Loading...
HomeMy WebLinkAbout20171595 Ver 1_Impact Information_20171214� � • � � V � � O V � To 5°T'sE��'1� ��II��°° �i ���� II--� (�'s'� I ' c�Iel�� � �^� iT���'�������,� �1T�' lI���II����`1y� Jo�Es cov�TY LOCATI011t: REPLACE BRIDGE N0.32. OVER TUCKAHOE CREEK SR 1142 (WEYERHAEUSER ROAD) TYPE OF WORK: GRADI11lG, DRAI1VAGE, PAVING AND STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT –L– STA 22 + 50.00 NOTES: 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. 2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. �k�k 3. DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVE (480.47') AND HORIZONTAL SSD (215') V= 35 MPH /�q\•� �q 2��� � \ DOCUMENT NOT CONSIOEREO FINAL UNLE55 ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH HYDRAULICS ENGINEER �INTB HNTB NORTH CAROLINA, P C. ADT 2012 = 410 RaleighS1NorthkCaRoltlnaS2760gz00 50 25 0 50 100 Nc �icensa wo: c-issa �_ ���, ADT 2032 = 820 ;;�'� ��������\ K= 10 % zate srax�nnr� srEcrFrcerioxs /a�° � ��� PLANS LENGTH OF ROADWAY PROJECT 17BP.2.R.77 = 0.110 MILES =� G D= 60 % DOUGLAS M. WHEATLEY, PE srcNArunE: P� r, '� PROJEf.Y' ENGINEER ,o �— 50 25 0 50 100 T= 6 %* LENGTH OF STRUCTURE PROJECT VBP.2.R.77 = 0.032 MILES �GHT OF WAY DATE: � g ROADWAY DESIGN �ti-" �� " �k�k V= 60 MPH NOVEMBER 8, 2017 ��� ��, PROFILE HORIZONTAL MONICA J. DUVAL ENGINEER \ ,�, � ) * TTST =2% DUAL 4% rHoltc'r DEsic.v excrxete �t� �o_—n�� ��� TOTAL LENGTH OF PROJECT 17BP.2.R.77 = 0.142 MILES 10 5 0 10 20 FUNC CLASS = LETTING DATE: MINOR COLLECTOR MAY 16, 2018 HEATHER C. LANE PE PROFILE (VERTICAL) SUBREGIONAL TIER n-cDor coxsncr PE S7GNATU7tE: - wz �� HAND CLEARING IN WETLANDS = <0.00 Ac /0.00 SF FILL IN WETLANDS = 0.00 Ac /0.00 SF � PERMANENT STREAM IMPACTS = 88 LF ��� TEMPORARY STREAM IMPACTS = 28 LF ..�x � DENOTES IMPACTS IN ��0• I 5��: �%j SURFACE WATER \ G ��.TS�/LS�;, DENOTES TEMPORARV � QG /' IMPACTS IN SURFACE WATER i i� I3�'GIN COh'STIdIJCTI01\r I3EGI?�' I'ROJECT 17BP.�.Id.77 -L- POC S7A 1�+00.00 � � BEGIN SBG -L- - O � srn.,s+ns ��n 2 /� SPECIAL LAT. 4'BASE DITCH� SEE DETAIL 2 - SPECIAL L4T.'V' DITCH $EE DETAIL 1 F: PDE-�'�PD \�Cj \\t CI-IOf \. \ � _ �- PDE _ � � ,�} � �� � �A�� I SPEGIA� L4T.'V' DITCH �(�h � SEE DC�TAIL i _���_ / \C \ P�F� � �; \ � 1�" RCP-IV� -� P�f '��PD - E ftEMOVE 14` RCP-IV -B�Z- DETAIL 1 DETAIL 3 SPECIAL L4TERAl 'V' DITCH SPECIAL LATERAL 'V' DITCH , �o, �o ��a��, � �o, �o ko��, � � -F�il NONroI �_ p.