 120 LBS/AC SUMMER - GERMAN MILLET 40 LBS/AC 4. PERMANENT SEED MIX SHALL BE ERNST CONSERVATION SEEDS PIEDMONT RIPARIAN SEED MIX APPLICATION RATE 25 LBS/AC. 5. MATTING PLACED ON STREAM BANK TO ELEVATION 4 FEET SHALL BE C-700 COIR MATTING. TEMPORARY AND PERMANENT SEED ALONG WITH A LAYOR OF STRAW MULCH SHALL BE PLACED UNDER MATTING. 6. THE SITE SHALL BE PLANTED AS DEPICTED ON THE BANK STABILIZATION AND LANDSCAPE PLANS. PLANTS FOR BANK STABILIZATION TO BE SELECTED FROM THE FOLLOWING SPECIES LIST. BANK STABILIZATION QUANTITIES ARE LISTED IN THE TABLE BELOW. BANK STABILIZATION SPECIES PLANT LIST/QUANTITIES LIVE STAKES (WATER LEVEL 0-1 FOOT) LIVE STAKES SHALL BE A MINIMUM OF 2 FEET IN LENGTH AND X INCH IN DIAMETER ONE GALLON CONTAINER PLANTS (WATER LEVEL 3+ FEET) CONTAINER PLANTS UNLESS PILOT HOLES ARE DRIVEN THEN SMALLER DIAMETER LIVE STAKES MAY BE USED UPON APPROVAL BY DESIGNER. THE LIVE SHALL BE PROVIDED IN THE QUANTITIES DESIGNATED BELOW FOR EACH SPECIES. STAKES SHALL BE OF EQUAL QUANTITIES OF THE FOLLOWING SPECIES. CALLICARPA AMERICANA - AMERICAN BEAUTYBERRY (QUANTITY -12 ) CORNUS AMOMUM - SILKY DOGWOOD PHYSOCARPUS OPULIFOLIUS - NINEBARK EUBOTRYS RACEMOSUS - SWAMP DOGHOBBLE (QUANTITY -12 ) SAMBUSUS CANADENSIS - ELDERBERRY SYMPHORICARPOS ORBICULATUS - CORALBERRY (QUANTITY -12 ) ROOTED PLANT PLUGS/WHIPS ,WATER LEVEL 1-3 FEET) ROOTED PLANT PLUGS SHALL BE 18 INCHES IN HEIGHT AND WHIPS BETULA NIGRA - RIVER BIRCH (QUANTITIY- 3) SHALL BE 3 FEET IN LENGTH. THE ROOTED PLANT PLUGS/WHIPS SHALL BE PROVIDED IN EQUAL QUANTITIES OF THE FOLLOWING MAGNOLIA VIRGINIANA - (QUANTITIY - 3) SPECIES. CORNUS AMOMUM - SILKY DOGWOOD PHYSOCARPUS OPULIFOLIUS - NINEBARK SALIX SERICEA - SILKY WILLOW GRASSES/SEDGES/RUSHES (WATER LEVEL 1-3 FEET) PLANTS SHALL BE EITHER PLUGS OR BARE ROOT 12-18 INCHES IN HEIGHT. THE PLANTS SHALL BE PROVIDED IN EQUAL QUANTITIES OF THE FOLLOWING SPECIES. CHSMANTHIUM LATIFOLIUM - RIVER OATS CLADIUM JAMAICENSE - SAW GRASS ELYMUS HYSTRIX - BOTTLEBRUSH GRASS JUNCUS EFFUSUS - SOFT RUSH SCHOENOPLECTUS AMERICANUS - SWITCHGRASS SCHOENOPLECTUS TABERNAEMONTANI -SOFT STEM BULRUSH ONE GALLON CONTAINER PLANTS (WATER LEVEL 3+ FEET) CONTAINER PLANTS SHALL BE PROVIDED IN THE QUANTITIES DESIGNATED BELOW FOR EACH SPECIES. CALLICARPA AMERICANA - AMERICAN BEAUTYBERRY (QUANTITY -12 ) EUBOTRYS RACEMOSUS - SWAMP DOGHOBBLE (QUANTITY -12 ) SYMPHORICARPOS ORBICULATUS - CORALBERRY (QUANTITY -12 ) BETULA NIGRA - RIVER BIRCH (QUANTITIY- 3) MAGNOLIA VIRGINIANA - (QUANTITIY - 3) 8 6 4 2 0 -2 -4 -6 1+00 GRASS/SEDGE/RUSH o LASS I MIX RIPRAP ROCKTOE 1+10 GRASS/SEDGE/RUSH 8 SOIL LIFTS 6 4 2 0- -2 -2 — -4 CLASS I MIX RIPRAP —61 I IROCKTOE 1+00 1+10 C-700 COIR MATTING SOIL LIFT WRAP OVERLAP FABRIC FOR EACH LIFT 5' MIN. ELEV. 0.5 ELEV. 0 FT. K OF LIFTS AS CALLED FOR ON PLANS NOTE 1' 5' TYP. 2' 2' 2' CONTAINER EXISTING PLANT GROUND IFTS PROPOSED 8 GROUND 6 4 TOP 3rd LIFT 3.0 FT. TOP 2nd LIFT 2.5 FT. 2 TOP 1 st LIFT, 1.5 FT. TOP ROCK TOE 0.5 FT. 0 \\\\WHIIP TO BE INSTALLED -2 9 5p BETWEEN EACH LIFT (NP) (2' ON CENTER) -4 1+20 1 +30 1+40 1 +50 SECTION A -A SCALE: 1 "=5' ROOTED CONTAINER EXISTING 5' PLUG 5' 1 4' 1 4' 1+20 1+30 SECTION B -B SCALE: 1 "=5' MIRAFI MIRAGRID 2XT OR APPROVED EQUAL EXTEND LANDWARD TO LIMIT OF EXCAVATION 1' (MAX) SOIL FILL 18" (MIN) WARD CONSULTING �[�ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com KUUNU 8 PROPOSED GROUND 6 TOP 2nd L TOPI 2 5 Fjrd LIF T.3.0 FT. z 2 TOP 1st LIFT 1.5 FT. —TOP ROCK TOE 0.5 FT. 0 -2 J WHIP TO BE INSTALLED BETWEEN EACH LIFT -4 (2' ON CENTER) LO j 1 +40 -6 J Q U U) J Q U CD � LU Lq 5 2.5 0 5 10 `" Z LO HORIZONTAL SCALE 1"=5' O O U z 3:: WHIP ROOTED O C-700 PLANT PLUG FABRIC 2-3' IN LENGTH F I.I . 