Loading...
HomeMy WebLinkAbout20171595 Ver 1_PCN Form Submission_20171214Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 12/14/2017 8:09:27 AM (Start Event) Accept by Carpenter,Kristi 12/14/2017 12:01:14 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: December 19, 2017 5:00 PM 12/14/2017 8:09 AM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) November 25, 2017 Ver 2.1 * Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are ans�red. Below is a link to the online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx A. Processing Information County(or Counties) where the project is located:* Jones Is this project a public transportation project? (?) r Yes C' No Is this a NCDOT Project? C� Yes C' No (NCDOT only) T.I.P. or state project number: WBS # 17BP.2.R.77 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps: ri Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? rJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 03 - Maintenance 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r% Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification For the record only for Corps Permit: * C' Yes C•' No C' Yes r No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No i 1f. Is the project located in anyof NCs twentycoastal counties?* C' Yes �' No 1h. Is the project located in a designated trout watershed?* C� No C' Yes Link to trout information: http://v�uwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* NCDOT (attn: Heather Lane) 1b. PrimaryContact Email:* hclane@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)439-2813 1d. Who is applying for the permit? I7 Owner rJ Applicant (other than owner) rJ AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: i NCDOT 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address 1037 W.H. Smith Boulevard Address Line 2 �Y Greenville Fbstal / Zip Code 27835 2e. Telephone Number: (xxx)xxx-xxxx (252)439-2813 State / Rovince / Region NC Country USA 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* hclane@ncdot.gov 3. Applicant Information (if different from owner) 3a. Applicant is: C' Agent C� Other N_ If other please specify. 3b. Name: NCDOT (attn: Heather Lane) 3c. Business Name: (if applicable) 3d.Address Street Address 1037 W.H. Smith Boulevard Address Line 2 �� Greenville Fbstal / Zip Code 27835 3e. Telephone Number: i (252)439-2813 (xxx)xxx-xxxx 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* hclane@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name: Robert Turnbull 4b. Business Name: (if applicable) Environmental Services, Inc. 4c. Address Street Address 4901 Trademark Drive Address Line 2 �� Raleigh Fbstal / Zip Code 27610 4d. Telephone Number: (919)212-1760 (xxx)x�c-x�cx State / R-ovince / F�gion NC Country USA State / Rovince / f�gion NC Country USA 4e. Fax Number: (904)470-2122 (xxx)xxx-xxxx 4f. Email Address:* I rturnbull@esinacc AgentAuthorization Letter* Rease provide the Agent Authorization Letter if you are subrritting this docurrent. 17BP.2.R.77_Signed Agent Authorization.pdf FlLE NFE M.15T BE FDF 223.09KB C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Jones County Bridge 32 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Trenton, NC 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Weyerhaeuser Road (SR 1142) over Tuckahoe Creek, west of Trenton in Jones County. 2. Project Identification i 2a. Property Identification Number: (tax RNor parcel ID) 2b. Propertysize: (in acres) approx. 1.2 acres 2c. Project Address Street Address Weyerhaeuser Road (SR 1142) Address Line 2 �� Trenton Fbstal / Zip Code 28585 2d. Site coordinates in decimal degrees State / Rovince / F�gion NC Country USA Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* 35.03210 ex:34208504 Longitude:* -77.57945 -77.796371 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Tuckahoe Creek 3b. Water Resources Classification of nearest receiving water:* C;Sw, NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project study area and vicinity consist of agricultural and rural residential areas, silvicultural areas, and undeveloped forested communities. The proposed project and associated impacts are within and immediately adjacent to e�sting NCDOT right-of-way. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent 17BP.2.R.77_Jones 32_USGS topo.pdf Fle type rrust be pdF 452.33KB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent 17BP.2.R.77_Jones 32_Soils.pdf Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: <0.25 acre 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 300 feet 453.74KB 4f. Explain the purpose of the proposed project: � Replace existing Bridge 32 on SR 1142 (Weyerhaeuser Road) over Tuckahoe Creek. The sufficiency rating of the epsting bridge is 27.12. 