\°� -F"ill G�ound 3�� O 3' Slvpe Ground ,�.� D ��o�� � Slope Min. D- 1 5 Ft. � Min. D= 1 0 Ft. FROM -L- STA.14-00 TO STA.15-50 LT FROM -L- STA.201-00 TO STA.22+50 RT fROM -L- STA. 14-00 TO STA- 16+50 RT FROM -L- $TA.18-05 TO $TA.19-50 LT 60 50 40 30 20 �� � 11 + 00 DETAIL 2 SPECIAL LATERAL BASE DITCH � N�� �o s:.,iei Ne���a� 2, -F�� Giound ��� � Slor� D c<o�e,��l� . .. g � Min. D= 1.0 f�. B- 4.0 Fi. iype of Liner- Closs '�' R'ip-Rap FROM -L- STA. 15 a� 50 TO STA_ 16 i� 40 LT REMOVE WETLAN D & STREAM IMPACTS -L- PT Sla.16+28J7 REMOVE E%IST. BRIDGE � END 58G -L- STA.16+30.5 �LT� �; � � � � mN _ i`ON �a i: CV �'� IL y i�" � �� /�5 i 5 � � . ' . i � EXCAVATION LIMIT (TYP.� �OO N I C�NTB ��3e='�e�=���op����ssa`,s=,��e�oo W� HAND CLEARING IN WETLANDS = 0.00 Ac /0.00 SF FILL IN WETLANDS = 0.00 Ac /0.00 SF BM1 � � € � ^ SPECIAL LAT.'V' DITCH _- . � I Fn '�CL� ... SEE DETAIL 1 I !n .. , �. L_ � _`; ..� ....�. �E � '_.,__ PDE � PDE ,. -. < < - - \,OOF\p � - --.- - \\�F- � - --- ._ ���� F �Y � k', li � - ��� -' F ------- F-�� �� '�,IQ� i i� `n� 1 �E�' �� -- - --_ �E C � .. _J - V PDE ��'1 i'" �V �i`f �`, ' � � . . �E- �._---. c+ � �l �� a� �. � � � REMOVE � �-` . �'' � 1 ` � - .. . 15" RCP-V !� :L :4 � I I�_ SPECIAL LAT.'V" C EXCAIVATIfDN � 0 SEf. DETAIL 3 �'� LIMIT I jTYP.� � � �' a O x � � � B°GIN l � �L- PO OAVY HUSSEY, HEIRS � � A� 8 � A ?�i. + -BL3- _ _f- C �v' PROJECT REFERENCE NO. SHEET NO. 17BP.2.R.77 4 fLW SHEEf NO. ROADwAY DESIGN HYDRAUlICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING '•�� SHEET 2 OF 7 END CONSTRUCTION PROJECT 176P.2.R.77 -L- STA 22+SO.QO SKE1fCH O� BRIDGE IN RELATIONSHIP TO PAVEMENT NOT TO SCALE H SLAI3 E - 30.50 I },T � - 1 -_---' � i -- JS ... _. - ' � v � � ___-__-JS__... � iYPE -_--JSi ,- , _ W3 m HAND CLEARING IN WETLANDS = 0.00 Ac /0.00 SF W4 FILL IN WETLANDS = 0.00 Ac /0 SF HAND CLEARING IN WETLANDS = 0.00 Ac /0.00 SF FILL IN WETLANDS = 0.00 Ac /0.00 SF __ - rvPe III � MATERIAL TO BE REMOVED -` . - . - . . -._.-1,�T_.. -�T.. ��� .-. �. ELEV. = 52.54 PI = 14+90.00 EL = 52.27' VC = 160' K = 267 - - - ' --: V = 80 MPH+/- LL. . _ . ."