1 " OF TOP SOIL - BETWEEN LIFTS ." I -g -=70O MIRAGRID Z g ILZ 0 F Q N J m Q H cj) Y Z Q Im CLASS I MIX SOIL LIFT SHRUB TREE LIVE STAKES WHIPS/ROOTED CONTAINER CONTAINER PLANTING (ELEVATION PLANT PLUGS PLANTS PLANTS AREAS 0-1 FOOT) (ELEVATION (ELEVATION (ELEVATION TO WRAPPING FABRIC ON FACE AND TOP OF LIFT. 1-3 FOOT) 3 FOOT+) 3 FOOT+) USE IN SOIL LIFT 0 710 0 0 CONSTRUCTION �''•,��YNN;���` PRE -MIX STONE PRIOR TO PLACEMENT IN TRENCH. SUPPLEMENT TO 30 35 38 6 OP OF SOIL LIFTS CLASS I STONE 65% PERMIT SET TOTALS 30 745 38 6 8 6 4 2 0 -2 -4 -6 1+00 GRASS/SEDGE/RUSH o LASS I MIX RIPRAP ROCKTOE 1+10 GRASS/SEDGE/RUSH 8 SOIL LIFTS 6 4 2 0- -2 -2 — -4 CLASS I MIX RIPRAP —61 I IROCKTOE 1+00 1+10 C-700 COIR MATTING SOIL LIFT WRAP OVERLAP FABRIC FOR EACH LIFT 5' MIN. ELEV. 0.5 ELEV. 0 FT. K OF LIFTS AS CALLED FOR ON PLANS NOTE 1' 5' TYP. 2' 2' 2' CONTAINER EXISTING PLANT GROUND IFTS PROPOSED 8 GROUND 6 4 TOP 3rd LIFT 3.0 FT. TOP 2nd LIFT 2.5 FT. 2 TOP 1 st LIFT, 1.5 FT. TOP ROCK TOE 0.5 FT. 0 \\\\WHIIP TO BE INSTALLED -2 9 5p BETWEEN EACH LIFT (NP) (2' ON CENTER) -4 1+20 1 +30 1+40 1 +50 SECTION A -A SCALE: 1 "=5' ROOTED CONTAINER EXISTING 5' PLUG 5' 1 4' 1 4' 1+20 1+30 SECTION B -B SCALE: 1 "=5' MIRAFI MIRAGRID 2XT OR APPROVED EQUAL EXTEND LANDWARD TO LIMIT OF EXCAVATION 1' (MAX) SOIL FILL 18" (MIN) WARD CONSULTING �[�ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com KUUNU 8 PROPOSED GROUND 6 TOP 2nd L TOPI 2 5 Fjrd LIF T.3.0 FT. z 2 TOP 1st LIFT 1.5 FT. —TOP ROCK TOE 0.5 FT. 0 -2 J WHIP TO BE INSTALLED BETWEEN EACH LIFT -4 (2' ON CENTER) LO j 1 +40 -6 J Q U U) J Q U CD � LU Lq 5 2.5 0 5 10 `" Z LO HORIZONTAL SCALE 1"=5' O O U z 3:: WHIP ROOTED O C-700 PLANT PLUG FABRIC 2-3' IN LENGTH F I.I . 1 " OF TOP SOIL - BETWEEN LIFTS ." I -g -=70O MIRAGRID Z g ILZ 0 F Q N J m Q H cj) Y Z Q Im CLASS I MIX SEE NOTES SEAL: `ti41111f IPI!*! CAF?G '. LEGEND 1. SEED AND PLACE STRAW OVER SEED �:`iS`•,OFESS►•';���L�; �, - 'q• {'•. : •�� ON ALL EXPOSED FACES OF LIFT PRIOR TO WRAPPING FABRIC ON FACE AND TOP OF LIFT. "s 13344 2. INSTALL MIRAGRID FABRIC BETWEEN SOIL s - LIFTS TO EXTENT OF EXCAVATION.......... '�.�'�,••• 3. CLASS I MIX TO CONSISTS OF THE FOLLOWING. �''•,��YNN;���` PRE -MIX STONE PRIOR TO PLACEMENT IN TRENCH. #57 STONE 10% CLASS A STONE 25% CLASS I STONE 65% PERMIT SET 4. INSTALL PLANTS WHIPS/ROOTED PLANT PLUGS 2" ON CENTER IN BETWEEN EACH LIFT DURING CONSTRUCTION DATE: 11-17-2017 OF LIFTS. DO NOT INSTALL PLANTS POST LIFT CONSTRUCTION. 5. INSTALL LIFTS TO DISTANCES AS SHOWN ON CROSS REVISIONS: SECTIONS. 6. INCORPORATE SUPPLEMENTAL PLANTS TO LIFTS POST CONSTRUCTION IN LOCATIONS AS SHOWN ON PLAN VIEW. TYPICAL SOIL LIFT CONSTRUCTION SCALE: NOT TO SCALE DRAWN BY: JSV CHECKED BY: BLW BANK STABILIZAl10N PLAN SCALE: AS NOTED SHEET NO. 7- I `\ \ SEE- BANK STABILIZATION i DRnPn­,�-n ?4" x 1 R" — — — — • • — . \\ --- PLAN FOR EROSION --------------------_._._�__ --- -CONTROL MATING -'-��' �\�' MATERIAL FOR USE — 3 -SEE BANK STABILIZATION -THR000HOUT STREAM _ 2 PLAN FOR FOR ------- \ �• BANKS WITHIN LOD AND __ PROPOSED PLANTINGS ��--------____ - ____OUTSIDE SOIL LIFTS_ 1 FROM THE TOP OF QOM dOq Q\ - ---- -- STREAM BANK TO__W_ATER / _q_______----. �--------------- ------ �`- _-- -----_______ _ _-___ P� (70--3_____---.\ ------- --- --- --------- ---- -------------------- _00- 01 ..�� ...................................................... ...................................... — _ O -- 2 \ 1j1'............................................................... --- - -- + + \ 1\1 VVI ........................................................................ • a \ \\ 11 ..'....... \ 1 111 .'.'.'.'....... a.................................................................. �_ -� -- 1 I -- -------- 1 Q ............. \ -�, \ll\I 1111..................................................................................... - • III I�III �� y _ • • • • o ` ill II \t -- /• • - - - --- \\` • • O l........................'.'.'�.'