HomeMy WebLinkAbout20171597 Ver 1_Plan_Sheets_Chatham 19_20171215+
�
�
0
a
�
�
N
s
�
�
0
0
O
N
�
U
�
�
�
�
N
�
Q
�
E
0
:
U
�
vi
�
�
�
�
�
m
N
�
m
� '-
�
c
w
u
�
0
0
�
�
�
�
m
�
L
m
�z
c !
ti s c a
o a ° �
rv � n E
\ p •. o
� � � � m
� N y _
I� rvi � L�
19+00
20+00
SPAN A
FILL FACE C� END BENT 1
STA.19+50.13 -L- LIMITS OF UNCLASSIFIED
GRADE POINT EL.255.22 STRUCTURE EXCAVATION (TYP.)
1'-6"
� (TYPJ LOW CHORD
INTEGRAL EL.248.76
BEGIN FRONT SLOPE I II nh4j/ *,i
STA 19+37 40 -L-
60 GRADE POINT EL.255.06
50 �
N APPROXIMATE
40 n EXISTING c
�� GROUND LINE
30 ^
Zp FOUNDATION TYPE
TO BE DETERMINED —
10
90
+, I
� �
_ � /� �
w <c,�'�
II
II ��, I I
II �� EXCAVATE TO I I
II \1 EL. 240.00 � �.� I
I I �� ti I � �
u �l � L 1� �
`" � � _
ti
�
END BENT 1
HORIZa CURVE
DATA —L—
PI STA.16+99.34 -L-
� = 12°-35'-31.5"(RT.I
D = 03°-19'-52.1"
L = 378.01'
T = 189.77'
R = 1720.00'
1'-0"MIN. EARTH BERM
EL.243.58 (LEVELI
CLASS II RIP RAP� �
FILL FACE C� �
END BENT 1�
W.P.1 \
TO SR 2306 STA. 19+50.13 -L-
19+00
� BEGIN APPROACH SLAB
STA.19+35.96 -L-
PT STA. 18+87.58 -�- �
BEGIN FRONT SLOPE
STA.19+37.40 -L-
I L'
4'-0" O
COLUMN
�T
.�
�: /
21+00
22+00
SPAN C
23+00
FILL FACE c� END BENT 2
STA.22+93.88 -L-
1'-0"MIN. EARTH GRADE POINT EL. 255.73
BERM (TYPJ
HIGH WATER LOW CHORD EL.249.27 �, gEGIN FRONT SLOPE
EL.243.00* UNCLASSIFIED STRUCTURE �� INTEGRAL STA.23+06.66 -L-
BASE HIGH WATER �10/09/16) FIX. FIX. EXCAVATION (TYP.) F� `SS GRADE POINT EL.255.60
FIX. FIX. EL. 247.50 �� �_
❑ (100 YEAR) ❑ C
II II II
II II I
II II EXISTING �
I I I I�SUBSTRUCTURE �
I I I (TYP,) I
I I WS ELEV. I I I
I I EL.212.50 � �,L1'�' �
I I �06/14/17) I �; I
I �
���—= ------� �—__
_� r" m �----*— C—
r„ � r C'— � r �
r N � N o
N � O ry
� �' �� �i�+ �
li
4'-6" fd 4'-6" �
DRILLED PIER DRILLED PIER
TOP OF DRILLED PIER
EL.TO BE DETERMINED
BENT 1
EXISTING gENT 1
SUBSTRUCTURE CONTROL LINE�
(TYPJ
W.P. 2
STA.20+62.00 -L-
f � a' f
20+00 `� � �n
/1
� � �
IIII u, (
-90°-00'-00"
(TYPJ F I
z �
m
�
0
H
w
�
z
x
a
w �,
a �'
y
�
fl
4'-0" fd I I _ , — ��
COLUMN I I ' � � �/ I�
TEMPORARY ��I r `� ^' �� II
�1 T� w
CAUSEWAY i � "' � I�
(TYP.) � i ll W �� `'�* U 1
�� + EXCAVATE TO
EL. 240.00
TOP OF DRILLED PIER
EL.TO BE DETERMINED
BENT 2
SECTION ALONG -L-
ECTION TAKEN AT RIGHT ANGLES TO END BENTS AND BENTS)
/
w
H 1
� I
�Nw
,� o
��BENT 2
/ CONTROL LINE�
�S BRIDGE ID
STA.21+22.00 -L-
�
� n �ri � ��
� � 21+00 � �I I I
I I �I�I_ I I �
_ J -L- WC 42� L� � LU�
� �
60'-0" I 60'-0"
ill�-l�l/2 I i2�r_�ri
SPAN A SPAN B
TOTAL LENGTH OF BRIDGE = 343'-9"
(FILL FACE C� END BENT 1 TO FILL FACE C� ENO BENT 2)
PLAN
(PILES NOT SHOWN FOR CLARITY)
� ��
� �
�SLOPE 1�/Z:1
WORMAL TO CAP)(TYPJ
�FOUNDATION TYPE
TO BE DETERMINED
END BENT 2
HORIZa CURVE
DATA —L—
PI STA.24+97,q2 -L-
� = O1 °-11'-52.2' (RTJ
D = 00°-18'-05.6"
L = 397.22'
T = 198.62'
R = 19000.00'
1'-0" MIN. EARTH BERM
EL. 244.08 (LEVEU
� �
W.P. 3
STA.21+82.00 -L-
22+00 �
/ ��
� �,
/ WJ
TEMPORARY
CAUSEWAY
(TYPJ
111 -l�l/2
SPAN C
+1.2969% � -1.9506%
PVI STA.21+95.00 -L-
PVI EL. = 258.40
V.C. = 500'
GRADE DATA —L—
HYDROGRAPHIC DATA
DESIGN DISCHARGE ......................= 27300 CFS
FREQUENCY OF DESIGN FLOOD .. ..........= 10 YRS.
DESIGN HIGH WATER ELEVATION ...........= 242.8
DRAINAGE AREA ........................ = 1030 SO.MI.
BASE DISCHARGE (Q100) .................. . 45400 CFS
BASE HIGH WATER ELEVATION .............= 247.5
OVERTOPPING FLOOD DATA
OVERTOPPING DISCHARGE . . . .........= 29990 CFS
FREOUENCY OF OVERTOPPING FLOOD ......... = 10+ YRS.
OVERTOPPING FLOOD ELEVATION ............= 243.5
CLASS II RIP RAP
FILL FACE (c�
END BENT 2
� W.P.4
STA.22+93.88 -L-
TO SR 1007
3+00
END APPROACH SLAB
STA.23+08.04 -L-
BEGIN FRONT SLOPE
STA.23+06.66 -L-
I HEREBY CERTIFY THESE PLANS
ARE THE AS-BUILT PLANS
PROJECT N0. 41665.3H
PC STA.22+9g,80 -L- CHATHAM / LEE COUNTY
STATION: 21+22.00 -L-
SHEET I OF 2 REPLACES BRIDGE N0.19
REVIEW PLANS
DO NOT liSE FOR CONSTRUCTION.
+
�
�
a
N
0
t>
a
�
�
N
�
�
O
O
O
N
N
L
]
U
J
L
N
2
N
�
�
Qi
E
0
L
O
L
U
�
O
O
O
�
f
/
P
�
L
m
U
p� Z
C /
��'�ri:
a o �
� � n E
. p
� l C
m N � �
\ Q U1 =
I� V � L