_ _L �_ _LI-,_ J_L__.-_ L . - �.: EI�U or��,�n� Tr - T -_ T� �T, � T LAT. 'V' DITCH RT� !-- - PI = 16+00.00 RT PI = 16-F50.00 - �-I.� _ �_ EI = 48.46 EI = 45.96 �-r�- -- - _ _ u.- - (-lo.a000�o �+�o.s000°� -- _ � :._.----------- - ------ _.._.._ --- - --- __ .._..-.- -`o -, � i _� BEGW SPECIAL (-) 3.00OOga ``-'.0 5000% ( 1 5.0 pp a � -;� LAT. 'V' DITCH RT ��_.._. _. I--I � I-•. --- PI = 74+00.00 �-) 2 5000% EI = 49.46 / i.. i__i i � BEGIN SPECIAL ~ LAT. 'V' DITCH LT � " _ -°-�-° � PI = 14 + 00.00 ' '- � °' _ EI = 49.26 END SPECIAL __ / -i i.. i i -- .li. i i_ u i. �.l .i._i_i__i. i�: � .� i � �� � �- i_. . � -�i - --�� i �- �',--� i-1-w.. _�. _ �� -'� � I- � 1-i_ � 1-1� i -.: 1=i y.l : i_�.1i � i_i �.li i. i__I�I-i-�--i i._.I 12+00 13+00 LAT. 'V' DITCH (LT) BEGIN 4'SPECIAL � LAT. BASE DITCH LT PI = 15+50.00 EI = 44.76 i_� END 4' SPECIAL ; ' LAT. BASE DITCH (LT) `�` PI = 16 i- 40.00 i EI = 42.51 '-1i_:. �. . :,..-. ... . 14+00 15+00 16+00 -L- WS EL.= J1.4' SURVEY 06-13-1J GREII,TL� B_) T'rPE GREU, TL. 3 8�� II --7L.�U \I , �� �5 N �-`_ TF -�� - F� ,- T� _,TL�'- .=TC� .-:TLC. �r� rr� . . . ��f . �L� �t�; L�.-- t�. . - f �-: BM#1 -=7 END GRADE �= RR SPIKE SET IN 24" HARDWOOD Tr- --,-r�; ' r�,-- r�- -L- STA 21 +50.00 � -L- STA 20+75.59, 138.52' LT I_ e�ev. = si.ss -: ELEV. = 51.23 -:__ � - PI = 19+05.00 EL = 5351' - '� - VC = 760' BEGIN SPECIAL �i :_ END SPECIAL __:��_: ; i7- -- K = 163 `- V= 61 MPH LAT. 'V' DITCH RT -: ;- LAT. 'V' DITCH RT Pi = 20+00.00 =rF .:- Pi - zz+so.00 ��- -;�_ EI = 50.10 EI = 49.60 - - { � . (-)0.6796% �-' - - + 0 3000% ;�5-. _ -S: �. _. _, _i � _ � _------ -------- - - � ---� � �� _ __ - _--� � � � o.s000 o (-1 o.z000r- ' END SPECIAL BEGIN SPECIAL o LAT. 'V' DITCH L LAT. 'V' DITCH LT v� - N PI = 18+05.00 PI - 19+50.00 ,,, Fi - aF m EI = 46J3 17+00 18+00 19+00 20+00 21 +00 22+00 23+00 24+00 60 50 40 30 20 �� � - wz �� HAND CLEARING IN WETLANDS = <0.00 Ac /0.00 SF FILL IN WETLANDS = 0.00 Ac /0.00 SF � PERMANENT STREAM IMPACTS = 88 LF ��� TEMPORARY STREAM IMPACTS = 28 LF ..�x � DENOTES IMPACTS IN ��0• I 5��: �%j SURFACE WATER \ G Ty��' DENOTES TEMPORARV \ QG �, �', IMPACTS IN SURFACE WATER � i i� I3�'GIN COh'STIdIICTi01\r I3EGI?