.'.'.'.'................. - - - - -1 ... • -- - - • • .................. J • • ♦ • • \ A� IJill>>..'....'...'.'........................:.. `................ , , , - _ - - - -� _ ' ..'.'.'......'.'..... • • • • • • + + ................ \ ......... / _ _ _ _ _ _ _ _ _ _ • • • + l'.'.'.'.'.' ............. - I 1 I Jilt....... �c�.....................l.... \ \ .................................'.'+ + + RIPRAP ------- -1 ------ \ QOj ` ------ I I l I Lh .� .......... �/' `\ \ Q I _ wn1 Irk'•'•'•'•'•'•'•'•'•'•'•'•'•'•'•G'•'•'•'•'•'•'•'•' / i i 1 1 \ `� A � an Ilj �f.��...............................1..... 1Mrs \\-__---- - fel 11 I%��.'.'.'.�C.......'.......'..\.. �,\\\ II i `��� �' � , ` �\ / ��" \�`\ / � \`\ \\ \\ '• `� \� Mft 1l Ill. ''''�...... \ II I // \\ •�/ \ \ \ \ I1 I �.....'.'.' j.'.'.'.'.'.'.''''''' ...... i ........1 `::::::::::::::. �I \\\\ 111 111 \\\ ♦ i `/ `/ 04 MIN Oro& mail I � \` III \ �� LOD III .. I I ,,LOp\ �' � 1 \ • \ Q LoLODi, ` \ saw LOD 1 LOD / ` \ PLANTING NOTES The Contractor shall furnish plant material shown on the drawings, as specified and as indicated on the plant list. The Owner or his/her authorized representative shall be notified prior to the beginning of planting operations. PRE -CONSTRUCTION CONFERENCE: Prior to commencing plant installation, a Pre -Construction Conference shall be held. Attendees shall include Owner, General Contractor, Landscape and Irrigation Contractor(s) and Owner or his/her authorized representative. STANDARDS: All plants shall be in accordance with the American Standard For Nursery Stock, latest edition, published by the American Association of Nurserymen, Inc with regard to sizing and description. QUALITY: All plants shall be nursery grown and hardy under climatic conditions similar to those in the locality of the project. All plants shall be typical of their species or variety and shall have a normal habit of growth. They shall be sound, healthy and vigorous, well branched and densely foliated when in leaf. They should be free of disease and insect pests, eggs or larvae. They shall have healthy, well-developed root system. SUBSTITUTIONS: When plants of a specified kind or size are not available within a reasonable distance, the contractor may make substitutions upon request, if approved by the Owner or his/her authorized representative. Proposal for substitution of plant material shall be submitted at least 10 days prior to the final bid date for consideration. SIZE: All plants shall conform to all measurements specified on the plant list unless otherwise authorized in writing by the Project Consultant. PRUNING: Each tree and shrub shall be pruned in accordance with American Association of Nurserymen, Inc standards to preserve the natural character of the plant. All dead wood or suckers and all broken or badly bruised branches shall be removed. ROOT SYSTEMS: Ball & burlap plants shall be dug with firm natural balls of earth of diameter and depth to include most of the fibrous roots. Container grown stock shall have been grown in a container long enough for the root system to have developed sufficiently to hold its soil together firm and whole. No plants shall be loose in container or ball. PROTECTION: Root balls trunks, branches and foliage of plants shall be adequately protected at all times from sun and drying wind or frost. Plants with broken root balls or excessive damage to the crown shall be replaced, in kind, prior to installation. MULCH: Immediately following plant installations all tree and shrub planting pits shall be covered with four -inch (4") layer of triple shredded hardwood mulch. Ornamental Grasses and Perennial Flowers shall be covered with two-inch (2") larger. Final grade of mulch shall be 1/" below adjacent surface or steel edging to prohibit washout or migration of mulch