4g. Describe the overall project in detail, including the type of equipment to be used: The proposed project will replace the e�asting bridge on Weyerhaeuser Road (SR 1142) over Tuckahoe Creek in Jones County. The project will replace the existing timber floor bridge on continuous I-beams, timber caps, and timber piles with a cored slab bridge. The project work will consist of grading, widening, drainage improvements, bridge replacement, paving, and pavement markings. An off-site detour is proposed during construction. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent 176P.2.R.77_permit drawings.pdf 1.93M6 Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes �' No �' Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C�' Preliminary C' Approved C' Unknown C' WA Corps AID Number: 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Robert Turnbull Environmental Services, Inc. Sd. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. I Documentation not available. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C� No C' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. No. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands rJ Streams-tributaries rJ Buffers � Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site #- Reason 3b.lmpact 3c. Type of 3d. Stream name * for impact* type* impact* W2 - Drainage Improv e me nts N�p label (e.g. Fd�ad Qossing 1) W2 - Drainage Improve me nts N�p label (e.g. Fd�ad Qossing 1) P Relocatio UTtoTuckahoe Creek F2rrranent (P� n or Terrporary �� T Relocatio UTto Tuckahoe Creek F�rrranent (F) n or Terrporary �� 3e. Stream Type * 3f. 3g. Stream 3h. Impact Jurisdictior�idth* length* type * Intermittent Corps 3 88 F2rennial (F8� or interrrittent Average (feet) (linear feet) (If� Intermittent Corps 3 28 F�rennial (FS2) or interrrittent Average (feet) (linear feet) (IMj ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 88 3i. Total temporary stream impacts: 28 3i. Total stream and tributary impacts: 116 3j. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. �J Neuse � Catawba r Goose Creek r Other r Tar-Pamlico r Randleman r Jordan Lake 6b. Impact Type * 6c. Per or 6d. Stream name * Te mp * B1 -Allowable P Tuckahoe Creek Location and 6cerrpt, Allowable, allowable w/ rritigation F�rrranent (F) or Terrporary (� 62 - Allowable P Tuckahoe Creek Location and C errpt, Allowable, allowable w/ rritigation F2rrranent (Fj or Terrporary (� 6e. Buffer 6f. Zone 1 6g. Zone 2 mitigation impact* impact* required?* No 535 227 (squarefeet) (squarefeet) No 563 261 (squarefeet) (squarefeet) 6b. Impact Type * 6c. Per or 6d. Stream name * Te mp * 63 - Allowable P Tuckahoe Creek Location and C errpt, Allowable, allowable w/ rritigation F2rrranent (P� or Terrporary (� 64 - Allowable P Tuckahoe Creek Location and 6cerrpt, Allowable, allowable w/ rritigation F2rrranent (F� or Terrporary (� 6h. Total buffer impacts: Temporary impacts Permanent impacts: Total buffer impacts 6i. Comments: Zone 1 0.00 Zone 1 2,446.00 Zone 1 2,446.00 Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Gick the upload button or drag and drop files here to attach docurrent 176P.2.R.77_permit drawings.pdf Fle rrust be FDF Zone 2 0.00 Zone 2 1,190.00 Zone 2 1,190.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization 6e. Buffer 6f. Zone 1 6g. Zone 2 mitigation impact* impact* required?* No 518 351 (squarefeet) (squarefeet) No 1.93M6 830 351 (squarefeet) (squarefeet) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The proposed bridge replacement will occur as much as practicable within the footprint of the existing bridge. Stream impacts have been minimized as much as practicable and are necessary to improve drainage of the site. No wetland impacts are proposed for this project. Riparian buffer impacts have been minimized as much as practicable. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* No in-stream work will occur on Tuckahoe Creek during this bridge replacement. All work performed to relocate the UT to Tuckahoe Creek will be performed in the dry. All necessary sediment and erosion control BMPs will be installed and maintained through construction. Disturbed ground will be restored and stabilized with permanent vegetative cover. NCDOT Best Management Practices will be implemented throughout construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes �' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Stream impacts are less than 150 feet of intermittent channel. No impacts to wetlands are proposed. Buffer impacts are allowable and do not