�' I'ROJECT 17BP.?.Id.77 -L- POC S7A 1�+00.00 � _r;�� BEGIN SBG -L- - O � srn.,e+n.s ��n 2 1� SPECIAL LAT. 4'BASE DITCH� SEE DETAIL 2 - SPECIAL L4T.'V' DITCH $EE DETAIL 1 . F�°- PDE --�` D `�Cj � C�. yC ,,: CI-IOf \ . � _.c�,'�3�- _ PDE _ / �� �°o ' SPEGIA� L4T.'V' DITCH (� SEE DC�TAIL i _���_ ;�C \ PQF� � �� \ - t�" RCP-IV� � � P�E '��PD - ftEMOVE E -BL2- 24" RCP-IV DETAIL 1 DETAIL 3 SPECIAL L4TERAl 'V' DITCH SPECIAL LATERAL 'V' DITCH , �o, �o ��a��, � �o, �o ko��, � � -F�il NONroI �_ p.\°� -F"ill G�ound 3�� O 3' Slvpe Ground ,�.� D ��o�� � Slope Min. D- 1 5 Ft. � Min. D= 1 0 Ft. FROM -L- STA.14-00 TO STA.15-50 LT FROM -L- STA.201-00 TO STA.22+50 RT fROM -L- STA. 14-00 TO STA- 16+50 RT FROM -L- $TA.18-05 TO $TA.19-50 LT 60 50 40 30 20 �� � 11 + 00 DETAIL 2 SPECIAL LATERAL BASE DITCH � N�� �o s:.,iei Ne���a� 2, -F�� Giound ��� � Slor� D c<o�e,��l� . .. g � Min. D= 1.0 f�. B- 4.0 Fi. iype of Liner- Closs '�' R'ip-Rap FROM -L- STA. 15 a� 50 TO STA. 16 i� 40 LT REMOVE WETLAN D & STREAM IMPACTS -L- PT Sla.16+28J7 REMOVE E%IST, BRIDGE - � END 58G -L- STA.76+30.5 �LT� ry; � i i V � m �` , m i i 1 �i i � f }�� � � - i i � -, � - --�-1_ i- / -- �/v EXCAVATION LIMIT (TYP.� C�NTB ��3e='�e�=���op����ssa`,s=,��e�oo W� HAND CLEARING IN WETLANDS = 0.00 Ac /0.00 SF FILL IN WETLANDS = 0.00 Ac /0.00 SF OO 6TM1, N 1 �A' ,V € � ^ SPECIAL LAT.'V' DITCH : � � I F r, ��,_� SEE DETAIL 1 �� i rn.�u .� .. r �EC--q'-_ PDE�PDE _. <- � _ f'O - - ��F\�. �\..F____.. - - . ._. _ . �-__ F �Y � at �i i , �� -.' F ------ F � �'� �,� �� � �ts� E '', _ _ A � � _J �` ��� � � - E C - . a PDE ,i i ��'V < '� � . . �E- ^-.-- c' �4 �l 4 1• � �� N� � REMOVE E% �-' �. 1'� � � ... 15" RCP-v� �... :i � '� I Op � SPECIAL LAT.'V"C � I SEE DETAIL 3 ��, EXCAiVAT193N J I I 0 � unniri tnr.l I � O �,' a O x � � � B°GIN l � �L- PO :�uVY HUSSEY, HEIRS � � A� 8 � A ?�i + -BL3- �'° _ _f- C �v' PROJECT REFERENCE NO. SHEET NO. 17BP.2.R.77 4 fLW SHEEf NO. ROADwAY DESIGN HYDRAUlICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING '•�� SHEET 3 OF 7 END CONSTRUCTION PROJECT 176P.2.R.77 -L- STA 22+SO.QO SKE1fCH O� BRIDGE IN RELATIONSHIP TO PAVEMENT NOT TO SCALE H SLAI3 E - 30.50 I },T � - 1 -_---' � i -- JS ... _. - ' � J � i ___-__-JS__... � iYPE -_--JSi ,- , _ W3 m HAND CLEARING IN WETLANDS = 0.00 Ac /0.00 SF W4 FILL IN WETLANDS = 0.00 Ac /0 SF HAND CLEARING IN WETLANDS = 0.00 Ac /0.00 SF FILL IN WETLANDS = 0.00 Ac /0.00 SF __ - rvPe III � MATERIAL TO BE REMOVED -` . - . - . . -._.