to adjacent surface. ANTI -DESICCANT SPRAY: Trees and when planted in leaf shall be treated with anti -desiccant such as "Wilt -Proof". TOPSOIL: Existing or imported topsoil shall be fertile agricultural soil; typical for locality; capable of sustaining vigorous plant growth; taken from drained sites; free of subsoil, stones, clay or impurities, plants, weeds and roots; pH value minimum 5.7, maximum 6.5; organic content 5 to 7 percent. • All seed and sod areas shall have a minimum 6" of topsoil applied (depth after rolling). • All groundcover and ornamental grasses shall have a minimum 12" of topsoil applied (depth after rolling). • All tree and shrub beds shall have a minimum 18" of topsoil applied (depth after rolling). STAKING & GUYING: Trees shall be staked and guyed as is detailed on the drawings and according to accepted industry practice, only when directed by Owner or his/her authorized representative. LAYOUT: The contractor shall layout with identifiable stakes , the location of all plants and the the arrangement and outlines of planting beds as indicated on the drawings. Prior to any excavation of plant pits or preparation of plant beds, the Owner or his/her authorized representative shall approve the layout of planting. All planting shall be at the locations indicated on the drawings. The Contractor shall be responsible for planting at the correct grades, alignment and layout of planting beds. Minor adjustments to tree locations may be necessary due to field conditions and final grading. The Contractor shall notify the Owner or his/her authorized representative if major adjustments are anticipated. ADVERSE CONDITIONS: The contractor shall notify the Owner or his/her authorized representative in writing of any soil or drainage conditions which the Contractor considers detrimental to plant growth. The documented conditions shall include a proposal for correcting the situation, including any change in cost, for review and acceptance by the Owner or his/her authorized representative. QUANTITY: The quantity of plants in the Plant Schedule is for general reference only. The Contractor shall obtain quantities for pricing by compiling numbers from the plants illustrated on the drawings. Should there be a discrepancy between the drawings and the plant schedule, the quantities illustrated on the drawings shall take precedence. GUARANTEE: The Contractor shall guarantee all plant material for a full year from the date of initial acceptance. It is the Contractors responsibility to monitor the project during the guarantee period and notify the Owner in writing if problems are occurring or situations developed that appear detrimental to the plant material. Any plant material that is 25% dead or more shall be considered dead and must be replaced at no charge to the Owner. A tree is considered dead when the main leader has died back or there is 25% of the crown dead. LEGEND 4— — — — — — — — SURVEYED CONTOURS 4 PROPOSED CONTOURS \\ ` STREAM CENTERLINE \ EXISTING TOP OF BANK 1 ' \ -- -- MEANDER/PROPERTY LINE I \ \\\ \ )� PROPOSED RIPRAP CLASS I MIX I - i ' X ROOTED PLANT PLUGS (SEE SHEET 7) I \ ' I I \ I 10 5 0 10 20 SCALE 1"=10' VEGETATION REQUIREMENTS PER ARTICLE P, CITY OF GREENVILLE, NC ZONING REGULATIONS SITE DATA: A. REQUIRED VEGETATION PER ACRE FOR 0.23 ACRE SITE: O 1 GALLON CONTAINER PLANTS (SEE SHEET 7) • GRASSES/SEDGE/RUSH (SEE SHEET 7) THE FOLLOWING IS BASED ON SECTION 9-4-263(A)(2) SITE VEGETATION MATERIAL REQUIREMENTS (PER ACRE) LARGE TREES (1) 3 SHOWN SMALL TREES (10) 0 SHOWN (2 LARGE TREES SUBSTITUTED FOR 4 SMALL TREES)* (18 SHRUBS SUBSTITUTED FOR 6 SMALL TREES)** SHRUBS (15) 108+ SHOWN PROPOSED VEGETATION SUBSTITUTIONS: * ONE LARGE TREE FOR 2 SMALL TREES ** TO PROMOTE UNDERSTORY GROWTH AND EROSION CONTROL MEASURES ALONG THE RIVER, THREE