require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C� Yes C' No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The proposed bridge does not contain deck drains. Stormwater will discharge into the proposed drainage ditches in the northeast, northwest, southeast, and southv�st quadrants, where it will follow existing drainage patterns. The roadside ditches in the northeast, northwest, southeast, and southwest quadrants will be impacted. The redesigned ditches, with the exception oof the ditch in the northeast quadrant, will tie into Tuckahoe Creek, and match the existing drainage patterns. The proposed ditch in the southwest quadrant will begin as a V-ditch with 3:1 slopes, and transition into a 4' special lateral base dtich with 2:1 slopes and Class I rip rap lining. The rip rap is proposed on the southwest ditch to stabilize the side slopes. The northwest and southeast ditches will be special later V-ditches with 3:1 slopes and will tie into the e�asting wetlands. The southeast ditch will be lined with Class I rip rap at the end to minimize velocity and prevent erosion. The northeast ditch will be a special lateral V-ditch with a 4:1 front slope and 3:1 back slope. The northeast ditch will flow north, away from the project. 1c. What is the overall percent imperviousness of this project? 36 % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government � DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review rJ DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C� Yes �' No 2b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. Include a plan that fully documents how diffuse flow will be maintained. If, due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form What documentation are you providing? r Level Spreader �J Other BMP (check all that apply) Diffused Flow Documentation aick the upload button or drag and drop files here to attach docurrent 17BP.2.R.77_SMP.pdf Fle lype rrust be FDF 5. DWR 401 Stormwater Review !yk'*�!]:/:3 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? �' Yes �' No Stormwater Management Plan Upload C7ick the upload button or drag and drop files here to attach docurrent 17BP.2.R.77_SMP.pdf file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 425.79KB 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* �' Yes l" No 1c. If you answered "yes" to the above, has the document review been finalized bythe State Clearing House? (If so, attach a copy of the NEPAor SEPAfinal approval letter.)* C' Yes �' No Comments:* MCDC finalized 12/1/2017. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. The proposed project will result in minimum new impervious surface and will not result in any downstream impacts or growth-stimulating effects. The existing use of Tuckahoe Creek (C) should not change as a result of this project. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. i No wastewater will be produced as a result of this project. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * f Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes �' No 5d. Is another Federal agency involved?* C' Yes C•' No Se. Is this a DOT project located within Division's 1-8?* C' Yes C' No �' Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* North Carolina Natural Heritage Program Data and on-site evaluation by ESI Staff. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes �' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* http://owvw.habitat.noaa.gov/protection/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Archaeology and historic architecture reviews were conducted by NCDOT. Documentation for those reviews is attached. 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent 16-09-0028 Jones 32 HA NoSurveyReq.pdf 2.43M6 PA 16-09-0028 Jones 32 Arch (NSR).pdf 6.84M6 Fle rrust be F�F 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C� Yes �' No 8b. If yes, explain how project meets FEMA requirements: Tuckahoe Creek is subject to MOA 1 Criteria. There is no change in water surface elevation. 8c. What source(s) did you use to make the floodplain determination?* �wwv.ncfloodmaps.com Miscellaneous attachments not previously requested. C7ick the upload button w drag and drop files here to attach docurrent Fle rrust be FDF Signature * r% By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Robert Turnbull Signature ��°t.r�tor��/l Date : current_date Initial Review Is this project a public transportation project? *(?) C� Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No � BIMS#Assigned* 20171595 Version#* 1 Reviewing Office * Washington Regional Office - (252) 946-6481 Select Project Reviewer* Garcy Ward:eads\gpward