-1,�T_.. -�T.. ��� .-. �. ELEV. = 52.54 PI = 14+90.00 EL = 52.27' VC = 160' K = 267 - - - ' --: V = 80 MPH+/- LL. . _ . ."_ _L �_ _LI-,_ J_L__.-_ L . - �.: EI�U or��,�n� Tr - T -_ T� �T, � T LAT. 'V' DITCH RT� !-- - PI = 16+00.00 RT PI = 16-F50.00 - �-I.� _ �_ EI = 48.46 EI = 45.96 �-r�- -- - _ _ u.- - (-lo.a000�o �+�o.s000°� -- _ � :._.----------- - ------ _.._.._ --- - --- __ .._..-.- -`o -, � i _� BEGW SPECIAL (-) 3.00OOga ``-'.0 5000% ( 1 5.0 pp a � -;� LAT. 'V' DITCH RT ��_.._. _. I--I � I-•. --- PI = 74+00.00 �-) 2 5000% EI = 49.46 / i.. i__i i � BEGIN SPECIAL ~ LAT. 'V' DITCH LT � " _ -°-�-° � PI = 14 + 00.00 ' '- � °' _ EI = 49.26 END SPECIAL __ / -i i.. i i -- .li. i i_ u i. �.l .i._i_i__i. i�: � .� i � �� � �- i_. . � -�i - --�� i �- �',--� i-1-w.. _�. _ �� -'� � I- � 1-i_ � 1-1� i -.: 1=i y.l : i_�.1i � i_i �.li i. i__I�I-i-�--i i._.I 12+00 13+00 LAT. 'V' DITCH (LT) BEGIN 4'SPECIAL � LAT. BASE DITCH LT PI = 15+50.00 EI = 44.76 i_� END 4' SPECIAL ; ' LAT. BASE DITCH (LT) `�` PI = 16 i- 40.00 i EI = 42.51 '-1i_:. �. . :,..-. ... . 14+00 15+00 16+00 -L- WS EL.= J1.4' SURVEY 06-13-1J GREII,TL� B_) T'rPE GREU, TL. 3 8�� II --7L.�U \I , �� �5 N �-- �F -�� F� - r� _,�L�-=rrCk :TrC I�r� rr �' 1 � � �L� ; �t�: L�-- t�. - � BM#1 END GRADE �- RR SPIKE SET IN 24" HARDWOOD Tr- --,-r� ' r�-- r�- -L- STA 21+50.00 � � - e�ev. = si.ss -_ -L- STA 20+75.59, 138.52' LT .. _ -. --: ELEV. = 51.23 - - PI = 19+05.00 EL = 5351' - '� - VC = 760' BEGIN SPECIAL �i :_ END SPECIAL __:��_: ; i7- -- K = 163 `- V= 61 MPH LAT. 'V' DITCH RT -: ;- LAT. 'V' DITCH RT Pi = 20+00.00 =rF .:- Pi - zz+so.00 ��- -;�_ EI = 50.10 EI = 49.60 - - { � . (-)0.6796% �-' - - + 0 3000% ;�5-. _ -S: �. _. _, _i � _ � _------ -------- - - � ---� � �� _ __ - _--� � � � o.s000 o (-1 o.z000r- ' END SPECIAL BEGIN SPECIAL o LAT. 'V' DITCH L LAT. 'V' DITCH LT v� - N PI = 18+05.00 PI - 19+50.00 ,,, Fi - aF m EI = 46J3 17+00 18+00 19+00 20+00 21 +00 22+00 23+00 24+00 60 50 40 30 20 �� � ry- LEGEND � ALLOWABLE IMPACTS ZONE 1 ����� AILOWABLE IMPACTS ZONE 2 Bl ZONE 1 BUFFER IMPACTS = 535 SF ZONE 2 BUFFER IMPACTS = 227 SF I3�'GIN COh'STIdIJCTI01\r I3EGI?