SHRUBS ARE PROPOSED SUBSTITUTIONS FOR ONE SMALL TREE. B. REQUIRED STREET TREE VEGETATION: NOT APPLICABLE - PROJECT NOT ADJACENT TO RIGHT-OF-WAY C. REQUIRED SCREENING VEGETATION FOR BUFFERYARDS: NONE NOT APPLICABLE - PROJECT IS ENTIRELY WITHIN TOWN COMMON. NO OTHER ADJACENCIES D. REQUIRED VEGETATION LOCATED IN PUBLIC UTILITY OR DRAINAGE EASEMENTS: NONE PRELIMINARY PLANT LIST Botanical Name Symbol (Common Name) LARGE TREE Taxodium distichum (Bald Cypress) MEDIUM DECIDUOUS SHRUB Cephalanthus occidentalis (Common Buttonbush) Callicarpa americana (American Beautyberry) dentatum OViburnum + (Arrowwood Viburnum) Ilex verticillata (Winterberry Holly) Aronia arbutifloia (Red Chokeberry) MEDIUM EVERGREEN SHRUB OIlex glabra • (Inkberry Holly) PERENNIAL FLOWER Vernonia noveboracensis (New York Ironweed) OVerbena hastata (Swamp Verbena) Eutrochium maculatum (Spotted Joe Pye Weed) ORNAMENTAL GRASS Panicum virgatum 'Hot Rod' (Hot Rod Switchgrass) O Panicum virgatum 'Shenandoah' (Shenandoah Switchgrass) TURF GRASS TifTuf Bermuda NOTES: A. MINIMUM PLANT SIZES SHALL BE IN ACCORDANCE WITH THE ZONING REGULATIONS AS FOLLOWS: PLANTING MATERIAL TYPE MINIMUM PLANTING SIZE 1. LARGE TREE - SINGLE STEM 10' (HEIGHT) AND 2" CALIPER MULTI -STEM 10' (HEIGHT) 2. SMALL TREE 8' (HEIGHT) AND 1.5" CALIPER 3. SHRUB 18" (HEIGHT), EXCEPT AS PROVIDED UNDER SECTION 9-4-267(a) B. NO PORTION OF ANY PARKING AREA, INCLUDING ANY DRIVEWAY, PARKING SPACE, DRIVE AISLE OR TURNING AREA, SHALL BE LOCATED MORE THAN THIRTY (30) FEET FROM AN ON-SITE SMALL TREE OR MORE THAN SEVENTY-FIVE (75) FEET FROM AN ON-SITE LARGE TREE. FOR PURPOSES OF THIS SECTION, THE MEASUREMENT SHALL BE FROM THE FARTHEST EDGE OF THE SUBJECT AREA TO THE CENTER OF THE BASE OF THE CLOSEST QUALIFYING TREE. C. SITE PLAN APPROVAL FROM THE RESPECTIVE EASEMENT HOLDER SHALL BE CONSTRUED AS APPROVAL OF ALL ENCROACHMENTS, AS SHOWN. ON THIS PLAN. (SEE NOTE ON ITEM 1.D.) D. THE FOLLOWING VEGETATION MATERIALS, AS LISTED BY COMMON NAME, SHALL CONSTITUTE NOT MORE THAN TWENTY-FIVE (25) PERCENT OF THE TOTAL REQUIREMENT FOR THE SPECIFIC CATEGORY: LARGE TREE CATEGORY: RIVER BIRCH SMALL TREE CATEGORY: ARISTOCRAT PEAR EVERGREEN SHRUB CATEGORY: BRADFORD PEAR CAPITOL PEAR CLEVELAND SELECT PEAR RED TIP PHOTINIA E. DUMPSTER/COMPACTOR SHALL BE SCREENED ON 3 SIDES IN ACCORDANCE WITH SECTION 9-4-268 (U OF THE CITY CODE. F. EXISTING SUBSTITUTE VEGETATION MATERIALS HAVE BEEN NOTED INCLUDING THEIR SPECIFIC LOCATION(S), TYPE(S), AND SIZE(S). G. EXISTING SUBSTITUTE VEGETATION MATERIAL SHALL BE PROTECTED FROM SITE DEVELOPMENT ACTIVITIES IN ACCORDANCE WITH SECTION 9-4-265 (F) OF THE CITY CODE. H. NO LARGE TREES TO BE PLANTED WITHIN SANITARY SEWER OR WATERLINE EASEMENTS. I. PARKING LOT AREA TO BE SCREENED IN ACCORDANCE WITH SECTION 9-4-268(L)9 OF THE CITY CODE. PARKING AREA SCREENING SHALL BE INSTALLED WITHIN A 10 FOOT AREA ADJACENT TO AND EXTENDING THE FULL STREET SIDE WIDTH OF ALL PARKING AREAS WHICH FRONT A PUBLIC OR PRIVATE STREET. J. MINIMUM OF 3 FEET CLEARANCE MUST BE MAINTAINED AROUND ALL FIRE HYDRANTS IN ACCORDANCE WITH STATE BUILDING CODE. K. VEGETATION WITHIN 10' OF BUILDING SHALL NOT COUNT TOWARD SITE REQUIREMENTS. WARD CONSULTING �I ENGINEERS, P.C. l FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bwardCwce-corp.com THE EAST GROUP ■ Engineering ■ Architecture ■ Surveying ■ Technology ■ Corporate Office 324 Evans Street Greenville, NC 27858 Tel 252.758.3746 Fax 252.830.3954 www.eastgroup.com ■ NC Landscape Architectural License No. C 427 SEAL: \�O��N CARpZ�N.,�'. .�PNDSC,4AF•q ^�W 1509 �c'-O>i� J9 y'V PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: MMS CHECKED BY: MMS PLANTING PLAN SCALE: AS NOTED SHEET N0. z a 0 x —Q9� a01 Qo--r_-- -' _ _ 60�-C10�_ 1 ----- ao,-------- i- ------____ ' ____----------- ---_ ---- — ---------_ CIO, rCIO, o ��o ................ I■I■I■ISI■I■I■I■I■I■I■I■I■I ■I■I■I■I■I■I■I ■I■I■I■I■I■I■I■I ■I■I■I■I■I■I■I■I■I -_________________ ■I SII �����•11���1 4 2 0 4 8 SCALE 1/4"=1' LEGEND 4— — — — — — — SURVEYED CONTOURS 4 PROPOSED CONTOURS STREAM CENTERLINE EXISTING TOP OF BANK -- -- MEANDER/PROPERTY LINE PROPOSED RIPRAP CLASS I MIX WARD CONSULTING �I ENGINEERS, P.C. l FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bwardCwce-corp.com THE EAST NGROUP ■ Engineering ■ Architecture ■ Surveying ■ Technology ■ Corporate Office 324 Evans Street Greenville, NC 27858 Tel 252.758.3746 Fax 252.830.3954 www.eastgroup.com ■ NC Landscape Architectural License No. C-427 SEAL: `01111 u,,,,, , •I A CARpZ �N.,�'. .."QSC4**--•y ^ �W 1509 PERMIT SET DATE: 11-17-2017 REVISIONS: I DRAWN BY: MMS CHECKED BY: MMS DECORATIVE HARDSCAPE PLAN SCALE: AS NOTED SHEET N0. 9 I.] ■ W Aluminum I-finge Rad PVC Fringe —sleeve Land Side Hinge 1 /4.. - Use rod it TYPE: Gangway io Land RE:F Hinge 2 REV 1 DRAWN: I C. Diftsio r � NA SCALE: CHMKED, I LHarisar SHEET 3 OF 4 Dma I 01tW'7 Your First Choice for floating Lock Sorutions� 1 rl o the :1<, . etc.) TYPE: L_7ar1gway TO Lana REF L Hinge A AI Cross -Section - 1:2 Scale 1 -1/4" SCH 80 Pipe 6061-T6 Aluminum 01.66 Cross -Section - 1:2 Scale 114" Hardware 18-8ss 1 Cx "ex ex Caap Bolt 114" Flaf Washer jj[]�.—I:= Noxa_ - TYPE: Gangway to Land RFF: Hinge 2 SIA Side View REV 1 I DRAWN: C.Dficsio�■ ■jam SCALE. 2:3 I CH--cKED, J. Hraraor ■� `r' ��1 - - SHEET 2 OF 4 ani E of f%fl7 Your First Choice for floating i>kKk Solutions 1 Cross -Section - 1:2 Scale I -1 /2" PVC 1 120 Pipe PVC 01 $, 0 Cross -Section - 1:2 Scale 318" Rat Bar 6061 76 Aluminurn 6" of 8" 8 NA Cross -Section - 1:2 Scale Dock Connector 6061-T6 Alurninum 24 R1" Cross -Section - T:2 Scale 1/7' Flat Ear NOTE: 6061-T6 Aluminum - The 318" flat bar for the kind side hinge is 6" fora small gangway and 8" for a large gangway- - The 1/2" flat bar For the 3" or 4" rornplgangway side hinge is 3" for a small gangway and 4" for a large gangway. I REV T SCALE: SHEET 4 OF 4 Gangway to Land REV 1 DRawN: e.aecio _c lc TYPE: REF: NA SCALE: CHECKM J.Fgxrsan T Hinge Concrete Abutment SHEET 1 OF 4 Your !Fixe[ Choice for Floating 1}ock Solutions (By CAhefs) 2 p [] 1 1 /4.. - Use rod it TYPE: Gangway io Land RE:F Hinge 2 REV 1 DRAWN: I C. Diftsio r � NA SCALE: CHMKED, I LHarisar SHEET 3 OF 4 Dma I 01tW'7 Your First Choice for floating Lock Sorutions� 1 rl o the :1<, . etc.) TYPE: L_7ar1gway TO Lana REF L Hinge A AI Cross -Section - 1:2 Scale 1 -1/4" SCH 80 Pipe 6061-T6 Aluminum 01.66 Cross -Section - 1:2 Scale 114" Hardware 18-8ss 1 Cx "ex ex Caap Bolt 114" Flaf Washer jj[]�.—I:= Noxa_ - TYPE: Gangway to Land RFF: Hinge 2 SIA Side View REV 1 I DRAWN: C.Dficsio�■ ■jam SCALE. 2:3 I CH--cKED, J. Hraraor ■� `r' ��1 - - SHEET 2 OF 4 ani E of f%fl7 Your First Choice for floating i>kKk Solutions 1 Cross -Section - 1:2 Scale I -1 /2" PVC 1 120 Pipe PVC 01 $, 0 Cross -Section - 1:2 Scale 318" Rat Bar 6061 76 Aluminurn 6" of 8" 8 NA Cross -Section - 1:2 Scale Dock Connector 6061-T6 Alurninum 24 R1" Cross -Section - T:2 Scale 1/7' Flat Ear NOTE: 6061-T6 Aluminum - The 318" flat bar for the kind side hinge is 6" fora small gangway and 8" for a large gangway- - The 1/2" flat bar For the 3" or 4" rornplgangway side hinge is 3" for a small gangway and 4" for a large gangway. I REV T SCALE: SHEET 4 OF 4 DRAWN: I CHECKED: I DATE: I a fm'onorte+ J-Harisor OIPJV17 +�^ r--- rX i��� T�� Your First Choice for Floating Dart Salutimw flBy Others 1 K Concrete Abufinen' (By Others) 30' Control Arm Plan View Sidewalk } LU flBy Others 4'x 3D' Gangway Concrete Abutment } (By CAhefs) p [] 5'x S' float S' x 8' Float S' x 8' Float CompeTlsafion Roct Placed under gangway + here to support weight of gowwcly Float Float 4'x 8' --� l . City of Greenville RFV 1 DRAWN, a ny� A—A—a art ' [ W__•—i-•A--a TYPE: 18 x 24' ADA Dock REF: Town Common SCALE: W.S. CHECKED: I J-�aTiso 4' x 8' Float 3'x 12' SHEET 1 OF 2 DATE I OVW17 Your Fh-A Choice Lor Floating Dock solations 2 Safe Launch Sit 1 NOTE: CONTROL ARM MATERIAL TO BE CONSTRUCTED OF 3"x3" 6061 T6 MARINE GRADE ALUMINUM. REV 1 *A'OYH: G. Gi3asio111111"'Arl-■ _ (- TYPE: 18'x 24' ADA Dock REF: City of Greenville SCALE: 1:40 CH=CKED: x.