�' I'ROJECT 17BP.�.Id.77 -L- POC S7A 1�+00.00 '' yk v � � BEGIN SBG -L- - O� srn.,s+ns ��n 2 � i F: PDE-�'�P C \� � �E CMpR� CHORG � :- PDE - ,c\ �� � �\\ a _ _ --- is � o� -BLI- �C \ P�F� � �; \ � 1�" RCP-IV� � \ -� P�f '��PD - E ftEMOVE 14` RCP-IV -B�Z- DETAIL 1 DETAIL 3 SPECIAL L4TERAl 'V' DITCH SPECIAL LATERAL 'V' DITCH , �o, �o ��a��, � �o, �o ko��, � � -F�il NONroI �_ p.\°� -F"ill G�ound 3�� O 3' Slvpe Ground ,�.� D ��o�� � Slope Min. D- 1 5 Ft. � Min. D= 1 0 Ft. FROM -L- STA.14-00 TO STA.15-50 LT FROM -L- STA.201-00 TO STA.22+50 RT fROM -L- STA. 14-00 TO STA- 16+50 RT FROM -L- $TA.18-05 TO $TA.19-50 LT �i � 50 DETAIL 2 SPECIAL LATERAL BASE DITCH � N�� �o s:.,iei New�oi q.> -rm Giound ��� � Slon�� D c<o�e,��l� . .. g � Min. D= 1.0 f�. B- 4.0 Fi. iype of Liner- Closs '�' R'ip-Rap FROM -L- STA. 15 a� 50 TO STA_ 16 i� 40 LT 62 . ZONE 1 BUFFER IMPACTS = 563 SF ZONE 2 BUFFER IMPACTS = 261 SF � � Q�'� MATERIAL TO BE REMOVED -` - _ - . -._.-1,�T_.. -�T.. ��� .-. �. rr r r, �__r _ T �� ELEV. = 52.54 . -.. _ -. ._ -.._ - - PI = 14+90.00 - - - - - -- ----- - EL = 52.27' -�m `- � � °� r� _ �-Z-m Tr-r. . � VC = 160' `- -- __ -_�, : - --__ K = 267 - - ' --: V = 80 MPH+/- LL. . . _L � _LI-._ J_L__.-_. _L _ . �: ei�� ��«,�„� Tr - T -_ T� �T, � T LAT. 'V' DITCH RT� !-- - PI = 16+00.00 RT PI = 16-F50.00 - �-I.� _ �_ EI = 48.46 EI = 45.96 �-r�- -- - _ _ u.- - (-lo.a000�o �+�o.s000°� -- _ � � __ , ._ ----------------------------- - �, . . ._ .- REMOVE BUFFER IMPACTS -L- PT S!a 16+28J7 REMOVE E%IST. BRIDGE END 58G -L- STA. )6+305 �LT� �� -� /,`�/��_ ti ,mN ,, /,�1; y� m /// � � i � i 2 � - ` '� I EXCAVATION LIMIT (TYP.� I C�NTB ���e.'�e�=���op����ssa`,s=,��e�oo B3 � ' "'" ZONE 7 BUFFER IMPACTS = 518 SF ZONE 2 BUFFER IMPACTS = 351 SF O O B�, N � � /vq\ / t � / � I FNISHE� 4 OOR ._lCYaipry � '.. � �0�� � I .l r i ,: -,'�;, �. ��. � 1. . F.- .c l,lailR �..).el: : FflE C�-_ PDE � PDE � < �� p�F � �p _ ���F___- . _ __-�� F - ��i � 11 ', � �� PDE.�` � �'�- � � � r�� �i i r.. ' m O .� `�"'1 \� L l I I O EXCA ATI'fJN � i�- � LIMI�jTVP.� � � J i � �_ .._.._.._, _ �- ' _:1 BEGW SPECIAL �.._. 