� 1�IL-w 1-011— T�� Town Common SHEET 2 OF 2 DATE 0411E%I7 Yaw First Choice for Floating Dock solutions 2 1 1 NOTE: STIFFENER PLATES REQUIRED. 0 r 0 WARD CONSULTING �7ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce–corp.com N -4 CD J SEAL: '�ttiltlllf lPl!*! *`N CAC ` 'OF s 13344 NGIN� .+q PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW ACCUDOCK DETAILS HINGE DETAILS FLOATING GANGWAY AND CONTROL ARM SCALE: NOT TO SCALE 2-1 SHEET NO. 10 SCALE: NOT TO SCALE SCALE: NOT TO SCALE Float Assembly Plan View � p [] 5'x S' float S' x 8' Float S' x 8' Float S' x 6' 5' x 6' 4' x 8' Float Float Float 4'x 8' l . Float 4' x 8' Float 3'x 12' Safe Launch Sit 5` x 8' Float 5'x 8' Float 5' x 8' Float r-_ 24' REV 1 *A'OYH: G. Gi3asio111111"'Arl-■ _ (- TYPE: 18'x 24' ADA Dock REF: City of Greenville SCALE: 1:40 CH=CKED: x.� 1�IL-w 1-011— T�� Town Common SHEET 2 OF 2 DATE 0411E%I7 Yaw First Choice for Floating Dock solutions 2 1 1 NOTE: STIFFENER PLATES REQUIRED. 0 r 0 WARD CONSULTING �7ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce–corp.com N -4 CD J SEAL: '�ttiltlllf lPl!*! *`N CAC ` 'OF s 13344 NGIN� .+q PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW ACCUDOCK DETAILS HINGE DETAILS FLOATING GANGWAY AND CONTROL ARM SCALE: NOT TO SCALE 2-1 SHEET NO. 10 SCALE: NOT TO SCALE SCALE: NOT TO SCALE MIN. 10 GA. LINE WIRES 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER .I III=1 'III 111 MI I I- -I11- -1i1-II_I I I FRONT VIEW 111i1111„ NOTES: - USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW * FOR REPAIR OF SILT FENCE FAILURES, USE NO. 57 WASHED STONE STANDARD SILT FENCE STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC MIN. 12 1/2 GA. INTERMEDIATE WIRES /—GRADE 0 of FILL SLOPE N Z GRADE IIE] II=1 �III„111= �6" MIN. COVER OVER SKIRT* `V III= :III -II. ANCHOR SKIRT AS II- -s'-=111111 III -III= DIRECTED BY ENGINEER SIDE VIEW HARDWARE CLOTH RATE OR OPEN THROAT r - STRUCTURE I I I I I I I I I I I I CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE CURB FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE #57 WASHED STONE PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. 4. APPROVED EQUIVALENTS ACCEPTED. mLd Ld Of D 0 D STANDARD BLOCK & GRAVEL PROTECTION #57 WASHED STONE " EXPANSION JOINT 3000# CONCRETE CONTROL 1ITH WATERPROOF FILLER (BROOM FINISH & AS SHOWN TOOLED JOINTS) (SEE SHEET 9 FOR /ADDITIONAL FINISHES) V � 4 I I_ Ell 11 _=1 111 I I= _L1 �T— - I IIIII i IiiiI i I—III— I 6" AGGREGATE BASE COURSE PLAN VIEW 4" THICK CONCRETE SIDEWALK NOTES: 1. PLACE A J" EXP. JT W/ WATERPROOF FILLER EVERY 18' OR BETWEEN POURS. 2. SCORE CONCRETE FOR SIDEWALKS AS SHOWN ON PLANS. 3. SCORE CONCRETE RADIALLY TO MATCH CURVE WHEN WALK CURVES. CONCRETE SIDEWALK 1 3 SCALE: NOT TO SCALE2 1 SCALE: NOT TO SCALE SCALE: NOT TO SCALE TOP FLOTATION TURBIDITY CURTAIN 4 SCALE: NOT TO SCALE NOTES: CONTRACTOR TO SUBMIT SHOP DRAWING FOR APPROVAL PRIOR TO INSTALLATION. COMPACTED SUBGRADE L Y S fl G HT © 120 St. Mary's Street OMRaleigh, NC 27605 TOWN COMMONS FLOATING DOCK FILE NAME: 11527 TOWN COMMONS SIOl.dwg flSSOCIRTES 91 9.833.0495 GREENVILLE, NC 10/la/17 LysaghtAssociates.com structural engineers Firm No. C-0621 SHEET NO. 101 DOUSE ELEVATION 4 NOTES I. COFFERDAM, DEWATERING, RIP RAP AND ABUTMENT WATERPROOFING SHALL BE DESIGNED BY OTHER5. 