05000% (_15pp',Q - � •�_ LAT. 'V' DITCH RT (-) 3.00Opoa -.._.._.._ 40% . I "�_ . . .�'.� 40 I--I � I-•. - PI = 74+00.00 �-) 2 5000% _ EI = 49.46 ,.. �__�_�_.. � BEGIN SPECIAL ~ LAT. 'V' DITCH LT � � -°-� i PI = 14+00.00 � L 30 '- EI = 49.26 END SPECIAL m �=j- LAT. 'V' DITCH (LT) �: Z a ._i BEGIN 4' SPECIAL � -- _ j_;_ __i_ LAT. BASE DITCH LT w' i i i i -�: � .li. i iI_ uI �i. i'__iI_ j.�l .ji,._i,_i,_�_i;.. .i.. m i� 20 � +� ' _:�� +. . � �u� -i- PI = 15+50.00 - EI = 44J6 �`� �� �L� 1 =_ i i 11 END 4' SPECIAL �� 1 �_ l� �_� �� � �_ _ l �,__� � �, �Q ��� ui �� i u� ���: LAT. BASE DITCH LT -- - �r-;_7-+-r-t-i r -r-1� r+- PI = 16�-40.00 � �-', �I--- I I �I ;- • �, ;- I � - - EI = 42.51 � -L- WS EL.= J1.4' SURVEY 06-13-1J �. i-_i i -.- .1_i i�i= i i_i=�_i.l .i. ii__i i i. i__i. i. �_:. � i i-' =i i_i�..F_1 � ��_ ��_i_i.� ' i .. � i r i � - . . -�-µ -t-- t--Ft-i- i �.r .���� . .. I -- --- � ..I ....I-��LI.I�. ..__;-.1.11..� I-.�-11 L.I-:-I-._L .�I.I-'._L . .I!_IJ-I.a ._I--U-I.�. �I.I �-I:; :� ...��I .I ...��.I.I I.a...: p � � ! I I�I i�f � I I f 11 +00 12+00 13+00 14+00 15+00 16+00 17+00 -' F ------- F-�� �� \E� ' - E - _ REMOVE � � -... 15" RCP- � �' O ^ 1 � OAVY HUSSEY, HEIRS � � 1 J B4 ZONE 1 BUFFER IMPACTS = 830 SF ZONE 2 BUFFER IMPACTS = 357 SF + / -BL3- _ _ N�� �4" 4 PROJECT REFERENCE NO. SHEET NO. 17BP.2.R.77 4 fLW SHEEf NO. ROADwAY DESIGN HYDRAUlICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING '��� SHEET 4 OF 7 END CONSTRUCTION PROJECT 176P.2.R.77 -L- STA 22+SO.QO SKE1fCH O� BRIDGE IN RELATIONSHIP TO PAVEMENT IGW AI'FROACH SLAI3 NOT TO SCALE -L-� POT STA 16 - 30.50 E i }T ( 1 _. -- JS .. ._. - �----� _ ^ ___ _- i _-__-�5-�... � �iIPE �_--�$�I ._ I� P -- 1-L w i8° 42, .�i r, w - � � _ a I = �� , IYPC III 1-- T. - T�.: T .-T� -�T�, �T�F -�T� I�.�T� T - -'_ TT. , �� . T� ,- � 'T-I -T-I •T_-• I I T�... �L� ��. L�.-- L�. � � . . -� END GRADE Tr- --,-r�; ' r�,-- r�- -L- STA 21 +50.00 � ELEV. = 51.85 PI = 19+05.00 EL = 5351' --7L.�U \I , �� �5 N GREII,TL� _ B_) T'rPE GREU, TL. 3 8�� II __ �_' " � i ' "_ � �. �� - _�_�' . BM#1 i - =7 RR SPIKE SET IN 24" HARDWOOD -L- STA 20+75.59, 138.52' LT = ELEV. = 51.23 - - VC = 760' BEGIN SPECIAL -�L :_ END SPECIAL `:��_: ; i7- -- K = 163 `- V= 61 MPH LAT. 'V' DITCH RT -: ;- LAT. 'V' DITCH RT Pi = 20+00.00 =rF .:- Pi - zz+so.00 ��- ;� EI = 50.10 EI = 49.60 - - { � . (-)0.6796% �-' - - , + 0 3000% �5-. _ -S: � . _. _ , _ . . - �. ;.�. __ .__ ,.e .w_ `_ � � ._ . -. _ - _ _i � _-_ �m-.- _ --- --� -----�...� ------------------------ - ---- � (-1 o zoaor - ----- j- f.. � �-i-) 0.5000.0 ° : _ _.._.._.._.._.. , , i _ ._.._.._.._.._ ,� _. L� L END SPECIAL BEGIN SPECIAL _� _ o LAT. 'V' DITCH L LAT. 'V' DITCH LT _. � BRIDGE HYDRAULIC DATA N PI = 18+05.00 PI - 19+50.00 J�-� - EI = 46.01 EI = 46J3 �'-� DESIGN DISCHARGE = 2000 CFS _ i i o � � = DESIGN FREOUENCY = l0 YRS = � ' m ¢ - - - _ ,_L , ; DESIGN HW ELEVATION = 499 FT � N -� � � � ! BASE DISCHARGE = 4466 CFS � z i 1 -��� !�� � I BASE FRE�UENCY = l00 YRS _� : ` -' ' -i�'u-u �I f f I- i � -' -` i- ._-i ' �' � _i ' � BASE HW ELEVATION = 53J FT _� : � i ' �+� � ' ���- �'-!�-' L +L --'+�. -'+'--� -! pVERTOPPING DISCHARGE = 2030 CFS - �� r;_ i i i i � i _� i i� i. � OVERTOPPING FREOUENCY= l0+ YRS : �l _` ���_ �� �, �I=; � � � � 1 �_� .:;: � i OVERTOPPIN6 ELEVATION = 50.0 FT �. _ _��, , w � L � _ , �� � 1 __ � .- --- i L. �_ _7 �r-F`i- r-r-1-r i- I- __-t �I- _ _ I-t i � _-_ -7�.: . :- � '- -- ' � u=i- ' i-i- L �=I � �- -" �- ' i- �- 1 DATE OF SURVEY = 06-13-17 -I -� -: i.:, i_ _i..i.i �.:il :i_; i i_ii_i. i-iii_i ii_.1_ i. ��i i.i..:.i. i_i.i-�1�. i . i. � ��� � � � �; �� �� �� ,_. � '-_ � -' -� -� WS.ELEVATION '1 r-. : ' rt i- ' ' F`tr+-� -, I = 41.4 FT � � _�,_.. i� {. ':-i_. i� � -� { i _i : _ � i . i :_i._ i . i ._i._ � : i ._i.� { i . - , i . . -.{. i _ . . { AT DATE OF SURVEY . i :. 18+00 19+00 20+00 21+00 22+00 23+00 24+00 60 50 40 30 20 �� 0 WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 15+42 TO 16+60 24" CORED SLAB BRIDGE 0.02 < 0.01 88 28 TOTALS*: 0.02 < 0.01 88 28 0 *Rounded totals are sum of actual impacts NOTES: Permanent SW impacts: 1033 SF Temporary SW impacts: 229 SF 2016 09 09 RIPARAIN BUFFER IMPACTS SUMMARY I M PACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. STRUCTURE SIZE / TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) 1 24" CORED SLAB BRIDGE -L- 16+48 TO 18+13 X 2446.0 1190.0 3636.0 TOTAL: 2446.0 1190.0 3636.0 0.0 0.0 0.0 0.0 0.0 Rev. SEP 2016 Rev. May 2006 Rev.Jan 2009