2. TIMBER PILES SHALL BE PRESERVATIVE TREATED FOR MARINE USE. THEY SHALL HAVE AN 8" MINIMUM TIP AND NATURAL TAPER. EMBEDMENT DEPTH WILL BE 15' TO 20' TO ATTAIN ALLOWABLE LOAD5 OF 40 KIP5 VERTICAL AND 5 KIPS HORIZONTAL AT EACH PILE. 3. CONCRETE 5HALL BE 3,000 P51 FOR FOOTINGS AND 4,000 P51 FOR WALL5. r — — — — — — U5E A WATERPROOFING ADMIXTURE TO MINIMIZE WATER INFILTRATION IF THE 1 EXTERIOR WATERPROOFING SYSTEM FAIL5. REBAR5 Sf 4. ATTACHMENT OF GANGWAY AND CONTROL ARM TO ABL a I FLOATING DOCK 5UPPL I ER. SUBMIT SHOP DRAWINGS TO } — J ENGINEER FOR REVIEW PRIOR TO FABRICATION., +3'-O" T.O.W. FLOATING DOC❑AEJTMENT 5 SCALE: NOT TO SCALE MBER PILE P)REGU1 RED +I'-6" GRADE (MIN ALONG WALL) RIP RAP WATER LEVEL O C (D'11 uf moa � SCOUR DEPTH #4 BAR5 a 12" O.G. TRAN5VER5E REINFORCEMENT IN ;.-i'ii�°, • F .......... •��y''',: _ • �� SEAL �< • _ 7929 Al '•P�-3 WWI -WE J WARD CONSULTING �[�ENGINEERS, P.C. FIRM LICENSE NO: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com J SEAL: '`til{IIIf IPI!*! *` N CARle Si 'OF s rX 13344 G� PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW SITE, ABUTMENT, AND EROSION CONTROL DETAILS SCALE: NOT TO SCALE SHEET N0. PLANTING DETAILS SEEDLING/LINER BARER❑❑T PLANTING DETAIL DIBBLE PLANTING METHOD USING THE KBC PLANTING BAR HEALING IN 1. Loc to a healing—in site in a shady, well protaected area. 2. Excavate a flat bottom trench 12" deep and provide drainage. Y7 3. Backfill the trench with 2" well rotted sawdust. Place a 2" layer of well rotted sawdust at a sloping angle at one end of the trench. 4. Place a Ingle laxer of lants against tie sloping enc so that the root collar is at ground level. 5. Place a 2" layer of well rotted sawdust over he roots maintaining a sloping angle. 6. Repeat layers of plants and sawdust as necessary and water thoroughly. 4. Pull handle of bar toward planter, firming soil at bottom. 2" 2. Remove planting, bar 3. Insert planting bar and place seedTing at 2" toward planter correct depth. from seedling. KBC PLANTING BAR PLANTING NOTES: Planting bar shall have a blade with a triangular cross section, and shall PLANTING BAG be 12" long, 4" wide and During planting, seedlings1 " thick at center. shall be kept in a moisttA canvas bagg or similar container fo prevent theroot systems from drying. ROOT PRUNING All seedlings shall be root pruned, if necessary, so that no roots extend more than 10 inches (10") below the root collar. LONGITUDINAL ANCHOR TRENCH STAKE AT 3'-5" P fes,,.._: TERMINAL SLOPE AND CHANNEL ANCHOR TRENCH CHECK SLOT AT 25' INTERVALS (MIN) ISOMETRIC VIEW `"'nODEN STAKES INITIAL CHANNEL ANCHOR INTERMITTENT CHECK TRENCH SLOT NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 4. TRENCH MATTING AT TOP AND BOTTOM OF MAT AS SHOWN IN DETAIL 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. NOTES: 1. SPECIAL STILLING BASIN LOCATION TO BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION. 2. PROVIDE STABILIZED OUTLET TO DRAIN TOWARDS STREAM. 3. THE SILT BAG SHOULD BE REPLACED AND DISPOSED OF WHEN IT IS 75% FULL OR WHEN IT IS IMPRACTICABLE TO MOVE OR OTHERWISE NOT FILTERING WATER AT A REASONABLE FLOW RATE. 4. THE SILT BAG SHOULD BE REMOVED TO AN UPLAND AREA AND DISPOSED OF WITH OTHER WASTE MATERIAL IN AN AREA PROTECTED BY SEDIMENT AND EROSION CONTROL MEASURES. THE CONTENTS OF THE SILT BAG SHOULD BE DISPOSED OF IN THIS AREA AND THE BAG ITSELF TAKEN OFF—SITE FOR DISPOSAL. REFORESTATION DETAIL 2-1 COIR MATS CHANNEL INSTALLATION 3SPECIAL STILLING BASIN 1 SCALE: NOT TO SCALE A SCALE: NOT TO SCALE J SCALE: NOT TO SCALE WARD CONSULTING �[�ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce—corp.com (j) J Q D a 0 x x x 0 z w O U SEAL: �jtil{1111 IPS,* ►N CARL 'OF s rX 13344 NGIN� .+q �'�•�;; %`%" PERMIT SET DATE: 11-17-2017 REVISIONS: DRAWN BY: JSV CHECKED BY: BLW MISCELLANEOUS DETAILS SCALE: NOT TO SCALE 4_1 SCALE: NOT TO SCALE 5-1 SCALE: NOT TO SCALE SHEET NO. 12